Max. building height (m)

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

Mixed Landuse Project Madhav Menon University, Sector-17A, Yamuna Expressway, Greater Noida, UP PFR

Water supply components

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED

CONCEPTUAL PLAN FOR 150 SEATS MEDICAL COLLEGE &750 BEDS HOSPITAL PROJECT SAGAR ROAD NEAR BINA-BHOPAL RAILWAY LINE, DIST-VIDISHA, MADHYA PRADESH

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

DESIGNING OF MODULAR RAINWATER HARVESTING SYSTEM & STORM WATER DRAIN INSTALLATION OF LATEST DESIGN & TECHNOLOGY AT BAHRAMPUR GOVT.

ROOF TOP RAIN WATER HARVESTING. Manohar Patil

Rainwater harvesting for Aquifer Storage and Recovery - Case Studies in Goa

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

AQUATEK rainwater harvesting systems can reduce mains water consumption in the average domestic dwelling by up to 50%."

Urban Rainwater Harvesting Systems: Promises and Challenges

Producer Statement. Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2012)

RAINWATER HARVESTING SYSTEMS

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS

Producer Statement. Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2000)

Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi CONCEPTUAL PLAN

ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT

Conceptual Plan Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.

SEWAGE TREATMENT AND DISPOSAL

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications

Municipal Stormwater Ordinances Summary Table

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains

H2. Residential Rural and Coastal Settlement Zone

Hind Energy & Coal Beneficiation (India) Ltd.

Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living

Our Eastern Shore Groundwater Part IV Groundwater Quality on the Eastern Shore: How safe is our groundwater and are there ways we can protect it?

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Quality of Rainwater From Rainwater Harvesting Systems in Sanaa. Nagib Ghaleb N. Mohammed, Civil Engineering Department, University of Bahrain

DESIGN OF SEWER SYSTEMS

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)

What is a stormwater utility fee?

TECHNICAL GUIDANCE DOCUMENT APPENDICES

Quantity of sewage. Dry weather flow: Domestic and industrial wastewater (Base flow) including inflow, infiltration and exfiltration

ENVIRONMENTAL MANAGEMENT PLAN

WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES

Tucson Water s Rainwater Harvesting Incentive Workshop Provided as a community service by

H3. Residential Single House Zone

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON

The effects of pollution. What is stormwater runoff? Why is stormwater runoff a problem?


E. STORMWATER MANAGEMENT

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

LEED-2009 Green Building Rating System. New Construction & Major Renovations

RAINWATER HARVESTING AND REDUCING WATER LOGGING PROBLEM BY USING PERMEABLE CONCRETE

Module 2 : System of Sanitation. Lecture 2 : System of Sanitation

0% 3% 5% &»W3. r^oqui)

Design of Sewerage System for Jaffarpur area in Southwest New Delhi

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

The role of domestic rainwater harvesting systems in storm water runoff mitigation

APPLICATION FOR ENVIRONMENTAL CLEARANCE

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

CHAPTER-1 INTRODUCTION

H3 Residential Single House Zone

KALYAN DOMBIVLI MUNICIPAL CORPORATION PRE FEASIBILITY REPORT

The University has numerous athletic fields in its south campus complex. The varsity

Water in New Orleans. Jennifer Roberts. Sewerage & Water Board of New Orleans

D. B. G R A Y E N G I N E E R I N G I N C.

Service Level Benchmarking of

511. S.F.U. NEIGHBOURHOOD DISTRICT (P11) (2) Multiple-family dwellings or groups of multiple-family dwellings.

MODELING AND RELIABILITY OF RAINWATER HARVESTING SYSTEM AT EDUCATIONAL INSTITUTION

Storm Drain Inlet Protection for Construction Sites (1060)

Adaptation planning at different spatial scales

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

RAIN WATER HARVESTING STATE LEVEL NODAL AGENCY TAMIL NADU WATERSHED DEVELOPMENT AGENCY

RAINWATER HARVESTING. Ward Ling- Watershed Coordinator

Watershed Management and Rainwater Harvesting in Vishwaniketan Campus

Look after the land where the whanau stand

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

Project Name: Add a unique name that appropriately identifies the submission

The following is required for a complete permit submittal for each unit.

