QUALITY MANUAL Revision H

Similar documents
25 D.L. Martin Drive Mercersburg, PA (717)

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

QUALITY SYSTEM MANUAL

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008

Webster - Hoff Corporation. Quality Manual

Vendor Qualification Survey

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Quality Manual Revision: C Effective: 03/01/10

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

Quality Manual ISO 9001:2000

Correspondence Between ISO 13485:2016 and 21 CFR Part 820 QMS Requirements

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

Reliance Aerospace Solutions

INS QA Programme Requirements

QUALITY SYSTEM MANUAL

CORPORATE QUALITY MANUAL

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

ISO 9001:2008 Quality Management System QMS Manual

Quality Systems Manual

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

INTERNATIONAL STANDARD

HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL. ISO 22000:2005 Quality Manual

BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy

Quality Manual QM-9001 Revision 25 May 2013

0. 0 TABLE OF CONTENTS

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual

METUCHEN CAPACITORS INCORPORATED. Quality Manual P.O. BOX HIGHWAY 35, SUITE 2 HOLMDEL NJ USA

SUPPLIER QUALITY SYSTEM SURVEY


AS9003A QUALITY MANUAL

Objective Evidence Record (OER)

PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER

A Division of Research Products Corporation

Security Operations. BS EN ISO 9001: 2008 Issue 1.2: 21/10/2016. Quality Manual. Managing Director. Controlled / Uncontrolled when printed

QUALITY MANUAL RED CHECK DENOTES THIS IS A CONTROLLED COPY. APPROVED BY: (President) APPROVED BY: (Production Manager) APPROVED BY: (Quality Manager)

FEC QUALITY MANUAL. Federal Equipment Company River Rd. Cincinnati, Ohio

Plastics and Concepts of Connecticut Inc. Quality Manual

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

Document ID: Revision: Date. Approved:

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard.

EVANS CAPACITOR COMPANY

P. 1. Identify the Differences between ISO9001:2000 與 ISO9001:2008 ISO9001:2008 ISO9001:2000 版本的異同. 5 January 2009 ISO 9000 SERIES

ISO 9001:2008 Quality Manual

QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10

Correlation Matrix & Change Summary

GTG Inc. ISO 9001:2008 QMS Manual. Continuous Improvement

ISO 9001 QUALITY MANUAL

Beaver Machine. Quality Manual

Quality Management System Manual

KEVLIN CORPORATION DIVISION OF COBHAM DEFENSE ELECTRONIC SYSTEMS

Technical Manufacturing Corporation (TMC)

ISO 22000:2005 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER FOOD SAFETY MANAGEMENT SYSTEM ISO 22000:2005

Issued by ISO Management Representative Signature/Date: Ken Hicks 11/09/06 GOWANDA. Electronics. PO Box 111 One Magnetics Parkway Gowanda NY, 14070

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

Business Management System: Manual 00-BMS-001

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

SUPPLIER QUALITY MANUAL

Quality Assurance Policy and Procedures

Quality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer)

ISO 9001:2015 Readiness Review

MDSAP Purchasing Process

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

PRODUCTS AND SERVICES:

FDA 21 CFR Part 820 vs. ISO 13485:2016 Comparison Table created by greenlight.guru

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS

CERTIFICATE OF REGISTRATION

ISO 9001:2015 Quality Management System. New/Revised Requirements

AAMI Quality Systems White Paper: Comparison of 21 CFR Part 820 to ISO 13485:2016 1

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope

AS9003A QUALITY MANUAL

QUALITY MANUAL QM0492 AS9100 SUPPLEMENT II

Electronics. Document: QUALITY MANUAL. Revision: W. Date: 08/22/2016

Audit Report No: QE /12 - S. Hooks Industrial, Inc. Contact Person: Mr. John Valentine Phone: « »

Purchasing Controls. FDA Small Business Regulatory Education for Industry (REdI) Conference Denver, Colorado May 13, 2015

INTEGRATING ISO 9000 METHODOLOGIES WITH PROJECT QUALITY MANAGEMENT

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

9001:2015. Quality Manual 9001:2015. Engineering Value through Quality and Innovation.

