FAR SUBPART 22.9 NONDISCRIMINATION BECAUSE OF AGE (FEB 1964)

Similar documents
ACCOUNTING AND APPROPRIATION DATA


ADDENDUM # 1 To: RFQ for: Remodeling & Renovations at Victoria Plaza & O.P. Schnabel Apartments

SNOW REMOVAL SERVICES

ATTACHMENT B. General Decision Number: SC /31/2017 SC15. Superseded General Decision Number: SC State: South Carolina

ATTACHMENT J.11 FORM OF OFFER LETTER

ADDENDUM ADDENDUM NUMBER: One DATE: 30 October 2012

ADDENDUM NO. 1. Modernization of Two Elevators at 902 South L Street (Administration Building)

General Decision Number: WA /03/2017 WA100. Superseded General Decision Number: WA State: Washington

INVITATION FOR BID TERMS AND CONDITIONS:

Lyndhurst Elementary School Renovation & Addition Secondary Technology Design Package

Buchanan, Buckingham, Buena Vista*, Carroll, Charlotte, Clifton. Forge*, Covington*, Craig, Cumberland, Dickenson, Floyd,

2016 Wage Survey of Public and Private Construction Projects Building Construction Trades (Excludes Residential Construction)

BOILERMAKER...$ BRRI /01/2014

BOILERMAKER...$ BRRI /01/2016

PROPOSED TASK ORDER: DESIGN-BID-BUILD FOR CONTRACTS:

Connecticut Department of Labor Wage and Workplace Standards Division

BUREAU OF ENGINEERING CHANGE ORDER LABOR RATES FOR CONSTRUCTION (Based on Determination ) PAYROLL TAXES INSURANCE STRAIGHT TIME

BUREAU OF ENGINEERING CHANGE ORDER LABOR RATES FOR CONSTRUCTION (Based on Determination ) PAYROLL TAXES INSURANCE STRAIGHT TIME

BOILERMAKER...$ BRPA /01/2010

2. Detailed description of services Scope of Work (SoW) is attached in Attachment 1.

PREVAILING WAGE RATES. for. Public Works Contracts in Oregon

PREVAILING WAGE RATES. for. Public Works Contracts in Oregon

Attachment M - Prevailing Wage Information

Construction Industry Occupational Wage Survey Results

San Diego Unified School District Project Stabilization Agreement (PSA) Pre-Job Conference Form

CORRECTED (INCLUDES GENERAL INFORMATION) TECHNICAL SPECIFICATION

Construction Types: Building, Heavy, Highway and Residential


Davis-Bacon Wage Survey. Maine Building, Heavy, Highway 2014 Construction Survey

Prevailing Wage Rates

APPRENTICESHIP. Procurement

LABOR AGREEMENT BETWEEN THE UNIVERSITY OF MINNESOTA AND THE MINNESOTA STATE BUILDING AND CONSTRUCTION TRADES COUNCIL

2010 Construction Industry Occupational Wage Survey Report

15010 / Ashland Library - Boiler Replacement PROJECT TITLE PAGE

PREVAILING WAGE RATE DETERMINATION

Alberta Ministry of Labour 2015 Alberta Wage and Salary Survey

Getting into the Trades

Prevailing Wage Rates

Heavy Construction and Wage Schedule

PREVAILING WAGE RATE DETERMINATION

PREVAILING WAGE RATE DETERMINATION

Prevailing Wage Frequently Asked Questions

Attached please find the prevailing wage rates for the Fire & EMS Headquarters project per your request. Thanks,

CAREERS. in the Construction TRADES

Notice to Contractors-Request for Solicited proposals/quotes

2016 BUILDING DEFINITIONS

Designated workers for designated skills

Trane U.S. Inc. Authorized Government Price List. GSA Hourly Billing Rates for Labor Categories Under SINs and Position Description

Roller Shades FOR GREENWICH PUBLIC SCHOOLS BID #926-13

The Kent School District And American Federation of Teachers (AFT)

Project Name: Dawson Springs Museum Rehabilitation Project. Project No. : Date: May 17, 2013

G U I D E T O STATE REGISTERED CONSTRUCTION APPRENTICESHIP PROGRAMS

Public Utility Distric Of Jefferson County

NOTICE AND INSTRUCTIONS TO BIDDERS 01/24/2017

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

Forecasting Construction Labor Demand: A Working Model?

