Water conservation project

Similar documents
Vidarbha Intensive Irrigation Development Programme

& Watershed Management Practices. 4 Sustainable Watershed Management

IMPO P RT R AN A C N E C E O F G RO R UN U D N W

Soil and Water Conservation/ Watershed Management

SITREP-: Drought in Bundelkhand Region of UP & MP and Maharashtra 30 th March 2016

MAIN REPORT of SOCIO ECONOMIC BASELINE SURVEY (SEBS) AND PARTICIPATORY RURAL APPRAISAL (PRA)

Water and Climate Resilience Programme (WACREP) South Asia - India

A case study of Integrated Watershed Management Programme at Aapsinga Village in Maharashtra

PROMOTION OF DRY LAND MANGO CULTIVATION FOR INCOME SECURITY

Impacts of Climate Change on Food Security

Drought Conditions and Management Strategies in Botswana

GRAMA VIKAS - PROFILE

Women and Climate Change

Protection and Restoration of Rural tanks through Rain Water Harvesting in Tamil Nadu M. Karthi Dr. P. Balamurugan Abstract

An Assessment of Available Water for Livestock and Garden Irrigation in Dry Season for Subsistence Farmers in Zimba District

Strengthening the resilience of livelihood in protracted crises in the Democratic Republic of the Congo, The Niger and Somalia

Investing in rural people in India

Behavior Adaptations to Climatic Variability in the Use of Water for Drinking and Sanitation in the Dry Region of Sri Lanka

RAIN WATER HARVESTING STATE LEVEL NODAL AGENCY TAMIL NADU WATERSHED DEVELOPMENT AGENCY

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives

Participatory Rural Assessment

POLICY BRIEF. Vol 1 Issue 2. Land Resources Management Policy and Strategy

FACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods.

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

Report on Farmers Training in Peddapur Village, Peri Urban Hyderabad, India

APPENDIX-A Questionnaire (Drought-Primary Data) (i) Questionnaire for Farmers

Feasibility of Pipe Distribution Network (PDN) over Canal Distribution Network (CDN) For Irrigation

JAL JEEVAN. Water conservation Implementation Project in village Pachala, Phagi Block, Jaipur District, Rajasthan. Proposal Submitted

Adaptation Measures towards Climate change

Agricultural Development. Dana Boggess Program Officer, Agricultural Development December 18, 2012

Sustainable Development 6 and Ecosystem Services

Maximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat

Tata Trusts. Impacting quality of life of poor communities

UNITED REPUBLIC OF TANZANIA MINISTRY OF WATER AND IRRIGATION (MoWI) NATIONAL IRRIGATION COMMISSION (NIC) KILIMANJARO ZONE

Radical Terraces Rwanda - Amaterasi y'indinganire

Regional Consultative Workshop on El Niño in Asia-Pacific

CSR POLICY National Fertilizers Limited

Capacity Building on Climate Finance

INNOVATIONS IN DEVELOPMENT

Agricultural Mechanization in Kenya

YEMEN PLAN OF ACTION. Towards Resilient and Sustainable Livelihoods for Agriculture and Food and Nutrition Security SUMMARY

Project: Integrating climate resilience into agricultural production for food security in rural areas of Mali...and scaling up...

Simulation of Crop Growth Model for Agricultural Planning

MILLENNIUM DEVELOPMENT GOALS AND CLIMATE CHANGE ADAPTATION

Rainwater Harvesting Structures - A Case Study

Title: Drought conditions and management strategies in Mauritania

Trenches combined with living hedges or grass lines Rwanda - Imiringoti

Dr. S. K. Sharma Ground Water Expert

1. Introduction and Country Overview

Cost of Cultivation and Yield Rates of Paddy Crop in Agriculture: A Comparative Study between Irrigated and Un-Irrigated Areas of Telangana State

Context: Public works programs in India

A STUDY OF GOVERNMENT SUBSIDIES, ANALYSIS OF AWARENESS & UTILIZATION OF SUBSIDIES BY THE FARMERS IN WESTERN MAHARASHTRA

September Expert Consultation on Statistics in Support of Policies to Empower Small Farmers. Bangkok, Thailand, 8-11 September 2009

Enabling poor rural people to overcome poverty in Niger

Key words : Livelihood, aggregate development, per capita output, productive employment, distribution

COMBATING LAND DEGRADATION as an IMPLEMENTATION of NAP to the UNCCD IN INDONESIA

In Search of Ways to Sustainability of Smallholder Farming

Summary of Project/Program. Summary - Project Approval Request. Amount (USD):USD 1 1 million Date: June 29 th, 2011

SUSTAINABLE LIVELIHOODS APPROACH AND NATURAL RESOURCES MANAGEMENT: A CASE STUDY FROM KURDISTAN REGIONAL GOVERNORATE IN IRAQ

