SPECIFICATIONS - DETAILED PROVISIONS Section Horizontal Centrifugal Water Pumps C O N T E N T S

Similar documents
SUGGESTED SPECIFICATIONS Pump Frames through 64132

SECTION PACKAGE BOOSTER PUMP STATIONS

W ARR A NTY FAIRBANKS NIJHUIS 1600 SERIES SINGLE STAGE END SUCTION PUMPS. Certified to NSF/ANSI 372.

SINGLE STAGE END SUCTION PUMPS AURORA Series. Distributed By: Model 3804

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

PUMPS FOR INDUSTRY. The Vertical Pump Specialists CONTENTS: Introduction & User List. Product Overview. Vertical Process Pumps...

SUGGESTED SPECIFICATIONS

Engineering Data Pack HD Industrial Duty Pumps

SECTION SLUICE GATES

griswold EF&G Heavy Duty end suction

SECTION TAPPING SLEEVES AND VALVES

Series Sump and Sewage Systems

LIQUID-SPECIFIC PRODUCT LINE: ABRASIVE LIQUID PUMPS SERIES DESCRIPTION OPERATING RANGE: IMPROVEMENTS NOMINAL FLOW RATES:

SERVICE LINES, METERS AND APPURTENANCES

TECHNICAL HANDBOOK. ASME B73.1 Process Pump. Wilfley Sealing Technology. No Flush Water Required

SK75/100. Performance Data TOTAL HEAD IN FEET HEAD-METERS 6 SK100 SK Liters/Second Capacity-U.S. G.P.M.

SECTION MOTORS AND PUMPS FOR PLUMBING SYSTEMS

HUP. Performance Data. Wholesale Products Page: Section: Performance Data Dated: January RPM: 1550 Discharge: 1" Solids: 1/8" GPM: TDH:

In-line Twin Pump. Type Series Booklet. Omega DSL

SECTION ALUMINUM GATES

Gr i s w o l d. Ren e w a b l e Br o n z e. The renewable bronze shaft sleeve insulates the shaft from abrasion and contact with pumped liquids.

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION COOLING TOWER

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

Pump Company. Simsite Structural Composite Pumps. The only Pump that is Impervious to Salt Water Corrosion. Since 1919 VERTICAL PIT

SECTION SLUDGE HOLDING TANK DECANTER PUMP

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

Vertical Turbine Pumps

VERTICAL TURBINE PUMPS

12.1 MUELLER TAPPING MATERIALS AND SPECIALTY VALVES. MUELLER Tapping Sleeves and Crosses. MUELLER Tapping Valves. MUELLER Stainless Steel Tapping

UL / FM D-1 FIRE PROTECTION PRODUCTS TAPPING VALVE. MUELLER Tapping Sleeves and Crosses. MUELLER Tapping Valves

Available End Connections & Size Range

Direct contact and metal-to-metal seating make the T-pattern globe stop valve ideal for most shut-off applications.

Weir Specialty Pumps. WEMCO Torque-Flow

SECTION ROLLER GATES

4 1 /2 MARK 73-5 AMERICAN FLOW CONTROL. It s What We Know. AMERICAN-DARLING FIRE HYDRANT AMERICAN-DARLING 4 1 /2 MARK 73-5 FIRE HYDRANT

Customer-specific pump engineering

D-1 FIRE PROTECTION PRODUCTS TAPPING VALVE. MUELLER Tapping Valves. MUELLER Tapping Sleeves and Crosses. MUELLER Stainless Steel Tapping Sleeves

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL

SPECIFICATIONS - DETAILED PROVISIONS Section Welded Steel Tanks for Water Storage C O N T E N T S

ISO process pump with i-alert Patented Intelligent Monitoring

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER

Cutting-Edge Pumping Solutions for the Concentrated Solar Power Generation

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

ERPN Overhung, End-Suction Process Pump ISO 13709/API 610 (OH2)

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

Diffused Aeration Piping Equipment

TECHNICAL INFORMATION Bulletin

The following document can be provided to an Engineer, Contractor, or Owner to allow them to

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

Series 5500 Bellows Pump Connectors Catalog 474E

SPECIFICATION: CAST IRON SLUICE GATES

B. System Design and Performance Requirements

Introduction. Ultra Reliable

ARTICLE 29 SANITARY SEWER FORCE MAINS

Berliss Companies 644 Route 10 P.O. Box 45 Livingston, NJ Phone: (973) Fax: (973)

FLUID FLOW - PUMPS. Discharge Section. Section. Two main types of pumps: Positive Displacement pumps Centrifugal pumps.

