COUNTY SANITATION. Saugus and Valencia Water Reclamation Plants (WRPs) Chloride Study

Similar documents
Valencia Water Company. Groundwater Softening Demonstration Project

TDS AND SLUDGE GENERATION IMPACTS FROM USE OF CHEMICALS IN WASTEWATER TREATMENT

ADMIN DRAFT (SECTIONS 1-7) Castaic Lake Water Agency Recycled Water Master Plan

CHAPTER 5 EXISTING AND PROJECTED WATER AND WASTEWATER CHARACTERISTICS

HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY

Guide to Industrial Waste Fees for Commercial and Industrial Users

Wastewater ENVIRONMENTAL SETTING. Wastewater Collection

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria

Operations Report. September 10, 2015

Local Limits Evaluation. Genet Belete Oregon DEQ Pretreatment Program

Decentralised Wastewater Management. A sustainable strategy for wastewater management

Corrosion and Odor Control in Wastewater Systems

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

UWMP Standardized Tables. Palos Verdes District Urban Water Management Plan Appendix H

NPDES Permit No: AR , Routine Compliance Inspection

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

Controlling Odour and Corrosion in the Collection System: Region of Peel s Trunk Sewer Odour and Corrosion Control Master Plan

MONITORING AND RESEARCH DEPARTMENT

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018

Wastewater Treatment. Knowledge. Commitment. Excellence.

Application for Renewal Industrial Wastewater Discharge Permit

Domestic grey water treatment and recovery to meet up the standards of characteristics of irrigation water

Potable Water Supply, Wastewater & Reuse Element

Desalination. Section 10 SECTION TEN. Desalination

OAKLAND COUNTY HEALTH DIVISION SANITARY CODE ARTICLE II - GROUNDWATER PROTECTION

THM Removal by Water Spray Aeration- Tank Top Results. Thomas F. Clark, P.E. Production Engineer Monroe County Water Authority Rochester, New York

September 26, RE: Waste Water Treatment System. Dear Mr. Starks:

James Ferrell 10/3/07 Page 2

Executive Directive #5 Issue Date: October 14, 2014 Subject: Emergency Drought Response Creating a Water Wise City Introduction Los Angeles and

Evaluation copy. Total Dissolved Solids. Computer INTRODUCTION

Comparison of Water Quality Parameters

County of Sonoma Agenda Item Summary Report

Study on performance evaluation of. sustainability

2005 ANNUAL REPORT OF SANTA ANA RIVER WATER QUALITY

Wastewater Reuse Regulations In Saudi Arabia

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Public Health Guidance for Implementing Decentralized Non- Potable Water Systems SYBIL SHARVELLE

Alternatives for addressing chloride in wastewater effluent

Calleguas TMDLs 2012 Annual Progress Report

GUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT

Green Credits for Water & Wastewater Systems November 4, 2010

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

Report AQUA METROLOGY SYSTEMS. SafeGuard H2O Pilot Report. Online Cr(VI) Remediation System

COLLECTION SYSTEM O&M AND ASSET MANAGEMENT AT LACSD. Anthony Howard, PE Supervising Engineer Water Reclamation Plants Section

Closing the Gap Reaching for Energy Independence in Water Reclamation

Tweed Shire Demand Management Strategy & Water Supply Augmentation Options Study A Brief Technical Review

November 28, Dear Mr. Bechtold:

6.1 Introduction to Wastewater Issues

ROUGE RIVER MONITORING FOR E. COLI TMDL IMPLEMENTATION FINAL REPORT GRANT#

Copper Corrosion Control

Pam Iorio, Mayor 306 E. Jackson St * Tampa, FL Wastewater Department. Overflow Report

Removing Heavy Metals from Wastewater

USE OF CHEMICALS TO CONTROL ODORS AND CORROSION IN WASTEWATER SYSTEMS

OVERVIEW OF MDE WATER & WASTEWATER OPERATOR TREATMENT CERTIFICATION REQUIREMENTS. September 26, 2013

Design of Sewerage System for Jaffarpur area in Southwest New Delhi

Clark County Water Reclamation District January 1, 2017

DECENTRALIZED WASTEWATER TREATMENT PLANNING, ALTERNATIVES, MANAGEMENT

TECHNICAL MEMORANDUM. Kathy Eastley Garfield County Building and Planning. Date: March 28, William S. Otero, P.E Partners, LLC

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL

Evaluation copy. Chloride and Salinity. Computer INTRODUCTION

Appendix A Fees, Charges and Rates

Project Profile Information Form

Subsequent to these early efforts, the complexities associated with potable water provision have increased significantly.

