Capital Rail Constructors a Clark & Kiewit Joint Venture Jim Ansari Senior Vice President & General Manager

Similar documents
Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #92 Douthit Hills Student Community, Clemson University Project Joe Jett

Ironton Russell Bridge Project

Ironton Russell Bridge Project

PROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404

Phase 2 Exposition Metro Line Project

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Ironton Russell Bridge Project

MANHATTAN COLLEGE STUDENT COMMONS

Arbor Heights Elementary School. Concrete for South Building Foundation Stem Walls

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

New Reclaim Tunnel at Coal Fired Plant

Ironton Russell Bridge Project

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

FDA CDRH Laboratory Silver Spring, Maryland. Executive Summary: Timothy Mueller Structural Option Walter Schneider

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation.

Smarter. Safer. Leaner.

Construction Project Briefing

Metropolitan Washington Airports Authority. Phase 2: Extension To Dulles Airport/Route 772 STATEMENT OF WORK

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

Building Inspection Report

Jacksonville Port Authority Blount Island Marine Terminal Rail Improvements Jacksonville, Florida

Roofgard Paving Support System

SECTION UTILITY MANHOLES AND STRUCTURES

Project Information Session / Meet and Greet # 3

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711

Agenda. PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Training Certification Categories

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Superior strength, flexibility, safety and value.

Property Condition Assessment

Planned Procurement Opportunities Report. November 2017

CITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS

Planned Procurement Opportunities Report. February 2018

COMMUNITY BOARD EIGHT

Element Z General Design Requirements Existing Facilities Information

Retrofit of an Existing Californian Hospital to Immediate Occupancy Standards One Year Later Again R. Jay Love, S.E.

Bonner Bridge Replacement Update:

Sri Ganesha Temple HTNT Construction Update (June, 2016) Copyright All Rights Reserved.

CATAMARAN TOWER - 1 Seef Area Plot 19, 20

UNC Charlotte Residence Hall Phase X. Bid Results February 16, Alternate #7A Pinehall Brick Pavers. Alternate #6A Tile Student Bath

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following:

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST

Johns Hopkins Graduate Student Housing. Thesis Proposal. 929 North Wolfe Street Baltimore, Maryland Brad Oliver Structural Advisor: Professor Memari

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

The designer shall also submit additional information required by the University as described and underlined below.

TYPE "A" CATCH BASIN

Table of Contents. July

EXTREME. Makeover. Nu Skin Enterprises Utah campus gets a fresh new look.

Hamilton Rapid Transit Preliminary Design and Feasibility Study

Ongoing and Future Project Work. Construction Management

ARCHITECTURAL EXPANSION JOINT PRE-INSTALLATION INSPECTION

METRO BOARD OF DIRECTORS Capital and Strategic Planning

CHAPTER 11 CONDUITS AND FITTINGS

Planned Procurement Opportunities Report. December 2017

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

Cheldelin Middle School

Meriter Heights Renovations Madison, Wisconsin

Planned Procurement Opportunities Report. January 2018

Steps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to

CONDUITS AND FITTINGS

QUALITY CONTROL LABORATORIES, LLC th Street, Suite 102 Woodside, New York 11377

Aviation Capital Construction Program Update

CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

Design and Rating of Steel Bridges

STANDARD BWL-1: NOTES TO DESIGNER

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University

1 Firestone EPDM Roofing Systems

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

RESILIENT INFRASTRUCTURE June 1 4, 2016

GV 001 Equipment Bases and Enclosures General Information

MIDAS Training Series

LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap

PRE-CAST HOUSE CONSTRUCTION

Inspection History. YES Jan/08/2015 Completed OK Name: Jose Gonzalez Mobile Ph: Office Ph:

DIVISION PARKING STRUCTURES

Administrative Changes

Steps And Stairs Installation Option 1 - Steps In Wall Option 2 - Steps With Plant Space Option 3 - Steps In Front of Walls Option 4 - Steps Along

