INSTRUCTIONS AND GUIDELINES

Similar documents
Pre-Fabricated Roof Curbs

Series Silicone structural glazed. Installation Instructions

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

YCW 250 I-Beam Curtain Wall System Installation Manual

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

How to Construct a Feral Enclosure

OmniFlex 300 Plus Installation Instructions

Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions

SECTION GYPSUM BOARD

Se incluyen las instrucciones en español

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Installation Guide. PrivacyShield Outdoor Enclosure

MODULAR ACOUSTIC FENCING INSTALLATION GUIDE

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

Weep Valves Stucco Wire Mesh Reinforcement Weather Resistive Barrier Sheathing Insulation Framing

ROOF MOUNT KIT OWNERS MANUAL

BEARING METAL STUD FRAMING

Thin Brick Façade. Façades Installation Guide

DIVISION 13 - SPECIAL CONSTRUCTION SECTION ACOUSTICAL PANEL ENCLOSURE

PORTA-FAB Cleanroom Wall Systems

CONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

Floor Insulation Underlayment Section Sound Control Matting

Noise Control. Commercial, Industrial, and Environmental Products and Solutions.

INSTALLATION INSTRUCTIONS for MP-RC1 TWO PIECE CONSTRUCTION TO BE INSTALLED ON COMPLETED ROOF DECK

Maximum thermal performance ISOLEREN INSULATED METAL PANELS INSTALLATION GUIDE

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

CEILING & WALL SYSTEMS

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

138 H-STUD AREA SEPARATION WALL SYSTEM

ONE SCHOOL STREET SEPTEMBER 18, 2008 GOWANDA, NEW YORK ARCH PROJECT NO

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

SECTION EXPANSION CONTROL

SECTION GYPSUM WALLBOARD SYSTEMS. A. Gypsum board at new wall partitions or where indicated on drawings. B. ASTM C442 - Gypsum Backing Board

Assembly Instruction. wedi Fundo Primo Shower System

Open-Web Truss Long Span Installation Guidelines

BUILDING SCOPE OF WORK

ENKASONIC FLOOR UNDERLAYMENT 9110

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL WALL PANELS REPORT HOLDER: METL SPAN, A DIVISION OF NCI GROUP, INC.

Steps in Building a Shed

KS SERIES - VERTICAL INSTALLATION

ALLMET CONTINENTAL INSTALLATION GUIDE

Instruction Manual for Installing OutBack Steel-Framed Buildings. Gambrel Buildings

Chapter 7. Roof Framing

Chevy Chase Club June 30, 2008 Bowie Gridley Architects SECTION GYPSUM BOARD SHAFT WALL ASSEMBLIES

Shaftwall and Area Separation Wall Systems.

Modular Buildings. Installation Manual

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following:

Container Installation Guide

Specifications for FL-100 Soffit Panel

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board

SECTION 1043 FENCE MATERIAL

NOVABRIK MORTARLESS CONCRETE BRICK VENEER SPECIFICATION. MASTERFORMAT SECTION (Mortarless Concrete Brick Veneer)

Hoesch isorock vario Installation recommendations

Moduline. Acoustic Enclosure System. Rugged Noise Control Structures Using Acoustically Rated & Field Proven Demountable Components

SECTION GYPSUM WALLBOARD. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

The GlasRoc Shaftliner Type X advantage...

Wall Louvers (10200)

I-STUD Shaftwall System

Planning and installation instructions

Steel Door Frame Installation in Masonry Construction

Industry Standard Terms & Definitions Of The Steel Deck Institute

SECTION A. AAMA/NWWDA Voluntary Specifications for Aluminum, Vinyl (PVC) and Wood Windows and Glass Doors.

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

Container Installation Guide

Awning Windows Montecito New Construction Window

Installation Instructions

A. Submit the following in addition to the standard requirements.

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.