Empyrean by M/s Hallmark Housing Infra SURVEY NOS. 212 & 239, PUPPALAGUDA, RAJENDRANAGAR MANDAL, RANGA REDDY DISTRICT 1. FORM I 2.

ECO FRIENDLY RESORT FOR TOURISM A CASE STUDY AT ULAGALLA RESORT

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg

SEPARATORS A RANGE OF FUEL/OIL SEPARATORS FOR PEACE OF MIND

Review of State and Federal Stormwater Regulations November 2007

Modelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality

Implementing Stormwater Management through Split-Flow Drainage Design

REGISTRATION EXAMINATION, NOVEMBER 2012 LICENSED DRAINLAYER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

Management of Wastewater in Portsmouth and Havant

Boise City Public Works General Drainage Plan Review Requirements Checklist

RAINWATER HARVESTING SYSTEMS FOR DOMESTIC APPLICATIONS

first flush water diverters water quality first downspout, post/wall mounted and in-ground diverters

MARKET OVERVIEW FOR GREEN BUILDINGS

GreenCo BANGALORE INTERNATIONAL AIRPORT LIMITED, BENGALURU

BLDG. DESCRIPTION 02. CESAR CHAVEZ LIBRARY. Don Gray // Tucker Douglas. Line & Space Architects Laveen, Arizona AIA/COTE Top Ten Green Projects

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Rainwater Harvesting Systems for Domestic Applications

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance

8 Green Building Certification Credits

Transcription:

Details of Project The project proponent wants to develop a Residential complex with all modern amenities at R.S./L.R. Dag No - (442,447,453,454, 443,444), J.LNo-29 Of Khamar Mouja & R.S./L.R. Dag No-(99(P),101,102(P),103,105,106,107,108,109,110,111,112,113(P),114(P),115,125,126, 127,128, 141, 142, 143,144,185,186,187,188, 85(P), 680,686, 687,688, 689), J.L.No-44 Of Bishnupur Mouja,Under Rajarhat, P.S - Rajarhat, Dist- North 24 Parganas, West Bengal. The project site is a flat land of Land Area = 61364.47 sqm There will be construction of a Residential complex with 289407.06 sqm total built up area. Total Land Area 61364.47 sqm Total Built Up Area 289407.06 sqm Ground Coverage 23799.57 sqm (38.78%) Total Green Area 12956.07 sqm (21.11%) Exclusive Tree Plantation Area 12465.87 sqm (20.31%) Total Paved Area 9326.49 sqm (15.20%) Service Area (beyond basement) 2771.34 sqm (4.52%) Future Provision Area 5017.16 sqm (8.18%) Basement 7493.84 sqm (12.21%) No. of Block & Storey No. of Dwelling units Source of Water Total Quantum of Water required Quantity of Wastewater Generation Quantity of treated wastewater recycled Total Residential Blocks 10 nos. Residential building Block 1A, 1B, 1C, 1D, 1E,1F - (G+18), Block 2A, 2B, 2C, 2D - (2B+G+22) Sports Club Block G+3 Entertainment Club Block G+3 2692 nos. Underground source 2235 KLD 1692 KLD 844 KLD Quantity of treated wastewater Discharge 848 KLD Quantum of Fresh Water required Quantity of Solid Waste Generation Constructional Phase Water Demand Total Population During Construction 1391 KLD 7915 kg/day 193 kld (Construction work 29 kld, Workers 164 kld) 2340 persons Total Population During Operation 19596 persons (permanent - 14200, temporary- 5396) Electricity Load Electricity Supplied By D.G.Sets Fuel (diesel) Required for D.G.Sets Stack Height for D.G.Sets Car Parking provided No. of trees provided 9970 KVA WBSEDCL 2 x 2000 KVA, 3 x 1500 KVA & 1 x 1470 KVA DG sets 1595 litre/hr. 8.9 m stack for each 2000 KVA DG set, 7.7 meter stack for each 1500 KVA DG set & 7.7 m stack for each 1470 KVA DG set 2309 nos. 860 Nos. Page 1 of 8

