Company Presentation Iggy Tan Managing Director

Similar documents
Iggy Tan, Managing Director, Altech Chemicals Limited. High Purity Alumina Use in Non-Metallurgical Applications

ASX: ATC FSE:A3Y. 121 Mining Investment - London Company Presentation. Iggy Tan Managing Director. Altech Chemicals Limited

For personal use only

ASX: ATC FSE:A3Y. Company Presentation. Iggy Tan Managing Director. Altech Chemicals Limited

High Purity Alumina (HPA) Project

For personal use only

Outlook for Zirconium and Rare Earth Materials until 2020

For personal use only

BANKABLE FEASIBILITY STUDY CONFIRMS ALTECH S HIGH PURITY ALUMINA (HPA) PROJECT

The World s Next HIGH GRADE Vanadium Mine

6 th World Aluminium Raw Materials Summit

For personal use only. Minerals Explorer in South Korea

Project Update - PDAC March 1, 2015 WHITE MOUNTAIN CALCIUM FELDSPAR PROJECT

Valence Industries Australia s Only Graphite Producer

For personal use only

For personal use only

Valence Industries Australia s Only Graphite Producer

For personal use only. Cummins Range Rare Earths Project

For personal use only

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

Australia s New Nickel

For personal use only

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

The Orbite Process: Low-cost, eco-friendly red mud-free alumina production from a variety of ores

For personal use only

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Confidence in Carrapateena project grows

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

THE NOLANS RARE EARTHS PROJECT

Forward Looking Statements. Forward looking statements in these materials speak only at the date of issue. Subject to any

For personal use only

EXCO S PROJECT PIPELINE

Maiden Inferred Iron Ore Resources for Gum Flat

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

Second drill rig to accelerate major drilling program at Productora

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY

EXCO S PROJECT PIPELINE. Unlocking the Value

QUARTERLY REPORT March 2011

For personal use only. Botswana Power Development! March 2015!

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting

Awak Mas DFS Optimisation - Metallurgical Breakthrough

Azure Minerals Ltd ASX Code:

3 The Formation, Mining, and Use of Minerals

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation

For personal use only

Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION

ABM Hits 3000 Ounce Target from Trial Mining

The competent person in mine-site evaluation and responsibilities for study design, management and findings

WORSLEY ALUMINA REFINERY & BODDINGTON BAUXITE MINE SITE TOUR

209 million 36.1% Fe

For personal use only

WIM150 Mineral Sands Project 15 th Anniversary Mineral Sands Conference

Peak Resources Ngualla Rare Earth Project

For personal use only

DEVELOPING A WORLD-CLASS VANADIUM-TITANIUM-IRON PROJECT MOUNT PEAKE, NORTHERN TERRITORY. INFORMATION MEMOR ANDUM

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

For personal use only

Mud2Metal. Bauxite Residue (BR) valorization Efthymios Balomenos, PhD Senior Researcher NTUA AoG External Associate

Technical Presentation on Spent Pot lining Management & Red Mud

Low-cost, rich, DRC copper

Forward Looking Statement

For personal use only

Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits. ASX: AUZ October 2017

For personal use only

For personal use only

For personal use only

Developing High Grade Projects in Mexico

WPG TO ENTER THE IRON ORE INDUSTRY

For personal use only

New Nickel Sulphate Supplier

Ansongo Mali. For personal use only. Potentially the next High Grade Manganese Project. Callabonna Resources Limited Presentation August 2014

Australia Minerals & Mining Group Ltd

21 st Metal Bulletin Bauxite and Alumina Conference

The Challenges of Meeting Rare Earths Demand in 2015

Geology and mineral resources of the Kylylahti Mine

Syerston Nickel & Cobalt Pre-Feasibility Study Completed. Scandium by-product credits provide potential for significant economic upside

Pit to Port Infrastructure in SA

For personal use only

For personal use only

Tronox Limited: A Brighter Future From the Ground Up. Tennessee Tombigbee Waterway Conference

SILVERCORP REPORTS Q3 RESULTS: NET INCOME OF $12.7 MILLION, $0.08 PER SHARE AND PROVIDES FISCAL 2019 PRODUCTION AND CASH COSTS GUIDANCE

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA

EMERGING GRAPHITE AND IRON ORE PRODUCER 2 MINES IN 2 YEARS

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Topic 2.7 EXTRACTION OF METALS. Extraction of Iron Extraction of Aluminium Extraction of Titanium Recycling

