Responsibilities: Effective Date: November Revision Date: January 27, VP, Facilities and Construction Management

Similar documents
INTERIOR FINISHES CHAPTER 8

INTERIOR FINISHES CHAPTER 8

INTERIOR FINISHES CHAPTER 8

First Revision No NFPA [ Section No ]

Report on First Revision June 2014 NFPA 5000

Code Review for Theaters and Props

WOOD USE IN NONCOMBUSTIBLE BUILDINGS

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION 2601 SECTION 2603 GENERAL FOAM PLASTIC INSULATION

Overview of Revised School Regulation

Combustible Exterior Wall Cladding Systems: An ICC Perspective

The Building Codes A.R.E. Building Design and Construction Exam Prep

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II


Comparison of the life safety elements of the 1997 UBC and the IBC 2000.

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

FS , 712, 713, 714

FIRE AND SMOKE PROTECTION FEATURES

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: DEMILEC (USA) INC.

Applying the Building Code During Design

WILDLAND URBAN INTERFACE (WUI) PRODUCTS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

WoodWorks. Learning Objective. Presentation Overview. Fire Protection II Requirements for rated assemblies and common detailing

GUIDE SPECIFICATIONS IN CSI FORMAT: RESILIENT FLOORING

Alply CLASSIC WALL Architectural Insulated Panel Wall System

2009 IBC Section 1024 Approved Luminous Egress Path Markings

Application Specification:

Procedure for Department Managed Repair and Renewal Projects Under $15,000

FIBER GLASS INSULATION. Thermal. Acoustical. Fire Resistant. Moisture Control. Recycled Content. Formaldehyde-free. Air Control FIBER GLASS INSULATION

Building Codes and Ordinances ARC 227

Design & Construction Standards, Revised January

HIGH PILED COMBUSTIBLE STORAGE CITY OF NOVI SUBMITTAL CHECKLIST In Accordance with Chapter 23 of the 2006 International Fire Code

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.

Storage Buildings. Wood Uses In. Introduction. Table of Contents

BUILDING CODE PRESENTATION

CONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008

FCIA Webinar Gypsum Wall Patching

RISER DETAIL NTS SHANNON FIRE PROTECTION, LLC SCALE: 3/32" = 1'-0"

DIVISION: THERMAL AND MOISTURE SECTION: THERMAL INSULATION REPORT HOLDER: CERTAINTEED CORPORATION

Minnesota Health Care Engineers Association

UBC. (1997 Edition) (p.1-116) 2-hr. shaft required for

TENTS AND OTHER MEMBRANE STRUCTURES

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: CERTAINTEED CORPORATION

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

PRESCRIPTIVE COMPLIANCE METHOD

ESR-2072 Reissued September 1, 2013 This report is subject to renewal September 1, 2015.

TENTS AND MEMBRANE STRUCTURES

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

Assemblies Evaluated For 1. Non Axial Load Bearing Wall 2. Transverse Load Capacity 3. Fire Resistance 4. Abuse Resistance

June 25, 2012 PARTIES INTERESTED IN SPRAY-APPLIED FOAM PLASTIC INSULATION

PRODUCT SPECIFICATIONS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ROOFING AND SIDING PANELS REPORT HOLDER: KINGSPAN INSULATED PANELS, INC.

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE

RETAIL TENANT TECHNICAL CRITERIA VERSION 2 MAY 2015

EXIT ACCESS RAMP. An interior ramp that is not a required interior exit ramp.

Typical Finished Basement Details

GUIDE SPECIFICATION

ESR-1655 Reissued April 2014 This report is subject to renewal April 1, 2016.

GUIDE SPECIFICATION

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

Fire Retardants and Truss Design. Overview

Xorel Summary of Test Results

Product Guide Specification

Originally Issued: 05/03/2013 Revised: 06/06/2016 Valid Through: 05/31/2017

WoodTrends Acoustical Wood Ceiling System BASIC Specification

SECTION GYPSUM CEMENT UNDERLAYMENT RECOMMENDED SPECIFICATION FOR DURA-CAP FLOOR UNDERLAYMENT OVER EXTRUDED OR EXPANDED POLYSTYRENE FOAM

Product Guide Specification

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: CHEMICAL BROTHERS INTERNATIONAL, LLC

Residential Product Selector Guide

CHECKLIST Inspecting a Garage

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: CERTAINTEED CORPORATION

REPORT HOLDER: OMEGA PRODUCTS INTERNATIONAL, INC CALIFORNIA AVENUE CORONA, CALIFORNIA EVALUATION SUBJECT:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: RHINO LININGS CORPORATION

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

Thermasheath -3. Insulation for the Building Envelope ROOF WALL SPECIALTY

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction

GUIDANCE DOCUMENT IGNITION RESISTANT EAVE CONSTRUCTION

A. American Association of Textile Chemists and Colorists (AATCC): 1. AATCC 16, Test Method of Colorfastness to Light.

Differences between EnCon Insulated Precast and EIFS

Jean Vaillancourt Fire Protection Specialist Hilti (Canada) Corp.

