Integrated Water Resources Management and Medway

Similar documents
Stormwater Management Plan (SWMP)

STORMWATER MANAGEMENT PROGRAM. Pottawatomie County, Kansas Stormwater Management Program

Storm Water Management Plan (SWMP)

Sewerage & Water Board of New Orleans

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

Appendix C. BMPS, Measurable Goals, and Implementation Schedule

PROGRAM EFFECTIVENESS ASSESSMENT PLAN Storm Water Management Plan

Warren County MS4 Stormwater Management Program Plan

Storm Water Annual Report

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

City of Saint Paul s STORMWATER MANAGEMENT PROGRAM

State College March 6, 2017

What is a stormwater utility fee?

FOR PHASE I PROPERTIES

City of Elko STORMWATER MANAGEMENT PROGRAM

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison

MNDOT. MnDOT Metro District 2017 MS4 SWPPP

STORMWATER MANAGEMENT PROGRAM. Table of Contents

TOWN OF AMHERST, NY STORMWATER MANAGEMENT PLAN. October 2016

STORMWATER POLLUTION PREVENTION PLAN

City of Vancouver March 2017 DRAFT

MS4 NPDES PERMITS FREQUENTLY ASKED QUESTIONS (FAQ) 1

STORM WATER MANAGEMENT PROGRAM. City of Jacksonville, Alabama Phase II Small MS4 NPDES General Permit ALR040004

Prepared By: Wengell, McDonnell & Costello, Inc. Consulting Engineers Newington, CT Tel. (860)

National Pollutant Discharge Elimination System (NPDES) Phase II Permit

MS4 Annual Facility Inspection Report

PA Municipal Separate Storm Sewer System (MS4) TMDL Plan

STORMWATER MANAGEMENT PROGRAM

DRAFT Stormwater Management Program

Enclosures: NPDES Phase II Small MS4 General Permit Annual Report Year 11

Angelo State University. Stormwater Management Program. TPDES No. TXR040000

8.1 Regulatory Requirements

STORMWATER MANAGEMENT PLAN

MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS

Storm Water Pollution Prevention Program (SWPPP)

The Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017

Stormwater Management Plan. City of Norwich Norwich, Connecticut. July Prepared by: 146 Hartford Road Manchester, CT

S.O.P. No. HMD

2017 Update Stormwater Management Program (SWMP)

Stormwater Management Program for the City of Newark, Ohio

The Village of Wellington NPDES Guidance/Reference Document

PARK CITY STORMWATER MANAGEMENT PROGRAM

Illinois Environmental Protection Agency Annual Facility Inspection Report for General Permit for Discharges from Small MS4s

TOWN OF MANCHESTER CONNECTICUT

Stormwater Management Plan

City of Spanish Fort, Alabama Stormwater Management Plan For Phase II MS4

Stormwater Management Plan (SWMP)

Preparing for a Stormwater Comprehensive Compliance Investigation (CCI) Part I. Presented by: Jack Higginbotham

GUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT

9. Evaluation Mechanisms

Polluted Runoff and Land Conservation: What s the Connection?

EL PASO COUNTY TEXAS POLLUTANT DISCHARGE ELIMINATION SYSTEM (TPDES) MANAGEMENT PROGRAM. Section I Overview 1. Storm Water Rule Overview.

Public Education and Outreach and Public Participation/Involvement

Engineering Department

REQUEST FOR COUNCIL ACTION

Andrea Sullivan Orange County Department of Education Joanne Branch San Diego County Office of Education David Miranda Tustin Unified School District

REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017

Illinois Environmental Protection Agency

Illinois EPA update to DuPage County Watershed Management Section Bureau of Water

Stormwater Management Program (SWMP) Plan

Presented by Henry L. Barbaro Stormwater Management Unit Supervisor MassDOT Highway Division

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018

Newton s Evolving Stormwater Utility

Sacramento Stormwater Quality Partnership Mercury Programs

*MS4 permittee name: City of Lake Elmo *County: Washington (city, county, municipality, government agency or other entity)

City of Camas STORMWATER MANAGEMENT PROGRAM (SWMP) As required by the: Western Washington Phase II Municipal Stormwater Permit for MS4

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

Chesapeake Bay Action Plan

NPDES Phase II Permit

NPDES PHASE II - STORMWATER MANAGEMENT PLAN

Storm Water Pollution Prevention Plan. Wastewater Treatment Facility and Streets & Parks Facility. Village of Fox River Grove, Illinois

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD

Pollution Reduction Plan For Municipal Separate Storm Sewer System

Phase II MS4 CITY OF DOVER Permit No. DE

Attachment 10: Updated Nitrogen TMDL Methodology

SMALL MS4 ANNUAL REPORT FORM

STORM WATER MANAGEMENT PLAN

J. Sargeant Reynolds Community College. Chesapeake Bay TMDL Action Plan

DRAFT STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH

SURFACE WATER UTILITY FEE

CITY OF CLEVELAND DIVISION OF WATER POLLUTION CONTROL USEPA PHASE II

Web Forum 3: Stormwater Program Organizational Structure Questions and Answers March 17, :00 am 12:30 pm (EST)