DRY SEAL INSTALLATION GUIDE

SECTION ALUMINUM STORM WINDOWS

INSTALLATION MANUAL. METAL INSULATED PANELS -ROXUL -Expanded Polystyrene

GLASS WALL SPECIFICATIONS

SECTION METAL BUILDING SYSTEMS

BioPrism Solid Surface

A. Access doors and frames are part of an access door and frame allowance.

EDGEWATER, FLORIDA JUNE 14, 2010

Acousti-Seal Encore Paired Panel (10650) Operable Partitions

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE Magnetic Shielding

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

Single Post Anchor Part Number Spectrum Lane ~ Missoula MT ~

2000 POCKET DOOR TECHNICAL DATA

200 / 300 SERIES PANELS COLD STORAGE

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

PIPE. Central Texas Largest Distributor. Structural Steel, Pipe and Metal Building Components

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

SECTION COMPOSITE METAL WALL PANEL SYSTEM (Accu-Trac Low Profile DS)

Assembly Instruction wedi Fundo Floor element

B. Provide fire-rated access doors where indicated or scheduled.

4 EXTREME FOUNDATION PANELS

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)

ECONO 200 INPLANT OFFICE

University Apartments on Brooklyn PROJECT MANUAL

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper

Transcription:

INSTRUCTIONS AND GUIDELINES NOISEBLOCK TM MODULAR PANEL SYSTEMS ENCLOSURES & PRESSURIZED PLENUMS

PLANNING HINTS & NOTES: 1. Review the Kinetics Noise Control submittal and installation drawings and bill of material. 2. The bill of material contains a complete list of pieces and parts supplied by Kinetics Noise Control including panels, trim (flashing) and miscellaneous hardware. Each part number corresponds to a piece-marked item on the installation drawing. 3. Before the delivery of panels arrives, clear an area near where the panels are to be assembled. To save time and labor in handling the panels, unload the panels directly from the truck to this area. Make sure the necessary material handling equipment is available, including lifts for getting the panels off the truck and the proper floor carts to move the panels. 4. When panels are stored near the installation area, stack them on end and lengthwise. This will save time moving and restacking panels as the NOISEBLOCK TM enclosure is assembled. If more than one enclosure is involved, separate and stack the panels by drawing number, which can be found on the label on the end of each panel. 5. Assemble a complete set of tools and equipment required to install the panel system. Depending on the nature of the job, the following items may be required: Welding and cutting equipment Ladder Extension cord Drill masters & self-drilling driving head Lifts Portable lighting Masonry drills Metal cutting saws Steel tape measure Come-a-long Sealer gun GENERAL NOTES: 1. Where sealant is called for on the piece-marked, installation drawings use a ¼ inch bead of sealant to properly seal joints. Kinetics Noise Control supplies the sealer with each enclosure system shipment. This sealer is used at the base channel, outside trim, panel joints, and where shown on the installation drawings. Kinetics Noise Control will provide the quantity of sealer supplied is approximately equal to the total linear feet of all panel system trim, roof panel joints and wall joints divided by 20. This amount should be adequate, but KNC does not guarantee that the quantity will be enough for any specific job or installing contractor. 2. All base channel and outside trim is supplied in standard 10 foot lengths to be field cut to size during installation. Sheet metal screws are supplied with each panel system. Kinetics Noise Control will provide a quantity of TEKS 4 (sometimes TEKS 5 are specified) sheet metal fasteners to approximately 5 times the total lineal feet of all panel system trim and base channel. This

number should be adequate, but KNC does not guarantee that it will be enough for any specific job or installing contractor. SUMMARY OF INSTALLATION 1. Locate base channel 2. Set corner panels 3. Install wall, partition and door panels 4. Add wall trim outside and inside 5. Structural steel (as required) 6. Add roof panels 7. Add roof trim inside and outside 8. Completed enclosure STEP 1: INSTALLATION OF BASE CHANNEL A. Check grade/floor/curb/base to ensure it is square, level, and in accordance with the approved dimensions. Problems may arise later if the curb is not properly installed or grade not properly level. B. Apply two parallel beads of KNC supplied caulking on curb, spacing it so both beads will be under base channel when it is placed on the curb or level grade. Do not apply more sealer than what will be covered by the base channel within 15 minutes. C. Starting at the corner where the first panels will be assembled, miter the base channel, forming a corner and secure the channel with anchors (by others) 12 to 18 inch centers. x2 x2

C L 12" - 18" (305 mm - 457 mm) C L = = C L The anchor centerline is also the centerline of the base channel. The anchors (by others) must be located on this centerline so they will not be under an edge of a NOISEBLOCK TM panel. If anchor bolts are used, locate them on 12 to 18 inch centers with 3/8 inch bolt projection above. The base channel is furnished in standard 10 foot lengths, to be field cut as required. Sections of base channel should fit together tightly. STEP 2: INSTALLATION OF WALL PANELS A. Starting at the same corner as the base channel, apply caulk along the interior edge of the base channel. B. Insert panels that form the first corner into base channel.

