Developing SLR adaptation strategy for the Thames Estuary (TE2100) Jonathan Simm HR Wallingford, UK

Similar documents
Climat e Change Adaptation in London

Bay of Fundy: Tides and Sea Level Rise SC 211, June 2, Gary Oberts

Wallasea Island Wild Coast Project Phase 1

Causes of Sea Level Rise*

Natural Flood Management. Measures & Multiple Benefits. Steve Rose (JBA)

UK Climate Change Risk Assessment 2017: Summary of ASC-commissioned research projects

Cork City Tidal Barrier. Cost estimate

Estimating the Costs and Benefits of Climate Change Adaptation in Europe. Paul Watkiss

Flood Protection System Technology supplied by Bosch REXROTH

SURREY COASTAL FLOOD ADAPTATION STRATEGY (CFAS) Improving Coastal Flood Adaptation Approaches (ICFAA) Stakeholder Workshop

PLEASE do not reuse without permission from NYCDEP. [Please notify Pinar Balci and Alan Cohn

Thames Regional Flood and Coastal Committee (RFCC) Flood risk management and environmental benefits in the Thames River Basin, 2015 to 2021

Adaptation to climate change

Sea Level Rise in New York:

Scottish Government: Climate Change

Kilbirnie Town Centre Plan Working Paper. Assessing the implications of sea level rise Kilbirnie Town Centre

Challenges in fluvial and coastal forecasting in Wales. Andrew How and Sam Mitchell

The Importance of the Pearl River to Mississippi s Estuarine Habitats Jennifer Buchanan Education Coordinator

Climate Change, Human Activities, and the State of New Jersey. Michael J. Kennish Institute of Marine and Coastal Sciences Rutgers University

IPCC 5 th Assessment Report : Coastal systems and lowlying

ICCG Think Tank Map: a worldwide observatory on climate think tanks Arctic, Energy Poverty and Health in the Second Volume of IPCC s AR 5

CHAPTER 7. San Dieguito River Flooding Adaptation

Flow-ecology relationships. Flow-ecology relationships Susitna case study

Flood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully

T. Frank, J. Jensen, Ch. Mudersbach, B. Schubert, M. Wörner

London Tideway Tunnels Modernising London s Sewerage System Rob Furniss

Unique ID: (from PFRA database) Location: Clonfert, Co. Galway. Stage 1: Desktop Review

What does IPCC AR5 say? IPCC as a radical inside the closet

Use of Ecosystem Services Approach for Integrated Estuarine Management

TfL Managing Adaptation to Climate Change

Adapting to Rising Tides

Benefits and consequences of managing the Haringvlietsluices for fish migration

COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS

Sea-level Rise Science and Decision Making in an Uncertain Future. Rob Thieler U.S. Geological Survey Woods Hole, MA

Consultation on Draft Air Quality. Strategy for the Thames

Adaptation planning at different spatial scales

ASSESSMENT OF SALINITY INTRUSION IN THE RED RIVER UNDER THE EFFECT OF CLIMATE CHANGE

A Freshwater Blueprint for Maritime Canada

Water Framework Directive Water for Life and Livelihoods

SUSTAINABLE USE OF OCEANS IN THE CONTEXT OF THE GREEN ECONOMY AND THE ERADICATION OF POVERTY, PRINCIPALITY OF MONACO, NOVEMBER, 2011

Climate Adaptation: The Role of Natural Infrastructure in Sustainable Development. September 22, 2011

Roles and Responsibilities of Rijkwaterstaat. Eric Boessenkool

Projects: Supporting the work of NEPA T

II. CLIMATE CHANGE AND ADAPTATION

From: John D. Hines, P.E. Re: Old Dominion University Campus Master Plan Sea Level Rise Narrative

These potential changes and their implications are outlined in Annex 1.

Click the map to read about possible consequences of climate changes in different parts of the world. Africa

Directorate of Research and Development Research and Development for Civil Works

Port of Manzanillo. Port of Manzanillo: Climate Risks and Opportunities. IAIA Symposium: Sustainable Mega- Infrastructure and Impact Assessment

Climate Change and SDGs: Policy Coherence? Leena Srivastava TERI University

1 INTRODUCTION 2 MOTIVATION FOR THE PRESENT EXPERIMENT. Dynamics of the Salt-Freshwater Mixing Zone in Ocean Beaches. N. Cartwright 1 and P.

Resilience and Climate Change Adaptation Session

PRINCESS ANNE DISTRICT STORMWATER PROJECTS

(1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options)

Climate Adaptation & California Native American Tribes

Environmental and Social Impact Assessment for Rogun Hydro Power Plant

Sunrise or Sunset. for the Ems estuary? The future Ems System: restored by the power of. nature. or engineers?

