HVAC INSULATION. A. General Requirements for Flexible Elastomeric Insulation: 3. Use pre-molded roll on pipe sizes 3.5" and below.

Similar documents
Design & Construction Standards, Revised January

University of Houston Master Construction Specifications Insert Project Name

SECTION PIPING INSULATION

SECTION THERMAL INSULATION GENERAL THERMAL INSULATION PART RELATED DOCUMENTS

HVAC Piping Insulation- FIBERGLAS Insulation

ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1

Mechanical Insulation for Refrigeration Systems

PRODUCT SELECTION GUIDE

GOWANDA, NEW YORK SEPTEMBER 18, 2008 ARCH PROJECT NO

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING

A. Source Limitations: Obtain each type of building insulation through one source.

*************************************************************************************************************

Recommended Installation and Repair Guide

SECTION PLUMBING INSULATION

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER

SECTION HVAC INSULATION PART 1 - GENERAL 1.1 SUMMARY. A. Section Includes: 1. Insulation Materials: a. Mineral fiber.

Redi-Klad 1000 Pipe Insulation

GUIDE SPECIFICATION: DUCT LINER

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION HVAC DUCTS AND CASINGS

Questar ThermWise Duct Technical Specifications

FOAMGLAS INSULATION SPECIFICATION

Sample Specification

Tube Insulation. Fiber Free

This Product MasterSpec Section is licensed by ARCOM to Polyguard Products, Inc. ("Licensee").

Tel: Fax:

PIPEWORK INSULATION. 14/ Page 1 of 10 Pipework Insulation Rev D

Techna-Duc. Advantages. Features and Benefits. LEED Eligible Product

Pipe & Equipment Insulations Product Selection Guide

SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

FIBER GLASS INSULATION. Thermal. Acoustical. Fire Resistant. Moisture Control. Recycled Content. Formaldehyde-free. Air Control FIBER GLASS INSULATION

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003

SECTION HYDRONIC PIPING

Ammonia. Product performance for insulation of ammonia piping

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction

SECTION MANUFACTURED ROOF EXPANSION JOINTS

EcoTouch Insulation with PureFiber Technology

Roof Replacement. Notes: T-1 (Title Sheet) Roof Key Plan Russell House Student Union 1400 Greene Street Columbia, South Carolina 29208

Chapter 2: Foundation

SECTION PLUMBING PIPING SYSTEMS

HVAC SPECIFICATION DETAIL GUIDE. A guide to specifying ROCKWOOL insulations for HVAC applications

Training Certification Categories

Encapsulated, Sealed & Closed Crawlspace Installation Manual

Pipe Freeze Protection Insulation System Patent Pending US Patent Office Serial Number John Certuse P.E. ISE Engineering Inc.

Crawl Space Moisture Control

QUALITY ASSURANCE MANUAL FOR APPLICATORS OF ELASTOMERIC SHEET LININGS

CONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008

CONTENTS OF THE DECLARATION. The PCR review was conducted by: 333 Pfingsten Road Northbrook, IL 60611

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

SPECIFICATION FOR COLD INSULATION

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

SECTION ACOUSTICAL PANEL CEILINGS

Radon Vent Pipe System. Labeling Performance Indicators

ACOUSTICAL DUCT & PIPE LAGGING INDUSTRIAL NOISE CONTROL PRODUCTS

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

Insulation Board. Knauf Data Sheet PE-DS

FastWrap+ 1 1 /2 Commercial Kitchen Grease Duct Air Ventilation Duct

SECTION GYPSUM BOARD ASSEMBLIES

EC The Effective Detective : Finding Energy Savings at Home

Solving Corrosion Under Insulation Utilizing FOAMGLAS Cellular Glass Insulation Systems

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1

SPECIFICATION DIVISION 7 NUMBER SECTION DESCRIPTION DIVISION 07 THERMAL AND MOISTURE PROTECTION SECTION THROUGH-PENETRATION FIRESTOP SYSTEMS

UFGS (August 2013) UFGS (February 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

HALIFAX HUMANE SOCIETY BOARDING AND GROOMING FACILITY SECTION STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS

Union County Vocational - Technical Schools Scotch Plains, New Jersey

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

DIVISION 11 - EQUIPMENT FOOD SERVICE EQUIPMENT LABORATORY FUME HOODS. A. Design Considerations

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

Smart Vapor Retarders

Knauf Data Sheet PE-DS-2e Insulation Board. with ECOSE Technology

Price Single Duct Terminal Units

PIP INSC1000 Cold Service Insulation Materials and Installation Specification

A. This Section includes acoustical panel ceilings installed with exposed suspension systems.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER

OptiLiner Banded Liner System, Thermal, Metal Building

Metal Roof Panels

Construction. Tricosal Waterstops - Tricomer. Waterstops for joint sealing in watertight concrete construction according to DIN and DIN

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

ACBC Floor Mounted Active Beam

Earthwool 1000 Pipe Insulation

Wall Louvers (10200)

SECTION TURBINE VENTILATORS

Ductslab and Ductwrap

NFPA STANDARDS DEVELOPMENT SITE

MSC Guidelines for Review of Ventilation System Plans

Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017

June 7, 2012 PARTIES INTERESTED IN HVAC DUCT ENCLOSURE ASSEMBLIES

PIP INSA1000 Acoustic Insulation Systems Specification

Cryogenic Pipe Support Systems

CHECKLIST Inspecting a Garage

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Transcription:

