ISO-9001:Quality Management System Progress Report

Similar documents
Pavement Management Systems

Computer-Aided Maintenance Management

Presented by Henry L. Barbaro Stormwater Management Unit Supervisor MassDOT Highway Division

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013

Benefits of Pavement Preservation

Sandstone Curb Replacement Standards

SPECIFICATIONS FOR SAND SEAL

8.1 Regulatory Requirements

NCDOT s Performance Based Contracting Experience in Charlotte. Jennifer Brandenburg, PE State Road Maintenance Engineer July 21, 2009

Cold Foam In-Place Recycling (CIR)

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

Environmental Management System Semi-Annual Update. Briefing to the Transportation and Environment Committee December 10, 2007

COUNTY HIGHWAY ASSET MANAGEMENT FOR ELECTED OFFICIALS

The Village of Wellington NPDES Guidance/Reference Document

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

The Cost Savings Potential of Sustainability Practices

Project Need and Evaluation

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

550 Surface Treatments

Project Type: Drainage and Storm Systems

The Ultimate Stress Absorbing Membrane

Asset Management Performance Measures for Privatized Highway Concessions in British Columbia

2013 PAVEMENT MANAGEMENT PLAN

Innovative Sustainable Pavement Solutions

Field Guide on. Safe Maintenance and. Work Zone Operations

PAVEMENT MANAGEMENT REPORT 2011

For Public Input Period

Public Works Department Organizational and Operational Analysis: Town of Saugus, Massachusetts

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

ODOT Asset Management Plan 0

Flexible Pavement of Ohio

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by:

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

AMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS

Appendix C. BMPS, Measurable Goals, and Implementation Schedule

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

CITY OF GEORGETOWN, TEXAS

Storm Drain Inlet Protection for Construction Sites (1060)

City of Martinsburg 1. TASK & DUTIES LIST AND MEASURES OF PERFORMANCE FOR: PUBLIC WORKS LABORER

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Maintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments

The Role of Pavement Preservation in Asset Management

Alligator Cracking. Light. Medium. High

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

Full Depth Reclamation

Newport Bay Watershed Executive Committee

SURFACE WATER UTILITY FEE

SPECIFICATIONS FOR NEW WORK CHIP SEAL

UNDERSTANDING PMIS: RIDE, PATCHING, AND OTHER FACTORS. Darlene C. Goehl, P.E. Dist. Pavement-Materials Engr. TxDOT - BRY

APPENDIX G Fire BMPs

EMERGENCY OPERATIONS Educational Series

BASE CONSTRUCTION MATERIALS A Aggregate

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4

Eco Supply Canada Offering The Best. Pothole Repair Solution. GeoLite Asfalto

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

Section 505. CHIP SEALS

Engineering Department

Combining Preservation Treatments

Comparing Tools for Managing Infrastructure. VUEWorks. September 15, 2016

Zoning Permits 11-1 ZONING PERMITS

Benefit Assessment Report. Santa Barbara County Flood Control & Water Conservation District

San Francisco Bay Area Green Initiatives. Theresa Romell, Principal Planner/Analyst, Metropolitan Transportation Commission October 12, 2016

City of Los Angeles Mandatory Commercial Organics Compliance Plan

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

Existing Conditions Report

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

S.O.P. No. HMD

Overview. Preventive Maintenance Concepts. What are thin and ultra thin mixes. Experience in Michigan with ultra thin

Municipal Stormwater Ordinances Summary Table

Hydro-Demolition in North Carolina

Nova Scotia 2009 Pavement Preservation. Jim Chisholm Highway Construction Services

EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

Annual Maintenance & Operations Plan

Fig Plan of Access Road

Parking Area Maintenance

CITY OF' BULLHEAD CITY

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

Cold In-Place Recycling

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program

Life Cycle Cost Analysis

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

ISSUED: 1/16/15 REVISION: 1.0 REVISION: STANDARD DETAIL COMBINATION 6'' CURB & GUTTER CITY OF FALLS CHURCH VA PUBLIC WORKS

Conformity Assessment - Requirements for the Operation of Various Types of Bodies Performing Inspection

Richland County Department of Public Works Engineering (Land Development) Division

