SAN BERNARD RIVER WATER QUALITY MODEL UPDATE. August 18, 2011

Similar documents
Rock Creek Floodplain Analysis

The Impacts of Climate Change on Portland s Water Supply

Utilization of the SWAT Model and Remote Sensing to Demonstrate the Effects of Shrub Encroachment on a Small Watershed

The Fourth Assessment of the Intergovernmental

IMPACT OF CLIMATE CHANGE ON WATER AVAILABILITY AND EXTREME FLOWS IN ADDIS ABABA

Overview of the Surface Hydrology of Hawai i Watersheds. Ali Fares Associate Professor of Hydrology NREM-CTAHR

Chehalis Basin Strategy Causes of Extreme Flooding. October 11, 2016 Policy Workshop

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

M.L. Kavvas, Z. Q. Chen, M. Anderson, L. Liang, N. Ohara Hydrologic Research Laboratory, Civil and Environmental Engineering, UC Davis

RIO GRANDE HEADWATERS RESPONSE TO CLIMATE AND FOREST CHANGE

Mekong Climate Change and Adaptation Initiative of the Mekong River Commission

Application of a Basin Scale Hydrological Model for Characterizing flow and Drought Trend

REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017

2

CHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow

The Confluence Model. Presentation to Modeling and Forecasting Working Group January 21, 2015

Water Operations 101. Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09

Estimation of Actual Evapotranspiration at Regional Annual scale using SWAT

USING ARCSWAT TO EVALUATE EFFECTS OF LAND USE CHANGE ON WATER QUALITY. Adam Gold Geog 591

Relationship Between Bacteria and Conventional Water Quality Parameters

GULF OF MEXICO - SEGMENT 2501

Development of a tool to estimate Best Management Practices (BMP) efficiency using SWAT

EVALUATION OF HYDROLOGIC AND WATER RESOURCES RESPONSE TO METEOROLOGICAL DROUGHT IN THESSALY, GREECE

SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION

An Environmental Accounting System to Track Nonpoint Source Phosphorus Pollution in the Lake Champlain Basin. Year 2 Project Work Plan

Simulation of Event Based Runoff Using HEC-HMS Model for an Experimental Watershed

Science Supporting Policy: The Case For Flow Quantity

Climate Change & Urbanization Have Changed River Flows in Ontario

Lecture 9A: Drainage Basins

Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development

Stanley J. Woodcock, Michael Thiemann, and Larry E. Brazil Riverside Technology, inc., Fort Collins, Colorado

Pennsylvania s Phase III Watershed Implementation Plan: What are the Expectations?

Hydrologic Modeling with the Distributed-Hydrology- Soils- Vegetation Model (DHSVM)

2.2 Middle Fork Nooksack River

Surface Soil Moisture Assimilation with SWAT

A Heavy Metal Module Coupled in SWAT Model and Its Application

Reforestation in grassland areas of Uchindile, Kilombero, Tanzania & Mapanda, Mufindi, Tanzania

CARTERS & BURTON CREEK TMDL MONITORING CASE STUDY. Kevin Wagner, PhD

Non-point Source Pollution Assessment of the San Antonio - Nueces Coastal Basin

Appendix 5. Fox River Study Group Interim Monitoring Evaluation

Tangible benefits of technological prospection and prefeasibility studies in SHP projects Ing. Sergio Armando Trelles Jasso

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

Impacts of changes in climate and land use on hydrology of the Flint River

Title: Modelling of Cascade Dams & Reservoir Operation for Optimal Water Use: Application to the Omo River Basin, Ethiopia

Sources and Persistence of E. coli in Inland Texas Streams

RAINFALL-RUNOFF STUDY FOR SINGAPORE RIVER CATCHMENT

Impact of Point Rainfall Data Uncertainties on SWAT Simulations

Coupling SWAT with land cover and hydropower models for sustainable development in the Mekong Basin

Training Course Brochure Building Capacity in Rural & Urban Water Management

Technical Memorandum. 1.0 Introduction

Crop Water Requirement. Presented by: Felix Jaria:

Land Use Change Effects on Discharge and Sediment Yield of Song Cau Catchment in Northern Vietnam