TKL Titan Slurry. Heavy-Duty, Dual Case Lined Pump. Bulletin PS-10-8c (E)

Module 9 : Sewage And Storm water Pumping Stations. Lecture 11 : Sewage And Storm water Pumping Stations

SECTION WATER DISTRIBUTION

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

HYDROMATIC W/D/V-A1 SUBMERSIBLE SUMP/EFFLUENT

- CONSTRUCTIONS 300 SECTIONAL VIEW 300 SECTIONAL TABLE 301 QUANTITY FOR MODEL 302 MECHANICAL SEAL 303 BEARINGS 304

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT

2000-SG STAINLESS STEEL SLIDE GATES

- CONSTRUCTIONS 300 SECTIONAL VIEW DRAWING 300 SECTIONAL VIEW TABLE 301 QUANTITY FOR MODEL 302 MECHANICAL SEAL and BEARINGS 303

Pioneer Forced Draft Cooling Tower Specifications

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

FAIRBANKS NIJHUIS SUBMERSIBLE SOLIDS HANDLING PUMPS.

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

1. Cast-in-place concrete is specified in Section

Product Range Non-Metallic Pumps

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

jung-process-systems.de Hygienic gentle economical

PVXM API 610 / ISO (OH3)

SECTION TURBINE VENTILATORS

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

Series 1100 Mechanical Joint Restraint for Ductile Iron Pipe

NAVSEA STANDARD ITEM. 2.1 S9086-RJ-STM-010/CH-504, Pressure, Temperature and Other Mechanical and Electromechanical Measuring Instruments

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

Experience In Motion MPT. Self-Priming, Solids-Handling Pump

Aftermarket Technical Service Solutions for Pumping Technologies

DRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing).

VALVE PRODUCT OVERVIEW

ROWA-HP. High-Pressure Centrifugal Pump

Model EVMS Vertical Multistage Pumps for the Global Market

SECTION PLUMBING PIPING SYSTEMS

Transcription:

SPECIFICATIONS - DETAILED PROVISIONS Section 11931 - Horizontal Centrifugal Water Pumps C O N T E N T S PART 1 - GENERAL... 1 1.01 PUMP - GENERAL... 1 1.02 CERTIFIED PUMP CURVES... 1 1.03 NPSH REQUIREMENTS... 1 1.04 PUMPING UNIT FABRICATION DRAWINGS... 1 PART 2 - PRODUCTS... 2 2.01 PUMP CASE... 2 2.02 IMPELLER... 2 2.03 WEARING RINGS... 2 2.04 STUFFING BOXES... 3 2.05 SHAFT... 3 2.06 SHAFT SLEEVES... 3 2.07 SHAFT COUPLING... 4 2.08 BEARINGS... 4 2.09 MISCELLANEOUS FITTINGS... 4 PART 3 - EXECUTION... 4 3.01 EQUIPMENT TESTING... 4 3.02 INSTALLATION... 5 3.03 FIELD ACCEPTANCE TEST... 5 3.04 CERTIFICATION OF INSTALLATION... 5 3.05 WARRANTY... 6 3.06 MAINTENANCE BOND FOR PUMPING EQUIPMENT... 6 ATTACHMENT MANUFACTURER S CERTIFICATE OF PROPER INSTALLATION Rev: 10/05/07

Section 11931 1 SECTION 11931 HORIZONTAL CENTRIFUGAL WATER PUMPS PART 1 - GENERAL 1.01 PUMP - GENERAL The pump shall be a single-stage, horizontal extended shaft, horizontally split case, double suction type centrifugal pump. Pump shall be Goulds Model 3405, Peerless Type A, or approved equal. Pumps for electric motor drivers shall have no mounting bedplate, but shall be furnished complete with shaft coupling and safety guard. 1.02 CERTIFIED PUMP CURVES The Contractor shall submit certified pump curves, for approval by the Engineer, for each different pumping unit to be furnished herein, showing head versus capacity, bowl efficiency versus capacity, NPSHR versus capacity, and BHP versus capacity; each curve shall be continuous over the full operating range from zero (0) flow up to the maximum flow permissible through each pump, and each curve shall be based upon the maximum RPM listed. Each curve shall state the RPM speed of the pumping unit, and shall be furnished full-size on 8 1/2" x 11" paper. The Contractor shall provide pumps capable of meeting all aspects of the Pumping Unit Design Data specified in the Special Conditions Section (SC-1) of this Specification, and as shown on the Drawings. 1.03 NPSH REQUIREMENTS The pumping equipment to be furnished shall be designed and shall operate in accordance with the available Net Positive Suction Head (N.P.S.H.A.) listed in the Special Conditions Section of this Specification. 1.04 PUMPING UNIT FABRICATION DRAWINGS Before the order is place for the pumping units and appurtenances, the Contractor shall submit to the Engineer for acceptance, detailed fabrication drawings of said pumping unit material. The Engineer shall give an early acceptance or correction of the submittals.