Chapter 13 of Agenda 21

09. The National Agricultural Technology Project (NATP)

PROMOTING FOOD AND FARMING SYSTEMS TO FIGHT MALNUTRITION USING NUTRITION-SENSITIVE AGRICULTURE

Fact sheet: Mauritania - Women, agriculture and rural development

CLIMATE CHANGE AND AGRICULTURAL POLICIES

COHERENCE BETWEEN KENYA S PRSP, ERS AND ACHIEVEMENT OF MDGs. Nicholas N. Waiyaki

CARIBBEAN COUNTRIES FACED DROUGHT CONDITIONS DURING 2010

CLIMATE CHANGE AND THE ENVIRONMENT INTEGRATION IN NORTH AFRICA: ISSUES AND OPTIONS. Climate Change & Human Security: African Perspectives

AFRICAN RESILIENT LANDSCAPES INITIATIVE Concept Note

Bench terraces on loess soil China - 土坎梯田, 梯地

Natural Resources Management in Odisha

AGRICULTURE AND RURAL DEVELOPMENT

Development of Climate Resilient Villages

ZAMBIA NATIONAL FARMERS UNION. THE ZNFU SUBMISSIONS ON THE ROLE OF ICTs IN NATIONAL DEVELOPMENT

Increasing Community Resilience to Drought in Sakai

2 Stakeholder Analysis

SOCIO ECONOMIC PROFILE OF THE SAMPLE HOUSEHOLDS

Jérôme E. Tondoh, Director of Research WASCAL Competence Center Ouagadougou, Burkina Faso

A Comprehensive Impact Assessment Study of Assam Rural Infrastructure Agricultural Services Project

Water, Agricultural Productivity and Environmental Services

Factors Influencing Economic Viability of Marginal and Small Farmers in Punjab 1

Chapter 2 People as Resource

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination

Module 11 ///Innovative Activity Profile 4. Ethiopia: Improving Household Nutrition and Food Security 1. Innovative Features

FAO-Italian Cooperation

MEASURING EFFICIENCY OF VILLAGE TANKS IN PURULIA AND BANKURA DISTRICTS OF WEST BENGAL, INDIA

Integrated Domestic Water Management. Workshop Date: 5 th June Venue: TARA Gram Orcha

Session 8 Session Title Social Audit: Role of Gram Sabha and Movie Show on Right to Information

Increasing food security and farming system resilience in East Africa through wide-scale adoption of climate-smart agricultural practices

Assurance Services on Positive Water Balance to PepsiCo India Holdings Pvt. Ltd

NABARD s Experience in Climate Finance

Special Seminar on Food Security: Focusing on Water management and Sustainable Agriculture

Gender and Financing for Climate Change Mitigation and Adaptation in the Philippines

Module 1 (L3) Introduction and Basic Concepts. 3 Watershed Management Policies

Mobile based Agriculture Services for the Millions.. Nokia Life

Private Rural Service Provision System

Drought Situations and Management in Vietnam

fao and traditional knowledge: the linkages with sustainability, food security and climate change ImpactS

WOMEN PARTICIPATION IN CARP CULTURE ACTIVITIES IN INDIA

Transcription:

Water conservation project Introduction: The nature can only sustain when there is equal balance between ecosystem and human system, the equal balance will create good quality life and unbalanced act will create worst quality of human life. In the rural areas the natural resource such as land, water, vegetation, livestock and livelihood are interlinked with each other. Approximately 17 percent in the Indian GDP is contributed from the Agriculture and approximately 60 percent of the population is depending on the income from agriculture. In the last few decades we are seeing that the environment is getting degraded and destroyed due to human s greedy activities. This kind of unwanted activity and experiment with the environment has not only threatened to the various species but now human is also suffering from various effect of globalwarming. This has breakdown the traditional local management connection between the human and nature. These two brothers from Karanjgaon village have bunked their school because they have the responsibility to bring water for their daily needs from distance. Watershed programme: Watershed is not simply the hydrological unit but also socio-political-ecological entity which plays crucial role in determining food, social, and economical security and provides life support services to rural people. At the backdrop of less rainfall, depleted ground water conditions, crop failures, Govt. Of Maharashtra has declared more than 24,000 villages in the state as drought affected during year 2015-16. Out of 1353 villages in Aurangabad district, 237 have been declared as drought affected in year 2015. To deal with the recurrent drought situation, Government of Maharashtra launched Jalyukta Shivar Abhiyan on