Activities Report Quarter Ended 31 st March 2015

For personal use only

ASX Release ASX Code: YTC

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa

TVI Pacific Inc. Announces First Nickel Production from Pilot Plant

For personal use only

Developing Mount Peake: The right partners, the right metals, the right time Company Update Paul Burton, Managing Director

AUSTRALIA AND NEW ZEALAND BANKING GROUP LIMITED. ANZ Overview CGI Glass Lewis Webinar. December 2015

New focus and new opportunities in Canadian graphite and coal

Hydro takes over Vale s aluminium business in transforming transaction

Global expansion in the world recovery

Properties of Minerals

Developing an African iron ore project

Transcription:

Company Presentation Iggy Tan Managing Director

To be a world leading producer of high purity alumina (HPA) Our vision

Sapphire - natural form of high purity alumina (HPA) Formed by mother nature like diamonds Extremely hard no. 9 on Mohs scale (third hardest mineral behind diamond) Scratch-resistant artificial sapphire glass made from HPA Sapphire gemstone

Purified alumina or aluminum oxide (Al 2 O 3 ) Greater than 99.99% (4N) purity Lots of work to upgrade SGA (99.5%) 4N 99.99% HPA Maximum allowable impurities of 100ppm 4N category - 99.99% pure (impurity 100ppm) - most sales volume 5N category - 99.999% pure (impurity 10ppm) HPA properties: heat resistance, electrical isolation, abrasion resistance, corrosion resistance, extreme hardness What is HPA? SGA Smelter Grade Alumina

Smelter Grade Alumina SGA 99.5% $0.4 per Kg High Purity Alumina HPA 99.9% (3N) $1-10 per Kg High Purity Alumina HPA 99.99% (4N) $10-50 per Kg High Purity Alumina HPA 99.999% (5N) $50-150 per Kg High price for purity Our Target Business

HPA is placed in an autoclave Heated to >2,000 o C melting point under intense pressure Forms single crystal sapphire (boule) Allowed to cool slowly 22 day cycle Diamond cutting equipment to cut sapphire shapes Heat & scratch resistant Artificial sapphire process

Welcome to the world of HPA Electronic Substrates Hybrid Cars Ceramic Tools HP Refractory Sodium Lamps Abrasives Ultrafiltration Display Screens Special Ceramics Semiconductors Medical Polishing Abrasives Separation Membranes Cosmetics Headlights LED Lighting Industrial Military Aerospace Optical Lenses

High Purity Alumina Applications LEDs Smartphone sapphire glass is a new market Semi conductors Others 7% Phosphor Based Applications Phosphor 16% Other Applications Uses of HPA 99.99% 4N Semiconductors 22% LED 55%

Technavio Research Global HPA demand 19,040tpa in 2014 Expected to increase to 48,230tpa by 2018 Growing at a CAGR of 28% QY Research Global HPA demand 24,550tpa in 2014 Expected to grow to 36,000tpa in 2017 Growing at a CAGR of 16% Demand for HPA

60.0 HPA Demand & Growth Forecast 40% 50.0 40.0 30.0 20.0 10.0 14.1 35% 19.0 33% 25.3 28% 32.4 23% 39.9 21% 48.2 35% 30% 25% 20% 15% 10% 5% Demand for HPA 0.0 2013 2014 2015 2016 2017 2018 Volume ktpa Growth Rate % 0% Rapid growth rates Estimated supply deficit

HPA in the news

Estimate 30g of HPA in an iphone sapphire glass screen Approx. 300 million iphones sold from 2013-2014 200 million iphones estimated to sell in 2015 500 million smartphones sold per year If Apple implement sapphire glass technology o It would require about 6,000tpa of HPA o That s two of our 3,000tpa plants There will be a HPA supply deficit AMMG is in the right space! HPA demand: smartphones

70% of HPA demand is in Asia Pacific region (APEC) o Region for the world s manufacturing AMMG s HPA plant (Australia) well-positioned to service in APEC region Transport, customer service, technical credibility Americas 14% Europe, Middle East, Africa 16% HPA geographic demand Asia Pacific 70%

1 Alumina Refinery Alumina Smelter HPA Plant 2 Bauxite Bauxite Alumina Refinery Smelter Grade Alumina >90% Aluminium Hydroxide Aluminium Metal HPA Plant 99.99% HPA 99.99% HPA Current HPA production processes 3 AMMG HPA PLANT Aluminous Clay AMMG 99.99% HPA Current use of expensive high purity feedstock