Section 11931 2 PART 2 - PRODUCTS 2.01 PUMP CASE The case shall be of close grained, gray cast iron, free from blow holes, sand pockets, and other detrimental defects, and shall be horizontally split and so arranged that the top half of said case can be removed without disturbing the rotating element of the suction and discharge piping. The suction and discharge nozzles shall extend horizontally and shall be on opposite sides in the lower half casing. The water passageways in said case shall be smooth so as to allow freedom from cavitation and permit maximum efficiency. The internally wetted portions of the pump casing shall be fusion-bonded epoxy coated in accordance with AWWA Standard C-213. The pump is to be sized such that inlet velocity shall not exceed 14 feet per second. Said case shall be equipped with suitable lifting lugs or eyebolts and shall be drilled and tapped for vent, priming, drain, and gage connections. The suction and discharge flanges shall be American Standard, drilled and faced. Said case shall be hydrostatically tested at 250 psi, 1.5 times the shut-off discharge pressure, or at a pressure prescribed by the Engineer, whichever is highest. 2.02 IMPELLER The impeller shall be of high grade bronze and shall be of the double suction type, cast in one piece, with vanes formed by accurately placed cores, and with surfaces suitably hand finished for maximum efficiency in accordance with modern practice. Said impeller shall be effectively balanced with approved hydraulic balancing devices so that end thrust on the pump bearings is minimal. Said impeller shall also be accurately keyed to the shaft and individually fixed in an axial position by shaft sleeve nuts, or other positive positioning devices and shall be held tightly to the shaft in such a manner that the said impeller will not become loose should the pump rotate in reverse direction. Suitable thrust collars, or other devices, shall be provided to carry any unbalanced thrust the pump or driver might develop, and to insure proper positioning of the impeller in the case. 2.03 WEARING RINGS Renewable bronze wearing rings shall be provided on the casing only. Said rings shall form a single step-type passageway. Rings shall fit with clearances so as to permit only a minimum of recirculation. The table below lists nominal clearances for various sizes of pumps. Tolerances shall be 0.002 inch.

Section 11931 3 Table of Wear Ring Clearances Size of Pump (Discharge Outlet Diameter-inches) Nominal Wear Ring Clearance (inches) 4 0.012 5 0.014 6 0.016 8 0.018 10 0.020 12 & 14 0.022 16 0.024 18 0.026 A positive means shall be provided so that the said wearing rings will not rotate, or change position with respect to their support. 2.04 STUFFING BOXES The stuffing boxes shall be large and deep and shall hold a minimum of five (5) rows of soft, graphited, braided, non-asbestos packing and a bronze lantern water seal ring. The packing gland shall be horizontally split in two halves so as to facilitate removal for repacking. Gland bolts shall be made of stainless steel with brass nuts. 2.05 SHAFT The shaft shall be made of high grade stainless steel AISI-303 S.S. or better, and shall be turned, ground, and polished to highly accurate dimensions. Said shaft shall be designed with a high safety factor so as to easily withstand the torsional loads and other stresses to which it may be subjected. Said shaft shall be so designed that no detrimental vibrational stresses will occur. The shaft shall be threaded to allow axial adjustment of the impeller by means of threaded sleeves or sleeve nuts. 2.06 SHAFT SLEEVES The shaft shall be protected through the stuffing boxes by means of removable bronze shaft sleeves, threaded to the shaft and secured by set screws.

Section 11931 4 Said sleeves shall be so designed as to prevent leakage between the shaft and said sleeves, and rotation of the shaft within said sleeves. The sleeves shall present a smooth surface to the packing material so that packing pressure may be kept to a minimum. 2.07 SHAFT COUPLING The shaft coupling shall be P. X. Dodge Paraflex or Woods. Flanges shall have no projecting bolts or nuts, and outer surface of the coupling shall be accurately machined and dressed. Coupling shall have a manufacturer's rating in excess of the brake horsepower requirement of the pump,and the recommended operating speed range of the coupling shall include the normal RPM of the pump. 2.08 BEARINGS The bearings shall be of the sleeve or shell type or ball and face type, and shall be so designed as to allow their complete removal with the removal of the rotating element. Bearings shall be designed for minimum B-10 life of 20,000 hours continuous duty. The outboard bearing shall be angular-contact ball thrust type, and the inboard bearings shall be a single-row radial type ball bearing. Bearings shall be grease lubricated and shall be designed to operate for extended periods of use without adding extra lubrication. 2.09 MISCELLANEOUS FITTINGS Drain connections shall be provided at all low points in the pump volutes, as well as at the drip pockets underneath the stuffing boxes and all other points where drainage should be possible. The volutes shall be provided with air vents so that the pump can be freed from air pockets. Stuffing boxes shall be provided with in and out connections, and all other miscellaneous items as required shall be provided. At least two (2) jack screws shall be provided on opposite ends of the upper casing to facilitate upper casing separation. Packing lubrication water shall be plumbed from discharge piping beyond the downstream check valve to the stuffing box fittings of the upper casing. PART 3 - EXECUTION 3.01 EQUIPMENT TESTING The purpose of equipment testing is to demonstrate that the pump units meet the specified requirements.