TEMPORARY MEMBRANE STRUCTURES, TENTS AND CANOPIES Created July 2005, Revised January 2012

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA

2018 IBC Update. Based on the 2018 International Building Code, (IBC ) Goal. Objectives. Content

July 23, 2010 PARTIES INTERESTED IN REFLECTIVE FOIL INSULATION

LEED v4 Building Design and Construction Quiz #8 EQ

Demolition Plan A1 A3. Scale: 3/32" = 1'-0" Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender.

Originally Issued: 12/12/2014 Revised: 12/29/2017 Valid Through: 12/29/2018

Fairfax County, Virginia

ALL-ALUMINUM DOOR & WINDOW FRAMING

RESIDENTIAL BUILDING REQUIREMENTS

Basement Renovation Guide For Residential Dwellings

SECTION PREFINISHED FSC MAPLE FLOORING. This is a template: edit this specification carefully to suit specific project requirements.

Division 09 FINISHES TABLE OF CONTENTS

Originally Issued: 07/31/2015 Revised: 07/31/2017 Valid Through: 07/31/ General

SIMEILINGS TORSION SPRING CEILING SYSTEM SPECIFICATION

Week of June 6, 2005

Transcription:

Title: Fire Safety Requirements for Interior Finish Materials Procedure Effective Date: November 2005 Revision Date: January 27, 2017 Issuing Authority: Responsible Officer: VP, Facilities and Construction Management Melisa Puglisi, Director Environmental Health and Safety PURPOSE OF THE PROCEDURE To ensure that interior finish materials selected for installation will not pose an unacceptable fire hazard due to their ease of ignitibility and subsequent evolution of smoke and toxic by-products; and to ensure that these materials meet or exceed all applicable statutory and voluntary standards. SCOPE OF THIS PROCEDURE WHO NEEDS TO KNOW THIS PROCEDURE All New York University academic, commercial and residential facilities. PROCEDURES FOR IMPLEMENTATION Responsibilities: Department of Environmental Health and Safety Directors or Department Chairs Facilities Manager, Department Manager, Construction Manager and Supervisors Project Managers & Facility Managers ensure interior finishes meet all code required standards for the Department of Buildings occupancy group for a facility & the spaces within. Maintenance and Housekeeping Personnel Medical Surveillance Complaint Response 1 P a g e

PROCEDURE DEFINITIONS "ASTM". American Society for Testing and Materials. "Critical Radiant Flux". The level of incident radiant heat energy on a floor covering system at the most distant flameout point as determined by the test procedure of NFPA 253: "Standard Method of Test for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source"/ASTM E-648. The unit of measurement of critical radiant flux is watts per square centimeter (watts/cm2). "DOC". Department of Commerce. "Flame Spread Rating". A rating of the propagation of flame over a surface. "NFPA". National Fire Protection Association. "Smoke Developed Rating". A rating of the propagation of smoke over a surface. 2 P a g e

UNIVERSITY PROCEDURE Interior Wall and Ceiling Finish 1. Interior wall and ceiling finish is defined as those materials that form the exposed interior surfaces of a building and are part of or affixed to walls, fixed or folding partitions, ceilings, and other construction elements. 2. No material that upon exposure to fire will produce products of decomposition or combustion more toxic than those emitted by wood or paper under comparable conditions shall be used in any interior location. 3. Textile materials having a napped, tufted, looped, woven, non-woven, or similar surface shall not be applied to interior walls or ceilings without prior approval from the Environmental Services Department. 4. Cellular or foamed plastic materials shall not be used as interior wall or ceiling finish without prior approval from the Environmental Services Department. Interior Wall and Ceiling Finish Flame Spread Requirements 1. Interior wall and ceiling finish shall be classified as follows when tested in accordance with NFPA 255: "Standard Method of Test of Surface Burning Characteristics of Building Materials"/ASTM E-84: Class A - Flame Spread Rating 0-25 Class B - Flame Spread Rating 26-75 Class C - Flame Spread Rating 76-225 Class D - Flame Spread Rating Over 225 2. An interior finish material that was affixed to a substrate when tested in accordance with NFPA 255/ASTM E- 84 shall be applied to an equivalent substrate in use to be credited with the same flame spread rating. 3. An interior finish material shall be secured to an interior surface in the same manner and with equivalent materials as used during flame spread testing in accordance with NFPA 255/ASTM E-84. 4. Where an interior wall or ceiling is required to have a fire-resistance rating or to be constructed of noncombustible materials, and the interior finish is secured to studs or furring, the surface of the interior finish facing the concealed space shall have either a Class A rating, be applied to a substrate having a Class A rating, or have the concealed space completely filled with noncombustible material. a. Interior wall and ceiling finish in any University academic, commercial or residential facility shall be as follows: b. A wall covering or coating less than 0.036 inches thick is exempt from the above requirements when applied to a noncombustible or fire-retardant treated wood substrate. c. Exposed structural members and planking in buildings of Class II-A construction (in accordance with Title 27 New York City Administrative Code, Construction & Maintenance Section 27-269), which may be left exposed in any room or space other than an exit, are exempt from the above requirements. d. Ten percent of the aggregate wall and ceiling area of any room, space or corridor requiring a Class A or Class B rating may be finished with materials having a Class C rating. This allowance shall include the area of doors, folding partitions, windows, glazing, skylights, luminous ceilings, trim, bases, chair rails, moldings, etc. 3 P a g e