Correspondence between ICMED criteria and ISO 13485: 2012

Clause Map IATF 16949:2016 to ISO/TS 16949:2009

HACCP audit checklist

QUALITY MANUAL W.R. Larson Rd. P. O. Box San Antonio, Texas San Antonio, Texas (830) (210) FAX

LT Industries SQFR 101

General Document or OQE Comments SAT UNSAT

SUPPLIER QUALITY ASSESSMENT

Vosky Precision Machining Corp. 70-B Air Park Drive, Ronkonkoma, NY Tel: (631) Fax: (631)

ISO/TS TECHNICAL SPECIFICATION

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

ELECTRONIC DESIGN AND MANUFACTURING

25 D.L. Martin Drive Mercersburg, PA (717)

Moving from ISO/TS 16949:2009 to IATF 16949:2016. Transition Guide

Transcription:

QUALITY MANUAL Revision H JADE PRECISION MEDICAL COMPONENTS, LLC 3063 B Philmont Avenue Huntingdon Valley, PA 19006

Page: 1 of 15 Table of Contents 1. Purpose & Scope... 2 2. Applicable Standards... 2 3. Business Profile... 2 4. Authority & Responsibility... 2 5. Terms & Definitions... 2 6. Policy & Objectives... 3 7. Application... 3 8. Quality Management System... 4 9. Management Responsibility... 5 10. Resource Management... 6 11. Product Realization... 7 12. Purchasing... 8 13. Production Control / Product Identification & Traceability... 8 14. Control of Inspection, Measuring, and Test Equipment... 9 15. Measurement, Analysis, Improvement... 10 Appendix A: Document Map... 12 Appendix B: Quality Plan... 13 Revision History... 15

Page: 2 of 15 1. Purpose & Scope This manual describes the Quality Management System (QMS) established by and for Jade Precision Medical Components LLC (JPMC). The principles and policies on which this manual is based; along with operating procedures, work instructions, and other supporting documents; govern all processes that affect quality throughout the organization. 2. Applicable Standards 2.1 The QMS is structured and intended to be in compliance with the following standards. ISO 9001:2008 Quality Management Systems Requirements ISO 13485:2003 Medical Devices Quality Management Systems Requirements for Regulatory Purposes 21 CFR Part 820 Quality System Regulation (Exclusions and Exceptions noted below.) 2.2 Normative References ISO 9000:2000 Quality Management Systems Fundamentals and Vocabulary ISO/TR 14969 Medical Devices Quality Management Systems Guidance on the Application of ISO 13485:2003 3. Business Profile 3.1 Mission Statement To deliver zero defects to our internal and external suppliers and customers. 3.2 JPMC, with one facility located at 3063 B Philmont Avenue, Huntingdon Valley, Pennsylvania, 19006, USA, is a contract manufacturer of precision medical components. 3.3 The organizational structure is described by RE-42-002 Organization Chart. 4. Authority & Responsibility 4.1 This manual is issued under the authority of the General Manager/President. 4.2 It is the responsibility of the Director of Quality, who is the designated Management Representative, to ensure that the principles of this manual, the Quality Policy, and quality objectives are communicated to and understood by all JPMC employees. 5. Terms & Definitions 5.1 Corrective Action A process improvement methodology aimed at identifying and eliminating the causes of known nonconformities to prevent their recurrence. A problem solving process. 5.2 Customer 1. A business entity and the individuals representing it that specify and purchase products produced by JPMC. 2. A business entity considering JPMC as a potential supplier. 5.3 Customer Complaint A communication from a customer expressing dissatisfaction with product or service or a concern based on observations or perceptions of JPMC; classified as Formal Complaint, Informal Complaint,