The Economics of Climate Resilience CA0401

Winter resilience: Is our infrastructure fit for purpose to cope with flooding?

Guidance on the role of flood and coastal defence in nature conservation in England

Aquaculture in Natura 2000

Climate Change Adaptation in London. Alex Nickson, Strategy Manager Climate Change Adaptation & Water, Greater London Authority

Adaptation planning at different spatial scales

City-scale integrated assessment of climate impacts, adaptation and mitigation

CITY OF MOUNTAIN VIEW

Climate Adaptation & Disaster Risk Reduction Building Coastal Resilience

Assessing Risks to Inform Resilience: a Criticality Assessment of the British Railway Network

Schemes. Flood Risk Review. South Eastern Catchment Flood Risk Assessment & Management Study CFRAMS. EI Presentation

Land Management and Flooding. Where are we now?

What is climate change? - BBC News

THESEUS DECISION SUPPORT SYSTEM FOR COASTAL RISK ASSESSMENT AND MANAGEMENT

Lower Lee (Cork City) Flood Relief Scheme (Drainage Scheme) Supplementary Report Option of Tidal Barrier

Blue Growth and Blue and Green Infrastructure

Sewer System Flood Reduction Measures in the Rockcliffe Area

CLIMATE CHANGE ADAPTATION IN MASSACHUSETTS

The Dublin Coastal Protection Project

Adaptation to Climate Change Assessing Costs and Evaluating Policy Measures

Climate Change: Background and Implications

Climate Adaptation Roadmap for Melbourne s East

Climate Change Adaptation Strategy Summary & Roadmap. SUMMARY & ROADMAP DRAFT

The Delta Programme and updated flood risk management policies in the Netherlands. Jos van Alphen Staff Delta Programme Commissioner

PRIORITY AXIS 1: A well connected region

Building Resilience to Sea Level Rise in SE Florida

CHECK AGAINST DELIVERY! Denis Roger (EDA Director ESI) : Intervention SEDE 25 January 2017 Preparatory Action in the field of Defence Research

AP Environmental Science

1 General questions on zone and catchment management plans

Monday 9 October. Co-located with: Created and produced by: Powered by:

Fourth Assessment Report (AR4) of the IPCC (2007) on Climate Change. Part II Climate Change Impacts, Adaptation and Vulnerability.

The TIDE Project: An overview. - Kirsten Wolfstein, Hamburg Port Authority -

Strategies adapted to Climate Change in the Metropolitan Area of Hamburg

Vincent Rebour, Frédéric Ménage IRSN: PRP-DGE/SCAN, PSN-EXP. Assessing flooding hazards: new guidelines

Transcription:

Developing SLR adaptation strategy for the Thames Estuary (TE2100) Jonathan Simm HR Wallingford, UK

Outline The Thames in context Use of indicators and tipping points The TE2100 journey Option development The final (consultation) plan Page 2

Thames in context Loadings (Sources) River Lee River Roding Barking Waves Canvey Island Westminster Fluvial Flows Richmond Greenwich Purfleet Tilbury Sea levels (tide Gravesendand surge) Legend Tidal flood risk area Tidal flood defences Thames Barrier Other barriers Flood control gates Teddington weir 10km Page 3

Thames in context Defences (in Pathways) River Lee River Roding Barking Canvey Island Westminster Purfleet Tilbury Richmond Greenwich Gravesend Legend Tidal flood risk area Tidal flood defences Thames Barrier Other barriers Flood control gates Teddington weir 10km Page 4

Thames in context what is at risk (Receptors) Central and Local Government >80,000 civil servants River Lee River Roding Barking Canvey Island Westminster Purfleet Tilbury Richmond Greenwich Gravesend Legend Commercial centre of the UK Tidal flood risk area Other barriers Tidal flood 250b Historical defencesannual contribution buildings of Flood control Thames Barrier gates Teddington weir significant cultural value 10km Page 5

Thames in context System Pressures Thames Gateway Project 200,000 new jobs and commercial development (incl. Olympic Park (2012)) Page 6

Broad input assumptions Sea level rise in the Thames over the next century due to thermal expansion of the oceans, melting glaciers and polar ice is likely to be between 20cm and 90cm. There remains a lot of uncertainty over the contribution of polar ice melt to increasing sea level rise. At the extreme, it may cause sea level to rise by a total of up to 2 m (including thermal expansion) although this is thought to be highly unlikely. Upper limit assumed to be 2.7m Climate change is less likely to increase storm surge height and frequency in the North Sea than previously thought. Future peak freshwater flows for the Thames, at Kingston for instance, could increase by around 40% by 2080. Page 7