Reissued MRP: How is it the same and how is it different

7.1 Background. Define success; Guide the implementation and evaluation of programs; and

Patrick Bradley LimnoTech MWEA Government Affairs Committee NPDES Compliance Seminar December 2, 2009 Bath, MI

Pennsylvania Stormwater Best Management Practices Manual DRAFT - JANUARY Section 1 Introduction and Purpose of Stormwater BMP Manual

University of Virginia - MS4 Program Plan - VAR Minimum Control Measure No. 1: Public Education and Outreach on Storm Water Impacts

Pennsylvania s Phase III Watershed Implementation Plan

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

Phase II MS4 Annual Report Transmittal for Fort Bend County Municipal Utility District No TPDES Permit Number: TXR040319

Stormwater Management Program Plan (SWMPP) NPDES Permit ALR Revised May 31, Prepared By:

The Regulatory Framework

North Dakota s Nutrient Reduction Strategy. Presented to the 2016 ND Water Quality Monitoring Conference March 4, 2016

STORMWATER MANAGEMENT POLICY

Transcription:

Integrated Water Resources Management and Medway Kirsten Ryan & Betsy Frederick, Kleinfelder, Cambridge MA Board of Selectmen / Conservation / Water Planning, August 15, 2016

Integrated Water Resources Management Agenda 1. What is Integrated Planning? Why Integrated Planning? 2. Medway s Water Resources Challenges A. Drinking Water B. Wastewater C. Stormwater 3. Medway s Integrated Plan 4. MS4 Program & IWRMP 5. Timeline & Tasks 6. Next Steps

Why Integrated Water Resources Planning? Water resources and infrastructure are all interconnected!

Why Integrated Water Resources Planning? Water Management Act; Safe Drinking Water Act Clean Water Act; Wetlands Protection Wastewater Regulations Water resources and infrastructure regulations overlap!

Why Integrated Water Resources Planning? Pressure on aging infrastructure Pressure on available land Competition for limited resources

What is Integrated Water Resources Planning? evaluates alternative means for addressing current and future wastewater, drinking water, and stormwater needs and identifies the most economical and environmentally appropriate means of meeting those needs - MassDEP Community Public Health Affordability Environment Sustainability Regulatory Compliance

What is Integrated Water Resources Planning? What Resources exist? Drinking Water What condition are they in? What requirements must be met? Surface Water / Stormwater Wastewater What are the needs & priorities of the community? How can they be balanced and sequenced? What is our short & long term plan?

Integrated Water Resources Planning Process DOCUMENT Existing conditions ASSESS Needs EVALUATE Alternatives IMPLEMENT Plan PRIORITIZE Solutions Public Involvement

Integrated Water Resources Planning in MA Who is doing it? Brewster Canton Easthampton Springfield Truro Medway Others..

Benefits of Integrated Water Resources Planning Needs identified Solutions prioritized Increased access to funding sources Regulatory leverage DEP EPA Proactive vs reactive Most cost effective and beneficial projects come first

Medway s Water Resources Challenges

Medway s Water Resources Challenges: Drinking Water Quantity Lack of well supply capacity Lack of well redundancy Aging water mains Demands increasing New regulatory constraints / requirements (WMA 2014) Offsets will be required to seek higher permit limit Quality High iron and manganese in several wells Treatment Facility needed Challenges are increasing..

Medway s Water Resources Challenges: Waste Water Physical Limitations Challenges are increasing.. High groundwater, extensive wetlands Poorly drained soils Septic systems failing in unsewered areas Close to CRPCD permit limit CRPCD Disposal costs increasing Increasing development pressure on permit limits & land Sewer moratorium New wastewater regulations

Medway s Water Resources Challenges: Stormwater Challenges are increasing.. MS4: Large annual cost increases (1.5-2x) Funding for stormwater management not dedicated Condition unknown for majority of stormwater infrastructure More frequent large storms cause flooding Charles River Phosphorus TMDL requirements Phosphorus Control Plan 30% reduction in P Discharges 3 Phases over 20 Years Future Costs Yr 6-20 may exceed ~$15M Development pressure or other Town needs may consume land needed for future BMPs

Medway IWRMP History & Regulatory Changes 2009 Medway Town Master Plan #1 Concern: Water Quality and Quantity 2010 IWRMP planning meetings begin Discussions with DEP, State Reps, local officials EPA issues Draft MS4 Permit 2011 $500,000 SRF Loan application submitted for IWRMP Prepared by KLF on Medway s behalf 2012 SRF Loan Awarded; IWRMP Scope Approved by DEP Kleinfelder begins work on Phase I. Focus on 2003 MS4 Stormwater compliance tasks

Medway IWRMP History & Regulatory Changes 2013 IWRMP Phase I in progress SWMI Grant study - evaluates Water Management Permit options WMA regs in preparation New Mn health advisory for water 2014 January: IWRMP phase I completed EPA issues new Draft MS4 Permit DEP issues new WMA and Sewer regs 2015 IWRMP on hold pending final MS4 Permit SWMI Grant water loss study 2016 April: EPA issues Final MS4 Permit Effective date 7/1/17 June: KLF completes Grant funded Stormwater Funding study

