Control Solutions for Farm Dairies

Similar documents
Data Logging Solutions from Lascar Electronics

WasteMan 2G. Key Features. Newcastle Weighing Services Pty Ltd. Prepared by. Office: (02) Fax: (02)

X30 System Components

GRAVOTECH GROUP FIBRE LASER. Complete range of integrable laser marking systems LASER SOLUTION F-SERIES.

Automated valve control and monitoring. Valve-top control and indicator units

INNOVATION TO MEET YOUR NEEDS

The. universal 3D Inspection reference. advanced 3D measurement software & solutions

testo 340 Speed, power & precision in industrial combustion analysis.

AS950 ALL-WEATHER REFRIGERATED SAMPLER

ProODO Optical Dissolved Oxygen Meter for the Lab or Field SPECIFICATIONS

Online Gas Analyzer / Monitor

UV400 LINE WATER ANALYSER TETHYS INSTRUMENTS 57, CHEMIN DU VIEUX CHÊNE, MEYLAN -FRANCE-

UDI DPM Workstation A Complete Traceability System

EUROλYZER STx. Flue Gas Analyzer. BlueLine

Enterprise Call Recorder

Biogas analysers. Product overview. MRU over 30 years of innovative gas analysis! Biogas, landfill gas, biomethane, coal mine gas, CHP exhaust gas

Instruction Manual. for. gskin U-Value Kit

GRAVOTECH GROUP. Complete range of Integrable Fiber Laser Marking Solutions LASER SOLUTION F-SERIES.

Controls and Software CHORE-TRONICS 2 Controls

Energia Online. User Guide

INDEX. 1 Introduction. 2 Software installation. 3 Open the program. 4 General parameters. 5 Tuning

Eurotherm. Temperature Control, Measurement and Data Recording Solutions. Product Selection guide

ph / Temperature Meter for Milk with Application Specific Probe

Real time production and quality monitoring from fiber to yarn. EN product brochure A00523

Daikin LXE10E Reefer Machine

Model BF 720 Incubators Avantgarde.Line with forced convection

GC8000 Process Gas Chromatograph. Bulletin 11B08A01-01E

RESTORE 1030TM Testing Protocol

Niagara 4 + JACE our newest products are open 4

GI India Automation and System Pvt.Ltd.

On Demand Customer Feedback at the Point of Experience

3D Layout Navigator. The world s first 3D positioning system designed specifically for construction layout.

Combustion Laboratory Unit C492

Professional thermometer and food oil monitor

FITOCLIMA WALK-IN STABILITY

UFL Micro Biogas CHPs

Model BF 260 Incubators Avantgarde.Line with forced convection

testo 330 Flue gas analysis with increased convenience and safety

Tank Scale Service Checklist

Robert E. McMains Date Robert E. McMains Date

Instructions for Use: Temp-USB-TP and Temp-USB-TH

ICP Expert software. Technical Overview. Introduction

LANCOM4 PORTABLE FLUE GAS MONITORING. NO NO2 NOx CO2 H2S SO2 CxHy. CO low CO high O 2 QUALITY CUSTOMER SOLUTIONS

Table of Contents HOL CMP

PORTABLE HARDNESS TESTING

Model FD 115 Drying and heating chambers Avantgarde.Line with forced convection

The complete, efficient, solar water pumping solution Delivering you more water!

Marine Applications Ships. Components and Systems

M + F Systems. The software solution for greater flexibility

Control Products & Systems OEM siemens.com/buildingtechnologies-oem

Caja electrica ECB1000Q monof.c/2sensore. Electric board for small and medium size cold storage

T-Series. An all-new line of self-powered truck units destined to become the new industry benchmark.

EMS 100, 200: SAUTER EMS and EMS Mobile

Technical System Catalogue Modular PDU (PSM)

Thermoforming packaging machine R 145 with MULTIVAC Clean Design. Maximum process reliability and cleanroom suitability

Engineered Hot Water Systems. For your specific requirements

Element D Services Heating, Ventilating, and Air Conditioning

Chiller Optimiser Technical Specification

SIMPLIFY YOUR MAILING SYSTEMS WITH A POWERFUL MAIL SOFTWARE SOLUTION. Managing Your Mailing And Shipping Is Easier Than Ever!