Some questions What will London and the Thames Estuary look like in 100 years? How will public attitudes to flood risk and the environment change over this time? Flood risk today, and in the future? What are the best ways of managing this risk?.. ensuring Plan is adaptable to change and remains fit for purpose for 100 years?.. Presenting Plan ed in a way which promotes multipartner working (key Pitt recommendation) Page 8

TE2100 HEADLINE OBJECTIVES: To manage the risk of flooding to people, and minimise the adverse impacts of flooding to property and the environment; To adapt to the challenges that we will face from climate change; To support and inform the land use planning process to ensure appropriate, sustainable and resilient development in the tidal floodplain; To protect the social, cultural and commercial value of the tidal River, its tidal tributaries and its floodplains; To enhance and restore estuarine ecosystems to contribute to biodiversity targets and maximise the environmental benefits of natural floods. Page 9

The traditional response to floods in the Thames (picture courtesy: Rachael Hill, Environment Agency) Page 10

Indicator value (e.g. sea level rise) Tipping points: thresholds, lead times and decision points Threshold value of indicator when intervention is needed Decision point based on best estimate Predicted values of indicator based on rate of change Recorded values of indicator Date of review Lead time for planning and construction Time Page 11

Impact of change on Decision Points Indicator value (e.g. sea level rise) Threshold value of indicator when intervention is needed New Decision Point based on best estimate Decision Point in Plan New Decision Point based on best estimate Lead time for planning and construction Predicted values of indicator based on rate of change Recorded values of indicator Assumed values of indicator in Plan Date of review Change in date of Decision Point Time Page 12

Area of intertidal mudflat and saltmarsh (depends on Mean Sea Level rise and morphological change) Managed realignment area 1 Managed realignment area 2 Managed realignment area 3 Managed realignment area 4 Threshold 1 Present day area Area with no interventions Time Notes: 1. The portfolios of responses are designed to keep the area of mudflat and saltmarsh above present-day level. 2. The timing of realignments is to a large degree dependent on when existing defences would otherwise require replacement. Page 13 2100 Impact of Mean Sea Level increase (and other changes) on habitat area

Managing flood risk over the century Page 14

Risk indicator (probability x consequence) Pathway (e.g. beach, raised/non-raised defence and floodplain) Receptor (e.g. people and property) Source (River or sea) Performance' = risk mitigation (largely) Page 15

Damage to Properties (Res. + Commercial) ( Million) 4500 4000 3500 3000 Expected Annual Damage Upper Bound = 119,971,588 Best Estimate = 102,483,258 Lower Bound = 85,209,508 Present day Barriers not working Expected annual damages 2500 2000 1500 1000 500 By Flood cell 0 1 10 100 1000 10000 Return Period (years) Upper Bound Best Estimate Low er Bound By Flood Area Page 16

The system model attributing risk to individual levees Contribution to risk due to overtopping Defence Unique identifier Rank Total Contribution Breach Contribution Overtop Contribution Contribution to risk due to breaching 300005043 1 334,601 311,041 23,560 300000014 2 320,896 0 320,896 300005266 3 166,306 166,306 0 300003265 4 147,851 147,851 0 300000975 5 142,233 141,901 332 300000926 6 139,721 0 139,721 300001596 7 115,803 115,803 0 300002431 8 106,515 364 106,151 300000754 9 102,060 3,932 98,128 300000007 10 98,961 95,964 2,997 300005019 11 79,216 45,124 34,092 300000920 12 77,339 0 77,339 300004585 13 75,830 26 75,804 300003352 14 74,511 50,524 23,987 300001681 15 73,386 73,386 0 300005254 16 67,857 67,857 0 300001695 17 63,973 63,969 4 300000332 18 63,328 0 63,328 300000318 19 62,659 0 62,659 300000477 20 62,090 32,023 30,066 Page 17

Project Closure The TE2100 journey TE2100 Consultation Plan TE2100 Final Plan PAR 1 PAR 2-4 ECOs HLOs Jan 2002 Jun 2003 Nov 2004 Jan 2010 Phase 0 Phase 1 Phase 2 Phase 3 Phase 4 Exploring the problem Project Scoping Understanding the Estuary Policy and Options Investigation and Appraisal Plan Finalisation, and approval 2002 2003 2004 2005 2006 2007 2008 2009 2010 Page 18

TE 2100 Policy Options P1 No active intervention (including flood warning and maintenance). Continue to monitor and advise. P2 Reduce existing flood risk management actions (accepting that flood risk will increase over time). P3 Continue with existing or alternative actions to manage and maintain flood risk at the current level (accepting that the likelihood and/or consequences of a flood will increase over time from this baseline). P4 Take further action to sustain current scale of flood risk into the future (responding to potential increases in flood risk from urban development, land use change, and climate change). P5 Take further action to reduce the risk of flooding (now and/or in the future). Page 19

