OP Transport and

Similar documents
DIRECTIVE 2012/34/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 November 2012 establishing a single European railway area (recast)

Questionnaire for reporting on progress made on the attainment of the Paris Goals

Helsinki-Tallinn Transport Link Feasibility Study of a Railway Tunnel February 2018

Climate Proofing of Major Projects Climate change related requirements for major projects in the programming period

COMPONENT 4 Feasibility studies THEPTA. Tendering and awarding bus transport services in Thessaloniki

Developments in the Hamburg system and coordination of transport in the Hamburg urban area

TRANSPORT Policies and progress on transport access

Climate risk & vulnerability assessment: Poznan case study

Appendix 2 Eligible expenses Unofficial translation 1 January 2015

Development of urban public transport in Kazakhstan POLICY OVERVIEW AND RECOMMENDATIONS

Multi-modality assessments in promoting sustainable urban traffic

TENDER PROCESS FOR LICENSING THE USE OF ROADS OF THE PUBLIC TRANSPORT SYSTEM OF THE CITY OF SANTIAGO - TRANSANTIAGO

CEF Transport Info day 2016 Greece

Capital Metropolitan Transportation Authority Response to the State-Mandated Performance Audit, January 12, 2017

Introduction. Public services in transport in EU and Central Europe

2015 CEF Transport Calls

Clean Sky 2 Joint Undertaking traineeship programme Support to the CSJU Legal Office Brussels, 12/9/2014

Toll Road Development in China: Highlights in Practice

RED BUS LIMITED STATEMENT OF INTENT 2017/18

The Development of a Master Plan for Public Transport: The Riyadh Example

I n t r o d u c t i o n. C h o i c e b e t w e e n P u b l i c Tr a n s p o r t a t i o n M o d e s

China, PR: Metro in Guangzhou. OECD sector Railway sector / BMZ project ID

Transport and automotive industry of the Republic of Kazakhstan

Struma Lot 3.2 EIA Development, Working Document

ROSTERS OF JUNIOR AND SENIOR EXPERTS Specifications of the Call for expression of interest

DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES. Article 1. Subject matter

1 Introduction. 2 Mobility in Palermo. 164 Urban Transport XIX

DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES

Operational issues when mixing public and private financing sources

CDM in Urban Railway Sector and JICA s Cooperation

Transit Service Guidelines

VACANCY AT THE JOINT SECRETARIAT. Project Finance Manager September 2017

Integrated Transport Model of Thuringia

METROPOLITAN RAILWAY NETWORK TRACK OCCUPATION PROTOCOL

Contracting in urban public transport

UITP/JASPERS WORKSHOP Performance Monitoring in Public Transport 14 March 2016, Brussels. Are cities smart enough to allow AVM everywhere?

AMENDED CODE SERIES 400: MEASUREMENT OF THE ENTERPRISE AND SUPPLIER DEVELOPMENT ELEMENT OF BROAD-BASED BLACK ECONOMIC EMPOWERMENT

State Transit Authority. Corporate Plan June 2016 (Issue 5) State Transit Authority. Corporate Plan June 2016 (Issue 5) 1

HaCon the timetable company. Joint efforts - seamless handling of cargo information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives 4. Project Description

Leveraging Data Analytics to Expand Audit Coverage and Add Organizational Value

BRIEF OBSERVATION OF TRANSANTIAGO DE CHILE

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Reserve list of Administrative Assistants / Logisticians (AST6)

Charging Arrangements for New Connection Services

Cost Reduction Strategies Suggested by Participants of the Workshop on December 10 & 11, 2008

Adaptation to climate change, risk prevention and management in the Regional Policy

There is no duty on municipalities in the UK to manage or reduce CO 2 emissions.

Public Transport in Greater Munich

DIRECTIVE (EU) 2016/798 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 May 2016 on railway safety (recast) (OJ L 138, , p.

