Eskom coal requirements

Similar documents
THE FUTURE OF COAL: EXISTING POWER STATIONS CONSIDERATIONS FOR NEW STATIONS. Brett Cohen sti!s Power Sector Workshop 5 March 2013

South Africa s planned coal infrastructure expansion: drivers, dynamics and impacts on greenhouse gas emissions

ESKOM APPLICATION FOR EXEMPTION FROM THE MINIMUM EMISSIONS STANDARDS FOR THE KRIEL POWER STATION. DATE: 28 October 2013

ICES Core Cost Engineering Competencies

Future wind deployment scenarios for South Africa

ELECTRICITY GENERATION: INDEPENDENT TECHNICAL AUDITS CONDUCTED ON TWELVE SOUTH AFRICAN POWER STATIONS

Presentation to the B-BBEE Codes of Good Practice. 16 August 2016

INQUIRY INTO THE NATIONAL ELECTRICITY SUPPLY SHORTAGE AND LOAD SHEDDING

Social & Ethics Committee UNCOVERED

REQUEST FOR PROPOSALS FOR THE APPOINTMENT OF SECRETARIAT SERVICES FOR THE FOOD AND BEVERAGES MANUFACTURING SECTOR EDUCATION AND TRAINING AUTHORITY

CSDP Supplier Guidelines

Online Vending Agency RFP

TERMS OF REFERENCE RFP NO.: SALGA/32/2016

08 NOVEMBER PURPOSE

Regulatory Framework PPAs and IPPs

PROCUREMENT GUIDELINES FOR DEVELOPER DELIVERED INFRASTRUCTURE

University of the Witwatersrand, Johannesburg

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002

Andries van der Linde Director Millennium Energy South Africa

Carbon Tax. September Deloitte Touche Tohmatsu Limited. All rights reserved.

What is the carbon emission factor for the South African electricity grid?

Medium Term Scenarios for Electricity Supply/Demand Balance

The South African Coal Chain 2011

PREVIEW COPY ONLY TRANSNET SOC LIMITED (REGISTRATION NO.1990/000900/06) TRADING AS TRANSNET FREIGHT RAIL

Black Economic Empowerment

Contract management of medical services. Department for Work and Pensions

ROLE DESCRIPTION. Strategic Procurement Manager

Casework Technical Support (Social Welfare - Project Management)

Emissions from coal-fired utilities in South Africa and neighbouring countries and potential for reduction

AMENDED B-BBEE CODES OF GOOD PRACTICE. Gazetted: 11 October 2013 Effective Date: 11 October 2014

Coal is one of the country s abundant and valuable resources, with South Africa ranking among the top ten

B-BBEE Codes of Good Practice

2013/14 Annual Report of the Department of Public Enterprises. Presentation to Portfolio Committee

MODERN SLAVERY AND HUMAN TRAFFICKING STATEMENT 2017

AMENDED CODE SERIES 400: MEASUREMENT OF THE ENTERPRISE AND SUPPLIER DEVELOPMENT ELEMENT OF BROAD-BASED BLACK ECONOMIC EMPOWERMENT

Enterprise and Supplier Development (ESD) Mario Venter Executive, Resources and Industry AECOM South Africa

Series Amendment Problem/ Issue Comment/ Suggestion

Electricity Slide Index Slide 2: Generating Electricity Slide 3: SA Power Grid

AHTR Project Status (PBMR Restart)

Certificate IV in Project Management Student Assessment Guide

COMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM PIPELINE AND A STORAGE FACILITY.

Template for ToR for Transaction Advisory Services

Draft Revised Construction Sector Codes

PREFERENTIAL PROCUREMENT AND ENTERPRISE DEVELOPMENT POLICY

TERMS OF REFERENCE. For INTERNATIONAL LEADERSHIP DEVELOPMENT PROGRAMME (ILDP)

Invitation to Tender

Gambling-Related Harm Minimisation in Criminal Justice Invitation to Tender

Teck s Coal Export Ports. Brad Johnston General Manager, Marketing & Logistics, Coal

Overview of Alberta s Greenhouse Gas Reduction Program

Energy Efficiency in South Africa: Governance Structure & Lessons Learnt

The assessment is based upon the design ore production of 95 million tonnes / annum.