Majors like Sumitomo, Sasol: o Aluminum alkoxide from Al metal (1) Chinese producers: o Choline Dissolving Al foil in choline Chinese producers: o Aluminium Hydroxide (2) (from bauxitealumina process) with HCl All use relatively expensive feedstock AMMG aluminous clay 5 times cheaper than Al metal (3) Current HPA producers Route HPA Process Method Feedstock Costs USD/t per 100% Al2O3 1 Aluminium Metal $1,052 /t 2 Aluminum Hydroxide $570 /t 3 AMMG Aluminous Clay $220 /t

Processed and purified by mother nature Very low impurities due to weathering Iron levels are 0.7% vs 21% in bauxite Silica is non reactive easily removed Low-impurity Bauxite Darling Range Canadian HPA Project Al 2 O 3 (%) 34.5 22.77 30.5 SiO 2 (%) 21.5 53.29 56.3 Fe 2 O 3 (%) 21.2 8.36 0.7 TiO 2 (%) 2.00 0.98 0.7 AMMG HPA Project aluminous clay feedstock Typical Mean Analysis

Private freehold land Landowner agreement in place No native title Low environmental impact Previously mined for kaolin trial pit Low stripping ratio 65Mt JORC Resource Approx. 130kms from capital city Perth (Kwinana industrial area) Meckering aluminous clay deposit

HCl process employed is a conventional, proven and robust chemical process Can produce >99.99% HPA from aluminous clay Simple recovery of acid and recycling HCl process was first developed in early 1980 s for SGA production o Couldn t compete with bauxite SGA costs Bauxite process can t achieve >99.8% due to Na Demand for HPA (99.99%) developed over last decade Right place, right time! AMMG s HPA process

Laboratory test work simulates process Final product achieves 99.99% (4N) HPA Integrated Plant Study (IPS) Larger optimisation pilot plant test work Process works and is robust IPS opex around A$8.6/kg IPS capex for 700tpa (now 3,000tpa) Our success so far

AMMG s HPA Process

Target: to be a top 3 HPA producer in the world Launched BFS for 3,000tpa HPA o BFS completion: end Q3 2015 In parallel, progress necessary approvals, funding, off- take agreements etc. Subject to funding: In position to order long lead capital items (plant equipment) Then detailed design, site works, construction Continuous laboratory pilot plant work Bankable Feasibility Study (BFS)

Highly experienced board: Fundraising Project building Industrial chemical processing Alcoa Alumina management Sherwin Alumina management High purity chemicals Iggy Tan Managing Director Luke Atkins Chairman Experienced board Dan Tenardi Non Exec Director Peter Bailey Non Exec Director

Corporate Snapshot ASX Code AKA Shares on Issue 107.7m Share Price¹ A$0.077 Cash Position $ Cash 2 + R&D return A$ 1.8m Debt 2 A$ 0 ASX Share Price Performance Market Capitalisation (Undiluted) 5 A$8.2m Options on Issue 6 21.5m Major Shareholders Lake McLeod Gypsum Pty Ltd 22.2% Board & Management 14.0% P Sharbanee 4.5% Eagle River Holdings Pty Ltd 2.7% 1 Closing price on 1 October 2014 2 As at 1 October 2014 3 As at 1 October 2014 5 Based on closing share price of shares in note 1.

Right Place Right Time Right Feedstock Right Technology Thank you

Forward-looking Statements This announcement contains forward-looking statements which are identified by words such as anticipates, forecasts, may, will, could, believes, estimates, targets, expects, plan or intends and other similar words that involve risks and uncertainties. Indications of, and guidelines or outlook on, future earnings, distributions or financial position or performance and targets, estimates and assumptions in respect of production, prices, operating costs, results, capital expenditures, reserves and resources are also forward looking statements. These statements are based on an assessment of present economic and operating conditions, and on a number of assumptions and estimates regarding future events and actions that, while considered reasonable as at the date of this announcement and are expected to take place, are inherently subject to significant technical, business, economic, competitive, political and social uncertainties and contingencies. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of our Company, the Directors and management. We cannot and do not give any assurance that the results, performance or achievements expressed or implied by the forward-looking statements contained in this announcement will actually occur and readers are cautioned not to place undue reliance on these forward-looking statements. These forward looking statements are subject to various risk factors that could cause actual events or results to differ materially from the events or results estimated, expressed or anticipated in these statements. Competent Person Statement Technical information in this report is based on information compiled by B.Sc. Geology, AMMG Chief Geologist and a member of the Australasian Institute of Geoscientists. Mr O Mara has sufficient exploration experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves ( JORC 2004 ). Mr O Mara consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.