Chip Seal News & Views

Controlling Reflection Cracking in HMA Overlays of PCC Pavement. Gary L. Fitts, P.E. Sr. Field Engineer Asphalt Institute San Antonio, Texas

TC3 AASHTO Technical Service Program for Training

Road Maintenance Annual Plan

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Transcription:

ISO-9001:Quality Management System Progress Report Department of Street Services May 2, 2007

Purpose Provide an overview of the Department of Street Services Provide background of ISO 9001 certification process Review of ISO 9001 Implementation Next steps 2

Overview $52M budget with 584 employees Organized into four business units: Street Repair Division Service Maintenance Areas (5) Flood Control Contracts, Finance, and Inspections 3

Overview Responsible for: Street maintenance and repair Right-of-way maintenance and CBD Night Operations Flood Control and river levee maintenance 4

Background What is ISO 9001? International Organization for Standardization (ISO) 9001 An internationally recognized quality management standard Certification is a coveted recognition for quality management Dallas is the first major city in the United States to achieve ISO 9001 certification for an entire city department 5

Background Why is ISO 9001 important to the City of Dallas? Our goal is to: Align everyday work with our quality policy Provide targets that can be measured Allow easy review of performance Drive continual improvement 6

Continual Improvement ISO Certification Quality Manual Project Plan 7

Background On February 23, 2005 the Council approved a contract with the University of Texas at Arlington-TMAC to assist with the implementation of ISO 9001 within the Street Repair Division of Street Services On May 10, 2006 the Council approved a multi-year contract with the University of Texas at Arlington-TMAC to implement an ISO 9001 Quality Management System for the entire Department of Street Services and other City Departments 8

Background Council Committees were provided periodic progress reports on Street Services progress Process-mapped each service provided to assist us in understanding the work Developed work instructions for employees to standardized work processes Established measurable objectives to serve as guiding principles for each business unit 9

Background Conducted a series of internal audits to identify opportunities for improvement Held management reviews to foster decision making Developed a quality manual to outline the StreetWorks way of doing business 10

Background Pre-Assessment was conducted on January 18-19, 2007 Final-Audit was completed February 28, 2007 through March 2, 2007 ISO 9001 Certification was awarded March 13, 2007 11

Status and Review Developed measurable objectives that address: Delivery of service Efficiency Quality Customer feedback 12

Business Unit: Service Maintenance Areas Objective Measurement Source 1. Delivery of Service / Efficiency Respond to 3-1-1 service requests in accordance to the Service Level Agreement The total number of service requests completed compared to the total number available to be worked on Customer Service Response Management System 2. Quality Establish an inspection results baseline to set future quality standards STS Inspection Program 3. Customer Feedback Receive a satisfactory score on the Customer Feedback Surveys performed Review Street Services related results of citywide 5% Customer Feedback Survey conducted Strategic Customer Service 5% Customer Feedback Survey 13

Asphalt Street Repair- Level Up Efficiency ($/per SY) District 1 District 2 District 3 District 4 District 5 Nights Benchmark $9.00 $9.00 $9.00 $9.00 $9.00 NA October $ 7.69 $ 6.01 $ 7.91 $ 9.36 $ 11.77 - November $ 7.06 $ 5.63 $ 7.61 $ 9.36 $ 11.64 - December $ 10.85 $ 9.12 $ 9.81 $ 8.93 $ - - January $ 17.76 $ 11.06 $ 14.18 $ 11.26 $ 10.34 - February $ 10.38 $ 9.09 $ 12.70 $ 12.12 $ 14.52 - AVERAGE $ 10.75 $ 8.18 $ 10.44 $ 10.21 $ 9.65 -

October Comments: District 1 Cost was low due to higher volume of large level ups. November Comments: District 2 Special Project: Veteran s Day (Mountain Creek Pkwy-1600 SY) December Comments: District 5 One of two patch trucks down. Focused on pothole repair. January Comments: District 1 Special Project: Fair Park Extension (extensive full depth level-ups). February Comments: No comments. Note: Average cost will increase in the winter months due to the use of a cold patch material on rainy days and when the temperatures stay below 45 degrees ($80/ton vs. $45/ton for hot-mix).