Page: 3 of 15 or Customer Return. 5.4 Customer Feedback Customer assessment of JPMC's performance as it relates to meeting customer requirements and/or expectations. 5.5 Process A set of interrelated resources and activities; i.e. people, materials, equipment, environment, methods; used to transform specific inputs into specific outputs. 5.6 Product 1. The end result of activities performed and resources applied by JPMC; a process output. 2. Purchased goods and services. 5.7 Preventive Action A process improvement methodology aimed at identifying and eliminating potential causes of nonconformities before they occur. A risk management process. 5.8 Qualified Having attained the knowledge, skills, or other attributes necessary to perform a particular activity or task in accordance with specified requirements. 6. Policy & Objectives 6.1 Quality Policy Our goal, at JPMC, is to provide products and services that comply with applicable requirements and exceed our customers expectations. This will be accomplished through employee involvement and ongoing education to ensure continuous improvement of our processes. This quality policy is communicated to all employees as part of their training, with the intent of providing a clear, common understanding, directly applicable to their work. The quality policy is reviewed at least once per year for continuing suitability and adequacy. 6.2 Quality Objectives Only Defect-Free Product and Services shipped/provided to customers/suppliers Continuous Improvement in Delivery Performance through the Utilization of Capable Processes Maintenance/Continuation of ISO 13485:2003 Certification 7. Application 7.1 The QMS described in this manual is applicable in contractual situations entailing the manufacture of components/devices in accordance with customer specifications. 7.2 Exclusions 7.2.1 ISO 9001:2008 Clause 7.3 Design & Development including all sub-clauses. ISO 13485:2003 Clause 7.3 Design & Development including all sub-clauses. 21 CFR Part 820 Subpart C Design Controls including all sub-sections. JPMC is a contract manufacturer and does not design, develop, test, or market its own products/brand(s). All medical components/devices produced by JPMC are manufactured in accordance with specifications provided and authorized by our customers. Planning, execution, and control of design and development activities are, therefore, not addressed in this manual and are excluded from the QMS.

Page: 4 of 15 7.2.2 ISO 13485:2003 Clause 7.5.1.2.2 Installation Activities 21 CFR 820.170 Installation JPMC does not perform or support any installation activities. Control and verification of installation activities is not applicable to JPMC. 7.2.3 ISO 13485:2003 Clause 7.5.1.2.3 Servicing Activities 21 CFR 820.200 Servicing JPMC does not perform or support any servicing activities. Control and verification of servicing activities is not applicable to JPMC. 7.2.4 ISO 13485:2003 Clause 7.5.1.3 and Clause 7.5.2.2 Particular Requirements for Sterile Medical Devices JPMC does not perform sterilization of any kind. Record maintenance of sterilization process parameters is not applicable to JPMC. 8. Quality Management System 8.1 General 8.1.1 JPMC has developed, documented, implemented, and maintains its QMS in accordance with ISO 9001:2008, ISO 13485:2003, and 21 CFR Part 820. 8.1.2 The QMS is based on a process approach to quality management and JPMC applies continuous process improvement methodology, i.e. the Plan-Do-Check-Act Cycle (Figure 1), to ensure its ongoing effectiveness. Adopt/Standardize Process/Change (or repeat the cycle) Establish Objectives Assess Situation Propose Process/Change Determine Resource Requirements PDCA Cycle Analyze Data/Evaluate Process Compare to Objectives Execute Plan Monitor/Measure Output Figure 1 8.1.3 System processes, including their interrelationships and correlation to ISO 9001:2008 and ISO 13485:2003 sub-clauses, are described in the appendices of this manual. 8.2 Document Control 8.2.1 The document system is tiered as shown in Figure 2.

Page: 5 of 15 Tier 1 Quality Manual describes the Quality Management System (QMS). Tier 2 Procedures describe the processes of the QMS. Tier 3 Work Instructions describe tasks within processes. Tier 4 Forms are used to record data. Tier 5 Records provide detailed information pertaining to specific events or series of related events. Figure 2 8.2.2 All documents comprising the QMS; i.e. this Quality Manual, Procedures, Work Instructions, Forms; their current revision level and file type are listed in RE-42-001 Document Register. 8.2.3 QMS documents are controlled as described in procedure PR-42-001 Control of Documents. 8.2.4 Records required by the QMS, ISO 9001:2008, ISO 13485:2003, and 21 CFR Part 820 are maintained in accordance with procedure PR-42-002 Control of Records. 8.3 References PR-42-001 Control of Documents PR-42-002 Control of Records RE-42-001 Document Register 9. Management Responsibility 9.1 General 9.1.1 JPMC management is committed to the development and implementation of the QMS and fully supports maintaining its effectiveness by: communicating, to all functions and levels within JPMC, the importance of meeting customer, regulatory, and statutory requirements. establishing an appropriate quality policy and measurable objectives and ensuring these are communicated and understood throughout the company. providing a framework for review of quality objectives and processes, including regularly scheduled Management Reviews to ensure continuing suitability, adequacy, and effectiveness of the QMS. ensuring the integrity of the QMS as changes are planned and implemented. allocating sufficient resources and providing education and/or training as required.

