Storm Water Pollution Prevention Plan (SWPPP) for Small Construction Sites

Similar documents
LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

General Information for Builders. September 2014

11 Ways to Avoid Storm Water Fines. No Exceptions!

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

James Ferrell 10/3/07 Page 2

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison

Starting Construction: Your Storm Water Permit

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

SITE DESIGN ENGINEER'S STATEMENT:

Construction Application for Permit (CAP) Instructions

STORMWATER AND EROSION CONTROL PERMIT

Erosion & Sedimentation Control Policy

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions

Overall Instructions

Soil Erosion and Sedimentation Control Compliance Form

Stormwater Management Program Plan (SWMPP) NPDES Permit ALR Revised May 31, Prepared By:

Form 2L - Land Application of Industrial Wastewater and/or Sludge

SACHSE EROSION CONTROL GUIDELINES

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Common Plan of Development Storm Water Pollution Prevention Plan for: Operator(s):

STORMWATER MANAGEMENT PROGRAM. Table of Contents

Virginia Stormwater Management Permitting

RESIDENTIAL BUILDING PERMIT

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

RE: Complaint Investigation at Highway 282 near Mountainburg in Crawford County

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Storm Water Annual Report

Storm Water Pollution Prevention Program (SWPPP)

The Village of Wellington NPDES Guidance/Reference Document

Cass County Soil Erosion & Sedimentation Control Program

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)

North Carolina Sedimentation Control Law

Key Requirements of the Construction General Permit Scott Taylor, P.E. Tanya Bilezikjian, P.E.

KABA DEMOLITION INFORMATION PACKET

6.1 Introduction to Wastewater Issues

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT

Phase II MS4 Annual Report Transmittal for Fort Bend County Municipal Utility District No TPDES Permit Number: TXR040319

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Figure 1. Report of Inspection Process Flowchart.

STORMWATER POLLUTION PREVENTION PLAN

City of Anacortes Utility Rates & Information January 2016

WHITNEY OAKS COMMUNITY ASSOCIATION P.O. Box 1459, Folsom, CA (916) (916)

The following materials and documents are required in order for you to obtain a Building Permit:

MILLER'S CROSSING PROPERTY OWNERS ASSOCIATION ARCHITECTURAL CONTROL COMMITEE GUIDELINES AND PROCEDURES (Effective 27 November 2007)

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE

Food Service Establishment Permit Application

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Starting Construction: Your Storm Water Permit

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

S.O.P. No. HMD

SMALL SITE Stormwater Pollution Prevention Plan For:

Stormwater Pollution Prevention Plan for:

The Clean Water Act: Phase I

Module 7: When Things Deviate from the Plan!

Boise City Public Works General Drainage Plan Review Requirements Checklist

STORMWATER MANAGEMENT PROGRAM. Pottawatomie County, Kansas Stormwater Management Program

Concrete Waste Management

Review of State and Federal Stormwater Regulations November 2007

SECTION EROSION AND SEDIMENTATION CONTROLS

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK

General Permit No.: OHR Page 53 of 146

MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

CITY OF FARGO SPECIFICATIONS EROSION AND SEDIMENT CONTROL

Application for Renewal Industrial Wastewater Discharge Permit

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

Application For Waste Regulation (Check all that apply)

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018

APPLICATION FOR CONSTRUCTION LETTER OF APPROVAL

Hazardous Waste Management

BMP #: Water Quality Inserts

Ordinance amending the San Francisco Public Works Code by adding Article 4.2,

JEFFERSON COUNTY STORM WATER MANAGEMENT

PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR)

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180

Commercial Tax Abatement

1. Pre-Construction Conference Information: Date of Pre-Construction Conference: Owner/Operator Name:

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

Storm Drain Inlet Protection for Construction Sites (1060)

Storm Water Pollution Prevention Plan (SWPPP) Approved By: Eric St Pierre, GM

REQUEST FOR ELECTRIC SERVICE Residential

Richland County Department of Public Works Engineering (Land Development) Division

What is a stormwater utility fee?

Building Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission:

Soil and Site Evaluation for OSS

SECTION TRENCHING & BACKFILLING

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

Ports of Long Beach and Los Angele Summary of Key Water and Sediment Quality Programs & Projects. Common and/or Joint POLB/POLA Programs & Projects

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:

Stormwater Management Plan

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Transcription:

for Small Construction Sites *(Please note this document is intended for guidance only and does not ensure permit compliance.) PROJECT NAME: Single Family Residence PROJECT SITE: XXXX Subdivision LOT # Block ADDRESS of SITE: OWNER NAME and ADDRESS: OWNER TELEPHONE NUMBER: SITE AREA: Approximately X ft X X ft (0.5 acre) See the plot plan PROJECT DESCRIPTION: A single-family house. XX bedrooms, XX bathrooms, Kitchen, Living Room, Game Room. Brick and rock outside. Light excavation to remove trees and grade the lot for the construction of house. After 80% of the house is complete the yard will be graded for driveway and landscaping at that time Silt Fence will be removed. RUNOFF COFFICIENT: 0.3 0.5 SEQUENCE OF ACTIVITIES: Survey, Plot Plan, Building Permit, Storm Water Permit, Clear the Lot, Green Box (Toilet), Footing, Foundation, Filling, Framing, Bricking, Gas and Electricity pipeline, Grading the lot, Landscaping, and Final clean up