IMPACTING DAVIS-BACON WAGE DETERMINATIONS

GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA. N$4.00 WINDHOEK - 19 June 2012 No. 4970

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Preconstruction, Certified Payroll & Relocation

GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA. N$4.00 WINDHOEK - 24 December 2013 No. 5372

8367 TRANSPORTATION WORKER 3

LORD Erie Robinson Road Relocation Project Exterior Sitework 2455 Robison Road

Gain an NVQ qualification for your skills

The Corporation of The City of London

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

We value your time and Business COMPANY PROFILE


MATERIAL ALLOWANCES AND UNIT PRICES

U.S. DEPARTMENT OF LABOR SCA RESOURCE BOOK 11/2002 SCA WAGE DETERMINATIONS SERVICE CONTRACT ACT WAGE DETERMINATIONS

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

REQUEST FOR CONSTRUCTION BIDS May 23, 2017

CONSULTING OFFICE OF MORRIS S. FARKAS PROFESSIONAL SAFETY ENGINEER

Career Paths. James Murphy Workforce Development Coordinator

Construction Summary

Government Gazette Staatskoerant

BETTER SANITARY FACILITIES ON CONSTRUCTION SITES ERRATUM TAXABLE BENEFITS. Edition. Published for the employers in the construction industry

APPENDIX 7 SPECIAL CONDITIONS

Application for Employment

LOCAL HIRING POLICY FOR CONSTRUCTION

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

Construction Education Foundationof Alabama

Table of Contents. Page Number

UPPER MILFORD TOWNSHIP DIRECTIONS TO APPLICANTS PUBLIC WORKS MAINTENANCE WORKER. General Description of Duties: Duties and Responsibilities:

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

SECTION UNCLASSIFIED EXCAVATION AND GRADING

ROCKDALE WORLD WAR I MEMORIAL RESTORATION

Table of Contents for Guide Specifications

The Construction Industry Labour Relations Act, 1992

Legal Eagle: OSHA s Multi-Employer Policy

ARCHITECTURAL REVIEW CRANBERRY WOODS

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

BUILD UP Skills - IRELAND

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Expo Light Rail Line. Expo Board Presentation Monthly Project Status Update December 3, 2015

Electrical System, Maintenance and Repair Services For the PennDOT District 6-0 Office and Lab Buildings Statement of Work

Builder Agreement. Access to build in Mountainside Village constitutes agreement to abide by the following:

Does the applicant have a permanent yard? Does the applicant provide 24 hour services? What is the radius of operations: Usual: miles Maximum: miles W

Transcription:

PART 3 - WAGE DETERMINATION 3.J MINIMUM WAGE SCHEDULE FAR SUBPART 22.9 NONDISCRIMINATION BECAUSE OF AGE (FEB 1964) 22.901 Policy. Executive Order 11141, February 12, 1964 (29 CFR 2477), states that the Government policy is as follows: (a) Contractors and subcontractors shall not, in connection with employment, advancement, or discharge of employees, or the terms, conditions, or privileges of their employment, discriminate against persons because of their age except upon the basis of a bona fide occupational qualification, retirement plan, or statutory requirement. (b) Contractors and subcontractors, or persons acting on their behalf, shall not specify in solicitations or advertisements for employees to work on Government contracts, a maximum age limit for employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan, or statutory requirement. (c) Agencies will bring this policy to the attention of contractors. The use of contract clauses is not required. General Decision Number: MD120077 01/06/2012 MD77 Superseded General Decision Number: MD20100133 State: Maryland Construction Type: Building County: Anne Arundel County in Maryland. BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories). Modification Number Publication Date 0 01/06/2012 CARP0132-013 05/01/2011 CARPENTER (Including Drywall Hanging, Form Work and Metal Stud Installation) (Excluding Acoustical)...$ 26.74 7.45 PILEDRIVERMAN...$ 24.94 8.15 CARP1831-002 04/01/2011 MILLWRIGHT...$ 30.24 7.65 ELEC0024-012 05/30/2010 3-J-1

ELECTRICIAN (Including low voltage wiring for and installation of alarms; HVAC controls)...$ 34.10 5.25%+12.95 ELEC0024-013 05/30/2010 ELECTRICIAN (Communication and Sound Equipment)...$ 23.38 4.75%+10.45+a PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day ENGI0037-026 04/01/2009 OPERATOR: Bobcat/Skid Loader...$ 22.93 OPERATOR: Bulldozer...$ 24.88 OPERATOR: Excavator...$ 24.88 OPERATOR: Forklift...$ 24.88 OPERATOR: Gradall...$ 24.88 OPERATOR: Paver...$ 24.88 OPERATOR: Roller excluding Asphalt...$ 19.30 a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day. IRON0016-012 04/01/2010 GLAZIER...$ 26.38 16.25 IRONWORKER (Fence Erection)...$ 26.13 16.25 IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL...$ 26.38 16.25 IRONWORKER/SHEETER...$ 26.63 16.25 PAIN0051-024 06/01/2010 PAINTER Brush, Roller, Spray, Drywall Finisher/Taper and Paperhanger...$ 24.64 7.86 Industrial...$ 27.68 7.86 * PLAS0891-005 07/01/2011 PLASTERER...$ 27.66 5.82 3-J-2