Page: 6 of 15 9.1.2 Management is ultimately responsible for determining and satisfying customer/product requirements. 9.1.3 Roles, responsibilities, authorities, and their interrelationships are clearly defined, documented, and communicated within JPMC. Personnel who manage, perform, and/or verify work affecting quality have the authority and independence to perform these tasks effectively. 9.2 The Director of Quality serves as the Management Representative and, as such, is responsible and fully authorized to manage the QMS and related matters on an ongoing basis. Roles and responsibilities include the following. Interprets applicable standards and continually verifies QMS compliance. Ensures that required processes are established, implemented, and maintained. Advises the management team regarding operation and performance of the QMS and opportunities for improvement. Serves as liaison to external parties regarding matters relating to the QMS. Promotes awareness of customer and regulatory requirements throughout JPMC. 9.3 Management Review 9.3.1 Management Review Meetings are conducted at regularly planned intervals to ensure continuing suitability, adequacy, and effectiveness of the QMS. 9.3.2 Input to management reviews may include, but is not limited to, the following. Quality Policy Quality Objectives Follow-Up Items From Previous Management Review(s) Audit Results Customer Complaints & Feedback Non-Conformances (NCRs) Delivery Performance Data Supplier Performance Data Corrective & Preventive Actions Status Changes that could affect the QMS Changes in Regulatory Requirements Resource Issues/Requirements 9.3.3 Output of management reviews includes decisions and actions related to the following. Improvements needed to ensure continued effectiveness of the QMS and its processes Improvement of Product Resource Needs 9.4 References PR-56-001 Management Review 10. Resource Management 10.1 The JPMC management team is responsible for identifying, obtaining, allocating, and/or training appropriate resources to ensure effective implementation and management of the QMS and to satisfy customer and regulatory requirements. 10.2 Human Resources Training & Competence 10.2.1 Personnel who manage, perform, and/or verify work affecting quality are fully competent on the basis of education, training, skills, and experience. 10.2.2 New employees are provided with the following essentials and are subsequently deemed fully

Page: 7 of 15 qualified for a position or job function. Review of Company Policies & Best Practices Review of the Quality Manual, including Quality Policy & Objectives Review of Relevant Procedures and Work Instructions Familiarization with Equipment and/or Software Facility Tour & Introductions 10.2.3 All changes to the QMS are reviewed with appropriate personnel when they are put into place. 10.2.4 Competencies are re-evaluated, with respect to current and future requirements, on an ongoing basis to determine if/when/what additional training is necessary. Appropriate training is provided if a deficiency is identified. 10.3 The Infrastructure; including building/workspace, equipment/tools, and support services; is designed and maintained to enable conformity with product requirements and continuous improvement. 10.4 References PR-62-001 Personnel Qualifications & Training PR-63-001 Facility & Equipment Maintenance 11. Product Realization 11.1 Product Realization at JPMC encompasses the following. Request for Quotation (RFQ) from customer Initial Assessment to determine if: work is suitable and within JPMC capabilities, customer delivery and price targets are realistic, requirements, specifications, acceptance criteria are adequately defined. Quotation based on material cost, labor estimates, workload and schedule. Order Processing including review and confirmation of requirements Job Planning & Scheduling Purchasing Manufacturing Measurement/Inspection Documentation Delivery to customer 11.2 Risk Management 11.2.1 JPMC is a contract manufacturer and does not design, develop, or market its own products/brand(s). Risk management is limited to analysis of customer requirements/specifications and assessment and control of product realization processes (above). 11.2.2 Product realization processes and manufacturing plans are designed to minimize risk. 11.3 References PR-72-001 Quoting PR-72-002 Job Planning PR-72-003 Order Review & Entry PR-75-001 Manufacturing PR-75-003 Shipping & Receiving PR-75-006 Product Identification & Traceability PR-82-001 Inspection PR-83-001 Control of Non-Conforming Material