Regional Study & Resource Centers (RSRC s) pre-bid meeting: OSHAKATI HELAO NAFIDI

ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Thesis Proposal Dr. Ali Memari January 13 th, 2012

Status of ITER Buildings construction and next procurement steps

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Landscaping and Fencing

Prof. Nichols St. Nooshin Ahmadi Yasaman Bagheri Farzad Golestanirad. An Iconic Building And A Successful Stadium

Electric Service Standards

Transcription:

Program Panelist Capital Rail Constructors a Clark & Kiewit Joint Venture Jim Ansari Senior Vice President & General Manager Moderator Kevin Pavuk, Structural Technologies Presentation 5:30 to 7:00 p.m. Reception 7:00 to 8:00 p.m.

Dulles Corridor Metrorail Project Phase 2, Package A Capital Rail Constructors Project Update Jim Ansari Capital Rail Constructors APRIL 2018

Scope

Overall Project Status Design and Construction: Construction Status: Design Status: 81% Complete 80% Complete 99.98% Complete

Facilities: Dulles Airport Station Platform Granite: Elevator Install: Storefront Glass: TPSS 16 Install: Start Up Station AC Switchgear: Apr 2018 - May 2018 May 2018 - Aug 2018 Feb 2018 - Jun 2018 Ongoing Apr 2018

Innovation Station Pavilions SOUTH: Structural Precast: Structural Steel: Complete 90% Complete NORTH: Retaining Wall: Site Ductbank: 90% Complete Underway

Innovation Station Pedestrian Bridges 2 1 NORTH PAVILION SOUTH PAVILION 8 7 6 5 4 3 # = Span Installed SOUTH: 4 Spans NORTH: 4 Spans

Facilities: Herndon Station Roofing: Mezzanine Waterproofing: Platform Paving: Elevator Cab Installation: Underway Underway Underway Underway

Herndon Station Pedestrian Bridges 8 SOUTH PAVILION 7 6 5 4 4 3 2 1 NORTH PAVILION # = Span Installed SOUTH: 5 Spans NORTH: 3 Spans

Facilities: Reston Town Center Station Mechanical Rough-In: Jan 2017 - Fall 2018 Roofing: Sep 2017 - Jun 2018 Elevator : Starts Apr Curtain Wall (West Stair): Starts Apr 2018 Barrel Roof: 20% Complete Set Escalators: 25% Complete Topping Slab: 40% Complete Ceiling Framing: 70% Complete Concrete Masonry Units: 80% Complete EPDM Roof (Rubber Membrane): 90% Complete Precast: Complete Steel Erection: Complete Metal Decking: Complete Curtain Wall (Mezz. Level): Complete

Reston Town Center Station Pavilions SOUTH: Concrete Work: Pavilion Backfill: Precast Erection: 80% Complete Complete Start Mid-Apr NORTH: Precast Erection: Escalator Setting: Steel Canopy Erection: Complete Complete 90% Complete

Reston Station Pedestrian Bridges 6 5 4 3 2 SOUTH PAVILION 1 NORTH PAVILION # = Span Installed SOUTH: 2 Spans NORTH: Spans 4

Loudoun Gateway Station Precast Erection: Complete Apr 2018 Vault Roof Steel Erection: Complete Granite Edge: Feb 2018 Apr 2018 Platform Pavers: Started Mar 2018

Loudoun Gateway Pavilion NORTH: Cast-In-place Concrete: Complete Precast Erection: Feb 2018 Apr 2018 Escalators Set: Apr 2018

Loudoun Gateway Pedestrian Bridge 4 3 2 1 NORTH PAVILION # = Span Installed NORTH: 4 Spans

Loudoun Gateway Pedestrian Bridge NORTH: Topping Slab Spans 3-4: Topping Slab Spans 1-2: Complete Complete