December 5, 2015 a flagship programme for making Drought Free Maharashtra by year 2019 enabling water for all. Integrated water and soil conservation Programme According to the Soil Conservation Society of America, a watershed is a geo-hydrological unit comprising land and water within the confines of a drainage divide. The focus of project is Soil and water conservation is on i) In situ water harvesting, ii) increasing ground water level, iii) increasing irrigation potential & creating facilities for protective irrigation, iv) creating decentralized water bodies, v) rehabilitation of existing water bodies through de-silting, vi) soil conservation vii) livelihood programme. It has been implemented various water harvesting measures and soil conservation on integrated approach through convergence of various ongoing schemes. The benefits of the interventions have reach out directly to the villagers in terms of increase in ground water table in dug wells / bore wells, increase in area under protective irrigation, reduction in incidence of crop failures due to longer dry spell, increase in cropping intensity, increase in crop yields, all this has lead to increase in income & development of drought coping mechanism. Holistic approach of MGVS 1. Promotion of modern technologies for maximum output of the programme 2. Soil conservation to increase crop productivity. 3. Increase the income and income source of underprivileged people. 4. Create awareness on natural resource management. 5. Livelihood programme by establishing Self help Groups (SHGs) 6. Empowering rural women by involving them in the decision making process. Significant Activities: Planning and Advocacy: Specific Intervention Plans is prepared with active participation of local community and villagers. Plans prepared by the district authorities are also referred & reviewed and then works to be taken up is finalized. Detailed technical survey of identified sites have undertaken for preparation of design and estimates. The technical plans & estimates are duly scrutinized by technical team prior to approval. Water resources development interventions: Based on the local needs & suitability, Water resources development interventions like Cement Check Dam, ENB etc and old CNB repairing Nalla/River deepening & widening of streams only black / fertile soil and murum. Water user group and committees formation: 34 Water user groups / Committees have been formed for around each of the structure for effective operation and maintenance of created structures including effective water management. These committees have been provided training & capacity building inputs for ensuring sustainability. Further Social Mobilization campaign has been conducted in proposed villages with emphasis on increasing water literacy & effective water management. Implementing approach: 1. Water management and drip irrigation

2. Farmer club 3. Natural resource management 4. Livelihood development 5. Community mobilization. Role of Stakeholders: 1. Villagers: The villagers have contributed Rs. 14.10 lakhs cash for the water conservation project, this contribution was voluntary contribution. The villagers have also participated actively in the planning and implementing stage from time to time for the success and completion of the programme. 2. Local government Authority: the local government Authority support is very important because they are the one who clear the project work and authority like Sarpanch and local community group have helped us in convincing the villagers in actively participating and supporting us for the work. A) District and Block Govt. department: the district and block government department help in the project work at the different stages of the project from time to time, like providing no Objection certificate and other required clearance. MGVS has shared all the required project information with the concern department so there is not overlapping/duplication of work. Outcome of the project After successful implementation of the project under integrated water and soil conservation, following are the outcome. 34 Water User Groups has been established from each structure and managing the operation & maintenance of water harvesting structures. Water harvesting structures benefitting 9433 hectare of area under protective irrigation in Kharif season. Water harvesting structures created storing of rain water every year in selected villages. Increase in ground water level of dug well / bore well has lead to assured drinking water throughout the year and livestock. This has lead to tanker free villages. Trained / capacitated water user groups have adopted efficient water management practices. It has lead to increase in crop yield and thereby increased income level. Generation of self employment in watershed programme Women along with men have participate in the decision making process. Awareness on water and soil conservation Agro based small scale income generation is being created Crop growing area has increased. Access to safe drinking water throughout the year for humans and for livestock as well. Project sustainability 34 Water User Groups / Committees are formed for around each of the structure for effective operation and maintenance of created structures including effective water management. These committees have been provided training & capacity building inputs for ensuring sustainability. Further Social Mobilization

campaign is conducted in selected villages with emphasis on increasing water literacy & effective water management Water User Group is ultimately responsible for future operation & maintenance of created structures. Difficulties in the project at the ground level: At the initial stage it is was very difficult to convince the farmers to support for the cause because many of the farmers have increased their farm sized in the nearby area of pond and nala therefore they don t agree to give-up that land therefore it become very difficult to began the work. MGVS has made all efforts to convince these farmers so that once the project is started we don t have to face any objection. We have organized PRS meeting at the center of the village with the villagers and then solved all the hurdles with the help of old villagers and other local influential personality of the area to make the thing happen according to the project.

Water Conservation work Village name Work name No/ quantity of work Total beneficiary Water storage(m 3 ) Community contributions Work expenditure (in Lakh) Irrigation area (in Hectare) Karanjgaon Construction Cement Check Dam Village pond construction 3500x11x2.75 1760 105875 0.40 27.25 1270 4 75000 0.60 12.00 80x60x2.50 16800 0.10 9.75 Hadas pimpalgaon Village pond 100x40x4 1277 16000 0.00 5.50 640 Palkhed and K.T weir repairing Desilting of Percolation Tank 6 4277 98280 1.36 32.00 1667 260x47x1.50 18330 0.80 8.80 Village pond 45x55x3 4227 7425 0.35 3.77 1896 Shivrai 230x3x12 8280 0.36 2.95 Village pond 42x45x3 1293 5670 2.50 598 Malisagaj 6 67800 1.85 47.00

Aghur Kanaksagaj Dhaigaon Desilting of Percolation Tank K.T weir 120x60x2.50 3240 18000 0.76 8.50 1342 4 35495 1.39 16.00 3 1860 16700 0.88 9.55 1270 30x2.5x500 1560 37500 5.25 5.25 750 Total 17934 527155 14.10 190.82 9433