STERIS Continuous Effluent Decontamination (CED) System

PATHFINDER 350A ARCHIVER YOUR ANSWER TO CAPPING, SORTING AND ARCHIVING OF SAMPLE TUBES

SENTRON Powermanager. SENTRON Powermanager. Identifying hidden potential for energy optimization and savings. Answers for industry.

Xe-90/145M Series Controllers. Rotary Compressors

SCR Product Number DOC0048

Wireless Freezer Manual Installation Guide

The Ton-Tel Weighbridge

MLM version of the information system ICM 2

Movicon in the food industry: The dairy production plant at Parmareggio

G.Rack Operation Manual

Innotech is a registered Trademark of Mass Electronics Pty Ltd Copyright 2013 Mass Electronics Pty Ltd

New Measurement Engineering For Monitoring Emissions In Industry

Access Control. StarWatch SMS - Core System Capabilities

TEMPERATURE SWITCHES AND THERMOSTATS

Audit Logging and Reporting

Using the PPM2 Portable Trace Moisture Transmitter

Introduction to Mainchain 3 Site Navigation... 5 Favorites... 5 Quick Track... 5 Dashboard & Widgets... 6 Searches

2B. Performance Advantages of Alerton BACnet. 1. Alerton Overview

B Futura and B Classic. The curtain goes up on reliability.

TUBE INSPECTION SYSTEM

ecotec exclusive with Green iq

Simple. Smart. Agile. Carestation 620

Digital innovation in ultrasonic flow SITRANS FS230. siemens.com/fs230

TEMPERATURE CHAMBER (+5 C +180 C) TK-50 CK TK-105 CK TK-190 CK TK-340 CK TK-500 CK TK-1000 CK

Ovation GE LM6000 Control System Retrofit

Controlling Agilent 1200 Series Rapid Resolution LC systems through Waters Empower chromatography data software. Technical Overview.

PAYD Pro Plus. In-Store Solution. Hardware Installation Guide (11/17)

The intuitive control of the future MC6 Multitouch

JetScan MPS 4100 Multi-Pocket Sorter

min. 50min. 65min. PIT / P3 / P4 Ø

EASY TO USE. PAYROLL FOR ANY SIZE AND TYPE OF BUSINESS.

Konica Minolta Basic Instructions

Water purification in the pharmaceutical industry

Dinamica Generale. DINAMICA GENERALE The company

Expedient User Manual Container Management

SG06UNINC-Series BGA/IP55/P Series in Outdoor Designed

HARVESTING/PROCESSING HEADS 200 SERIES

Weighing Terminals. IND780 Connectivity Communications Customized Solutions. Power and Performance for Advanced Weighing Applications

Remedy Change Management 4.0

Introduction to APG Cash Drawers. Cash Drawer Accessories. APG Integration Products. APG Interfaces

Multi-function VAC measuring instrument

Transcription:

Control Solutions for Farm Dairies Refrigeration Control Technology from Eurotec Maximise Refrigeration Plant Capacity and Efficiency Reduce Plant Operating Costs Reduce Milk Temperatures Faster (and improve Milk Quality) Dairy Cooling Solutions A Division of Eurotec Limited Eurotec has been building and supplying Control Panel Solutions to the Refrigeration industry since 2008. Since then we have become a leading manufacturer and supplier of Refrigerated Milk Vat control panels to the dairy sector controlling the refrigeration system(s), pumps and CIP functions as well as Condensing Unit control panels for OEM s, custom control panels for Refrigeration Racks, Chillers and a variety of commercial refrigeration applications. In 2012 the Control Panel Solutions division (CPS) was established to reflect the growing control panels business and we now supply Control Panel Solutions to the Refrigeration, HVAC and Electrical markets. CPS is supported by the wealth of industry and application knowledge that has been synonymous with Eurotec for over a quarter of a Century. This dairy sector booklet contains details on the latest solutions to help meet the new milk cooling requirements which take effect from the 1st of August 2016. EEV + Sensors & Accessories NEW - Milk Vat Control Panel with viewing window as standard EVD 4D Panel 4 x EEV Valve Driver Dairy Panel HVAC Refrigeration Electrical Measurement 1

