Building Systems and Design Elements included in SliDeRulE

Similar documents
SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

MODULAR BUILDING SPECIFICATIONS

THE STRATA UNIT May 25, 2008

DEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS. TABLE OF CONTENTS Section

CATAMARAN TOWER - 1 Seef Area Plot 19, 20

2003 International Residential Building Code

CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD

Company s Formal/Legal Name: US Mail Address: 9 Digit US Mail City: US Mail State: US Mail Zip: -

Meriter Heights Renovations Madison, Wisconsin

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

TERMINAL BUILDING EVALUATION

Property Condition Assessment

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

Building Inspection Report

Davis Frame Co., Inc. Construction Budget Considerations


Residential Accessory Structures & Room Additions

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

Division 09 FINISHES TABLE OF CONTENTS

Additions and Renovations to Saint Robert Bellarmine Parish Center and Narthex 9/16/14 Outline Design Development Specification

NHIE STUDY GUIDE. Examination Board of Professional Home Inspectors

Typical Finished Basement Details

BUILDING SCOPE OF WORK

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

WIRING METHODS CHAPTER 38

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

2018 British Columbia Building Code Public Review of Proposed Changes

Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

LECKIE ELEMENTARY SCHOOL

COLUMN SPACING TRUCK ACCESS/DOORS EAVE HEIGHT UTILITIES PARKING & DRIVES

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

ISO Types 1-6: Construction Code Descriptions

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Chapel House- Design Process- Envelope and Energy savings

CAREERS. in the Construction TRADES

SOL UTIONS LIVING SOLUTIONS LIVING SOLUTIONS

Fairfax County, Virginia

2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28-

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

Building Codes and Ordinances ARC 227

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

FDA CDRH Laboratory Silver Spring, Maryland. Executive Summary: Timothy Mueller Structural Option Walter Schneider

The Inspection Process. Waxhaw N.C.

ArcelorMittal Europe - Long Products Sections and Merchant Bars. Office Building ArcelorMittal in Esch Alzette

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

RESIDENTIAL BUILDING PLAN REQUIREMENTS

LASALLE - BACKUS EDUCATION CAMPUS

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

A/E Design Deliverable Checklist

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Seal Harbor Development 1 Nagog Park Acton, MA 01720

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

The designer shall also submit additional information required by the University as described and underlined below.

Structural Inspection

BUILD A SHOWER CUBICLE

NFPA 285 Compliant Wall Systems and Assemblies

Administrative Changes

Requirements for Additions/Enclosed Deck/Finished Bonus Room/Dormer

A. Coordinate concrete unit masonry (also termed CMU and block ) work with work before and after, especially:

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University

Construction Cost Estimate - DRAFT

RESIDENTIAL COMPONENT TECHNOLOGY Mobile Manufactured Housing

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

Structural Technical Report #2 By Robert Whitaker

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

INTERIOR FINISHES CHAPTER 8

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

STRUCTURAL ABBREVIATIONS S-001 GENERAL NOTES CONCRETE MASONRY NOTES DESIGN NOTES SOF NSWG-10 UAS SUPPORT FACILITY FY 2016 MILCON P-225

THE UNIVERSITY OF ALABAMA AT BIRMINGHAM (UAB) BIRMINGHAM, ALABAMA

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST

FLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE

WALNUT CREEK - DETAILS OF TECHNICAL SPECIFICATIONS SPECS FOR VASWANI PORTION. 200 mm solid concrete blocks. Reinforced Cement Concrete - Flat Roof

WORK PROCESSES SCHEDULE ACOUSTICAL CARPENTER SPECIALIST O*NET/SOC CODE: RAIS CODE: 0861

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8

Lifting Sockets. Flat Lifting Sockets

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

Margaret Batts Tobin Laboratory

GC s Subcontractor QA/QC Plan Sample

AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW.

Seasons Business Center New Construction!

Presented by The National Association of Certified Home Inspectors Chicago Chapter

Slab edge insulation is one of

Office of Design & Construction State University Plaza Albany, New York

Transcription:

Building Systems and Design Elements included in SliDeRulE No. System Subsystem Design Element 1.1.1 Foundation Deep Foundation Steel H-pile 1.1.2 Foundation Deep Foundation Steel pipe pile 1.1.3 Foundation Deep Foundation Precast concrete pile 1.1.4 Foundation Deep Foundation Bored concrete pile 1.1.5 Foundation Deep Foundation Driven concrete pile 1.1.6 Foundation Deep Foundation Pile cap 1.1.7 Foundation Deep Foundation Drilled shaft/pier 1.1.8 Foundation Deep Foundation Drilled caisson 1.2.1 Foundation Shallow Foundation Isolated column/spread footing 1.2.2 Foundation Shallow Foundation Wall/strip footing 1.2.3 Foundation Shallow Foundation Mat foundation 1.2.4 Foundation Shallow Foundation Slab-on-ground/slab-on-grade 2.1.1 Structural Frame Column Structural steel column 2.1.2 Structural Frame Column Steel built-up column 2.1.3 Structural Frame Column Cast-in-place (CIP) concrete square column 2.1.4 Structural Frame Column Cast-in-place (CIP) concrete round column 2.1.5 Structural Frame Column Precast concrete column 2.2.1 Structural Frame Wall Cast-in-place (CIP) concrete shear walls 2.3.1 Structural Frame Beam/Girder Structural steel beam 2.3.2 Structural Frame Beam/Girder Steel plate girder/built-up girder 2.3.3 Structural Frame Beam/Girder Precast beam 2.4.1 Structural Frame Slab One-way solid slab 2.4.2 Structural Frame Slab Two-way solid slab 2.4.3 Structural Frame Slab Flat plate slab 2.4.4 Structural Frame Slab One-way joist slab 1 2013 SliDeRulE