Project Cost Height of the building 434 crores 60 mt. (max) Water Supply, Wastewater Generation, Recycling and Discharge Daily water demand of the proposed project during operation phase will be 2235 kld. Out of the total water demand 1391 kld will be the fresh water demand and rest 844 kld (Landscaping - 112 kld; Car Washing 93 kld, Flushing 639 kld) will be recycled from treated wastewater. The total wastewater generated from this project during operational phase is around 1692 kld. The wastewater will be collected through a well designed sewer network leading to STP. The STP will be based on FAB technology followed by tertiary treatment (PSF Pressure Sand Filter, ACF- Activated Carbon Filter and Disinfection by UV Radiation). Treated wastewater discharge to Panchayat drain - 848 kld. The fresh water will be abstracted from underground source. Total popu. Lpcd Total litre/day kld Residential 14200 135 1917000 1917 Service Persons 40 45 1800 2 Floating Population 5356 15 80340 81 Sub Total 1 2000 Landscaping 112 Car washing 93 Losses 20 Swimming Pool 10 Sub Total 2 235 TOTAL WATER REQUIREMENT 2235 Total Wastewater Generation 1692 Total Wastewater discharge 848 Total Recycling 844 Landscaping 112 Flushing 639 Car washing 93 Fresh Water Requirement 1391 OCCUPANCY RATE AS PER NBC 2016, PART 9, PAGE 11, SECTION 1,CLAUSE 4.1 Page 2 of 8

WATER BALANCE DIAGRAM FRESH INPUT 1391 kld Flats 1917 kld (Fresh water 1278 kld, flushing 639 kld) Service Persons 2 kld Floating Population 81 kld Swimming Pool 10 kld Losses 20 kld Flushing 639 kld WASTEWATER GENERATED 1692 kld CAR WASHING 93 kld RECYCLED 93 kld TREATED WASTEWATER GENERATED 1692 kld RECYCLED 639 kld TREATED WASTEWATER DISCHARGE 848 kld RECYCLED 112 kld LANDSCAPING 112 kld Solid Waste Generation and Its Management Garbage will be segregated at source for biodegradable, in-organic recyclables and inorganic inert material during construction (468 kg/day) (2340 persons @ 0.2 kg/day) and operational phase (7915 kg/day). The garbage (solid waste) generated within the project site will be biodegradable, recyclables and inert material in nature. Organic portion (40%) will be treated in-house by installing mechanical composter, In-organic recyclables will be sold to the vendor and in-organic inert material will be disposed off in SLF by Project proponent in association with Rajarhat Bishnupur-II Gram Panchayat, as per the guideline given by SEAC/SEIAA/WBPCB for management of Rajarhat Bishnupur -II Gram Panchayat solid waste. Page 3 of 8

Person Rate Total kg/day kg/day Residential 14200 0.45 6390.00 Service Persons 40 0.10 4.00 Floating population 5356 0.10 535.60 Street Sweeping 19596 0.05 979.80 GRAND TOTAL 7909.40 Say 7915.00 Solid Waste Management proposal for the Project Solid waste to be generated in the project = 7915 kg/day Storage and Segregation of waste Biodegradable solid waste generated will be segregated at site. Biodegradable part will be treated by installing mechanical composter to produce manure. Non biodegradable recycles will be sold to the vendor. The general characteristics of solid waste generated from the complex indicate organic part as 40%, inorganic recyclables as 20% & inorganic inert material as 40%. Volume required for Solid Waste segregation for the entire project @ 200 kg/cum = 39.575 cum Considering Storage depth = 0.5 m Area required for Solid Waste segregation for the entire project = (39.575/0.5) = 79.15 sqm Say total segregation area = 2.0 times of 79.15 sqm = 158.3 sqm Adding additional 20% area for movement, etc. Total area for storage and segregation of waste = 189.96 sqm Organic waste management We will install package plant for converting organic solid waste to compost (technology approved by WBPCB) Organic waste generated = 3166 kg/day Requirement of area for composting (50 kg/day/sqm) = 63.32 sqm Storage area for compost (50%) = 31.66 sqm Adding additional 20% area for pathway etc, Total area requirement for organic waste composting = 63.32 + 31.66 + 20% X (63.32 + 31.66) = 113.976 sqm. Inorganic waste management The inorganic recyclable waste generated = 20% of 7915 kg/day =1583 kg/day The recyclable waste will be disposed off in regular manner. Page 4 of 8