Fillmore, CA. Fillmore Wastewater Treatment Plant LOCATION: MBR MANUFACTURER:

Hybrid RO & Softening Birjand Water Treatment Plant

Carbon Canyon Water Recycling Facility Title 22 Engineering Report

CHAPTER 5 WASTEWATER FLOWS

REAL WORLD APPLICATIONS OF USING DYNAMIC SIMULATION SOFTWARE TO OPTIMIZE WATER TREATMENT PLANT PROCESS OPERATIONS

UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing and reporting

INDUSTRIAL PRETREATMENT PROGRAM 101. MWEA IPP Seminar 2017

How to Collect Your Water Sample and Interpret the Results for the Livestock Analytical Package

First things first.. A Brief Overview of the PTI Program. Why offer training? PTI Survey Results. Today s Main Topics:

COUNTY OF LOS ANGELES

ARSENIC IN DRINKING WATER

URS Corporation (URS) conducted a

Chapter 21 Stormwater Management Bylaw

Hilmar Cheese Company, Hilmar, Merced County, California. On behalf of Hilmar Cheese Company (HCC), Jacobson James & Associates, Inc.

Este informe contiene informacion muy importante sobre su agua potable. Traduzcalo o hable con alguien que lo entienda bien.

TAHOE TRUCKEE SANITATION AGENCY WASTEWATER TREATMENT INQUIRY

County of Sonoma Agenda Item Summary Report

Economic Analysis of Decentralized Options for Providing Water Service to Low-Income Settlements

9. Evaluation Mechanisms

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

WESTERN ENGINEERING CONSULTANTS, Inc LLC

REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES-

WATER SYSTEM MASTER PLAN UPDATE FINAL DRAFT

Private Sewage Systems Standard of Practice Proposed Revisions

Regulatory & Research Aspects of the San Gabriel Valley Indirect Reuse Replenishment Project (IRRP)

RECORD OF DECISION I. INTRODUCTION

Drilling for Natural Gas in the Marcellus and Utica Shales: Environmental Regulatory Basics

Dr. Larry R. Parsons. Reclaimed Water A Sustainable Source for Florida s Growing Water Demands. Citrus Research & Education Center Lake Alfred, FL

1 VAC 30 CHAPTER 45 CERTIFICATION FOR NONCOMMERCIAL ENVIRONMENTAL LABORATORIES PART I. GENERAL PROVISIONS

Study Justification. Coordinated Resource Management Project Little Snake River Conservation District

Northfield Township WWTP Capacity Evaluation Report

AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal

Treatment Processes for Potable Water

RE: AFIN: Permit No.: 5025-W

City of Paso Robles Uses Online Monitor to Detect Low-Level of THMs in Treated Wastewater

MARYLAND DEPARTMENT OF THE ENVIRONMENT

Transcription:

COUNTY SANITATION 0 LOS Ar-.JGELES ICTS UNTY 1955 Workman Milt Road, Wh11toer, CA 9060 I 1400 Mailir g Address P.O. Box 4998, Whittier, CA 906074998 Telephone. (562) 699-7 411, FAX (562) 699-5422 www!acsd.org J <'\iv\es F. STAHL Chief Engineer and <.C,enerol Manager March 16, 2001 File No: 32-17.01-55 Mr. Jonathon Bishop California Regional Water Quality Control Board Los Angeles Region 320 W. 4th Street, Suite 200 Los Angeles, CA 90013 Dear Mr. Bishop: Saugus and Valencia Water Reclamation Plants (WRPs) Chloride Study Enclosed is a schedule of completed, ongoing and future tasks for various projects that the Districts have initiated to quantify the chloride loading that enters the Saugus and Valencia WRPs. The attached schedule also includes a brief narrative summary of all the tasks and subtasks that have been and will be initiated through the end of 2001. If you have any questions regarding this schedule, please contact the undersigned at extension 2801. VOC:VL:bl Very truly yours, James F. Stahl.;;G {7 (~ 1/ '~"'/ jai/f:v'g'-. '' ltl;'/r,r,-t(.-'7 Victoria 0. Conway Head, Monitoring Section 0:\Ch loride200 1 \Chloride Quantification \cl_ source_ identification_ schedule. wpd