Changes to NZCP1: Operation Code for the Design and Operation of Farm Dairies This code of practice is recognised and has been assessed to be a valid and appropriate means of partially fulfilling the requirements of a risk management programme for farm dairies. The Ministry of Primary Industries (MPI) have reviewed this code of practice and in particular the cooling requirements for raw milk. The proposed changes are to help the NZ dairy industry meet the requirements and standards of new and existing export/import markets. One of the main focus areas is around the faster cooling of raw milk post harvest. The code of practice suggests farm dairy operators should be targeting to cool their milk more effetively than these requirements to ensure the quality of milk is maintained. The following is an extract from section 5.14, 5.15, 5.16 Milk Cooling NZCP1: Operational Code for the Design and Operation of farm Dairies 1st December 2015. The full document can be reviewed at: http://www.foodsafety.govt.nz/elibrary/industry/dairy-nzcp1-design-code-of-practice/amdt-2.pdf 5.14 Milk Cooling (1) Raw milk grows bacteria rapidly above 7 C. Therefore, adequate milk cooling is essential for ensuring quality milk is supplied. The following time/temperature requirements are a minimum standard for the cooling of milk. Farm Dairy Operators should be striving to cool their milk more effectively than these requirements. (2) Unless used immediately for further processing, milk must be: a) primary cooled after filtering, refer to clause 11.1 General for further primary cooling requirements; b) cooled to 18 C or less at the completion of the first milking into the bulk milk tank, and should not exceed 13 C at the completion of subsequent milkings; or c) cooled to and maintained at 7 C or below within 3 hours of the completion of milking and kept at or below 7 C until it is collected or the next milking. (3) In the case of automatic milking systems (robotic milking systems) milk must be cooled to 7 C immediately after harvesting and held at 7 C or below until collection. (4) Documented milk cooling checks must be carried out at least twice per season to demonstrate compliance to the above standards. Corrective action must be taken if these standards are not being met at any time. (5) The following milk cooling curve can be used as a guide for compliance for the first milking, and subsequent milkings into the vat. Continued on page 3. Reference: Ministry of Primary Industries. NZCP1: Operational Code for the Design and Operation of Farm Dairies, 1 December 2015 2 HVAC Refrigeration Electrical Measurement

(6) It is recommended that the temperature of the milk be maintained at 4 C to 5 C. (7) Any system that can be demonstrated to be capable of meeting the regulatory and company s requirements for cooling is acceptable. A record of milk temperature at collection or use must be available for independent confirmation. 5.15 New Milk Cooling Standards (1) The following raw milk cooling standards apply as of the applicable commencement date in clause 5.15.1 Implementation Date. (2) Raw milk must: a) be cooled to 10ºC or below within four hours of the commencement of milking; and b) be cooled to 6ºC or below within the sooner of: i) six hours from the commencement of milking, or ii) two hours from the completion of milking; and c) be held at or below 6ºC without freezing until collection or the next milking; and d) must not exceed 10ºC during subsequent milkings. (3) In situations where there is continuous or extended milking, such as automated milking systems, the milk must enter the bulk milk tank at 6 C or below. Continuous or extended milking is defined as milking for six hours or longer from the time that milk first enters any bulk milk tank. 5.15.1 Implementation Date (1) From 1 August 2016 farm dairies that are: a) new; or b) undergoing any significant change to the secondary milk cooling system must meet the milk cooling requirements set out in clause 5.15(2). (2) From 1 June 2018 all farm dairies must meet the milk cooling requirements set out in clause 5.15(2). (3) Consideration should be given to improving the cooling performance of existing equipment, and to technology options that improve existing equipment performance. New technology options must meet the requirements of this Code directly and be acceptable to the RMP Operator/Dairy Company. Reference: Ministry of Primary Industries. NZCP1: Operational Code for the Design and Operation of Farm Dairies, 1 December 2015 HVAC Refrigeration Electrical Measurement 3

