South Boston. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Similar documents
The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Tier 1 Recommendations October 30, 2017

TRANSPORTATION TRANSPORTATION 9-1

TRANSPORTATION IMPACT STUDIES

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

Functional Classification Comprehensive Guide. Prepared by

Executive Summary. Overview

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

Curb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

HORIZON 2030: Plan Projects November 2005

Woodburn Interchange Project Transportation Technical Report

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

Executive Summary October 2017

Funding for this guidebook was provided through the Genesee Transportation Council s Unified Planning Work Program

High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal Transportation Center Project

Scope of Work. Project Approach and Understanding. Task 1: Study Initiation and Administration

Interchange Workshop Report (August 2004)

NEW OPPORTUNITY FOR MIDDLESEX COUNTY

LAND USE POLICIES BY COMMUNITY DESIGNATION

TRANSPORTATION IMPACT ANALYSIS GUIDELINES FOR ENVIRONMENTAL REVIEW

Staff Priority and UPWP Committee Priority List 3/25/2016. ID Proposed Study Name Project Category Tentative Project Cost

Transit, Intercity Bus, Taxi 8-1

Route 670 Connector Road

PLAN 2040 Regional Transportation Plan Update. Final Recommendations. Transportation and Air Quality Committee March 13, 2014

CHAPTER 1: INTRODUCTION/ GOALS AND OBJECTIVES

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

LMPO 2040 Metropolitan Transportation Plan. Table of Contents

Oregon Theodore R. Kulongoski, Governor

Connecting Cleveland 2020 Citywide Plan TRANSPORTATION & TRANSIT

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT

HCM 6th Edition Planning and Preliminary Engineering Applications Guide (PPEAG) to the HCM Bringing Back-of-the-Envelope Back.

Greater Cleveland Regional Transit Authority

ITEM 8 Action May 17, 2017

Technical Memorandum MULTIMODAL NEEDS. Prepared for: Oklahoma Department of Transportation. Prepared by:

Greenhouse Gas Emission Reduction Strategies

Chapter 1: The 2035 Virginia Surface Transportation Plan 1. Challenges & Opportunities 2 VTrans2035: The Precursor 2 The VSTP and VTrans2035 2

IOWA TRANSPORTATION BY THE NUMBERS:

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

TRANSPORTATION FACTS. OUR CUSTOMERS: Travel Patterns

1.1 Purpose of the Project

This page intentionally left blank.

County of Calaveras Department of Planning

MAINE TRANSPORTATION BY THE NUMBERS:

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

City of Brantford Chapter 3 TABLE OF CONTENTS

HB2 Implementation Policy Guide

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

TransAction Plan Draft for Public Comment Spring/Summer 2017

Rapid Transit in Winnipeg. Winnipeg TOD Summit November 17, 2014

Funding Intelligent Transportation Systems in the Los Angeles Region

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

LOCATION AND DESIGN DIVISION

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA

Standard Performance Attributes for Transportation Projects

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

COMPREHENSIVE TRANSPORTATION REVIEW THE WHARF PHASE 2 PUD

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

Envisioning the Future: A History of Regional Planning Initiatives, Studies, and Plans

Zoning Permits 11-1 ZONING PERMITS

Tri-Cities Transportation Study Area Congestion Management System Operations Plan

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

IX. STRATEGIC PLAN ELEMENT

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress

FERRY COUNTY COUNTY-WIDE PLANNING POLICIES

FUTURE BUS RAPID TRANSIT PLANS

NATMEC June 30, 2014 Anita Vandervalk, PE, PMP

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\

MONITORING IMPLEMENTATION AND PERFORMANCE

City of San Angelo, Texas Capital Improvements Program. 50th Street Extension

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Appendix B. Benefit-Cost Technical Memorandum

Transit Oriented Development Study

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

Draft Noise Study Report

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

Transform 66 Multimodal Project: Prioritization Process and Evaluation Criteria Approved March 3, 2016

Shannon Noonan, City of Cambridge Don Drackley, IBI Group Scott Johnson, IBI Group PTSL

REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES. TAB September 20, 2017

Regional Transportation Studies Regional Council

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY

6.2.2 Environmental Consequences and Mitigation Measures

500 Interchange Design

State Route 8 Bridge Replacement Project

Chapter 5: Highway Investment Direction and Plan

PUBLIC HEARING April 24, 2017

North Side Transfer Zone. Public Open House April 16, 2014

STATEWIDE ANALYSIS MODEL (SAM-V3) June 5, 2014 Janie Temple

DR-15-11/LLA Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment

Rapid City Area Metropolitan Planning Organization OPERATIONS PLAN

Transcription:

2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration and the Town of South Boston September 2002 This report does not constitute a standard, specification, regulation or provide a funding mechanism for the included transportation recommendations.