Page: 8 of 15 12. Purchasing 12.1 Suppliers are evaluated and selected based on their ability to provide products and/or services that meet specific requirements; and supplier performance is reviewed regularly to ensure ongoing control over purchased products and outsourced services. Evaluation/selection/review criteria and procedures have been established and documented. 12.2 Purchasing documents describe products/services clearly and completely. (Information may include technical specifications, acceptance criteria, certification requirements, traceability, etc.) 12.3 Incoming product is controlled in accordance with referenced procedures to ensure that: receipts are properly recorded and relevant information is retained, purchase requirements have been met, non-conformities are handled correctly, promptly and consistently. 12.4 References PR-74-001 Purchasing PR-74-002 Supplier Approval PR-75-003 Shipping & Receiving PR-75-006 Product Identification & Traceability PR-82-001 Inspection PR-83-001 Control of Non-Conforming Material 13. Production Control / Product Identification & Traceability 13.1 The manufacture of JPMC products is planned and carried out under the following controlled conditions. Requirements, procedures, work instructions, reference materials, etc. are available, as needed. Product is manufactured and verified using suitable tools and equipment. Material/product identity and status is clearly discernible at all times throughout the manufacturing process. Product is adequately protected while in-process or in storage and packaged to prevent damage during shipment. 13.2 A record containing relevant manufacturing information is established and maintained for each lot of manufactured product. Records include the following information to enable product identification and traceability. Product Specifications/Requirements Raw Material Information; including certifications and heat numbers. Lot Size; i.e. quantity of product manufactured. Manufacturing Details; including job/lot numbers, sequence of operations, start and completion dates. Purchasing Information Inspection Reports Shipping Information 13.3 When the output of a manufacturing process cannot be verified by subsequent measurement or monitoring, the process is validated according to industry best practices that are acceptable to the customer. 13.4 Customer Property Acquisition and control of customer-supplied materials is addressed in PR-75-006 Product Identification & Traceability and WI-82-002 Receiving, Inspection, and Labeling of Raw Materials. Such material that is lost, damaged, or otherwise deemed unsuitable for use, is handled in accordance with PR-83-001 Control of Non-Conforming Material and the customer is notified promptly.

Page: 9 of 15 13.5 Preservation of Product 13.5.1 Employees, contractors, and suppliers who come into contact with work-in-process or finished goods are provided with the proper instructions, tools, and supplies to protect the materials during production, handling, and while in transit. 13.5.2 Products manufactured by JPMC do not require special storage conditions and do not have limited shelf life. 13.6 References PR-42-002 Control of Records PR-72-001 Quoting PR-72-002 Job Planning PR-72-003 Order Review & Entry PR-74-001 Purchasing PR-74-002 Supplier Approval PR-75-001 Manufacturing PR-75-003 Shipping & Receiving PR-75-006 Product Identification & Traceability PR-76-001 Calibration & Control of Inspection, Measuring, and Test Equipment PR-82-001 Inspection PR-83-001 Control of Non-Conforming Material 14. Control of Inspection, Measuring, and Test Equipment 14.1 Inspection, measuring, and test equipment (IMTE) is controlled, calibrated and/or verified in accordance with a documented procedure. 14.2 A Calibration Log (Record) has been established and is updated on an ongoing basis to track the calibration history, status, and schedule of all IMTE. Each piece of IMTE as well as the calibration standards are identified by a unique ID number and detailed description. 14.3 IMTE is further identified by calibration labels (corresponding to the log) and is handled and stored to maintain accuracy. 14.4 Calibrations are performed at predetermined intervals that are subject to periodic review and adjustment. 14.5 Any piece of IMTE found to be in use past its calibration due date shall be returned to the QA Department and calibrated immediately. In such cases, affected material is considered to be non-conforming, i.e. handled in accordance with PR-83-001 Control of Non-Conforming Material, until the validity of measurements is determined. 14.6 Calibration laboratories and service providers contracted by JPMC are required to use standards traceable to the National Institute of Standards and Technology (NIST). 14.7 References PR-76-001 Calibration & Control of Inspection, Measuring, and Test Equipment PR-83-001 Control of Non-Conforming Material RE-76-001 Calibration Log