Identification and Quantification of Chloride Loadings to Saugus and Valencia WRPs The Districts have identified five chloride loading sources to the Saugus and Valencia Water Reclamation Plants (WRPs), in addition to the chloride loading to the Santa Clara River associated with WRP Operations. The chloride loading sources are broken down into the following six sectors: Industrial Waste Sector Commercial/Business Sector Residential Sector Hauled Septage Water Supply Saugus and Valencia WRP Operations A description of current and future work that is being done to quantify loading from each sector is contained in the summaries below. These summaries describe the various tasks and subtasks and their expected dates of completion as contained in the attached schedule (see Attachment 1 ). Industrial Waste The subtasks that are involved in the quantification of chloride loading from the Industrial Waste (IW) sector include: a review of relevant IW permits to determine chloride monitoring status for selfmonitoring reports; development of a comprehensive list of industrial users (IU's) that will be sampled for chloride; and development of sector summary report estimating current chloride loading based on the collected data. The Districts also continue to routinely inspect IW facilities for onsite self-regenerating water softeners (SRWS) and prohibit discharge from such systems into our sewers. To date, the. Districts have completed subtasks 3 through 5 (refer to Attachment 1), and are currently sampling relevant IU's for chloride. The Districts expect to have quantified chloride loading from this sector by early October. Commercial/Business The subtasks that are involved in the quantification of chloride loading from the Commercial/Business sector include: identification of a subset of commercial businesses that may potentially use SRWS; inspection of the subset of commercial businesses that may have potential SRWS usage and prohibition of any discharge from SRWS into our sewers for units found; identification of a subset of commercial businesses that would discharge chlorides as part of their normal business operations (excluding SRWS usage); sampling of those relevant and identified businesses for chloride; and development of sector summary report estimating current chloride loading based on the collected data. The Districts also continue to routinely inspect commercial facilities for SRWS and prohibit discharge from such systems into our sewers. To date, the Districts have completed subtasks 13 through 16 (refer to Attachment 1), and are currently sampling relevant commercial businesses for chloride. The Districts expect to have quantified chloride loading from this sector by early November. Residential The subtasks that are involved in the quantification of chloride loading from the Residential sector include: identification of appropriate sampling locations for residential chloride profiling; sampling of residential sewage from relevant sampling locations for chloride and conductivity; collection of potable water samples in relevant neighborhoods to test for chlorides; residential surveying (situs profiles) to determine the percentage of sampled neighborhoods that use SRWS; determination of individual SRWS chloride loading based on voluntary home sampling; and development of sector summary report O:\Chloride200 l \Chloride Quantification \gan t_ summaries2.doc

estimating current chloride loading based on the collected data. To date, the Districts have completed subtasks 26 through 31 (refer to Attachment 1), and are currently performing residential sampling/profiling in relevant neighborhoods. The Districts expect to have quantified chloride loading from this sector by late September. Hauled Septage The Saugus WRP operates a hauled septage waste dump station. Hauled septage is believed to be a very minor contributor of chlorides to the Saugus WRP. Nevertheless, the Districts are also characterizing the chloride contribution associated with this sector. The subtasks that are involved in the quantification of chloride loading from this sector include: inclusion of chloride as a required monitoring parameter for the Districts IW Random sampling program; a review of historical hauled septage waste records to determine chloride loading; and development of sector summary report estimating current chloride loading based on the collected data. The Districts expect to have quantified chloride loading from this sector by early November. Water Supply The potable water supply is a major contributor of chlorides to the Saugus and Valencia WRPs. As such, the Districts are updating and further developing a regression/mass-balance model taking into account water quality characteristics from potable surface and groundwater supplies. The subtasks that are involved in the quantification of chloride loading from this sector include: obtaining current water quality records (1997-2000) from water purveyors; obtaining historical trunk sewer flow monitoring records; development and calibration of regression/mass-balance model based on water quality and trunk sewer flows; and development of sector summary report estimating current chloride loading based on the collected data. The Districts expect to have quantified chloride loading from this sector by early November. POTW Operations The Districts have identified two processes in the wastewater treatment scheme that generate chlorides. These processes include disinfection by sodium hypochlorite and coagulation (primary sedimentation and biosolids processing) by ferric chloride. The Districts are in the process of quantifying the chloride loading contributed by the processes discussed above. The Districts have also taken steps to reduce chloride generated from treatment of wastewater by replacing ferric chloride with ferric sulfate for all coagulation processes. The Districts expect to have quantified chloride loading from this sector by late September. O:\Chloride2001\Chloride Quantification\gant_summaries2.doc