Facilities: Ashburn Station Looking East Cast-In-Place Concrete: Jan 2017 Apr 2018 Precast Erection: May 2017 Apr 2018 Steel Erection: Jan 2018 May 2018 Looking West

Ashburn Station Pedestrian Bridges # = Span Installed 5 4 3 2 1 SOUTH PAVILION NORTH PAVILION SOUTH: 2 Spans NORTH: 3 Spans

Civil: Wayside Ductbank Tie Breaker Stations 8 & 20 Median: Traction Power Substation 20 Median Phase I: Complete after Track Wall Installed Q2 & Q3 Active

Civil: Storm Drainage Storm/Wet Utilities: 73,500 of 86,400 Linear Feet Storm Pipe Installed: 85% Complete 9,000 of 22,400 Linear Feet of Water & Sewer Installed: 40% Complete Reston North & South Storm: Q2 N09: DIAAH/DTR Median Storm: Q3 Innovation North Water: Q2 Ashburn North/South Water & Sewer: Q2 Loudoun Gateway North Water & Sewer: Q2/3

Civil: Track Wall Track Wall: Total Footer Installed: 72,000 of 75,000 Linear Feet: 96% Complete Total Wall Installed: 70,400 of 75,000 Linear Feet: 94% Complete East Segment: Close Leave-Outs (4 Each) West Segment: West of Loudoun Gateway and Ashburn Stations: Active

Civil: Grading/Excavation/Paving East: Phase I Tie-in Sub-Ballast: Reston South Cistern: Herndon North Pavilion Excavation: DIAAH/DTR Road Widening Near Herndon: Innovation North DTR Retaining Wall: West: Shoulder/Sub-Ballast: Abutments B to YL: West of Loudoun Grading/Track Wall: East of Loudoun Duct Bank/Storm Drainage: Ponds 2-12 and 2-9 Construction: May Active Active Active Active Active Active Active Active

Track: Cable Trough Precast Cable Trough Installed: 69,984 of 81,176 Linear Feet: 86% Complete Cast-In-Place Cable Trough Poured: 38,520 of 38,520 Linear Feet: Complete

Track: Direct Fixated (DF)Plinths Direct Fixated Track Plinth: 37,595 of 37,595 Track Feet Poured: Complete

Track: Contact Rail Contact Rail (Aerial Guideway): 31,116 of 40,750 Linear Feet Installed: 76% Complete Contact Rail (Ballasted Guideway): 24,400 of 88,446 Linear Feet Installed: 28% Complete Emergency Guard Rail: 40,694 of 46,760 Linear Feet installed: 87% Complete

Track: Ballasted Ties Set and Rail Clipped: 52,254 of 87,090 Total Feet: 60% Complete

Systems: Wayside Facilities/Power Traction Power Substations 13/14/15/17/18/19/20; Tie-Breaker Stations 6/7/9/10/11 Train Control Room Buildout Complete for Automatic Train Control at Segment N97 and Underway at Segments N96/N09 Automatic Train Control Cable Pulled and Devices Set at Segments N97/N96 and Underway at Segments N99E/N09 Dominion Energy Vista Switch Yard Installations: Complete 95% of All 34.5kV Cable Has Been Installed, Spliced, and Terminated Project Wide Permanent 34.5kV Power Energized at Traction Power Substations 13/14/15/16/17/18

Start-up/Commissioning/Turnover WEST SEGMENT 19 9 Civil Trackwork ATC/TES Work Underway 10 TES Building Set 17 7 EAST SEGMENT 15 14 13 6 AIRPORT SEGMENT Stations: Switchgear Testing begins April; Communications Installation Started at Dulles and Innovation Stations Guideway: Turnover to Systems 59% Complete at Segments N99E/N98A/N97/N10/N96/N09/N08 Waysides: 93% of Buildings Set: Train-Braking Systems 6/7/9/10 andntraction Power Substations 12/13/14/15/ 17/18/19/20; Fit-Out Ongoing Overall: Finalizing Dynamic Testing Plans