230700 HVAC INSULATION PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 232300 Refrigeration B. Section 233100 Air Distribution 1.02 INSULATION A. General Requirements for Flexible Insulation: 1. Use is allowed in lieu of fiberglass on cold piping (roof leaders, chilled water, condensate drains from cooling units). 2. Material must meet ASTM E84 25/50 flame spread/smoke developed index. 3. Use pre-molded roll on pipe sizes 3.5" and below. 4. Use either pre-molded roll or sheet on pipe sizes 4" and above, adhere insulation on 100% of the pipe. This requirement exceeds the typical industry standard of adhering to lower one-third of pipe on horizontal runs. 5. Match thickness of fiberglass insulation on all pipe sizes. For piping requiring 1.5" thick insulation using sheet product, provide 2 layers of 3/4" thick insulation. 6. No exposed cross section edges are permitted. B. Insulation for cold piping shall be complete with a continuous vapor barrier. 1.03 PIPE INSULATION JACKETS A. Jackets for hot piping shall be factory applied, white, all service jackets composed of reinforced kraft paper and a self-sealing, pressure sensitive longitudinal lap seal. B. Jackets for cold piping shall be the same as for hot piping with the addition of a vapor barrier. Seal all butt joints with 4" wide strips of vapor barrier sealed with vapor barrier adhesive. This requirement exceeds the typical industry standard of using 3" wide strips. C. Jacketing in high traffic areas shall be covered with aluminum or PVC. DATE: 1/29/16 DATE: 1/29/16 Page 1 of 5

1.04 FITTINGS, VALVES AND SPECIALTIES A. Insulation shall be specified to be installed throughout the length of equipment and piping, including fittings, valves and specialties. B. Except for removable covers on pumps, Cornell prefers that insulation be permanently installed on piping specialties such as steam PRV stations, strainers and unions. A label shall be provided identifying the location of the pipe specialty. C. When available, insulate fittings with factory pre-molded fittings of the same thickness as adjoining pipe insulation. D. When pre-molded fittings are unavailable, use a hydraulic setting cement paste. E. Clamps and anchors on cold piping shall be insulated. Full taping of pre-molded fittings is required. F. Insulation at pipe strainer flanges shall be arranged for ease of servicing. G. Insulation and vapor barriers shall be properly protected at all hangers and penetrations. H. Insulated valves shall have extended handle stems so all operators or handles are outside of the insulation system. This is particularly true of high pressure steam piping. 1.05 PUMPS A. Chilled water pumps shall be enclosed in a removable, insulated aluminum box that allows access to the pump with no disruption of piping or electrical connections, or with minimum 1-inch thick, flexible elastomeric insulation (25/50 flame spread/smoke developed index). 1.06 DUCT INSULATION A. All duct insulation shall be complete with a factory applied reinforced aluminum foil vapor barrier, suitably anchored and sealed at all points. B. Dedicated outside air system supply ductwork installed in non-conditioned spaces shall be insulated, even if the design temperature difference between the operating temperature and duct plenum is within 15 F. This will allow future operation at lower system discharge air temperatures if needed to provide additional zone humidity control. DATE: 1/29/16 DATE: 1/29/16 Page 2 of 5

1.07 EQUIPMENT INSULATION A. Insulate equipment to match adjoining piping insulation. PART 2: PRODUCTS 2.01 PREFERRED MANUFACTURERS: A. Insulation 1. CertainTeed 2. Johns Manville 3. Knauf 4. Manson 5. Owens Corning B. Flexible 1. Aeroflex 2. Armacell LLC 3. RBX Corporation PART 3: EXECUTION 3.01 INSTALLATION SCHEDULE A. In addition to the piping system, Cornell requires the consultant to ensure insulation is designed and subsequently installed on the following specialty devices and equipment; which typically exceeds the requirements found in industry master specification documents: 1. Piping specialties, such as valves, flanges, unions and temperature/pressure test ports 2. Strainers, including the whole body and blowdown valve. 3. Steam PRV stations 4. Heads/bodies on steam to hot water converters and water to water heat exchangers. 5. Steam traps 6. Control valves, including actuators and gear boxes 7. Low point drain valves 8. Pumps 9. Expansion/compression tanks 10. Air separators DATE: 1/29/16 DATE: 1/29/16 Page 3 of 5

3.02 PIPING INSULATION SCHEDULE Interior Service Operating Pipe Size Insulation Type Above Ground Temperature Thickness Steam & Below 1" 4.5" >350 F Condensate 1" & Above 5" Below 1" 3" Steam & 251-350 F Condensate 1" to 1-1/4" 4" 1-1/2" & Above 4.5" Steam & Condensate Below 4" 2.5" 201-250 F Hydronic Heating 4" & Above 3" Hydronic Heating 105-200 F Below 1-1/2" 1.5" 1-1/2" & Above 2" Chilled Water < 60 F Below 2" 1" 2" & Above 1.5" Domestic Water 6" & Below 1" N/A Hot & Cold Above 6" 1.5" Roof Drain & Horizontal Storm Cooling Coil Condensate Drain Emergency Generator Exhaust N/A All Sizes 1" N/A All Sizes 1" N/A All Sizes 4" Calcium Silicate Refrigeration See Cornell Standard Section 232300 Exterior Service Operating Pipe Size Insulation Type Above Ground Temperature Thickness Chilled Water < 60 F All Sizes 3" Hydronic Heating 105-200 F All Sizes 4" DATE: 1/29/16 DATE: 1/29/16 Page 4 of 5

3.03 DUCT INSULATION SCHEDULE Interior Service Operating Density Minimum Type Above Ground Temperature (pcf) R-Value Interior Supply & Return, Exposed > 15 F from ambient 3.0 6, Rigid Interior Supply & Return, Concealed > 15 F from ambient 0.75 6, Blanket Interior Dedicated Outside All 0.75 6, Blanket Air Supply, Concealed Interior Outside Air Intakes All 6.0 8, Rigid Exterior Ducts All 6.0 8, Rigid DATE: 1/29/16 DATE: 1/29/16 Page 5 of 5