(4) It is recommended that Farm Dairy Operators contemplating an upgrade to primary cooling or secondary bulk milk tank refrigeration discuss options with their dairy company, farm dairy assessor, refrigeration supplier, or the Energy Efficiency and Conservation Authority (EECA) before committing capital. 5.16 Milk Cooling Performance Monitoring 5.16 Milk Cooling Performance Monitoring (1) From 1 August 2016 the periodic confirmation of milk cooling performance must be undertaken to confirm that the milk cooling system is meeting the requirements under clause 5.14 Milk Cooling, or clause 5.15 New Milk Cooling as follows: a) Farm Dairy Operators must have records to confirm that milk cooling requirements are being met to confirm the capability of milk cooling equipment. Milk cooling performance should be monitored monthly, but as a minimum must be monitored and recorded: i) about the time of expected peak milk production; and ii) in February. b) Each performance check must cover at least two consecutive milking s, and the records must include: i) the temperature of milk in each bulk milk tank immediately prior to the start of milking (if there is any); ii) the time that milking starts; iii) the time that milking is completed; iv) the temperature of the milk in the bulk milk tank at the completion of milking; and v) the time that the milk is confirmed to meet the requirements of clause 5.14 Milk Cooling, or clause 5.15(2)(a) and (b) New Milk Cooling, whichever is applicable. (2) Temperature measurements and recording can be accomplished using: a) an electronic monitoring system; b) a chart recorder; c) a tiny tag or similar temperature logging device; d) manual measurements using an electronic thermometer (non-glass); or e) any other equivalent method. (3) The accuracy of the temperature measurement device must be known as the data collected is an official record. 5.16.1 Failure to meet milk cooling requirements (1) Action must be taken to correct milk cooling performance should the information collected show that milk is not being cooled within the required parameters. In such cases the milk cooling performance checks described above must be repeated to confirm compliance with the milk cooling requirements. Where any equipment upgrade is contemplated, it is recommended that the farm dairy assessor or dairy company is consulted before committing to capital expenditure. 5.16.2 Electronic monitoring systems (1) Where electronic monitoring systems are installed it is recommended that such systems be capable of holding delivery line and bulk milk tank temperature data for a minimum of 30 days for both milk and CIP solutions. Reference: Ministry of Primary Industries. NZCP1: Operational Code for the Design and Operation of Farm Dairies, 1 December 2015 4 HVAC Refrigeration Electrical Measurement

CPS On Farm Standard Solutions: Milk Vat Alarm & Monitoring System This latest touch screen panel from Carel in Italy will allow farm dairy operators and service staff reliable and fast access to the whole cooling system from one dedicated point. Your valuable milk temperature records will be safe and secure for audits and all managed automatically. The system recognises when milking has started and monitors the cooling cycle to ensure the recommended temperatures and times are observed. PWPRO Panel Features: Highly waterproof and durable IP65 enclosure to protect against the elements Full colour touch screen TFT LCD Display - 7 inch, 16,000 colours with 800x480 WVGA resolution. Fast and easy access to temperature data and graphs for bulk milk storage Dedicated red alarm output indicator and siren for each milk vat (max. 2 vats) indicates high temperature conditions. Ability to store recorded data for more than 1 season. Waterproof IP65 USB port allows pen drives to be plugged and extract data for analysis purposes. Fully Ethernet compatible for access via the web with standard browser. Secure password protected access for multiple users and levels No moving parts which means robust hardware and high reliability Optional module to allow the monitoring of other key points in the system such a precooler, bulk milk delivery, water and air temperatures. Future proofed for communication and monitoring of chillers & refrigeration plant with simple communication card. Product Code Milk Vat Extra Measuring Points Available GSM Email PWPRO3-1 FOR 1 MILK VAT PWPRO3-2 FOR 2 MILK VAT PWPRO3-3 FOR 1 MILK VAT Up to x 4 PWPRO3-4 FOR 1 MILK VAT Up to x 4 YES PWPRO3-5 FOR 2 MILK VATS Up to x 4 PWPRO3-6 FOR 2 MILK VATS Up to x 4 YES HVAC Refrigeration Electrical Measurement 5