Commerzbank s Sustainability Programme

STANDARD CONDITIONS OF USE

Project Presentation 30/12/2005

VACANCY NOTICE HEAD OF UNIT (CORPORATE SUPPORT) REF: OPER TA 01/2018

ADIF-ALTA VELOCIDAD GREEN BOND

ITS Action Plan- Internet Consultation

HSR «EURASIA» DEMAND FOR FREIGHT TRANSIT

Eu Public- Private Smart Move High Level Group

SPECIFIC AGREEMENT NUMBER I-KAM2EU

Transportation Cost Estimation

Knowledge transfer and information actions

Rail Baltica Global Project Cost-Benefit Analysis. 24 April 2017

Energy Savings by replacing old facility o Energy savings o Emissions

METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS. Independent Accountants Report on Applying Agreed-Upon Procedures

(Non-legislative acts) REGULATIONS

STAFF VACANCIES Ref.1532CAFGIII

Justification Review. Public Transportation Program. Florida Department of Transportation

1. LOCATION OF ALBANIA

Questions & Answers Call for proposals 2018 H2020-S2RJU Date of publication: 15/02/2018

The effectiveness of long-distance haulage in the context of market reforms in Russia

Health and Safety Competent Person Service In accordance with the Management of Health and Safety at Work Regulations 1999

SOUTH CAUCASUS RAILWAY REPORT OF THE DIRECTOR GENERAL OF SOUTH CAUCASUS RAILWAY CJSC VIKTOR REBETS

Model Grant Agreement AMENDMENT v4.0 27/02/2017

How can the public sector further

POLICY EXPERT (Credit/Market Risk)

Mini-presentation on Turnover/Output for Office Administrative and Support Activities (ISIC 8210) in Poland

Rehabilitation of Prater junction

Moscow Transport in the Smart City: Current Status and Development Plans

EIB actions for Energy Efficiency in the Urban Sector

VACANCY NOTICE TRAINING SPECIALIST REF: PAC CA 01/2018

Sources of Federal Government and Employee Information

The organizations and companies dealing with sericulture development in Bulgaria are the Sericulture Experiment Station in Vratza, Agricultural

National Energy Efficiency Strategy

Template for ToR for Transaction Advisory Services

PSTA PROCEDURE 4.03 CHARTER SERVICE

Your logo here. The waste recycling stategy in Sofia: from national to local level. Sofia Municipality 28/10/201423

LIBERIA TELECOMMUNICATIONS CORPORATION

Report to the Finance Committee Comprehensive Annual Financial Report. Prepared by the Office of Finance April 2016

THE ROUTE MAP TO A CONNECTED EUROPE

Wirral Council. Pay Policy Statement

IMPORTANT: PLEASE READ BEFORE COMPLETING YOUR APPLICATION

Introduction to Transportation Systems

Supplement to the Official Journal of the European Union. Official name: National registration number: 2

Roadmaps to 2050 FFE (Madrid, Spain) 21 September 2017

External costs of traffic in Sweden with a European outlook, Summary Report 2015:4

Administration Procedure

DETAILED PROVISIONS RELATED TO TRANSPORT

Private Sector Participation in the Uganda Water Sector: Past, Present Future of Small-Town Water Supply

Paul S. Sarbanes Transit in Parks Technical Assistance Center. Alternative Transportation Systems (ATS) Training for Federal Land Management Agencies

Transcription:

Sofia Metro Extension Project OP Transport 2007-2013 and 2014-2020 Beneficiary SM-Metropoliten JSC OPT 2007-2013 MS Druzhba start 04 2015 OPT 2007-2013 MS Sofiyska Sveta gora -Lot 1-start 04 2015

Part 1 General information on the Sofia Metro Extension Project Beneficiary: Metropoliten JSC А/ Sections completed in the Programming Period 2007-2013

Transport situation in the capital of R. Bulgaria - Population of Sofia as of 2012 including the temporary inhabitants - more than 1.5 mln. people - Annual increase during the last 5 years -10-20 thousand a year - Number of registered vehicles in 2014 - more than 850 000 - Traffic jams along the busiest directions - more than 1.5-3 hours/daily - Trips duration in rush hours - more than 40-60 min. - Traffic speed of Mass Public Transport in rush hours/without metro/ - 8-12 km/h - Average transport capacity of the MPT lines /without metro/ - 4-8 thousand pass./hour - Load along the busiest directions /along the metro L 1, L 2 and L 3/ - more than 20-30 th.p./hour - Duration of a trip by metro from the city suburbs to the center - 10-15 min. in each hours - Transport capacity of Sofia Metro - 40-50 thousand pass./hour The above said requires an expedited construction of the metro extension along the three main directions of the city,