GIS Hydropower Resource Mapping Country Report for Ghana 1

Gwinnett County Stormwater System Assessment Program

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

GIS Hydropower Resource Mapping Country Report for Niger 1

Grand River Monitoring

General Instream Flow Methods Overview. Agency Meeting on 2012 Draft Study Descriptions January 24, 2011

Climate Change Challenges faced by Agriculture in Punjab

Cedar River Watershed Habitat Conservation Plan

Hydrologic Engineering Center. Training Course on. Hydrologic Modeling with HEC-HMS. Davis, CA. Course Description

CEE3430 Engineering Hydrology

Uncertainty in hydrologic impacts of climate change: A California case study

San Diego Basin Study IRWM RAC Meeting

2.0 Scope of Work. 3.0 Stream Discharge Measurements. Technical Memorandum City of Farmers Branch Page 2

2013 SWAT CONFERENCE Toulouse, France, July 17-19, 2013

VI. WATER QUALITY MODELING

Hood River Basin Study

Improved Water Supply Forecasts for the Kootenay Basin

L-THIA Online and LID in a watershed investigation

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

Estimation of Areal Average Rainfall in the Mountainous Kamo River Watershed, Japan

Continuous Simulation Modeling of Stormwater Ponds, Lakes, & Wetlands: A BUILT-IN APPLICATION OF PONDS 3.2

Joint Research Centre (JRC)

Appendix VI: Illustrative example

Memorandum. 1 Introduction

ROUGE RIVER MONITORING FOR E. COLI TMDL IMPLEMENTATION FINAL REPORT GRANT#

Lecture 1: Importance of Irrigation and Drainage

State of West Virginia Source Water Assessment and Protection Program Source Water Assessment Report

WATER QUALITY ASSESSMENT REPORT 2013 SAGINAW CHIPPEWA INDIAN TRIBE. Clean Water Act Section 106 October 1, 2012 September 31, 2013 Grant #: I 00E57603

San Bernard River Watershed Data Report

NBI strategic water resources analysis Phase I findings

PREDICTION OF FLOW DURATION CURVES FOR USE IN HYDROPOWER ANALYSIS AT UNGAGED SITES IN KOSRAE, FSM

Multi-Objective Optimization Tool for the Selection and Placement of BMPs for Pesticide (Atrazine) Control

Assessment of Future Flow of Hatirjheel- Begunbari Drainage System due to Climate Change

July, International SWAT Conference & Workshops

Nutrient Loading: NAWQA Regional SPARROW model

December 7, Dr. Christine Pomeroy University of Utah Civil and Environmental Engineering MCE Salt Lake City, UT. Dear Dr.

Annual Stream Runoff and Climate in Minnesota s River Basins

Two Dimensional Modeling to Simulate Stormwater Flows at Photovoltaic Solar Energy Sites

For Bandon Utilities Commission

National Integrated Drought Information System Southeast US Pilot for Apalachicola- Chattahooche-Flint River Basin. 14 August 2012

Bexar County Flood Warning System. Curtis Beitel, PE, CFM, Anthony Henry and Wayne Tschirhart, PE, PMP

Narragansett Bay and Watershed Restoration Bond Fund

LELY AREA STORMWATER IMPROVEMENT PROGRAM (LASIP) STAGE AND FLOW SUMMARY

Coupling Transport and Transformation Model with Land Surface Scheme SABAE- HW: Application to the Canadian Prairies

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Culvert Sizing procedures for the 100-Year Peak Flow

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

Transcription:

SAN BERNARD RIVER WATER QUALITY MODEL UPDATE August 18, 2011

Agenda Model Set-up Watershed model Watershed delineations Generate model input files & establish coefficients Receiving Water model Establish boundary conditions Segmentation based on tidal conditions and stream volumes Develop model and establish coefficients Data gathering Next Steps

Agenda Model Set-up Watershed model Watershed delineations Generate model input files & establish coefficients Receiving Water model Establish boundary conditions Segmentation based on tidal conditions and stream volumes Develop model and establish coefficients Data gathering Next Steps