Section 11931 5 A. Tests shall be performed on the actual assembled unit over the entire operating range on the certified performance curve. Prototype model tests will not be acceptable. B. All pumps 10 to 50 horsepower shall be factory-tested in accordance with the above specifications. Pumps larger than 50 horsepower may be subject to a "factory witness test" attended by a District representative. The District shall be notified at least 2 weeks in advance such that a representative can witness the pump testing. Certified test results shall be submitted to the Engineer for approval prior to shipment. C. Pump curves shall reflect data secured during actual test runs and shall be signed by a responsible representative of the pump manufacture. Test reports and procedures shall conform to applicable requirements of the Hydraulic Institute Standards. 3.02 INSTALLATION The Contractor shall install all pumping equipment in strict accordance with the manufacturer's instructions. Care shall be used in handling to avoid bumping, twisting, dropping, or otherwise damaging the equipment. All pump manufacturers shall furnish the services of factory-trained personnel as required to examine the installation, supervise start-up of equipment installed, and repair the equipment at no additional expense to the District. 3.03 FIELD ACCEPTANCE TEST The contractor under this specification shall have full responsibility for the proper installation and performance of said pumping equipment, including furnishing the services of a pumping equipment Field Service Engineer to inspect equipment installation, and to adjust, if necessary, any portion of the pumping equipment required herein. The manufacturer s Field Service Engineer shall assist the District in the proper conduct of pumping unit field acceptance tests. The pump units shall perform in the field as shown on the certified pump curves furnished by the Contractor. Tests shall also demonstrate operation without cavitation, vibration, overheating of moving parts, and excessive noise. The Contractor and pump manufacturer shall make necessary corrections to achieve smooth pump operation. In the event the tests reveal noncompliance of the workmanship or equipment, the Contractor shall either make alterations as necessary or replace the pumps in order to meet the requirements of the specifications at no additional cost to the District. 3.04 CERTIFICATION OF INSTALLATION The Contractor shall submit the attached Manufacturer s Certificate of Proper Installation to the District confirming that all pumping equipment was inspected, operation checked, and installation approved in writing by the respective pumping equipment representative.

Section 11931 6 3.05 WARRANTY All pumping equipment shall carry an extended warranty for a two year period from the date of acceptance. All warranties shall be turned into the District prior to project completion. 3.06 MAINTENANCE BOND FOR PUMPING EQUIPMENT The contractor or his supplier shall provide a maintenance bond (see EMWD standard form C-14 or C- 14.1) from a bonding company acceptable to the District equal to 100% of the pumping equipment value (including motors, pumps and pump assemblies) for a two (2) year term starting when the District has accepted the contracted work. Equipment and/or components failing within this period due to deficiency in design, workmanship or material shall be removed, replaced, and reinstalled at no cost to the District, and said replacement shall be guaranteed for two years continuous service. The maintenance bond shall be submitted to the District prior to the performance test of the pump(s). END OF SECTION 11931

MANUFACTURER'S CERTIFICATE OF PROPER INSTALLATION OWNER: EQUPT TAG NO: PROJECT NO: EQPT SERIAL NO: EQPT/SYSTEM: SPEC. SECTION: I hereby certify that the above-referenced equipment/system has been: (Check Applicable) Installed in accordance with Manufacturer's recommendations. Inspected, checked, and adjusted. Serviced with proper initial lubricants. Electrical and mechanical connections meet quality and safety standards. All applicable safety equipment has been properly installed. System has been performance tested, and meets or exceeds specified performance requirements. (When complete system of one manufacturer) Comments: I, the undersigned Manufacturer's Representative, hereby certify that I am (i) a duly authorized representative of the manufacturer, (ii) empowered by the manufacturer to inspect, approve, and operate his equipment and (iii) authorized to make recommendations required to assure that the equipment furnished by the manufacturer is complete and operational, except as may be otherwise indicated herein. I further certify that all information contained herein is true and accurate. Date: Manufacturer: By Manufacturer s Authorized Representative: (Authorized Signature) C:\TEMP\MANUCERT.WPD

[PAGE LEFT INTENTIONALLY BLANK]