e. When a sprinkler system is installed in any room or space in compliance with the construction provisions of Chapter 1, Subchapter 7 of Title 27 New York City Administrative Code, Construction & Maintenance, interior finish materials may be one class higher in flame spread rating than required by 5. Interior Wall and Ceiling Finish Smoke Density Requirements a. Materials used for interior wall and ceiling finish in any University academic, commercial or residential facility shall not develop smoke in greater density than follows when tested in accordance with NFPA 255: "Standard Method of Test of Surface Burning Characteristics of Building Materials"/ASTM E-84: b. Exits and corridors - Smoke Developed Rating 25 c. Rooms in which the net floor area per occupant is 10 sq. ft. or less - Smoke Developed Rating 100 d. All other areas - Smoke Developed Rating 0-450 e. Interior finish materials covering not more than twenty percent of the aggregate wall and ceiling area of any room, space or corridor shall be exempt from the above requirements. Interior Floor Finish 1. Interior floor finish is defined as those materials that form the exposed floor surfaces of a building and are part of or affixed to a normal finished floor or stair, including risers. 2. Interior Floor Finish Requirements Floor Coverings a. Exits - In any University academic, commercial or residential facility, except those of construction group II-E (Title 27 New York City Administrative Code, Construction & Maintenance Section 27-269), finish flooring in exits shall be of noncombustible material. Stairs meeting the criteria listed in Title 27 New York City Administrative Code, Construction & Maintenance Section 27-375 are exempt from this requirement. b. Buildings or spaces of construction group I - Except for the provisions of 3.2.1, finish flooring in buildings or spaces of construction group I (Title 27 New York City Administrative Code, Construction & Maintenance) may be of combustible material when cemented directly to the top surface of noncombustible floor construction, or attached to noncombustible or combustible sleepers. When attached to sleepers, the space between the non-combustible floor construction and the bottom of the combustible floor finish material shall be solidly filled with noncombustible material to within one-quarter inch of the flooring; or the space between the sleepers under the combustible finish flooring shall be fire stopped into areas of not more than twenty square feet with the additional provision that no open spaces shall extend under or through such fire divisions or separations. Combustible insulating or sound absorbing boards not greater than one-half inch thick and having a flame spread rating not greater than Class C may be used when attached directly to noncombustible floor construction and covered with finish flooring. c. Buildings or spaces of construction group II - Except for the provisions of 3 finish flooring in buildings or spaces of construction group I (Title 27 New York City Administrative Code, Construction & Maintenance) may be of combustible material. 1. The requirements of this paragraph shall apply only to carpets and carpet assemblies used as floor coverings, not those used as interior finishes. Carpet assemblies include the carpet, its underlay and adhesives. 2. Floor Coverings Requirements a. All carpets and underlayment shall meet the requirements of DOC FF1-1970, "Methane Pill Test". 4 P a g e

b. Carpets and carpet assemblies shall be tested in accordance with the requirements of NFPA 253: "Standard Method of Test for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source"/ASTM E-648. The duration of the test shall be at least a fifteen-minute exposure. i. Exits - Carpets shall not be installed in any University facility exit that is required under Title 27 New York City Administrative Code, Construction & Maintenance. Wool carpeting may be installed in lobby areas, exit passageways and convenience stairs. ii. Corridors - Minimum Critical Radiant Flux of 0.5 watts per square centimeter. iii. Other areas - Minimum Critical Radiant Flux of 0.4 watts per square centimeter. c. Carpets and carpet assemblies shall be tested for smoke developed ratings in accordance with the requirements of ASTM E-662 and shall not exceed 300 within the first four minutes of the test. Furniture 1. All mattresses shall meet the test requirements of the State of California Technical Bulletin 129. IF a mattress/foundation (mattress/box spring) set is purchased, it shall meet the testing requirements of the State of California Technical Bulletin 603. 2. All upholstered furniture for student housing and all public areas shall meet the test requirements of the State of California Technical Bulletin 133. 3. If a buyer other than the New York University Purchasing Department (i.e., an architect or general contractor) initiates the purchase of interior finish materials, the Project Manager must submit all interior finish flammability test reports to the Environmental Services Department for approval prior to selection for installation. Where materials submitted have not been tested, the Environmental Services Department can arrange for testing by an accredited outside laboratory to determine compliance with this policy. RELATED POLICIES NYU Environmental Health and Safety Policy RELEVANT RESOURCES NYC Building Code NFPA ASTM 5 P a g e