INTRODUCTION The South Boston 2020 Transportation Plan (the Plan) was developed as a cooperative effort between the Federal Highway Administration, Virginia Department of Transportation (VDOT), and the Town of South Boston. The Plan is the product of a study that evaluated the transportation system in South Boston and recommended a set of transportation improvements to best satisfy existing and future transportation needs. The study identified needs based on capacity, safety and engineering aspects of the transportation system. Effective transportation systems are essential to continued local and statewide economic growth and development. Providing safe, effective, and efficient movement of people and goods is a basic goal of all transportation programs in Virginia. It is with this basic goal in mind, and with further consideration of environmental issues and local government transportation objectives, that this Plan was developed. VDOT will use this Plan when evaluating requests from the Town for specific transportation projects, and when implementing projects on the VDOT-maintained roadway system. The recommendations in the South Boston 2020 Transportation Plan will also be used as part of the VDOT statewide transportation planning process to ensure that local transportation projects are compatible with and support transportation improvements both statewide and in neighboring localities. STUDY AREA AND THOROUGHFARE SYSTEM South Boston is located on the banks of the Dan River in south-central Virginia, on the eastern edge of the state's Piedmont region. The area was first settled in the 1700s, but did not grow quickly until the construction of two railroads in the 1850s. After this, South Boston developed into an active trading hub for tobacco and other crops, and the area incorporated as a town in 1884. The town continued to grow during the early and middle 1900s as a center for textile manufacturing, and incorporated as a city in 1960. However, as textile manufacturing declined through the rest of the 1900s, the City took the unusual step of reverting to status as a town in 1995 under the state guidelines for doing so. The study area for this Plan coincides with the corporate limits of South Boston. As part of the analysis of transportation operations and needs performed for the study, however, connectivity to facilities in surrounding Halifax County and potential extension of improvements into the county were also investigated. A subset of the town's roadway network is designated as the urban thoroughfare system. The thoroughfare system includes roads that are functionally classified as collectors or arterials. Arterial roads serve as the major traffic-carrying facilities in the area. Collector roads carry a lesser volume of traffic and feed traffic to the arterial roadways. The focus of the South Boston 2020 Transportation Plan is the thoroughfare system. In addition to roadways, improvements to the following other modes of transportation have been evaluated as part of this study: parking; bicycle and pedestrian facilities; intercity rail, bus, and air travel; transit and paratransit; taxi; and the movement of goods. DEMOGRAPHIC OVERVIEW The recent 2000 U.S. Census reports South Boston to have a population of 8,491. According to the 1990 census, the population of the town was 6,997. The 2000 census count represents significant growth from the

1990 count, but it is important to note that this increase represents population gained through an annexation, as well as "natural" growth. Based on historic trends, as well as input from local officials, the town's population is expected to grow slowly over the 20-year horizon of this study. Industries in South Boston are in the areas of lumber, distribution, and textiles. Major companies include Dollar General, ABB Power T&D, Lasco Bathware, O'Sullivan Industries, and Presto Products. Spokespersons for each company expect the number of jobs with each of these local employers to remain steady for the foreseeable future. SUMMARY OF APPROACH AND ANALYSIS METHODS This transportation plan was developed as part of a structured approach with five basic components: Data Collection Forecasting of Future Traffic Demands Development of Recommendations to Meet Existing and Future Transportation Needs Coordination with South Boston Citizens and Government Officials Environmental Overview and Plan Documentation Recommendations for the South Boston 2020 Transportation Plan are based on a comprehensive review of the capacity, safety, and geometry of the roadway system, as well as on other issues that affect the area's transportation system, such as parking, other modes of transportation, and goods movement. The transportation system recommendations for South Boston are divided into three phases. Phase One recommendations apply to existing deficiencies and the most immediate transportation needs of the area. Phase Two recommendations apply to transportation improvements needed by the interim year 2010, and Phase Three recommendations are long-term projects needed by 2020. PHASE ONE: BASE YEAR (1999) RECOMMENDATIONS This study identified current deficiencies in the South Boston transportation system. These include traffic flow and safety concerns, parking, and goods movement by truck. Six projects were identified as short-term, immediate improvements and are described below. Wilborn Avenue at Edmunds Street Enhance intersection safety by prohibiting right turns on red. Also, close the two driveways on the southwest quadrant of the intersection. Main Street at Enhance intersection safety by adjusting the signal phasing to provide a separate phase for eastbound traffic. Additionally, right turns on red will be prohibited. Halifax Road at Enhance intersection safety by installing signs warning motorists of the upcoming traffic signal. Warning signs should be installed on each approach.