Stages in the implementation of Sofia Metro Extension Project included in the OP Transport 2007-2013y up to 2015y Sofia metro extension Project is divided into three stages: Stage І: Metro section from Line 2 Nadezhda Overpass-Center-Lozenets quarter 6,5кm long with 7 metro stations. Construction duration: 2009-2012. Total coast stage І - 247 mln. euros Stage ІІ: Lot 1- metro section Obelya RD-Nadezhda Overpass, 4,2кm long, 4 metro stations, connection and depot extension and 12 trains. Construction duration: 2010-2012 Lot 2- metro section Mladost І RD-Tsarigradsko shose blvd., 2,2кm long, 2 metro stations and 6 trains. Construction duration 2009-2012. Total coast-stage ІІ 280mln. euros Stage ІІІ: Lot 1-metro section Tsarigradsko shose blvd. Druzhba RD-Airport, 5кm long, 4 metro stations and joint metro and railway station. Construction duration: 2013-2015 Lot 2-metro section Mladost І RD-Business Park 2,7кm long and 3 metro stations. Construction duration: 2013-2015. Total coast stage ІІІ 119 mln. euros Share in the Public Transport System after Stage ІІІ- 30%

MS Lavov Most MS European Union Stage І: Nadezhda Overpass Central Railway Station Cheni Vrah blvd 31.08.12 MS Serdika Archaeological finds at МS Serdika

MS Beli Dune Station MS Mladost ІІІ MS Al.Malinov Stage ІІ, Lot 1 and Lot 2: commissioned on 25.04.2012 MS A. Balan

Construction of a station using an arch structure according to the New Austrian Tunneling Method /MS Serdika ІІ/ Construction of a station open method Connections with the national network

B/ Sections which implementation is included in the next Programming Period 2014-2020 of OP Transport and Transport Infrastructure Lane 3: Stage 1 /OP TTI-2014-2020/ Vl. Vazov blvd. Orlov most - NDK Bulgaria blvd. Krasno selo quarter - 8 кm and 8 metro stations. Construction tunnels under shield method, metro stations open method, with the exception of MS Orlov most. Status tender for selection of contractors and Engineering consultant. Duration of construction 3 years and 6/9/months. Prognosticated start start construction - 2016y. Depot and rolling stock - duration of 2,5 and 3 years. Start 2016y.

Plan, longitudinal profile and section of the tunnels in the central city part from the route from Line 3

General view of the tunnel boring machine with pressure in the head and diameter of 9.40 m for section Krasno Selo Off The Channel Theatre General structure View of the similar German machine used in the Line 2 - Manufactured by Herrenknecht Germany Преминаване на машината през метростанция

=================================================================== Stage Stage I 6,4 km - 7 metro stations Road junction Nadejda - Cherni Vrah Blvd. Stage II 6,5 km - 6 metro stations Lot 1 Obelya Nadezhda Lot 2 Mladost І Tsarigradsko Shose Stage III 7,7 km - 7 metro stations Lot 1 Tsarigradsko Shose Blvd. Sofia Airport Lot 2 Mladost 1 RD Business Park in Mladost 4 Stage I of Line 3 7,8 km 8 metro stations Vladimir Vazov Blvd. Centre Zhitnitsa str. Economic Indexes Construction period years 2009-2012 2010-2012 2009-2012 2012-2015 2013-2015 2015-2020 Investment Value (mill EUR) 247 (157) 311 (200) 120 (116) 433 (341) * Investment value of eligible costs ** Community Assistance is presented in brackets Economic Rate of Return % Economic Payback Period (years) Benefit-Cost Ratio (times) 16,56 9 2.70 10,00 14 1.85 7,05 18 1.36 5,70 19 1.12

=================================================================== Public benefits from the completion of Stage I, Stage II and Stage III from Sofia Metro extensionn project and from the future Line 3 Public benefits Measure 2012/with Stage 1 and 2/ 2015/with Stage 3/ 2020 /after Stage 1-L3/ Length Km 31/27МS 40кm/35МS 48кm/43МS Number of carried passengers Th. daily 280 380 550 Share in the system of Mass public transport % 24 30 over 45% Traffic reduction % 18 25 35 Reduction of road accidents % 12 18 25 Connections with the national network number 1 2 3 Connections with tram lines number 9 10 14 Connections with bus and trolley lines number 31 37 over 55 Number of passengers transfers per day Th. 95 110 over 180 Reduction of noxious gasses per year Th. Tons 59 79,5 110 Saved time for the citizens daily Th. hours 75 115 160 - High carriage capacity - 50 thousand passengers/hour - High travel speed - up to 80 кm/h - Duration of traveling time to the Centre of the city 10-18 min