Public Private Partnership PPP & The Egyptian Experience

New Zealand Telecommunications Forum. Disconnection Code

HOFOR S SUSTAINABLE BIOMASS PROGRAMME

SABPP POLICY ON CONTINUING PROFESSIONAL DEVELOPMENT (CPD) FOR REGISTERED SABPP MEMBERS

Contracting for Goods and Services

Procurement Strategy

BEE and the revised codes of Good Practice: how this directly and indirectly affects payroll

MSHOLOZI INFORMAL SETTLEMENT PRE-FEASIBILITY STUDY MADIBENG LOCAL MUNICIPALITY

Speedy Group Policy Part of: Group Policies & Procedures

Freedom of Information: Guide to information available from Brentford School for Girls under the Model Publication Scheme

KZN Region: 27 August 2015 Commercial and Marketing (CRM, NBD & Property)

otel business, from housekeeping to banqueting everything in be-

The South African Perspective on CCS

SAMOA INSTITUTE OF ACCOUNTANTS QUALITY ASSURANCE (QA) FOR AUDIT REVIEWER (CONTRACTOR SERVICES)

Quotation Procedure TRIM: D12/85125P

WESKUS DISTRIKSMUNISIPALITEIT WEST COAST DISTRICT MUNICIPALITY

MBDA Germany. Procurement Policy. 1 Preamble and Purpose of the Policy 2 2 Introduction of MBDA MBDA Group 2 2.

Non-Governmental Organization/ Nie-Regeringsorganisasie NON-GOVERNMENTAL ORGANIZATION NOTICE 931 OF 2017 DEPARTMENT OF TRADE AND INDUSTRY

Indigenous Employment Evaluation Framework

PORT OF PORT HEDLAND - BULK PRODUCT MANAGEMENT PROCEDURE

A. OWENS 1 and J. BURKE 2

Thabametsi Power Station

1 July Guideline for Municipal Competency Levels: Head of Supply Chain and Supply Chain Senior Managers

Market Procedure: Network Control Services

Indonesia update: Tariff framework for renewable energy

Public Sector Contract Management. Summary of The South African National Treasury Framework & Guide

B-BBEE Advisory Council and implications to companies and legislation

RFP for Consultancy to Upgrade from CMMI Maturity Level 3 to CMMI Maturity Level 5 & Prism Certification

Guidance Note: Corporate Governance - Audit Committee. March Ce document est aussi disponible en français.

B-BBEE CODES OF GOOD PRACTICE GUIDE

1 July Guideline for Municipal Competency Levels: Accounting Officers

EWA ENVIRONMENTAL AFFAIRS

Oversight and Monitoring in Public Procurement in the Republic of Serbia

INVITATION OF BIDS. The Passenger Rail Agency of South Africa (PRASA) invites suitably qualified cleaning companies for the following bids:

Is Outsourcing Right for You? Five key questions to answer about your equity plan.

BOARD CHARTER TOURISM HOLDINGS LIMITED

Independent Auditor s report

EUROPEAN SPACE AGENCY ESA EXPRESS PROCUREMENT PROCEDURE EXPRO / EXPRO+ TENDERING CONDITIONS ( EXPRO/TC ) NOTE

BLACK ECONOMIC. 4 November Revised Broad-Based Black Economic Empowerment Codes of Good Practice

Martin Smit 1 and Ingrid Pistorius 2. Abstract

Efficiency. Purpose of the Checklist. Description

For personal use only. Botswana Power Development! March 2015!

Management of Fatigue in Tram Operations Limited - TOL (IA )

FURTHER EDUCATION AND TRAINING CERTIFICATE: TOURIST GUIDING (71549) LEVEL 4).

Guide to B-BBEE Codes of Good Practice

Responsible Procurement Policy

Cargotec Supplier Requirements

LOAD SERVING ENTITIES PJM REGION

ASX / MEDIA ANNOUNCEMENT 5 March 2018

Transcription:

Eskom coal requirements Fossil Fuel Foundation Junior Coal Mining VenturesVII 22 June 2012 Johann Bester GM Fuel Sourcing, Primary Energy Division Eskom Holdings SOC Limited

SOURCING AND PROCUREMENT MANDATES Primary Energy Division has a mandate to ensure the security of supply of Eskom s primary energy requirements in an effective and efficient manner Supplier Development & Localisation has a mandate to achieve maximum and sustainable local development impact through leveraging Eskom s procurement spend in a manner that allows flexibility within the business in order to accommodate government local development initiatives and policies