Page: 10 of 15 15. Measurement, Analysis, Improvement 15.1 Customer Communications, Complaints, Feedback 15.1.1 Communications related to customer requirements, product quality, and process improvement may include: Customer Complaints Customer Feedback Advisory Notices 15.1.2 Customer complaints and feedback are communicated, documented, and tracked according to procedures for control of non-conforming material, corrective & preventive action, and management review. 15.1.3 Advisory Notices are issued as needed. 15.2 Internal Audits 15.2.1 The purpose of internal audits is to verify that process activities and work practices are in conformance with QMS procedures. 15.2.2 Audits are planned and conducted in accordance with a documented procedure. 15.2.3 Auditors are drawn from various functional areas and departments and qualified according to relevant QMS procedures. Because auditors must maintain independence, they do not audit their own work, functional area or department. 15.2.4 Audit results are reviewed with personnel working in audited areas and in management reviews. Findings and observations are addressed through corrective or preventive action. 15.3 Process Monitoring & Evaluation QMS processes are monitored and evaluated by comparing planned results to actual outputs. Deficiencies are addressed through management review and subsequent corrective or preventive action. 15.4 Product Monitoring & Measurement 15.4.1 Raw materials and work-in-process are subject to Receiving, First Article, and In-Process Inspections as they progress through manufacturing operations; and finished goods must undergo Final Inspection before they are released for shipment to customers. 15.4.2 All inspections are performed in accordance with documented procedures and work instructions to ensure that evidence of conformity with requirements is recorded and maintained. Inspection data includes measurements, inspection methods and IMTE used, inspectors identities. 15.5 Control of Non-Conforming Product 15.5.1 Product that does not conform to requirements is identified and controlled to prevent its unintended use or delivery in accordance with documented procedures. 15.5.2 JPMC employees have the responsibility and authority to report nonconformities promptly and take appropriate action. Responsibility and authority for review, investigation, and dispositioning of non-conforming product is also defined. 15.5.3 The following steps are taken when a non-conformity is identified. Review to determine the disposition of non-conforming product. Corrective Action to investigate and eliminate the cause of the non-conformity. Advisory Notice (if necessary). 15.6 Data Analysis & Improvement 15.6.1 To ensure continuing suitability, adequacy, and effectiveness of the QMS and demonstrate product conformity, JPMC has established, documented, and implemented procedures to monitor, measure, analyze, and improve its processes. Information collected and used for this purpose includes:

Page: 11 of 15 Customer Complaints & Feedback Audit Results Product Conformity/Inspection Data Other Measurable Process Outputs/Results (such as delivery performance, supplier evaluations, etc.) 15.6.2 Results of analyses are used to identify trends, determine causes of existing or potential problems, guide decisions pertaining to corrective/preventive actions, and assess process effectiveness and supplier performance. 15.7 Corrective & Preventive Action 15.7.1 The process for initiating, investigating, planning, implementing, verifying and closing corrective and preventive actions is described in PR-85-001 Corrective & Preventive Action. 15.7.2 Corrective or Preventive Action is required in the following situations. Corrective Action A SCAR is issued by a customer. An audit finding is reported by a customer as a result of a customer quality system audit. A non-conformance is issued by a customer as result of defective material being shipped to a customer. A non-conformance is reported as a result of an internal quality system audit. An action item that emanates from a management review meeting. A noticeable trend concerning a particular non-conformance occurs (the same failure mode occurs as a result of the same root cause on the same part family three times) Preventive Action The reliability or ongoing effectiveness of a process is called into question. A potential cause of a non-conformity is identified. An opportunity for improvement is identified. A safety concern is raised or a potential hazard is identified. 15.7.3 Corrective or Preventive Action may also be initiated for isolated incidents as deemed necessary. 15.8 References PR-56-001 Management Review PR-82-001 Inspection PR-82-003 Internal Audits PR-83-001 Control of Non-Conforming Material PR-84-002 Data Collection, Analysis, & Statistical Techniques PR-85-001 Corrective & Preventive Action