=================================================================== Distribution of Socio-economic benefits of the project Benefit Stage I PV (EUR) Stage II PV (EUR) Stage III PV (EUR) Total % Total Value of Time 623 493 834 371 109 817 195 253 915 1 189 857 566 66% Total Vechicle Operation Costs Total Decrease of Accidents Total Decrease of Emission Costs TOTAL ECONOMIC BENEFITS 183 146 276 85 334 113 55 082 319 323 562 707 18% 151 449 864 72 776 722 26 660 545 250 887 131 14% 20 322 905 16 279 320 8 186 966 44 789 191 2% 978 412 879 545 499 972 285 183 745 1 809 096 596 100% Benefit Measure Stage I Stage II Stage III Saved time a day Hours 19 300 13 420 4 755 Reduction of CO2 emissions per year Tons 11 500 9 899 2 600

=================================================================== CHAPTER 2 Transport Public Services provided by the transport operator Metropoliten EAD Public Service Contract according to EU Regulation 1370/2007 signed following recommendation from JASPERS and prepared by EIB consultants hired by Sofia Municipality

=================================================================== Public Service Contract (1) Contract parties tree parties Sofia Municipality and Urban Mobility Center - Clients Metropoliten EAD - operator Contract date - 05.12.2013 Period of the contract 15 years Annual transport volume of services According to annual transport task approved by the Client with the decision of Sofia Municipal Council Financial parameters The annual financial frame for execution of the transport task is defied every year by the Client with the decision of Sofia Municipal Council

=================================================================== Public Service Contract (2) Terms subject of control from of the Client : Rights and Obligations of the Operator Report and Monitoring daily, monthly, quarterly, annually Payments and monthly invoicing Sanctions, control and audits on base of monthly report and control Annexes to be submitted to the Client: Business planning and Financial frame Tariffs, Financial reports, Assets Operation plans and schedules Methodology for reporting and quantifying the transport work Indexes of Quality of service, stimulus and sanctions Methodology for defining of Compensation, etc.

=================================================================== Economic Frame and Revenue Reporting The Client defines routs, schedule and kilometers for every year according to the demand for transport service On the annual base the following parameters are forecasted: sales of tickets and passes for the whole public network and only of the operator the amount of compensation for preferential trips the number of passengers revenues of the operator: Share of revenues from passengers using passes for the whole public network Share of revenues from sale of tickets by the operator Share of compensation for preferential trips Other revenues

=================================================================== Compensations Pursuant to the Contract for Public Transport of Passengers and Regulation (EC) No 1370/2007 the compensation should not exceed the net financial effect-costs less the revenues and reasonable profit Compensations received by transport operators follow the Methodology for the allocation of compensation for tariff obligation of Sofia Municipal Council Reasonable profit - rate of return on capital that is normal for the sector - in the Bulgarian legislation is set to maximum 5 percent of the total costs for providing the compensated transport services In case that provided funds as Compensation for a public service exceed the amount of the operating expenses and 5% reasonable profit, reduced by own revenues of the Operator, the excess of compensation must be reimbursed within 20 days after completion of the respective reporting period.

Methodology for distribution of compensation 1. Vehicle capacity VC and base carriage capacity BC.c. /lowest capacity of all the operators/ 2. Coefficient of reduction of run (Crr) = Carriage capacity/ Base carriage capacity 3. Reduced run= Crr х Route run 4. Coefficient of distribution (C distrib.)=reduced run of operator/ Total of reduced runs of operators 5. Number of passengers with discounts by operator = C distrib. of operator х Total discounted trips 6. Compensation of tariff duty of operator = C distrib. х Total amount of compensations under Regulation 2 It is set for compensations by the state and compensations by the municipality by types of discounted trips compensated by the state and municipality. Each 6 months it is updated of the parameters if there is a change exceeding 5%.