MilkCella: The new control solution for milk vats with future proof logging capability. MilkCella is the latest control panel solution for refrigerated milk vats developed by Eurotec in response to the proposed changes to NZCP1. At the heart of this milk vat controller is the latest Ultracella programmable platform control from Carel Industries. Some key features of the platform are: Features: Carel Ultracella Controller IP65 Lockable Main Enclosure. Metal Tagged lock supplied. Wide easy to read and bright LED display Flat IP65 keypad is hygenic and easy to clean USB service port for upload/dowload of parameters, software and collection of data* Easy navigation of menu with backlit keyboard and icon Option for additional languages to be loaded for use overseas Optional graphical interface tool for service and installation teams Pre-wired back to terminal block Electrical controls mounted in internal enclosure Multifunction switch > PUMP - IPC - OFF - REF1 - REF2 IPC timer adjustable from 0 secs - 10hrs, set to 10 minutes IPC start push button Agitator control relay included 6 meter special vat probe included Wiring Diagram Included Application Sheet & Parameters Guide included Milk Document Clip *USB service port USB Key 6 HVAC Refrigeration Electrical Measurement

Electrical Control Panels for Refrigerated Milk Vats Features: IP65 Lockable Main Enclosure. Metal Tagged lock supplied. Pre-wired back to terminal block Electrical controls mounted in internal enclosure Multifunction switch > PUMP - IPC - OFF - REF1 - REF2 IPC timer adjustable from 0 secs - 10hrs, set to 10 minutes IPC start push button Agitator control relay included Carel IR33 Series Controller 6 meter special vat probe included Dual Controller option available (p/n IR33DAIRYPANEL2CW) Wiring Diagram Included Application Sheet & Parameters Guide included External Viewing Window Milk Document Clip Product Codes: IR33DAIRYPANELW Single Milk Vat IR33DAIRYPANEL2CW Dual Milk Vat Refrigeration Control Technology from Carel & Eurotec NEW! Milk Vat Control Panel - Single with viewing window as standard (provides enhanced visibility of the system status) Panel Configurations: CPS offers a range of configurations which can be fitted into the standard enclosure Alternatively these options can be supplied as stand alone solutions. Milk Vat Dual Panel - Small Single Panel Vertical - Small Single Panel Horizontal - Small HVAC Refrigeration Electrical Measurement 7

Control Panels for Electronic Expansion Valves EVD 4D Panel: 4 x EEV Valve Driver Dairy Panel EVD 2D Panel: 2 x EEV Valve Driver Dairy Panel Refrigeration Control Technology from Carel & Eurotec Maximises Refrigeration Plant Capacity and Efficiency Reduces Plant Operating Costs Faster Cooling of Milk HOW? Replacement of the traditional (and old technology) Thermostatic Expansion Valves (TEV s) with Carel Electronic Expansion Valves (EEV s) provides outstanding superheat control of your refrigeration plant. This in turn maximises the cooling efficiency of the refrigeration system and the milk vat. TEV systems can be easily upgraded to EEV versions. In addition to their proven Milk Vat Control Panels, Eurotec now offer for retrofit a range of Prewired Electronic Valve Driver (EVD) Panels complete with Valve Drivers installed, with all temperature and pressure sensors and cables included. Tip: By also installing Carel FCP Condenser Fan Speed Controls you can further maximise the plant potential. Tip: Non standard applications are our specialty! Contact Eurotec: AK: 09-579-1990 WLG: 04-499-3591 CH: 03-366-0017 Email us: sales@eurotec.co.nz Visit our website: www.eurotec.co.nz Follow Eurotec: Dairy Cooling Solutions A Division of Eurotec Limited Click on the link or logo to return to the Dairy Cooling Solutions website. www.dairycoolingsolutions.nz 8 HVAC Refrigeration Electrical Measurement