CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

Similar documents
PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM FOR SSC A/R (CDM-PoA-DD-SSC-AR) - Version 01. CDM Executive Board Page 1

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

The Project Design Document

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

VER PROJECT DESIGN DOCUMENT FORM CONTENTS. A. General description of the project activity. B. Application of a baseline and monitoring methodology

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

Overview of CDM Documentation and Procedures

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

JOINT IMPLEMENTATION PROGRAMME ACTIVITY DESIGN DOCUMENT FORM (JPA-DD) Version 01 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

ID08-WWP-10, METHANE RECOVERY IN WASTEWATER TREATMENT WEST SUMATERA, INDONESIA

Sarbari II hydro power project by DSL Hydrowatt Limited in Kullu, Himachal Pradesh

PDF criado com versão de teste do pdffactory Pro. Para comprar, acesse

Clean Development Mechanism. Lessons learned and future directions. Martin Hession CDM Executive Board

A. General description of the small-scale project activity. C. Duration of the project activity / Crediting period

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS

Annex 27 GENERAL GUIDELINES FOR SSC CDM METHODOLOGIES. (Version 19.0) CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS.

DRAFT UNFCCC/CCNUCC Page 1

" Working Paper Guidance on Criteria for Baseline Setting and Monitoring "

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS. Annexes

CLEAN DEVELOPMENT MECHANISM SMALL-SCALE PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-SSC-CPA-DD) Version 01 CONTENTS

DETERMINATION REfI=tt:::):t~::::I GLOBAL CARBON BV

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS.

THE GOLD STANDARD POA RULES AND GUIDANCE ANNEX F (GSV2.2)

Salto Pilão Hydropower Plant Project Activity

JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM Version 01 - in effect as of: 15 June 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROPOSED NEW METHODOLOGY: MONITORING (CDM-NMM) Version 01 - in effect as of: 1 July 2004 CONTENTS

THE GOLD STANDARD PROGRAMME OF ACTIVITIES GUIDANCE DOCUMENT

Large-scale Consolidated Methodology Waste energy recovery

JCM Project Design Document Form

VERIFICATION REPORT VEJO GUSIS,UAB

Vega Bahia Landfill Project Design Document

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

Bulgarian JI Guidelines. 2006, September

(GS-VER-PDD) THE GOLD STANDARD: Project Design Document for Gold Standard Voluntary Offset projects

JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM Version 01 - in effect as of: 15 June 2006 CONTENTS

Annex 2 PROCEDURES FOR THE SUBMISSION AND CONSIDERATION OF A PROPOSED NEW SMALL SCALE METHODOLOGY. (Version 03) I. BACKGROUND

JCM Project Design Document Form

Project Design Document

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS.

Determination Report

AWMS METHANE RECOVERY PROJECT MX06-S-89, AGUASCALIENTES AND GUANAJUATO, MÉXICO

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM Version 01 - in effect as of: 15 June 2006 CONTENTS

Santangou First and Second Grade Hydropower Stations Project MONITORING REPORT

JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM - Version 01

Version 05.0 Page 1 of 43

-SUBMISSION BY MEXICO REDUCING GREENHOUSE GAS EMISSIONS FROM DEFORESTATION IN DEVELOPING COUNTRIES

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

Supplement to the Official Journal of the European Union. Official name: National registration number: 2

CDM Programme of Activities Call for Public Inputs

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL

Memorandum of Understanding on cooperation regarding Clean Development Mechanism project activites and climate policy issues.

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS. Annexes

JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM Version 01 - in effect as of: 15 June 2006 CONTENTS

Validation Report. Abonos Colombianos SA.

VALIDATION REPORT. KKK Hydro Power Limited Baragran Hydro Electric Project, 3.0 MW (being expanded to 4.9 MW)

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

VALIDATION REPORT SAIHANBA EAST MW WINDFARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

GOLD STANDARD PASSPORT

PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03

Esivere and Virtsu II Wind Power Developments Project Design Document (PDD) Prepared by ECON Analysis, For OÜ Roheline Ring

Annex 10. Methodological tool. Tool to calculate project emissions from electricity consumption. (Version 01)

Methodological tool Tool to calculate project or leakage CO 2 emissions from fossil fuel combustion

CLEAN DEVELOPMENT MECHANISM SMALL-SCALE PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-SSC-CPA-DD) Version 01 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

Monitoring Report (Version 1) January 19, for Poland Walbrzych Coke Oven Gas CHP 01/01/ /12/2010

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

CLEA DEVELOPME T MECHA ISM PROJECT DESIG DOCUME T FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CO TE TS

Practical Considerations of LFG Analysis, Measurement, and Data Management to Receive CDM Credits. Tony Trocian

Version 03.0 Page 1 of 59

Clean Development Mechanism

MRV IN THE CONTEXT OF INDCS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROPOSED NEW METHODOLOGY: BASELINE (CDM-NMB) Version 02 - in effect as of: 15 July 2005

Validation Report. BK Energia Itacoatiara Ltda. Validation of the BK Energia Itacoatiara Project, Brazil. Report No , September 8

VER MONITORING REPORT

VALIDATION REPORT. Ratchaburi Farms Biogas Project at SPM Farm in Thailand REPORT NO REVISION NO. 01

VERIFICATION/CERTIFICATION REPORT PERIODIC VERIFICATION OF THE TROJES HYDROELECTRIC PROJECT IN MEXICO

JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM - Version 01

Validation Report. Report No , Revision April 2007

VALIDATION REPORT 7.5 MW GRID-CONNECTED BIOMASS POWER PROJECT, BY RAVI KIRAN POWER PROJECTS PRIVATE LIMITED IN INDIA

Project design document form for CDM project activities (Version 05.0)

VALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO.