SUPPLIER DEVELOPMENT & LOCALISATION Key performance area Skills development Localisation - Country - Province/Region - Site/Operation Industrialisation Employment and job creation Supplier development / Enterprise Development Definition Increasing the skill base (number and skill level) of South African workers in areas relevant to the energy sector and where there is a national scarcity of skills Utilisation of Eskom and suppliers spend to develop South African based suppliers relevant to the energy sector (focusing primarily on B-BBEE and Black Owned suppliers) Utilisation of Eskom and suppliers spend to foster the establishment of new competitive industries in the energy sector Creation of new jobs by suppliers as a direct result of Eskom business Providing a platform for SA-based suppliers to develop into national and international suppliers, through Capability & Capacity & Competitiveness development 3 3

PRIMARY ENERGY DIVISION Manages the supply of ~130Mt of coal per annum Influences the cost and operational performance at 6 cost plus mines (~60Mt) Sources and contracts ~35Mt of short term coal supplies primarily from junior miners 4

ESKOM COAL BURN PLAN TO 2022 Coal Burn Plan (Mt) 112 119 125 121 123 125 126 127 +2% 128 130 133 134 137 141 144 147 151 2006 2007 2008 2009 2010 2011 2012* 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Coal consumption will continue to show a steady increase over the next decade NB:* reflects projection Source: Eskom Integrated Report 2011 (for 2007-2011) 5

ESKOM COAL SUPPLY Mtpa Coal Demand (Mtpa) 170 160 150 140 130 120 110 100 90 80 70 60 50 Junior Miners Contracted Un-contracted Includes only Eskom requirements Waterberg Un-contracted Juniors Miners Contracted Contracted Based on a 50 year operational lifespan Only 5 stations still in operation after 2040: 40 30 Contracted 20 10 0 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 49 50 51 Years 6

JUNIOR MINING PARTICIPATION Junior Mining Development 31% 29% 27% 25% 23% 21% 19% 17% 15% 2007 2008 2009 2010 2011 2012 Currently sourcing 30% of coal on medium term contracts, which primarily are from junior miners (~35Mtpa). The significant volumes of coal Eskom still needs to secure for the long term, provides an increasing opportunity for the Junior Mining coal sector to collaborate with each other as well as with Eskom to further develop the mining sector of South Africa and also improve the security of supply from the Mpumalanga and the Waterberg. 7

KEY CONTRACTUAL REQUIREMENTS (1/4) Requirements Principles Regulatory Compliance Eskom: Will not contract with suppliers who operate illegally Wants to contract with owners of mining resources or value adding agents Will be entitled to conduct audits to assess compliance Will receive performance reports to monitor compliance Supplier: Will comply to all relevant legislation Before contracting, will prove or provide warranties/undertakings that there is compliance to relevant legislation Will prove following documents Mining Rights, EMP, IWUL Tax clearance certificate Employment Equity Plan 3 year audited financial statements B-BBEE certificate Environmental Compliance Eskom carries out environmental risk assessments of each source based on the legislative compliance to the relevant policies, acts and EMPR Any risks will be highlighted to the supplier with a request for assurance Eskom advises on the facilitation of mitigations to ensure security of supply No contracting with pre directives that have no mitigation plans An annexure in the contract covers the environmental liability 8

KEY CONTRACTUAL REQUIREMENTS (2/4) Requirements Principles Coal Quantities Eskom: Has security of supply as a main priority Would like to align supply of quantities with demand patterns Would like in-built flexibility in supply contracts To provide plans to rectify any shortfalls in off-take Supplier: To provide warranties that there are sufficient coal reserves to meet contractual quantities To provide flexibility in supply where possible To provide plans to rectify any shortfalls in supply Coal Qualities Eskom: Has to ensure optimal performance of its coal-fired stations Out of specification qualities will have a detrimental impact on its coal fired power stations load losses Coal quality is determined for each station Will sample/audit stockpiles prior to delivery Will test compliance to the Coal Quality Management Procedure Supplier: Required to have pre-certified stockpiles Required to supply within contractual quality parameters 9