=================================================================== Structure of Service Costs Variable costs Costs for materials and fuel Electricity Spare parts, etc. Fixed costs Protective equipment Work clothing Expenses for external services Security Maintenance Salaries of staff of the exploitation Depreciation Other operating expenses

=================================================================== Business Plan of the Operator Planned Vehicle kilometers Planned Heavy maintenance and Maintenance Planned Costs for electricity Planned Costs for Security, External services and other expences Forecast of revenues from different sources: own revenues from sale of tickets from passes for the whole public network from rent and advertising Corrections due to sectionals for outstanding mileage Cost price of transport service

Intermodal connections of the lines of the middle term scheme of metro development (up to 2020-2022) with the other transport types A P P A A A P A P A P A A P A

=================================================================== CHAPTER 3 COORDINATION AND CONSULTATIONS WITH JASPERS

=================================================================== ASSISTANCE FROM JASPERS CONSULTANTS WITHIN THE PERIOD 2007-2014 Start in June 2007 - Introduction to the project (I-st stage) and initial review of documents prepared by Metropoliten company 2007-2009 Meetings and Comments on CBA and AF of the I stage of Sofia Metro Extension project 2010-2011 - Meetings and Comments on CBA and AF of the II stage of Sofia Metro Extension project 2011-2012 - Meetings and Comments on CBA and AF of the III stage of Sofia Metro Extension project 2008-2014 - preparation by JASPERS of Completion Notes for every stage 2009-2014 - Review, coordination and consultations regarding the preparation of answers to comments to the questions of the EC, before receiving the final approval from the Commission During the whole work process continuous contacts with the Jaspers experts were kept by emails or phone calls to settle different problems and coordinate texts.

=================================================================== MAIN ISSUES DURING THE PREPARATION OF THE APPLICATION DOCUMENTS o Related to the preparation of the documents: - Correct and Update the Cost-Benefit Analysis - by following the recommendations of JASPERS additional data for the transport in Sofia was included; project costs were increased by including the rolling stock as part of project costs - Recalculation of the economic benefits by following the recommendations of JASPERS new unit values were used applicable for Bulgaria, for example value of time per hour o Related to the financing: - insufficient funds in the OP Transport and increase labor costs and costs for materials from 2008 to 2012 Solution 1- Repeat the tender for selection of contractors at Stage 1 in April - August 2008 and the investment costs were reduced by 42 mln. еuro Solution 2 - Additional financing was provided by Sofia Municipality amounting to 61 mln. euro to cover the difference between available funds at OPT and tender price; EIB provided loan amounting to 105 mln. euro for additional financing of the next stages of the project

=================================================================== MAIN ARES OF ASSISTANCE FROM JASPERS 1. General reviews of Cost Benefit Analyses and Application forms (Regulation ЕС1083/2006 ) 2. Recommendations regarding Traffic analysis - assessment of actual data from the General Master Plan for demand and supply of transport service; methodology for traffic surveys 3. Recommendations regarding Option analysis presentation of alternative options considered at earlier stages 4. Recommendations regarding Project Costs - update of project costs with actual investments costs according to the tender price 5. Recommendations regarding Economic analysis - unit values for Bulgaria of saved time, harmful emissions and other benefits; excluding tickets revenues form the project benefits 6. Recommendations regarding the use of Information for Environmental Impact Assessment 7. Recommendations regarding Appendixes - submission of additional information and maps 8. Consultations regarding the contents and update of the documents 9. Consultations regarding preparation of answers to comments and questions from EC

Thank you for your attention! Prof. PhD, eng. Stoyan Bratoev Consult. Rozalina Kozleva Metropoliten JSC 27-28. 05..2014

EUR =================================================================== Investments Structure of Eligible costs 350,000,000 300,000,000 250,000,000 200,000,000 150,000,000 100,000,000 50,000,000 0 Planning/design fees Plant and machinery Contingencies Publicity Stage I Stage II Stage III Building and construction Rolling Stock Technical assistance Supervision during construction implementation

Schedule for tendering and construction of the lots from Stage I of the Project for Line 3 of Sofia metro Участък 2014 2015 2016 2017 2018 I II III IV I II III IV I II III IV I II III IV I II III IV 1. Route: Central section МS 6 (D. Nikolaev blvd) - МS 14 (depot Zhitnitsa str.) Double-track tunnel with a shield and 7 stations - Tender and other 42 months procedures - Construction 42 months 2. Route: МS 5 ( Vl.Vazov blvd) - МS 6 with a connection to the national railroad network - Tender and other procedures - Construction 30 months 3.Delivery of rolling stock with transport automation and movement management (СВТС - system) - Tender and other procedures - Construction 36 months 36 months 30 months 4. Depot - Design - Tender and other procedure - Construction 24 months 24 months

34 For info or further questions on the JASPERS Networking Platform, please contact: Massimo Marra JASPERS Networking and Competence Center Senior Officer ph: +352 4379 85007 m.marra@eib.org www.jaspersnetwork.org jaspersnetwork@eib.org