2.4.5 Structural Frame Slab Two-way joist (waffle) slab 2.4.6 Structural Frame Slab Post-tensioned beam and slab 2.4.7 Structural Frame Slab Hollow-core plank slab 2.5.1 Structural Frame Decking Cellular steel deck 2.5.2 Structural Frame Decking Composite deck 2.5.3 Structural Frame Decking Open floor deck 2.5.4 Structural Frame Decking Steel form deck 2.5.5 Structural Frame Decking Steel roof deck 3.1.1 Exterior Enclosure Back-up Wall Steel stud back-up wall 3.1.2 Exterior Enclosure Back-up Wall Concrete masonry unit (CMU) back-up wall 3.2.1 Exterior Enclosure Exterior Skin Sheet metal panels 3.2.2 Exterior Enclosure Exterior Skin Insulated metal panels 3.2.3 Exterior Enclosure Exterior Skin Brick veneer curtain wall [Steel stud back-up wall with exterior insulation] 3.2.4 Exterior Enclosure Exterior Skin Brick veneer curtain wall [Steel stud back-up wall without exterior insulation] 3.2.5 Exterior Enclosure Exterior Skin Brick veneer curtain wall [CMU back-up wall] 3.2.6 Exterior Enclosure Exterior Skin Prefabricated brick panel curtain walls 3.2.7 Exterior Enclosure Exterior Skin Stone panel mounted on steel sub-frame 3.2.8 Exterior Enclosure Exterior Skin Monolithic stone cladding 3.2.9 Exterior Enclosure Exterior Skin Prefabricated stone curtain walls/stone cladding on steel trusses 3.2.10 Exterior Enclosure Exterior Skin Stone honeycomb panel (thin stone cladding) 3.2.11 Exterior Enclosure Exterior Skin Prefabricated stone honeycomb curtain wall 3.2.12 Exterior Enclosure Exterior Skin Precast concrete curtain wall 3.2.13 Exterior Enclosure Exterior Skin Glass fiber-reinforced concrete curtain wall 3.2.14 Exterior Enclosure Exterior Skin Stucco finish [framed partitions] 3.2.15 Exterior Enclosure Exterior Skin Stucco finish [CMU wall partitions] 3.2.16 Exterior Enclosure Exterior Skin Exterior insulation and finish system 3.2.17 Exterior Enclosure Exterior Skin Glass curtain walls/glass and aluminum curtain walls: Stick-built system 3.2.18 Exterior Enclosure Exterior Skin Glass curtain walls/glass and aluminum curtain walls: Unitized system 2 2013 SliDeRulE

3.2.19 Exterior Enclosure Exterior Skin Glass curtain walls/glass and aluminum curtain walls: Unit and mullion system 3.2.20 Exterior Enclosure Exterior Skin Glass curtain walls/glass and aluminum curtain walls: Panel system 3.2.21 Exterior Enclosure Exterior Skin Glass curtain walls/glass and aluminum curtain walls: Column cover and spandrel system 3.3.1 Exterior Enclosure Doors and Windows Exterior entrance/exit doors 3.3.2 Exterior Enclosure Doors and Windows Aluminum window systems 3.3.3 Exterior Enclosure Doors and Windows Plastic clad/metal clad windows 4.1.1 Roof Roofing Built-up roof membrane [over steel decks] 4.1.2 Roof Roofing Built-up roof membrane [over concrete decks] 4.1.3 Roof Roofing Modified bitumen roof membrane [over steel decks] 4.1.4 Roof Roofing Modified bitumen roof membrane [over concrete decks] 4.1.5 Roof Roofing Styrene-Butadiene-Styrene (SBS) modified bitumen membrane [over steel decks] 4.1.6 Roof Roofing Styrene-Butadiene-Styrene (SBS) modified bitumen membrane [over concrete decks] 4.1.7 Roof Roofing Atactic Polypropylene (APP) modified bitumen membrane [over steel decks] 4.1.8 Roof Roofing Atactic Polypropylene (APP) modified bitumen membrane [over concrete decks] 4.1.9 Roof Roofing Single-ply roof membrane (fully adhered system) [over steel decks] 4.1.10 Roof Roofing Single-ply roof membrane (fully adhered system) [over concrete decks] 4.1.11 Roof Roofing Single-ply roof membrane (mechanically fastened attachment system) [over steel decks] 4.1.12 Roof Roofing Single-ply roof membrane (mechanically fastened attachment system) [over concrete decks] 4.2.1 Roof Access Roof hatch 4.2.2 Roof Access Smoke hatch 4.2.3 Roof Access Skylight 4.3.1 Roof Protection Parapet wall 4.3.2 Roof Protection Building separation joint 4.3.3 Roof Protection Edge guard 5.1.1 Interiors Partition Steel stud framed partitions (steel stud wall) 5.1.2 Interiors Partition Concrete masonry unit (CMU) wall partitions (CMU wall) 5.1.3 Interiors Partition Glass masonry wall 5.1.4 Interiors Partition Folding accordion 3 2013 SliDeRulE