Wilborn Avenue at Webster Street Enhance intersection safety by installing traffic signal warning signs on the Wilborn Avenue intersection approaches. Signal phasing would be modified for northbound left turns, allowing protected lefts only. Main Street at Seymour Drive Enhance intersection safety by prohibiting right turns on red on the Seymour Drive approaches. Halifax Road at Cherry Street Improve safety in the vicinity of the intersection by prohibiting left turns into and out of Cherry Street. This would be accomplished by installing 'no left turn' signs. PHASE TWO: INTERIM YEAR (2010) RECOMMENDATIONS The interim year recommendations for the South Boston 2020 Transportation Plan include projects that are intended to correct existing deficiencies but, based on projected costs and potential impacts, would require a number of years to plan and fund. Three projects were identified in this category. Old Halifax Road at Halifax Road Improve capacity and enhance intersection safety by reconstructing the intersection to current VDOT standards. Old Halifax Road at Senior High School Entrance Improve high school traffic flow. Adjust the traffic signal phasing at Wal-Mart entrance to encourage high school traffic to use both entrances. Factory Street from Main Street to Broad Street Close Factory Street at Main and Broad Streets. Traffic will be diverted to Seymour Drive, increasing the reserve intersection capacity. PHASE THREE: FUTURE YEAR (2020) RECOMMENDATIONS The Phase Three recommendations in the South Boston 2020 Transportation Plan are intended to support the economic and business needs of the community while enhancing both the appeal and traffic operations of South Boston's Main Street areas. One project was identified in this phase. Main Street from to Route 716 To accommodate projected traffic volumes of 13,000 vehicles per day, widen roadway to four lanes. OTHER MODES AND GOODS MOVEMENT In developing the South Boston 2020 Transportation Plan, all modes of travel were considered. The Plan also considered the quality of the local transportation system for the movement of goods for commercial purposes. South Boston residents have a number of other travel options. The town is directly provided with paratransit service by the Lake Country Area Agency on Aging, which furnishes transit for senior and disabled residents.

South Boston also has three taxi companies, and is served directly by intercity bus service (Greyhound). The town does not have fixed-route bus service, and is not served by intercity passenger rail service. Commercial air service is not available in the immediate area. The nearest passenger rail service is in Danville and the nearest commercial air service is in the Lynchburg area. The Plan makes no recommendations regarding other modes of transportation. Most goods and raw materials are shipped into and out of the town by truck. While the flow of truck traffic through town is generally adequate, several of the proposed roadway recommendations will improve truck access for shippers by reducing congestion and making turning movements easier. Very little use of air and rail freight transport was reported by the major industries in South Boston. LOCAL PROJECTS The Town of South Boston identifies, plans, and implements transportation projects as part of its capital improvement process. Town officials identified four local projects for inclusion in the Plan. Watkins Avenue at Webster Street Install signs on all approaches warning motorists of the intersection, thereby enhancing safety. Extended Extend existing on new alignment south to Route 58 to improve general traffic circulation in town. Edmunds Connector Construct a connector road and bicycle trail from Edmunds Recreation Area to Cage Trail. This will connect Dixie Baseball fields, Edmunds Recreation Area, and a future recreation area at the town landfill. Halifax Road at Middle School Entrance The line of vehicles waiting in the middle school parking lot often backs up onto Halifax Road. The recommendation is to increase storage space on school grounds to avoid blocking through traffic on Halifax Road. ENVIRONMENTAL OVERVIEW An environmental overview was conducted for the South Boston 2020 Transportation Plan. No environmental features were identified in South Boston that would preclude the implementation of any of this Plan's recommendations. LOCAL COORDINATION AND CITIZEN PARTICIPATION The development of the South Boston 2020 Transportation Plan included coordination meetings with Town officials and a public meeting with citizens, local officials, and VDOT representatives. The two coordination meetings held for the study were: (1) a kick-off meeting, (2) an existing conditions and