Contents of CQMP CONTRACTUAL APPLICATION OF ANALYTICAL RESULTS SAMPLING Sample identification and labelling Responsibilities Sample certification TRANSPORT OF BULK SAMPLE TO THE NOMINATED LABORATORY SAMPLE PREPARATION Sample preparation regime Sample preparation flow sheet ANALYTICAL DETERMINATIONS Standard Methods ANALYTICAL DIFFERENCES AND RESOLUTION Conditions for declaring disputes Limits for Analytical Differences COAL QUALITY REPORTING TECHNICAL AUDITS Laboratory Audits Sampling Audits PRE-CERTIFIED STOCKPILE MANAGEMENT TREATMENT OF OUT OF SPECIFICATION STOCKPILES STOCKPILE MOISTURE MANAGEMENT SAMPLE PREPARATION FLOWSHEET SAMPLE PREPARATION FLOWSHEET APPENDIX : THE GENERAL LOCATION OF THE PAYMENT SAMPLING PLANT IN RELATION TO THE STOCKYARD LAYOUT. APPENDIX : SPECIFICATIONS OF SAMPLING PLANT APPENDIX : COAL QUALITY REPORT ROLES AND RESPONSIBILITIES: OBSERVER AND ROVING SUPERVISOR 10

KEY CONTRACTUAL REQUIREMENTS (3/4) Requirements Principles Price Eskom: Coal cost is one of the largest cost drivers for Eskom Coal cost directly impacts the cost of electricity Prices will be based on efficient costs plus a risk adjusted fair return Total cost of ownership to the power station will be considered Will benchmark costs for the type of mining operation Supplier: To provide technical mine information To provide geological information related to its coal reserves Contract Price Adjustment Eskom: Will consider appropriate indices and its weightings CPA should be based on recognised national/international published indices Supplier: Should fix at least 10% of its price Use a basket of indices that closely represents the cost drivers of its mining operations Only diesel escalations will be done monthly 11

KEY CONTRACTUAL REQUIREMENTS (4/4) Logistics Requirements Eskom: Logistics costs contributes significantly to the total cost of ownership Sub-optimal logistics solutions have detrimental economic and social impacts Preferred logistics solution Conveyor, followed by Rail and then Road Eskom is migrating from road to rail Eskom will utilise rail for Power Stations with rail infrastructure in place Contracts should be flexible enough to move between rail and road and between FCA & Delivered Principles Supplier: Logistics suppliers should be made aware of legislative requirements regarding transportation Must adhere to Road Transportation Management System standards Must adhere to Road Rules service level agreement 12

ESKOM HAS A PORTFOLIO OF LONG, MEDIUM AND SHORT TERM COAL CONTRACTS Cost plus contracts 47% Both parties contribute capital Eskom pays the supplier for the full operational costs and a pre-determined net return on its capital contribution Any additional capital requirements and/or cost increases are for Eskom s account Coal reserves are dedicated to Eskom ensures security of supply Fixed price contracts with escalation 24% Coal is sold to Eskom at a predetermined price The price is escalated annually by applying an escalation formula The supplier incurs penalties for not meeting quality specifications Coal reserves are not dedicated to Eskom Eskom makes no capital contribution and theoretically has no exposure to new capital requirements or cost overruns Short/medium term contracts 29% Coal is sold to Eskom at a predetermined price The price is escalated annually by applying an escalation formula The other criteria are similar to that of fixed price contracts Long term contracts (cost plus & fixed price) are contracts generally not less than 10 years in duration and often up to 40 years in duration, some with options to extend Short/medium term contracts are usually not more than 10 years in duration 13

CALORIFIC VALUE RANGES Power Station Year Commissioned CV Ranges Lethabo Kendal Matla Matimba Majuba Kriel Hendrina Tutuka Duvha Arnot Camden* Komati* Grootvlei* 1986 1988 1979 1987 1996 1976 1971 1985 1980 1971 18.3 MJ/kg 21 MJ/kg >21.5 MJ/kg Implications of different qualities: - Boilers are designed to burn particular qualities of coal - It is not always possible to transfer coal between stations because of different quality requirements at each station - Burning inappropriate qualities at stations can result in high plant inefficiency & increased maintenance requirements CV Air Dried basis * Return to service power stations 14

OPPORTUNITIES IN THE WATERBERG Eskom requires 20Mtpa of coal from the Waterberg for the next 40 years from 2018 Eskom has already secured up to 10Mtpa Request For Information to be issued in all major newspapers Compulsory bidders clarification to be held at Megawatt Park All tender information will be available at www.eskom.co.za Eskom engaging with Transnet for rail infrastructure upgrades Eskom engaging with the Department of Water Affairs for water infrastructure Contracting Principles for the Waterberg will include: Green Mining Principles (beyond legislative compliance) New parameters for coal quality management (automated systems) Key Coal Qualities for the Waterberg > 21MJ/kg (air dried) Ash < 30% (air dried) Sulphur < 1.2% (air dried) 15

Thank you