5.1.5 Interiors Partition Movable and borrow lites (demountable) 5.1.6 Interiors Partition Drywall [steel stud framed partitions] 5.1.7 Interiors Partition Drywall [CMU wall partitions] 5.1.8 Interiors Partition Portland cement plaster [steel stud framed partitions] 5.1.9 Interiors Partition Portland cement plaster [CMU wall partitions] 5.1.10 Interiors Partition Gypsum plaster [steel stud framed partitions] 5.1.11 Interiors Partition Gypsum plaster [CMU wall partitions] 5.1.12 Interiors Partition Veneer plaster [steel stud framed partitions] 5.2.1 Interiors Ceiling Suspended acoustical ceilings 5.2.2 Interiors Ceiling Suspended gypsum board ceilings 5.2.3 Interiors Ceiling Suspended plaster ceilings [gypsum plaster] 5.2.4 Interiors Ceiling Suspended plaster ceilings [cement plaster] 5.3.1 Interiors Flooring Ceramic tile flooring 5.3.2 Interiors Flooring Stone panel flooring 5.3.3 Interiors Flooring Terrazzo flooring 5.3.4 Interiors Flooring Raised access flooring 5.3.5 Interiors Flooring Carpet flooring 5.3.6 Interiors Flooring Resilient flooring 5.4.1 Interiors Stairs Precast stairs 5.4.2 Interiors Stairs Reinforced concrete stairs 5.4.3 Interiors Stairs Concrete filled tread pans 5.4.4 Interiors Stairs Precast concrete treads 5.5.1 Interiors Doors Aluminum doors 6.1.1 Fire Suppression Pumps Pump 6.2.1 Fire Suppression Piping Steel pipe 6.2.2 Fire Suppression Piping Copper pipe 6.2.3 Fire Suppression Piping Chlorinated polyvinyl chloride (CPVC) pipe 7.1.1 Plumbing Piping Thermoplastic pipe (PVC, CPVC, ABS) 4 2013 SliDeRulE

7.1.2 Plumbing Piping Steel pipe 7.1.3 Plumbing Piping Cast iron soil pipe 7.1.4 Plumbing Piping Copper pipe 7.1.5 Plumbing Piping Cross-linked polyethylene (PEX) tubing 7.1.6 Plumbing Piping Pipe insulation 7.2.1 Plumbing Fixtures Water heating equipment 7.2.2 Plumbing Fixtures Fixtures (sinks, faucets, toilets, urinals, shower heads, etc.) 8.1.1 HVAC Equipment Furnace 8.1.2 HVAC Equipment Boiler 8.1.3 HVAC Equipment Heat pump/split system air conditioner 8.1.4 HVAC Equipment Rooftop unit, RTU (Packaged terminal air conditioner, PTAC, or "Packaged Unit") 8.1.5 HVAC Equipment Multiple packaged terminal air conditioners, PTACs (window and wall units) 8.1.6 HVAC Equipment Chiller 8.1.7 HVAC Equipment Cooling tower 8.1.8 HVAC Equipment Pump 8.1.9 HVAC Equipment Copper pipe for hydronic systems 8.1.10 HVAC Equipment Air handling unit (AHU) 8.1.11 HVAC Equipment Terminal units (TUs), mixing/variable air volume (VAV) boxes, and dampers 8.2.1 HVAC Ductwork Sheet metal ductwork 8.2.2 HVAC Ductwork Flexible ductwork 8.2.3 HVAC Ductwork Diffusers, registers, grills 9.1.1 Electrical Underground Underground utilities 9.2.1 Electrical Grounding System grounding 9.3.1 Electrical Equipment Back-up generators 9.3.2 Electrical Equipment Transformers 9.3.3 Electrical Equipment Switchgear 9.3.4 Electrical Equipment Panelboards 9.4.1 Electrical Wiring Conduit and boxes (junction, pull, switch, receptacle) 5 2013 SliDeRulE

9.4.2 Electrical Wiring Wire cable trays 9.4.3 Electrical Wiring Wire and cable 9.4.4 Electrical Wiring Switches and receptacles 9.5.1 Electrical Fixtures Light fixtures 6 2013 SliDeRulE