IWRMP Phase I Tasks Citizens Advisory Task Force Stormwater Educational Outreach Materials GIS Outfall Compilation & Stormwater Map Priority Outfall Inspection & GPS Location Illicit Discharge Detection & Elimination Plan Municipal Good Housekeeping Manual

IWRMP Phase II Tasks Wastewater / Water / Stormwater Identify areas of convergence / incompatibility (e.g. SWMI offsets, Stormwater infiltration BMPs, wastewater decentralized discharge opportunities or possible well sites) Outcome: Integrated Plan with Prioritized Projects

IWRMP & MS4 Go to Chart of IWRMP tasks; interrelationship with MS4 Year 1-2 Tasks and compliance milestones

MCWRS Proposed MS4 Appeal Narrow legal appeal specific to the definition of Maximum Extent Practicable and whether imposition of conditions to meet water quality standards goes beyond that definition Even if appeal were to be upheld, would not impact the MEP portions of the permit (the 6 MCMs) First 5 years of this permit term address planning rather than capital projects

Recommended Next Steps FY17 Review MS4 annual costs Years 1-5 Evaluate / decide on MS4 funding sources Issue Stormwater Fact Sheet(s); decide on additional outreach Evaluate necessary changes to ordinances; rules & regs Proceed with IWRMP Phase II tasks Complete MS4 NOI by Q4FY17 Due 9/29/17 Funded Task under IWRMP Begin SWMP in FY17 ID priorities ahead of FY18 funding cycle Funded Task under IWRMP

IWRMP Phase II Benefits of Proceeding in FY17 Maintain momentum & public engagement Proceeding holistically provides efficiency Proactive vs. Reactive Planning Outcome: Medway well-positioned to achieve regulatory compliance and balance growth with environmental / fiscal sustainability.

Questions / Discussion

Revision Date: 8-15-16 Tasks and Timeline: Integrated Water Resources Management Plan (IWRMP) and MS4 Year 1 & 2 MS4-YR 1 MS4-YR 2 FY17 FY17 FY17 FY17 FY18 FY18 FY18 FY18 FY19 FY19 FY19 FY19 PROGRAM & TASK COSTS % Complete Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 NOTES IWRMP Cost to Complete 17% Cost =Contract Limit minus Phase I work completed. Existing / Future Conditions DRINKING WATER 90% WASTEWATER 0% STORMWATER 30% SWMP NOI NOI and SWMP are subtasks included in IWRMP Scope. Task supports development of Ph I MS4 PCP Needs Assessment $ 413,900 DW / WW / STORM 0% Task supports development of Phase I MS4 PCP Evaluation of Alternatives DW / WW / STORM 0% Task supports development of Phase I MS4 PCP Plan Development DW / WW / STORM 0% Task Force; Public Meetings DW / WW / STORM 50% NPDES MS4 Total Cost YR 1+2 Permit Requirement NOI $ 6,600 Prepare and Submit NOI 0% IWRMP by 9/27 Propose to complete 1 qtr ahead of deadline. Included in IWRMP SWMP $ 27,400 Develop Stormwater Mgmt Plan 0% IWRMP BY 6/30 Propose to complete ahead of deadline during IWRMP development Public Education & Outreach $ 20,600 Develop and Implement Public Education Program 20% Minimum 2 messages to each of 4 Audiences over 5 years; at least 1 year apart Some materials previously created; can be modified. TMDL IDDE Construction Runoff Management New/Redevelopment/Post-Construction Municipal Good Housekeeping $ ~$250k - IWRMP tasks = ~$85k 157,600 $ 26,700 $ 24,600 $ 341,500 Phase 1 Phosphorus Control Plan (PCP) 0% SSO Inventory 0% Outfall Inventory, Ranking 75% System Mapping 25% IDDE Plan 75% Outfall Inspections 60% Catchment Investigations 0% Staff Trainings 0% Ordinance Development 0% Site Inspections and Ordinance Enforcement 0% Update Ordinance 0% Street Design and Parking; Green Infrastructure Assessments 0% Municipal BMP Assessment 0% Muni Manual; Trainings 75% Catch Basin Cleaning Procedures 0% Street Sweeping 0% Muni BMP Inspections; Maint 0% SWPPPs 0% Program Evaluation, Records / Reporting $14,000 (Year 1) Annual Reporting 0% update ranking Update 60% complete annually 2008 requirement; update if needed Written inspection procedures Annual program evaluation and reporting Due Year 5. For efficiency propose completing most tasks by end of Year 2 as IWRM tasks support PCP development Update Annually Phase I due Revise Screening Procedures Revise Written Procedure annually Written inspection procedures Update per Permit requirements Completed; update as necessary Implement optimized procedures Implement increased sweeping targeted areas Implement SWPPP for DPS Garage Annual program evaluation and reporting BOS express desire to complete PH1 PCP by end Year 2. Subtasks of the IWRMP will partially support effort Revision date: 8-15-16 Year in which must be completed Progress has been made via IWRM Phase I