C. Secure base channel to corner panels TEKS 4 fasteners. 8" (203 mm) D. Cut outside trim for the first corner. Apply caulking to the outside trim. Position the trim and attach with TEKS 4 fasteners. Fastener spacing is typical 6-inch center line for pressurized plenums and 18-inch centerline for equipment/process enclosures where internal enclosure static pressure is not a concern. E. From this corner, run a tape measure along the base channel for the two walls that extend outward from this corner, and place a mark on the outside edge of the base channel at all panel width increments. Use panel dimensions noted on the piece-marked installation drawings.

F. In the following manner, assemble wall panels for the two walls extending outward from this corner. 1. Place sealer on curb for next section of base channel and install base channel. Apply sealer along interior outside edges of base channel. 2. Place caulk on inside face of the groove channel of each panel. x2

3. Insert panel tongue into base channel and seat into previous groove panel with come-along (by hand it a tight joint fit can be obtained). All panels must be properly seated to permit a proper fit and thereby minimize the possibility of growth in the length or shrinkage of the wall. SUGGESTED CLOSURE TOOL SUPPLIED BY OTHERS 4. As each panel is installed, the mark previously placed on the base channel (step E) will verify the location of each panel joint. If a panel joint does not line up with a mark, double check panel dimensions and panel markings with piece-marked installation drawings and make necessary corrections. G. As each wall panel is installed, secure the base channel to each wall panel with the supplied TEKS 4 fasteners. Fastener spacing is typical 6-inch center line for pressurized plenums and 18-inch centerline for equipment/process enclosures where internal enclosure static pressure is not a concern.

H. Follow the installation sequence on the piece-marked installation drawings and install all wall and partition panels by repeating steps F.1 through F.5. Door Panels Install door panels in the same manner as wall panels. Some doors are shipped as one unit, factory installed in their frames. Install these as noted on the drawings. STEP 3: INSTALLATION OF ROOF PANELS A. Review the roof plan detail on the piece-marked installation drawings and locate roof panels and any joining H-strips (if required).

x2 B. Following the installation sequence on the piece-marked installation drawings, place caulk on the inside groove channel of each panel. C. Completely seat roof panel tongue into adjacent roof panel groove.

D. If joining H-strips are shown on the piece-marked installation drawings, place four beads of sealer in each H-strip and secure to roof panels with TEKS 4 fasteners. Fastener spacing is typical 6-inch center line for pressurized plenums and 18-inch centerline for equipment/process enclosures where internal enclosure static pressure is not a concern.

STEP 4: INSTALLATION OF TRIM A. After all wall and roof panels have been installed, secure outside trim corners as shown below. Sealer must be placed under trim corners where shown.

B. Cut all outside trim (panel corners and panel-to-roof corners) to proper dimensions, apply sealer, position trim, and attach with TEKS 4 fasteners. Outside trim is shipped in standard 10 foot lengths to be field cut as required. C. After all outside trim has been installed, finish by installing inside trim at wall-to-wall and wallto-roof corners. The inside trim is shipped in standard 10 foot lengths to be cut in the field as required. The installing contractor must drill and anchor inside trim at all tongue and groove panel joints and at all internal panel stiffeners. SPECIAL ASSEMBLY CONSIDERATIONS FACTORY OPENINGS If a factory opening is required, a channel will have been factory installed inside the panel edge adjacent to the opening to retain (safe-off) the acoustic grade fill. STRUCTURAL SUPPORT STEEL If roof plans are greater than 12 feet, external, structural steel bracing may be required. If so, the external, structural steel will be detailed on the Kinetics Noise Control piece-marked installation drawings and should be installed according to be instructions.