For personal use only

Similar documents
For personal use only

AGM PRESENTATION NOV 2017 ASX: GLL

For personal use only

Large Uncontracted Gas Reserves Excellent Market. Excellence in Oil and Gas

The First Global Coal Bed Methane Company

HORIZON OIL (HZN) PNG PETROLEUM AND ENERGY SUMMIT PRESENTATION

Unconventional Gas and Water Resources in Australia. Dr Stuart Minchin Chief, Environmental Geoscience Division Geoscience Australia

Origin Energy 2011 Annual Reserves Report

LIQUEFIED NATURAL GAS LIMITED

Strike Energy Ltd Moving from technical success to commercial gas testing

Flax Field Flax Field Major Growth Potential June 2012

CARBON ENERGY. Surat Basin Coal & Energy Conference 23 MAY 2012

First appraisal wells brought online on the Western Surat Gas Project ahead of schedule, on budget and using local contractors

Carbon Energy Presentation Surat Basin Coal & Energy Conference

Eastern Australia Business Unit

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

For personal use only

ASX/MEDIA RELEASE 23 APRIL 2015 MAGNOLIA LNG PROJECT TOLLING AGREEMENT UPDATE WITH MERIDIAN LNG

Oil Search Update - Projects & Initiatives

Armour Energy Limited 2 September 2015 Armour to Become a Significant Gas, LPG, Condensate and Oil Producer

The Sole Gas Project Project update: 8 September 2016

For personal use only

For personal use only

11.0 Energy. Summary Energy snapshot

PERFORMANCE SUMMARY SENEX ENERGY LIMITED ABN

Santos lifts half-year net profit by 155% to $504 million. Underlying net profit up 12% to $236 million

FEEDING A GROWING SOUTHERN AFRICA DOMESTIC GAS MARKET

The information in this presentation: Qualified petroleum reserves and resources evaluator. Rounding. Reserves and resources calculation

ASX RELEASE BY METROCOAL LIMITED (ASX-MTE) $30 MILLION JOINT VENTURE SIGNED WITH CHINA COAL

QUARTERLY REPORT March 2011

June Quarter Q4 FY17. March Quarter Q3 FY17. Senex also released its Annual Reserves Statement to the ASX today, reporting:

WPG TO ENTER THE IRON ORE INDUSTRY

For personal use only

Coal seam gas, landholder rights and the law

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA

GLADSTONE TO JAPAN: EXPORT LNG PROJECT. December 2007

For personal use only. GLNG investor visit May 2013

For personal use only

Resource corridors: A case study of the Pilbara, Australia

June 2009 quarterly report

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

Lakes Oil NL Annual General Meeting

Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits. ASX: AUZ October 2017

Appendix A: Project Characteristics

ASX Announcement 25 January 2017

Industrial land demand forecasting for supply chain business supporting Queensland s resources sector

Cuba Block 9 Production Sharing Contract (Melbana Energy 100% # )

Pryme Energy Limited ASX Code: PYM Turner Bayou Project Update and Investor Presentation

For personal use only

Mining Update - Mongolia

Arrow Energy. Surat development update. December 2017

Confidence in Carrapateena project grows

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

Advice to decision maker on coal mining project

For personal use only

For personal use only

121 MINING INVESTMENT CONFERENCE HONG KONG

Arrow Energy. Surat operational update. July 2016

For personal use only

2017 ANNUAL RESERVES REPORT. For the year ended 30 June 2017

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

For personal use only

Report. National Instrument Technical Report on Narrabri North Mine and Narrabri South, Gunnedah Basin New South Wales. Anglo Pacific Group PLC

Large Scale Gas Projects Northern Territory, Queensland & PNG. Moyes & Co.

Ascot signs Heads of Agreement to acquire Urabá coal mining concession in Colombia

Silex Systems Limited 2015 Annual General Meeting (ASX: SLX) (OTCQX: SILXY)

For personal use only

ASX Release ASX Code: YTC

Syntroleum Coal to Liquids Integrating Gasification, Fischer-Tropsch and Refining Technology. CTL Forum, Beijing China June 15-16, 2006

For personal use only

ADX ASSETS & STRATEGY A PIVOTAL PERIOD AHEAD

Forward Looking Statements. Forward looking statements in these materials speak only at the date of issue. Subject to any

COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA

EXCO S PROJECT PIPELINE. Unlocking the Value

Investor Presentation Jogjakarta Iron Sands Project

KANMANTOO PUMPED HYDRO STEVE McCLARE IIIII CEO & MANAGING DIRECTOR PUMPED HYDRO ENERGY STORAGE CONFERENCE SYDNEY MARCH 2018