Secured Landfilling The non-recyclable inorganic (inert material) and rejects from compost unit will be transported for disposal in secured land filling site which will be operated and maintained Rajarhat Bishnupur -II Gram Panchayat in association with project authorities. Quantity of non-recyclable inorganic and rejects from composting = 40% of 7915 kg/day+ 10% of 3166 kg/day = (3166 + 316.6) kg/day = 3482.6 kg/day The inorganic inert waste transported to secured landfill site of the Rajarhat Bishnupur -II Gram Panchayat = 3482.6 kg/day Sl. No. Component Area (sqm) 1 Storage and Segregation 189.96 2 Organic waste Composting 113.976 TOTAL 303.936 SAY 305 Total inorganic Inert waste to be disposed of in secured landfill site of Rajarhat Bishnupur -II Gram Panchayat = 3482.6 kg /day Storm Water Management The surrounding area is predominantly residential and commercial area. The net land area of the proposed project is 61364.47 sqm. By applying rational formula the peak rate of storm runoff considering 12 mm/hr rainfall is given below. Total land area = 61364.47 sqm = 6.14 ha. By applying rational method, the peak rate of runoff = 10 x 0.60 x 12 x 6.14 cum. /hr. = 442.08 cum/hr. = 0.123 cum/sec. Velocity through pipe is 1.1 m/sec (non scouring and non silting). The required diameter of pipe is 420 mm. The storm drains of the complex will collect and convey the rainwater into the adjacent Panchayat drain. The internal drainage system will be designed considering the invert level of the Panchayat drain (outfall) in-front of the project site to avoid any flooding or water logging in the site. Page 5 of 8

RAIN WATER HARVESTING SEAC, West Bengal Guideline : The total roof area is about 23799.57 sqm. The SEAC guideline regarding rain water harvesting is as follows Sl. No. Category of Building Minimum percentage of rain water which should harvested by Surface Storage Sub-surface Recharge 1 11 to 15 storied Building & Above 40% 60% 2 6 to 10 storied Building 35% 45% 3 3 to 5 storied Building 25% 15% (recharge or additional storage) 4 Less than three storied Building 10% 10% Note While suggesting the guidelines, RWH potential in 1000 sqm Roof Area was considered to be 7, 68,000 liters annually based on the rainfall characteristics. Uniform utilization of harvested rainwater throughout the year from created storage tank was also considered. Based on the above consideration, the storage facility to be created from 1000 sqm roof area for Sl. No. 1,2, 3 were thought to be 3 lakh litre, 2.5 lakh litre and 1.5 lakh liters respectively. As per SEAC proposed guidelines the rain water harvesting potential is calculated in the following Table: DETAILS NO. OF STORY ROOF AREA, SQM TOTAL RAIN WATER POTENTIAL, lakh litre MINIMUM PERCENTAGE OF RAIN WATER WHICH SHOULD HARVESTED BY SURFACE STORAGE (%) SUB- SURFACE RECHARGE (%) RAIN WATER HARVESTING POTENTIAL AS PER SEAC GUIDELINES SURFACE STORAGE, lakh litre SUB- SURFACE RECHARGE, lakh litre Residential G+18, 2B+G+22 20166.35 154.88 40 60 61.95 92.93 Sports and entertainment G+3 3633.22 27.90 25 15 6.98 4.19 club block Total 23799.57 182.78 68.93 97.11 TOTAL 166.04 As per SEAC proposed guidelines of storage facilities and sub-surface recharging facilities required will be 68.93 lakh liters and 97.11 lakh litres respectively. Total volume of roof top rainwater to be harvested as per SEAC guideline is 166.04 lakh litres i.e.16604 cum. As per MoEFCC guideline [SO 3999(E), dated 09.12.2016) for Rain water harvesting : Roof Top Rain water storage : Atleast 1 day fresh water demand Page 6 of 8