Page: 12 of 15 Appendix A ISO 9001:2008 ISO 13485:2003 Sub-Clause: 21 CFR Part 820 Sub-Clause: QMS Management Responsibility Resource Management Product Realization Measurement Analysis & Improvement 4.1 4.2 5.1 5.2 5.3 5.4 5.5 5.6 6.1 6.2 6.3 6.4 7.1 7.2 7.4 7.5 7.6 8.1 8.2 8.3 8.4 8.5 20 40 20 20 20 20 20 20 25 25 70 70 70 86 50 70 72 180 70 90 250 100 Document Map Improvement Analysis of Data Control of Non-Conforming Product Monitoring & Measurement General Control of Monitoring & Measuring Devices Production & Service Provision Purchasing Customer-Related Processes Planning of Product Realization Work Environment Infrastructure Human Resources Provision of Resources Management Review Responsibility, Authority, Communication Planning Quality Policy Customer Focus Management Commitment Documentation Requirements General Requirements JPMC Procedure Doc. No. Title QM-42-001 Quality Manual PR-42-001 Control of Documents PR-42-002 Control of Records PR-56-001 Management Review PR-62-001 Personnel Qualifications & Training PR-63-001 Facility & Equipment Maintenance PR-72-001 Quoting PR-72-002 Job Planning & Entry PR-72-003 Order Review & Entry PR-74-001 Purchasing PR-74-002 Supplier Approval PR-75-001 Manufacturing PR-75-003 Shipping & Receiving PR-75-006 Product ID & Traceability PR-75-009 Validation Procedure PR-75-010 Part-Specific Swiss Type Tool Kits PR-76-001 Calibration & Control of IMTE PR-82-001 Inspection PR-82-003 Internal Audits PR-82-004 Overlays PR-82-005 Control of Keyence Programs PR-83-001 Control of Non-Conforming Material PR-84-002 Data Collection, Analysis, and Statistical Techniques PR-85-001 Corrective & Preventive Action PR-85-002 Customer Advisory Notices

Page: 13 of 15 Appendix B: JPMC Quality Plan Secondary QMS Reference Primary Process Description Request for Quotation (RFQ) PR-72-001 Quoting PR-72-003 Order Review & Entry Develop & Submit Quote Receive Purchase Order PR-42-001 Document Control PR-42-002 Records Control PR-62-001 Qualifications & Training PR-82-003 Internal Audits PR-84-002 Data Collection, Analysis, & Statistical Techniques PR-72-003 Order Review & Entry Sales Order Review Order Entry PR-72-002 Job Planning Job Planning PR-74-001 Purchasing PR-74-002 Supplier Approval Purchasing PR-72-002 Job Planning PR 72-003 Order Review & Entry Scheduling PR-42-001 Document Control PR-42-002 Records Control PR-62-001 Qualifications & Training PR-75-006 Product Identification & Traceability PR-82-003 Internal Audits PR-83-001 Control of Nonconforming Material PR-84-002 Data Collection, Analysis, & Statistical Techniques PR-75-001 Manufacturing PR-75-001 Manufacturing PR-75-010 Swiss Tool Kits PR-82-001 Inspection PR-82-004 Overlays PR-76-001 Calibration PR-75-001 Manufacturing PR-82-001 Inspection Programming Machine Set-up First Article Inspection Machining

Page: 14 of 15 Secondary QMS Reference Primary Process Description Deburring PR-75-001 Manufacturing Blasting In-process Cleaning PR-82-001 Inspection PR-82-004 Overlays PR-76-001 Calibration Final Dimensional Inspection PR-74-002 Supplier Approval PR-74-001 Purchasing PR-75-003 Shipping & Receiving PR-82-001 Inspection Outsourced Operations PR-42-001 Document Control PR-42-002 Records Control PR-62-001 Qualifications & Training PR-75-006 Product Identification and Traceability PR-82-003 Internal Audits PR-83-001 Control of Nonconforming Material PR-84-002 Data Collection, Analysis, & Statistical Techniques PR-85-001 Corrective & Preventive Action PR-75-001 Manufacturing Anodization Laser Etching 5 Passivation PR-75-001 Manufacturing Final Cleaning Assembly PR-82-001 Inspection Final Visual Inspection PR-75-003 Shipping & Receiving Packaging PR-75-003 Shipping & Receiving PR-85-002 Advisory Notices DHR Verification & Records Storage Shipping