SECOND QUARTER REPORT FOR PERIOD ENDED 30 JUNE 2014

For personal use only

Linking Energy Globally

ACCC Review of Proposed Timber Transaction

LNG FROM COLOMBIA Platts 13 th Annual Caribbean Energy Jan 24 th 2013

Chevron Australasia Overview

EXCO S PROJECT PIPELINE

Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation

ASX / MEDIA ANNOUNCEMENT 5 March 2018

UK Oil and Gas Reserves and Resources. As at end 2016

LETTER DECISION. File OF-EI-Gas-GL-Q June 2015

For personal use only Operations Update

AGL UPSTREAM INVESTMENTS PTY LTD GLOUCESTER GAS PROJECT

Economic Significance of Queensland s Large Gas Using Industry Combined QLIGC Report QLIGC

BUILDING AN EMERGING RESOURCE COMPANY UPDATE ON ACQUISITION OF COAL AND MANGANESE ASSETS IN INDONESIA

For personal use only

Pit to Port Infrastructure in SA

For personal use only

GAS BACKBONE OF THE ENERGY SYSTEM TANYA MORRISON, CLIMATE CHANGE GR MANAGER IGU & PGNIG at COP19, Warsaw November 2013

For personal use only. Botswana Power Development! March 2015!

For personal use only

WIM150 Mineral Sands Project 15 th Anniversary Mineral Sands Conference

For personal use only

Transcription:

Sydney, Australia 7 March, 2011 Eastern Star Gas Limited (ASX:ESG & OTCQX:ESGLY) as CSG Operator of Joint Ventures in PELs 6, 427 & 428, located in northern NSW with Orion Petroleum Limited (ASX: OIP) and Comet Ridge Limited (ASX: COI) is pleased to announce the first independent assessment of the coal seam gas resources in these licences. Licence PEL 6 ESG 77.5% OIP 22.5% PEL 427 ESG 50% OIP 25% COI 25% PEL 428 ESG 40% OIP 20% COI 20% DP/COI 20%* Recoverable Contingent Resources (PJ) Recoverable Prospective Resources (PJ) 152.8 1160.5 751.1 2457.8 107.3 1018.9 Totals 1011.2 4637.2 *A Binding Heads of Agreement was signed on 14 October 2010 to transfer the Davidson Prospecting Pty Ltd (DP) 20% interest in PEL428 to COI. The resource estimates provided in this statement were determined by Mr Timothy L. Hower of MHA Petroleum Consultants LLC in accordance with Petroleum Resource Management System guidelines. Mr Hower is a full-time employee of MHA, is a qualified person as defined under the ASX Listing Rule 5.11 and has consented to the use of the resources figures in this announcement. The estimate of resources was generated following nearly three years of exploration activity by ESG across the licence areas including coreholes and seismic. These data were combined with preexisting well and seismic data to delineate the resources in these areas for the first time. In particular, we are excited to note the interpretation that the Black Jack Formation and Maules Creek Formation resources identified by the Edgeroi-1 and -2 coreholes in PEL 238 continue into southern PEL 427. For personal use only INITIAL RESOURCE FOR PELs 6, 427 & 428 In the immediate term, ESG s appraisal and development field efforts will focus on the Narrabri Gas Project in PEL238 while a programme to convert these resources to reserves is designed. Eastern Star Gas Limited ABN 29 094 269 780 1

Mr David Casey, Managing Director of ESG, said: As Operator, ESG has applied its significant CSG experience in the unique conditions of the coals of the Gunnedah Basin, to the Joint Ventures permit areas. The resource estimates released today are testament not only to the success of our recent exploration programme, but also to the significant upside that exists for continued gas reserves growth for ESG in addition to the Narrabri Gas Project in PEL238 which already has 3P+3C of 9,012 PJs. Eastern Star Gas Limited ABN 29 094 269 780 2

About LNGN The LNG Newcastle Project (LNGN) is a key step in the commercialisation of the significant reserves of gas held by ESG in the Narrabri Gas Project. ESG proposes to use electric motor driven mid-scale LNG technology at Newcastle. Pairs of 0.5 million tonne per annum liquefaction units will be installed in 1 million tonne per annum (MMtpa) trains. ESG has purchased the 24 hectare parcel of land on Kooragang Island as a site for the LNGN Project. It is envisaged the site will be capable of accommodating capacity up to 4 MMtpa. LNG will be stored on site for loading into specially built LNG carriers. As an established port in close proximity to Narrabri, Newcastle is the stand-out location for a gas liquefaction and export project. Approvals processes, arrangements for port access, and water and electricity sourcing arrangements are being progressed The advantages of electric motor driven mid-scale technology The electric motor driven, mid scale, single mixed refrigerant technology offers multiple advantages, especially for LNG projects fed by coal seam gas, including: Low capital cost and quick construction, owing to modular design; High reliability, high efficiency and low environmental impact; Operational flexibility and train size ideally suited for coal seam gas; and Small footprint and low noise are ideal for Kooragang Island location. Project ownership and timetable ESG is working with Hitachi Ltd, Toyo Engineering Corporation and other specialist organisations with a view to committing to development of the LNGN Project by around the end of 2011 with potential for first LNG export by 2015. It is anticipated purchasers of LNG from the LNGN Project will also take equity in Project. Project benefits The LNGN Project will deliver significant benefits to NSW including employment, capital investment and enhanced security of gas supply as well as Royalty income. Schematic of LNG Newcastle Project at Kooragang Island (Image courtesy of Toyo Engineering Corporation) 3