PLAS0891-006 05/01/2010 CEMENT MASON/CONCRETE FINISHER...$ 27.15 9.58 PLAS0891-008 08/01/2011 PLASTERER (Fireproofing Including Sprayer, Mixer, and Handler) Handler...$ 15.00 3.89 Mixer/Pump...$ 17.00 3.89 Sprayer...$ 21.50 3.89 PLUM0486-012 05/01/2011 PIPEFITTER (Including HVAC Pipe and System Installation)...$ 35.585 15.43 ROOF0030-032 05/01/2011 All Areas South of the following line: where the point at which Maryland Route No. 175 crosses into Anne Arundel County from Howard County, southeast on Highway No. 175 into Highway No. 178 into Highway No. 50, then to Highway No. 2 to West Street; east to Bay Bridge Road and follow Bay Bridge Road to the bay. ROOFER, Excluding Metal Roofs...$ 26.60 8.98 ROOF0030-034 08/01/2009 Remainder of Area ROOFER, Excluding Metal Roofs...$ 23.80 5.77 SFMD0536-003 08/01/2011 SPRINKLER FITTER (Fire Sprinklers) Baltimore City including a 10 mile radius beyond the city limits...$ 30.80 15.55 SFMD0669-003 04/01/2011 3-J-3

SPRINKLER FITTER (Fire Sprinklers) Remaining Areas...$ 29.95 17.00 SHEE0100-020 07/01/2011 SHEETMETAL WORKER (HVAC Duct Installation Only)...$ 29.88 15.73 SUMD2010-087 08/20/2010 ABATEMENT WORKER: ASBESTOS (Removal from Mechanical Systems)...$ 12.37 3.91 ASBESTOS WORKER/HEAT & FROST INSULATOR...$ 22.60 8.26 BRICKLAYER (Excluding Pointing, Caulking and Cleaning)...$ 24.20 6.22 CARPENTER (Acoustical Installation Only)...$ 16.00 2.60 ELEVATOR MECHANIC...$ 29.11 6.13 LABORER: Common or General...$ 9.64 2.34 LABORER: Grade Checker...$ 16.00 2.90 LABORER: Landscape...$ 10.00 0.00 LABORER: Mason Tender - Brick...$ 12.63 1.29 LABORER: Mason Tender - Cement/Concrete...$ 17.81 0.00 LABORER: Mason Tender - Stone...$ 14.03 0.00 LABORER: Mason Tender (Pointing, Caulking, Cleaning)...$ 12.93 0.00 LABORER: Mortar Mixer...$ 16.61 9.08 LABORER: Pipelayer...$ 16.00 00.00 MASON - STONE...$ 29.82 10.05 OPERATOR: Asphalt Roller...$ 21.35 5.38 OPERATOR: Backhoe...$ 22.78 5.94 OPERATOR: Boom...$ 21.44 8.29 OPERATOR: Crane...$ 20.17 4.64 3-J-4

OPERATOR: Grader/Blade...$ 16.75 5.79 OPERATOR: Loader...$ 17.25 PLUMBER...$ 27.91 10.85 POINTER, CAULKER, CLEANER, Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...$ 19.75 SCAFFOLD BUILDER...$ 16.60 0.56 SHEET METAL WORKER (Excluding HVAC Duct and Metal Roof Installation)...$ 26.08 7.29 SHEET METAL WORKER (Metal Roof Installation Only)...$ 20.71 6.23 TILE FINISHER...$ 17.08 2.10 TILE SETTER...$ 21.38 4.65 Truck Driver, Dump...$ 15.40 1.96 TRUCK DRIVER: Tractor Haul Truck...$ 17.87 9.98 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with 3-J-5

characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters, PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division 3-J-6

U.S. Department of Labor 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION General Decision Number: MD120016 01/06/2012 MD16 Superseded General Decision Number: MD20100060 State: Maryland Construction Type: Highway County: Anne Arundel County in Maryland. HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction; bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction; and other major bridges). Modification Number Publication Date 0 01/06/2012 * SUMD2010-003 01/28/2010 3-J-7

CARPENTER...$ 20.60 7.96 CEMENT MASON/CONCRETE FINISHER...$ 23.30 ELECTRICIAN...$ 29.15 13.32 IRONWORKER Reinforcing & Structural...$ 26.55 14.68 LABORER Air Tool Operator...$ 15.56 4.33 Common/Unskilled...$ 14.52 2.55 Concrete Surfacer...$ 13.55 2.26 Pipelayer...$ 16.00 3.55 PAINTER Painter...$ 22.21 6.91 Steel Bridge...$ 30.32 7.91 POWER EQUIPMENT OPERATOR: Backhoe...$ 23.10 9.95+a Bobcat...$ 22.20 10.40+a Bulldozer...$ 23.10 10.40 Excavator...$ 23.10 10.40+a Gradall...$ 24.10 10.40+a Grader...$ 24.10 11.05+a Loader...$ 23.10 10.40+a Milling Machine...$ 23.10 9.95+a Paver...$ 22.20 10.40 Roller, Asphalt...$ 22.20 10.40 Roller, Earth...$ 22.84 8.29+a Scraper...$ 22.84 8.29+a Sweeper...$ 22.20 9.95+a FOOTNOTE: a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day. WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage 3-J-8

determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters, PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. 3-J-9

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION 3-J-10