O:\Chloride200 1 \Chloride Quantification\gant_ surnmaries2.doc Attachment 1

10 9tl~ation~ 49 Compare Historical Trunk Sewer Flows to Projected Flows Develop R119ression Relationship 75d 50 Update Chloride Water Supply Regression Model with 1997-2000 Mineral Data/Flow Records 45d 6/25101 51 Calibrate Chloride Water Supply Regression Model Using 1997-2000 Data 30d 8127/01 52 Develop Projections on Future Chloride Loading to POTWs with Projected Flow Data 5d 10/6/01 53 Report preparation 15d 10/15101 Sector Summary Report Estimate Current Loading 5d 1115101 POTW Operations 145d 3112101 Update WRP Chloride Information 140d 3/12101 Disinfection Sodium Hypochlorite Usage, Chlorine Gas Usage 130d 3/12101 58 Coagulation Ferne Chloride, Ferrous Chlonde Usage 130d 3/12101 59 Siosolids Processing -Fitter Press Coagulant Usage (Ferric/Ferrous Chlorides) 130d 3/12101 60 Other Processes 130d 3/12101 : T l ~ T : l : Monito:ring Staff i:rt~~ :< ::::~:~ ~\.; :~:=~ =::/~~ ~ ~.:?::3;~t r;.::;:=.;:;i. fj i.:.;:. = ::{(;:~;= ~. =.:_: j trr:rn:n:n : = :~n.t~lt;~~~:~~~r~~ttr Monito.ring Staff ttr:?~>~::;~: ~~ :: ~: ::. :. = ~ ; ~t~~ {::~;:i(j;{t/: ~:::. ~ ; =: =: =: =. )tn = t: ; =; = ~:. :::.: ::~t~~~rt~:~ 1~1=~ :~::1~f:=;:rn=t~: Monito~ing Staff...Mnnitnrinn Staff 61 Report preparation 10d 9/10/01 62 Sector Summary Report Estimate Current Loading 5d 63 Develop Executive Summary of Findings 15d 64 Final Report Preparation 20d 12/3/01 IW/Monit Project: Schedule for Analysis of Chloride Sources Date: 4/16/01 Task Summary...,. T Page3

25 I Residential Sector 26 1 Determine appropriate residential sewer sampling locations for profiling study 27 Locate residential neighborhoods with appropriate demographics for residential profiling study 28d 28 Determine if sampling location is accessible w/ sufficient flow conditions 28d 29 Inspect/photograph all sewer sampling and flow-monitoring manholes 28d 30 Provide on-site assistance to IW monitoring crew during residential sampling set-up period 28d 31 Collect potable water samples for each neighborhood profiled 28d 32 Residential proliling/sampling for chlorides 33 Sam pie collection 34 sample analysis (Began on 2120/01 --> Allow Lab 45 'NOrking days lor completion) 35 Situs Profiles 4124101 36 Data analysis 37 Report p"'paration 38 Individual Home Sampling (SRWS Vs Non-SRWS Characterization) Project Engineering ~roject Engineering 39 I Sector Summary Report - Estimate Current Loading 40 I Hauled Septage 41 I Include Chloride in Random IW Sampling Program 42 I Estimate chloride load from hauled septage waste records (2000-2001) 160d 43 I Sector Summary Report - Estimate Current Loading 10d 3/12101 10/22101 44 I Water Supply 45 I Update Regression Model (1988-1997 Data) wrth Recent Data 46 I Swvey Water Purveyors for 1997-2000 Water Quality Records 47 Obtain historical "'cords on mineral quality (CI, TDS, S04, K, Na" 48 Obtain Historical Trunk Sewer Flow Monitoring Records (1988-2000) 75d 3/12101 Project: Schedule for Analysis of Chloride Sources Date: 4/16/01 Task ~:~;~;~:~*:t~t~j~~~~:s~:l~~;~~:i ~~~- Summary...,...., Page 2

Identify/Quantify Chloride Loading Sources to POTW Industrial Waste Sector 182d 2/1/01. Review all Ml permit.. in Districts Nos. 26 and 32 to determine chloride monitoring status 26d Develop list of Industrial Users (IU's) that will require additional sampling by IW Monitoring Group 26d Develop list of Industrial Users (IU's) that will require additional sampling by Mllnspection Group 26d IU Monitoring/Sampling Schedule (MI Monitoring and Inspection Groups) 150d Sam pie collection Sample analysis lt~~l;t:~;l~tij~t/ :; ~:~;~~~$:~5.:~:n.~: Monitoringlln,spection Groups 9 Data analysis 7/16101 10 Report preparation 9117/01 11 Sector Summary Report - Estimate Current Loading 5d 10/8101 Project Engineering 12 Commercial Sector 202d 2/1/01 13 ldentifocation of commercial business sectors Compile updated list of commercial businesses that may have/use SRWS Inspect commercial businesses that may potentially have SRWS and require removal of any SRWS fc Develop list of commercial businesses that would discharge chlorides (without using SRWS) Determine non-water softening chloride contribution Commercial Business Sector Identification of accessible sampling locations 20d 3112101...----- ~ --- Grab sample collection 45d 419101 Inspection Group 20 Composite sample collection 45d 419101 21 Sample analysis 45d 8111101 ----- f---- 22 Data analysis 45d 8113/01 23 Report preparation I 15d 10/15/01-24 Sector Summary Report - Estimate Current Loading I 5d 11/5101 Project Enginee~ing IW I Monitoring Staff Project: Schedule for Analysis of Chloride Sources Date: 4116/01 Task Summary..., T Page1