1 10 100 1000 10000 Damage (Million ) Risk now and under future climate scenarios Present day and Year 2100, Return period/economic damage results 30,000 25,000 Year 2100, P1 Policy- Medium high EAD= 2.1 billion 20,000 15,000 10,000 Present Day P3 Policy EAD= 3 million 5,000 0 Return Period (Years) Page 20

Understanding the Estuary at a Local Level Chiswick City Barking Grays Canvey Island Hadleigh Putney Deptford Bexley High Halstow All Hallows Twickenham Gravesend Three phases of local studies and public meetings to find out what local communities think about their part of the Thames Estuary Page 21

Improve existing defences Flood Storage Page 22 New barrier Barrier with locks Hundreds of local FRM activities investigated and major changes to the asset system refined down to four, with two front runners

Max water level rise: 0m Defra UKCIP MH TE2100 H+ 1m 2m 3m HLO 1 TE2100 H++ 4m Improve Thames Barrier and raise d/s defences Existing system Over-rotate Thames Barrier and restore interim defences Flood storage, improve Thames Barrier, raise u/s & d/s defences HLO 2 Raise Defences Flood storage, restore interim defences Flood storage, over rotate Thames Barrier, raise u/s & d/s defences Latest climate change results for TE2100 H++ HLO 3a New barrier, retain Thames Barrier, raise defences New barrier, raise defences HLO 3b HLO 4 New barrage The final plan is a combination of approaches Page 23

98 TE2100 Actions.. Plan Over 8 Action zones.. and zone 0 covering the whole estuary Page 24 delivered through multi agency working

Likely Cost Profile The first 25 years Continuing investment and planning together 1.5 bn. The middle 15 years from 2035 to 2049 Renewal and reshaping the riverside 1.8 bn. To the end of the century from 2070 moving towards the 22 nd century 6bn to 7bn. Page 25

The detail.. The first 25 years 1.15bn the Assets 59m inter-tidal habitat creation 302m -- 3 rd party costs (FPM) The middle 15 years 1.65bn the Assets 29m inter tidal habitat creation 139m 3 rd party costs (FPM) To the end of the century 4.75.bn the Assets (new barrier?) 50m inter tidal habitat creation 1.2bn 3rd party costs (FPM) 1.5 bn. 1.8 bn. 6bn to 7bn. Page 26

TE2100 the first 25 Years Continue to maintain the current flood defence system including planned improvements Working with regional and local planning authorities to improve floodplain management Safeguard areas that may be required for future changes to flood managements Commencing work to create new habitats Monitor/Review the use of Thames Barrier for fluvial floods in West London Page 27

TE2100 the next 35 years 2035-2070.and from 2070, moving into the 22nd century!!!! Replacing and upgrading defences upstream and downstream of Thames Barrier Continue working with regional and local planning authorities on riverside improvements Take informed decision on building a new barrier at Long Reach or other end of the century option Remaining habitat creation sites Construct new barrier or adapt Thames Barrier ~ 2070!!! Page 28

3 phases of stakeholder engagement March 2009: launch TE2100 plan consultation April/May 09: targeting key stakeholders/future implementation partners June to Aug 09: public awareness and engagement Final revision of Plan TE2100 plan public consultation Page 29

Conclusions TE2100 provides an overarching FRM strategy for the Thames Estuary for the next 100 years to adapt to changes including SLR New methods and science have been used Methods and lessons learnt potentially have wider application beyond TE2100 but time and resource provided would not be available to all FRM strategies Page 30

Developing SLR adaptation strategy for the Thames Estuary (TE2100) Questions?

Page 32

Page 33

Early conceptual options Page 34

Indicator value (e.g. sea level rise) Thresholds, lead times and decision points Threshold value of indicator when intervention is needed Decision point based on best estimate Predicted values of indicator based on rate of change Recorded values of indicator Date of review Lead time for planning and construction Time Page 35

Indicator value (e.g. sea level rise) Thresholds, lead times and decision points Threshold value of indicator when intervention is needed Decision point based on best estimate Decision point taking account of uncertainty Band of uncertainty Predicted values of indicator based on rate of change Recorded values of indicator Date of review Lead time for planning and construction Time Page 36

2100 Annual number of closures of the Thames Barrier Threshold 3 Raise upriver defences Raise upriver defences New barrage or convert Thames Barrier to barrage (depends on Mean Sea Level rise) No. of closures with no interventions Threshold 2 Threshold 1 (70 closures per year) Note: The portfolios of responses are designed to keep the annual number of closures below 70. Thus the actual number of closures follows the dotted brown lines. Page 37 Time Impact of Mean Sea Level increase on defences upriver of the Thames Barrier