CDM projects development activities in India. Vivek Kumar TERI 26 July 2005

A/R Methodological tool. (Version 01)

Introduction to Baseline Setting: Why, What and How?

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS

Transcription:

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS A. General description of the small scale project activity B. Application of a baseline and monitoring methodology C. Duration of the project activity / crediting period D. Environmental impacts E. Stakeholders comments Annexes Annex 1: Contact information on participants in the proposed small scale project activity Annex 2: Information regarding public funding Annex 3: Baseline information Annex 4: Monitoring Information 1

Revision history of this document Version Date Description and reason of revision Number 01 21 January 2003 Initial adoption 02 8 July 2005 The Board agreed to revise the CDM SSC PDD to reflect guidance and clarifications provided by the Board since version 01 of this document. As a consequence, the guidelines for completing CDM SSC PDD have been revised accordingly to version 2. The latest version can be found at <http://cdm.unfccc.int/reference/documents>. 03 22 December The Board agreed to revise the CDM project design 2006 document for small-scale activities (CDM-SSC-PDD), taking into account CDM-PDD and CDM-NM. 2

SECTION A. General description of small-scale project activity A.1 Title of the small-scale project activity: A.2. A.3. A.4. Description of the small-scale project activity: Project participants: Technical description of the small-scale project activity: A.4.1. Location of the small-scale project activity: A.4.1.1. A.4.1.2. A.4.1.3. Host Party(ies): Region/State/Province etc.: City/Town/Community etc: A.4.1.4. Details of physical location, including information allowing the unique identification of this small-scale project activity : A.4.2. Type and category(ies) and technology/measure of the small-scale project activity: A.4.3 Estimated amount of emission reductions over the chosen crediting period: A.4.4. Public funding of the small-scale project activity: A.4.5. Confirmation that the small-scale project activity is not a debundled component of a large scale project activity: SECTION B. Application of a baseline and monitoring methodology 3

B.1. Title and reference of the approved baseline and monitoring methodology applied to the small-scale project activity: B.2 Justification of the choice of the project category: B.3. B.4. Description of the project boundary: Description of baseline and its development: B.5. Description of how the anthropogenic emissions of GHG by sources are reduced below those that would have occurred in the absence of the registered small-scale CDM project activity: B.6. Emission reductions: B.6.1. Explanation of methodological choices: B.6.2. Data and parameters that are available at validation: (Copy this table for each data and parameter) Data / Parameter: Data unit: Description: Source of data used: Value applied: Justification of the choice of data or description of measurement methods and procedures actually applied : Any comment: B.6.3 B.6.4 Ex-ante calculation of emission reductions: Summary of the ex-ante estimation of emission reductions: B.7 Application of a monitoring methodology and description of the monitoring plan: B.7.1 Data and parameters monitored: 4

(Copy this table for each data and parameter) Data / Parameter: Data unit: Description: Source of data to be used: Value of data Description of measurement methods and procedures to be applied: QA/QC procedures to be applied: Any comment: B.7.2 Description of the monitoring plan: B.8 Date of completion of the application of the baseline and monitoring methodology and the name of the responsible person(s)/entity(ies) SECTION C. Duration of the project activity / crediting period C.1 Duration of the project activity: C.1.1. Starting date of the project activity: C.1.2. Expected operational lifetime of the project activity: C.2 Choice of the crediting period and related information: C.2.1. Renewable crediting period C.2.1.1. C.2.1.2. Starting date of the first crediting period: Length of the first crediting period: 5

C.2.2. Fixed crediting period: C.2.2.1. C.2.2.2. Starting date: Length: SECTION D. Environmental impacts D.1. If required by the host Party, documentation on the analysis of the environmental impacts of the project activity: D.2. If environmental impacts are considered significant by the project participants or the host Party, please provide conclusions and all references to support documentation of an environmental impact assessment undertaken in accordance with the procedures as required by the host Party: SECTION E. Stakeholders comments E.1. E.2. E.3. Brief description how comments by local stakeholders have been invited and compiled: Summary of the comments received: Report on how due account was taken of any comments received: 6

Annex 1 CONTACT INFORMATION ON PARTICIPANTS IN THE PROJECT ACTIVITY Organization: Street/P.O.Box: Building: City: State/Region: Postfix/ZIP: Country: Telephone: FAX: E-Mail: URL: Represented by: Title: Salutation: Last Name: Middle Name: First Name: Department: Mobile: Direct FAX: Direct tel: Personal E-Mail: 7

Annex 2 INFORMATION REGARDING PUBLIC FUNDING 8

Annex 3 BASELINE INFORMATION Annex 4 MONITORING INFORMATION - - - - - 9