draft recommendations meeting. The kick-off meeting, held in July 1999, enabled the project team to discuss the purpose and scope of the study, the schedule for data collection and Plan preparation, and the coordination process. At the second meeting (existing conditions/draft recommendations), held in July 2001, the project team presented the results of the base year and horizon year traffic analysis and discussed potential projects to satisfy projected transportation needs. In December 2001, a draft set of transportation improvements was sent to Town officials and VDOT representatives for review. A public meeting was held on Monday, May 13, 2002, where the draft Plan was presented to Town officials, citizens, and other interested parties. Meeting participants were invited to provide comments on the Plan that were considered in the development of the final South Boston 2020 Transportation Plan. PLAN ADOPTION The South Boston Town Council voted to adopt the South Boston 2020 Transportation Plan on July 8, 2002. VIRGINIA TRANSPORTATION SIX-YEAR PROGRAM (FY 2003-2008) PROJECTS Detailed information on the development of the South Boston 2020 Transportation Plan and the study recommendations will be included in the South Boston 2020 Transportation Plan Technical Report. This document will be available for review at the South Boston Town Hall and the local library. The technical report will also be available in Richmond at the central office of VDOT's Transportation Planning Division, the VDOT Richmond District office in Lynchburg, and the VDOT residency office in Halifax. Projects included in the Virginia Transportation Six-Year Program (FY 2003-2008) are not part of the South Boston 2020 Transportation Plan. The Six-Year Program can be reviewed online at www.virginiadot.org. Information on Six-Year Program projects for the Town of South Boston can also be found by contacting the Resident Engineer at the VDOT Halifax Residency (434-476-6342).

Route Facility Name From To Road Segment Length Recommendation Estimated Cost [1] Existing Typical Section Recommended Typical Section Average Daily Traffic Year 1999 Year 2010 Year 2020 Old Halifax Road Halifax Road Reconstruct intersection $1,500,000 [2] Wilborn Avenue Edmunds Street Disallow right on red, close driveways in two corners of property on southwest quadrant of intersection $123,000 [3][4] Main Street Adjust phasing to provide separate phase for east leg, disallow right turn on red $123,000 [3][4] Halifax Road Install signal warning signage $12,000 [4] Wilborn Avenue Webster Street Add signal warning signage on Wilborn; adjust signal phasing for northbound left to make it protected only $126,000 [3][4] Main Street Seymour Drive Disallow right on red on Seymour approaches $3,000 [4] 927 Watkins Avenue Webster Street Add intersection warning signage on all approaches $12,000 [4][5] Halifax Road Cherry Street Allow only right-in and rightout on Cherry Street $3,000 [4] Old Halifax Road Senior High School Entrance Reconfigure High School Circle and traffic signal at Wal-Mart $120,000 [3] Halifax Road Middle School Entrance Increase storage space on school grounds to avoid spillover onto Halifax Road Local School [5] Board Cost Factory Street Main Street Broad Street 0.10 Close Factory Street at Main and Broad Streets; divert traffic to Seymour Drive $315,000 [6] Main Street Route 716 0.90 Widen Main Street to 4 lanes $6,480,000 [7] U4 9,350 11,400 13,300 Extended Route 58 3.50 Extend existing south to Route 58 $11,025,000 [5][6] Edmunds Connector Edmunds Recreation Area Cage Trail 0.47 Construct connector road and bicycle trails to Dixie Baseball fields, Edmunds Recreation Area, and future recreation area at landfill $1,552,000[5][6][8] ESTIMATED TOTAL THOROUGHFARE SYSTEM COST $8,805,000 [5] Notes: [1] The cost estimates included in this table are planning level costs in year 2000 dollars. These cost estimates are based on statewide unit cost averages and should be should be used for planning purposes only. Actual construction and right-of-way costs may vary based on local conditions. [2] Assumes reconstruction of 1200 feet of urban four-lane divided roadway at $5.3 million per mile plus 25 percent for maintenance of traffic at intersection. [3] Assumes a unit cost to improve phasing of system for a signalized intersection is $120,000. [4] Assumes a unit cost of $3,000 for signage. [5] Local projects are not included in the total thoroughfare system cost. [6] Assumes a unit cost for an urban 2-lane roadway of $2.1 million per mile plus 50 percent for right of way and utilities. [7] Assumes a unit cost for an urban 4-lane roadway of $4.8 million per mile plus 50 percent for right of way and utilities. [8] Assumes a unit cost for the construction of new 8' bicycle trail of $101,00 per mile. -- Not applicable 2,000

TYPICAL SECTIONS Urban two-lane roadway with curb, gutter, and sidewalk U4 Urban four-lane roadway with curb, gutter, and sidewalk