Watershed delineation: input data Necessary to delineate watersheds to take into account: Calibration stations Point sources Tidal boundary Tributary confluence with main steam of river Predominant watershed characteristics Data sources Digital Elevation Model (DEM) Stream Network Shapefile Land Use/Land Cover Data Layer Soil Data Layer

Delineated subbasins

Watershed Model Generate model input files Input files are being developed Model input file requires: Land use/land cover information Watershed practices Soils information Information about bacteria sources in the watershed to establish land practices and model coefficients

Agenda Model Set-up Watershed model Watershed delineations Generate model input files & establish coefficients Receiving Water model Establish boundary conditions Segmentation based on tidal conditions and stream volumes Develop model and establish coefficients Data gathering Next Steps

Tidal Prism Boundary Conditions Upper boundary established at State Highway 35 salt water barrier dam

Tidal Prism Boundary Conditions Lower boundary established at upstream side of intercoastal water way

Receiving Water Model Develop model Model being developed Model requires: Stream invert elevations Input from upstream and watershed runoff from watershed model Information about in-stream bacteria sources to establish loading and model coefficients

Agenda Model Set-up Watershed model Watershed delineations Generate model input files & establish coefficients Receiving Water model Establish boundary conditions Segmentation based on tidal conditions and stream volumes Develop model and establish coefficients Data gathering Next Steps

Data Gathering Weather data Rainfall Temperature Solar radiation Relative Humidity Wind speed Water quality data Bacteria Salinity Flow data

Precipitation Stations

Overall Simulation and Calibration/Validation Period Selection Rainfall Data Stations ID # Records Period of Record Bellville 1189 Jan. 2000 - June 2011 Freeport 1086 Jan. 2000 - June 2011 Wharton 1548 Jan. 2000 - June 2011 Brenham 818 June 2000 - July 2011 LCRA 1026 Jan. 2000 - May 2011 Rainfall and weather data available from January 2000 through May 2011

Calibration Stations - Flow

Calibration and Validation Period Selection Stations ID # Records Period of Record USGS 3891 Jan. 2000 - Sept. 2010 LCRA 4141 Jan. 2000 - May 2011 Flow data available through January 2000 through September 2010

Calibration Stations Water quality

Daily Flow (cfs) USGS Daily Flow Data 18000 16000 14000 12000 10000 8000 6000 4000 2000 0

Daily Flow (cfs) LCRA Daily Flow Data 25000 20000 15000 10000 5000 0

Overall Simulation and Calibration/Validation Period Selection Water Quality Data Stations ID # Records Period of Record 17519 10 Oct. 2001 - March 2004 12147 92 Jan. 2001 - Oct. 2010 15272 12 Jan. 2001 - Aug. 2002 16370 24 Oct. 2007 - Aug. 2010 16373 76 Dec. 2001 - July 2010 17420 13 Jan. 2001 - Aug. 2002 20722 8 Feb. 2010 - Aug. 2010 20723 4 Feb. 2010 - Aug. 2010 12146 84 April 2001 - Oct. 2010 20460 26 Oct. 2007 - Oct. 2010 Majority of bacteria data available from January 2001 through July 2010

E. Coli (MPN/100 ml) E. coli vs. Time, Upper Region Station 100000 Non-Tidal Station ID: 16373 10000 1000 100 10 1 Date

E. Coli (MPN/100 ml) Enterococci vs. Time, Lower Region Station 100000 Tidal Station ID: 12146 10000 1000 100 10 1 Date

Calibration and Validation Period Selection criteria: Majority of data are available January 2001 through July 2010 Flow data available beginning in January 2000 Model simulation period: January 1 st, 2000 to September 30 th, 2010 Calibration Period: January 1 st, 2001 to December 31 st, 2003 Validation Period: January 1 st, 2006 to December 31 st, 2009

Agenda Model Set-up Watershed model Watershed delineations Generate model input files & establish coefficients Receiving Water model Establish boundary conditions Segmentation based on tidal conditions and stream volumes Develop model and establish coefficients Data gathering Next Steps

Next steps Watershed model Complete model set-up Calibrate/validate BMP evaluation Tidal prism Complete model development Calibrate/validate Test BMP evaluation scenarios from the watershed model