About ESG Eastern Star Gas (ASX:ESG OTCQX:ESGLY), is focused on exploration, development, production and sale of coal seam gas in Australia. The Company s main activity, the Narrabri Gas Project, is located in Petroleum Exploration Licence 238 adjacent to the township of Narrabri in the state of New South Wales Australia. ESG holds a 65.0% interest in PEL 238 and is the Operator. The remaining 35% interest is held by Santos Limited (ASX: STO). PEL 238 covers 7,920 kms² (1.96 million acres) of the Gunnedah Basin, the most lightly explored portion of the Bowen-Gunnedah-Sydney Basin complex which presently supplies a large proportion of Australia s coal seam gas production. Production testing is underway at four locations; the Bibblewindi vertical pilot, Bibblewindi multi-lateral pilot, Bibblewindi West tri-lateral pilot and Bohena vertical pilot. As at 31 December 2009, independently certified 2P reserves were 1520 PJ (of which ESG s net interest is 988 PJ). The gas reserves estimate takes into account the flow testing of the multi-lateral production pilots at Bibblewindi and Bibblewindi West, and outstanding results from coreholes and appraisal vertical wells drilled across the Dewhurst area. Certified 3P reserves total 2,797 PJ (of which ESG s net interest is 1,818 PJ). Further upgrading of reserves will take place during 2011 through an ongoing corehole programme and production from multi-lateral production pilots, including new pilots to be brought on line at Dewhurst and Tintsfield. Like the Bibblewindi multi-lateral pilots, the new pilots incorporate in-seam, or horizontal wells with a length of around 750-1,000m (up to 3,300 feet) drilled perpendicular to the fracture system of the target coal seams. This well design maximises connectivity with the coal, resulting in many times greater flow rates than can be achieved from vertical, fracture-stimulated wells. Test gas from the production pilots is delivered by flowline to the joint venture s Wilga Park Power Station which will be expanded to take pilot production test gas. Arrangements are also being developed for full scale commercialisation of the Narrabri Gas Project. In particular, ESG is pursuing opportunities for supply of gas to new gas fuelled power stations including one proposed for development at Wellington (south of Narrabri). The opportunity for export of liquefied natural gas (LNG) from Newcastle is also being investigated (see About LNGN). LNG exports could commence as early as 2015 at an initial level of 1 Mtpa. PEL238 Prospects & Leads Map 4

This announcement contains forward-looking statements that are subject to risks and uncertainties. These forward-looking statements include information about possible or assumed future results of our business, financial condition, liquidity, results of operations, plans and objectives. In some cases, you may identify forward-looking statements by words such as "may," "should," "plan," "intend," "potential," "continue," "believe," "expect," "predict," "anticipate" and "estimate," the negative of these words or other comparable words. These statements are only predictions. One should not place undue reliance on these forward-looking statements. The forwardlooking statements are qualified by their terms and/or important factors, many of which are outside the Company's control, involve a number of risks, uncertainties and other factors that could cause actual results and events to differ materially from the statements made. The forward-looking statements are based on the Company's beliefs, assumptions and expectations of our future performance, taking into account information currently available to the Company. These beliefs, assumptions and expectations can change as a result of many possible events or factors, including those events and factors described in "Risk Factors" in the prospectus, not all of which are known to the Company. Neither the Company nor any other person assumes responsibility for the accuracy or completeness of these statements. The Company will update the information in this press release only to the extent required under applicable securities laws. If a change occurs, the Company's business, financial condition, liquidity and results of operations may vary materially from those expressed in the aforementioned forward-looking statements. For further information contact: David Casey Managing Director Tel: 61 2 9251 5599 Peter Lansom Exec. Director - Operations Tel: 61 7 3136 1515 Street Address: Level 7, 51 Pitt Street, Sydney NSW 2000 Postal Address: GPO Box 4526, Sydney NSW 2001 office@easternstar.com.au www.easternstar.com.au 5