Page 2 NAME OF RECEIVING STREAM: Insert name of receiving stream. EXISTING SOIL INFORMATION Insert type of soil. ENDANGERED SPECIES This construction project is located in a developed subdivision; therefore, there are no endangered or threatened species affected by the project. EROSION AND SEDIMENT CONTROLS: Silt fence and Hay Bales will be installed as necessary to reduce or eliminate the runoff from the site to the water of the state or municipal storm sewer. (See included map for the direction of the flow and the erosion control measures used.) TIMING OF CONTROLS/MEASURES Silt Fences and/or hay bale walls will be installed in areas where needed prior to clearing the lot. When the site is stabilized (sod), silt fence and other erosion controls will be removed by the trash company. WASTE MATERIALS: Trash will be collected in the trash container on the site. The container will be emptied by the trash company. SANITARY WASTE: Portable Toilet from XXXX (Company Name) Rentals will be on the site after the clearing of the lot and remain until 90% of job is complete. Service of the portable toilet will be done by the XXXX Rentals. CONTROLS INSPECTION AND MAINTANCE PRACTIES: Erosion controls will be inspected weekly or after any storm event of 0.5 inches or greater to make sure the controls are in affect and do not require any maintenance. All erosion controls will be maintained in good working order. Any repair or replacement will be done as soon as possible but no later than 5 days after the inspection. NON-STORM WATER DISCHARGES: None

Page 3 MATERIAL MANAGEMENT PRACTIES: An effort will be made to store only enough products (Cements, sand, and dirt) to do the job. The project superintendent will inspect daily to ensure all materials are on the site and not in the street. COMPLETION OF JOB: After completion of the sewer line, water line, electricity line, and gas line the lot will be graded and ready for landscaping. All erosion controls will be removed and the street will be cleaned to make sure it is free of debris. Member of Company: Name of the people on the job site and their position. Each of the members are allowed to make any changes necessary to the erosion controls on the job site or this SWPPP. 303(d) list, TMDL, others: Keep one of the following paragraphs whichever is applicable. The storm water from the construction site discharges to XXXX (receiving stream). This water body is not on the list of impaired water bodies (i.e., 303(d) list) for siltation/turbidity. Since this water body is not impaired, a TMDL is not applicable to this construction project. or The storm water from the construction site discharges to XXXX (receiving stream). This water body is on the list of impaired water bodies (i.e., 303(d) list) for siltation/turbidity. Even though this project discharges to an impaired water body, a TMDL has not been written for the water body. Therefore, a TMDL is not applicable to this construction project. or The storm water from the construction site discharges to XXXX (receiving stream). This water body is on the list of impaired water bodies (i.e., 303(d) list) for siltation/turbidity. A TMDL has been written for the water body that is applicable to the construction project. The following information documents the construction projects compliance with the TMDL. Must include documentation that the storm water discharges from the site will meet the applicable TMDL guidelines.

Page 4 CERTIFICATION: I certify under penalty of law that this document and all the attachments were prepared under my direction or supervision in accordance with Storm Water Permit Number ARR1500000. I am aware that there are significant penalties for submission false information, including the possible of fine and imprisonment for knowing violations. Signed (Operator): Position Singed (Member): Position Signed(Member): Position

Page 5 Small Construction Inspection Form Name of Company: Site Location: Date Location Silt Fence OK? Hay Bales OK? Initial Stabilization OK? Amount of Rain (inches) Time Inspectors Initials Correction CERTIFICATION: I certify under penalty of law that this document and all the attachments were prepared under my direction or supervision in accordance with Storm Water Permit Number ARR1500000. I am aware that there are significant penalties for submission false information, including the possible of fine and imprisonment for knowing violations. Signed: Title: Date:

SMALL (LESS THAN 5 ACRES) CONSTRUCTION SITE NOTICE FOR THE Arkansas Department of Environmental Quality (ADEQ) Storm Water Program NPDES GENERAL PERMIT NO. ARR150000 Permit No. ARR150000 The following information is posted in compliance with Part I.B.7.a.iv of the ADEQ General Permit Number ARR150000 for discharges of storm water runoff from small construction sites. Additional information regarding the ADEQ storm water program may be found on the internet at: www.adeq.state.ar.us/water/branch_npdes/stormwater Permit Number Contact Name: Phone Number: ARR150000 Project Description (Name, Location, etc.): Start Date: End Date: Total Acres: Location of Storm Water Pollution Prevention Plan: For Construction Sites Authorized under Part I.B.6.c (Small Construction Sites Authorization) the following certification must be completed: I (Typed or Printed Name of Person Completing this Certification) certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part I.B.2.a.iii of the ADEQ General Permit Number ARR150000. A storm water pollution prevention plan has been developed and implemented according to the requirements contained in Part I.B.7.a.iv of the permit. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter a regulated small, medium, or large MS4 system as defined in Part II.C of the ADEQ General Permit Number ARR150000. I am aware there are significant penalties for providing false information or for conducted unauthorized discharges, including the possibility of fine and imprisonment for knowing violations. Signature and Title Date