Recharge structure : 1 recharge structure for 5000 sqm built up area Proposal: Fresh water demand for the project is : 1391 KLD Total Built Up area of the project is : 289407.06 sqm We are proposing to make surface water storage to meet at least 1 (one) day fresh water demand and subsurface recharge through recharge structure of suitable diameter per 5000 sq.m built up area. We are proposing 16 nos. storage tanks of 87 cum capacity for roof top rainwater storage. Recharge structure of 58 nos. (289407.06/5000 = 57.88) Recharge structure Details : From the local survey/the agencies working for doing borewells, it is observed that there are prominent sand layers (confined aquifer) in the 39.6 to 146.3 meter zone. We are proposing to install our strainer in between 100 to 112 meter zone. The quantity of Recharge, Q can be calculated through the following formula for confined Aquifer: Q = [2(22/7) * T *(H-h)] /[2.3 log 10(R/r)] Where, K= Permeability Coefficient is 5 cum/day/sqm, considering fine sand b = Average height of Confined Aquifer = 12 meter, T= Tansmissibility of the aquifer = K * b H=Initial artesian pressure at the bottom of the aquifer h=artesian pressure in the well, (H-h) = Draw down =1.0 meter, R = 200 meter r =Radius of well = 150mm = 0.15 M Therefore, Total recharging capacity from 1 no. 150 mm diameter tubewells is given below (each) Q= [2X (22/7) X 5 X 12] / [{2.3 Log 10 (200/0.15)}] = (377.14 / 7.2) Cum/Day = 52.38 cum /Day Per day average roof top rainwater available for recharging through each recharge structure is 3.23 cum. We are proposing 58 nos. of 150 mm diameter tubewells for recharging with capacity of 52.38 cum/day. Recharging capacity through 58 nos. of tubewells is = 52.38*58 = 3038.04 cum/day and our average requirement is 187.80 cum/day Hence OK Page 7 of 8

RAINWATER HARVESTING FLOW SHEET ROOFTOP RAINWATER STORAGE TANK 16 NOS. OVER FLOW RECHARGE STRUCTURE OVER FLOW INTERNAL STORM WATERDRAIN FINALLY TO PANCHAYAT DRAIN Electricity, DG sets, Stack height Electricity will be supplied by WBSEDCL. The connected load will be about 9970 KVA. DG sets - 2 nos. 2000 KVA, 3 no. 1500 KVA & 1 no. 1470 KVA is proposed. The emission from DG sets will be discharged through a 8.9 m stack for each 2000 KVA DG set, 7.7 meter stack for each 1500 KVA DG set & 7.7 m stack for each 1470 KVA above the roof of the building. Fuel required for DG sets will be about 1595 litre/hr. TREE PLANTATION DETAILS SL. NO. BOTANICAL NAME COMMON NAME QUANTITY 1 Terminalia Catappa Badam 75 2 Spathodea campanulata African Tulip Tree 98 3 Tabebuia rosea Rosy Trumpet Tree 50 4 Azadiracha indica Neem 86 5 Cassia fistula Amaltas 65 6 Anthocephalus cadamba Kadam 72 7 Jacaranda mimosifolia Jacaranda 88 8 Delonix regia Gulmohor 85 9 Lagerstroemia speciosa Jarul 96 10 Artocarpus heterophyllus Kanthal 50 11 Mimusops elengi Bakuli 95 Total 860 Fire Fighting There will be all provisions as per NBC-2016 and other norms of fire fighting for the given height of the building. Clearance from WBFES will be obtained. Others There will be adequate car parking for the owners and provision for visitor s car park. Page 8 of 8