Business Unit: Street Repair Division Objective Measurement Source 1. Delivery of Service / Efficiency Perform Service Request for major asphalt and concrete street repair in accordance with the SLA 2. Delivery of Service / Efficiency Perform Streets 2010 projects and prep-work for preventative treatments in accordance with 2006/07 2010 program goals 3. Quality Establish an inspection results baseline to set future quality standards 4. Customer Feedback Receive a satisfactory score on the Customer Feedback Surveys performed The number of service requests completed per the goal The number of planned projects completed per plan Review Street Services related results of citywide 5% Customer Feedback Survey conducted Customer Service Response Management System Fiscal Year 06-07 2010 Project List STS Inspection Program Strategic Customer Service 5% Customer Feedback Survey 14

Business Unit: Flood Control Objective Measurement Source 1. Delivery of Service / Efficiency Perform work on the pumps, motors, sumps, and levees in accordance to the standards set by the United States Army Corp of Engineers United States Army Corps of Engineers annual and/or periodic reports United States Army Corp of Engineers Report 2. Efficiency / Quality Ensure 95% of pumps are readily available during the rainy season (March-May, September-November) and 80% of pumps are available during the non-rainy season (December-February, June-August) Total number of downtown hours divided by the total hours available each month Flood Control Preventative Maintenance Schedule 3. Customer Feedback Analyze and decrease the number of avoidable incidents by performing post event assessments Results of post event assessments Flood Control Post Assessment Report 15

Business Unit: Contracts, Finance, and Inspections Objective Measurement Source 1. Delivery of Service / Efficiency / Quality / Customer Feedback Process 100% of payments for services according to guidelines detailed in the service contract The number of payments within 21 days divided by the total number of payments processed monthly Accounts Payable Log 2. Quality Establish an inspection schedule and completion baseline to set future standards The number of inspections compared to the number of inspections scheduled STS Inspection Program Inspection Log 3. Customer Feedback Establish a baseline for performance on inspections The number of inspections completed on time compared to the number of inspections scheduled The number of disputes divided by the number of inspections completed per the target Inspection Log 16

Review Conduct management reviews that address: Resources Performance Indicators Methods Accountability Management reviews are a requirement of the ISO 9001 Standard 17

Management Review Resources: Budget Allocations Who is Responsible: Director, Assistant Directors, Management Representative, Program/District Mgrs, Supervisors Input Results of audits Customer feedback Process performance/product conformity Status of preventive/corrective actions Follow-up actions from previous management reviews Changes that could affect the quality of management systems Recommendations for improvement Performance Indicators: ICMA Benchmarks, Management Focus, Key Focus Area Results, Action Plan Results, Performance Plan Management Review Output improvement of the effectiveness of the quality management system and its processes improvement of product related to customer requirements resource needs Methods: Monthly Management Reviews, Scheduled Inspections, Internal Audits, Supervisor Production Meetings, Work Plan Meetings 18

Data Analysis Continual Improvement Internal Audit/ Corrective Actions Management Review 19

Review Initial Return on Investment A documented quality management system Improved internal communication Consistent and repeatable processes Customer feedback showing signs of increased customer satisfaction Corrective and preventative action systems to facilitate continual improvement Employee buy-in through training and involvement 20

Review Return on Investment Improved: Non-hazardous pothole SLA from 120 days to 5 days Concrete repair SLA from 120 days to 90 days Asphalt repair SLA from 120 days to 90 days Fleet preventative maintenance record Risk management report card Environmental compliance Response to customer service requests 21

Overdue SRs Since the ISO Certification Process Began Number of Overdue SR's 180 160 140 120 100 80 60 40 20 April 2005 Customer service requests for concrete and asphalt repair SLA s reduced to 90 days from 120 days April 2007 0 22

Next Steps Continue to work the ISO 9001 plan Registration is not permanent and must be renewed every three years The Registrar will return annually to conduct an audit of 1/3 of our organization Every 3 years a full external audit is conducted Focus on training and development Conduct internal audits Develop a 5 year Road Map Pursue continual improvement 23

Appendix 24

Street Repair Division Types of major maintenance repairs: Partial reconstruction Removal and replacement of large, failed sections of concrete streets Includes breakout and removal of old concrete Repair of any existing base failures Placing new concrete in failed areas to restore the street to good condition Rehabilitation A treatment for asphalt streets without a curb and gutter Street surface is repaired and crack-sealed if necessary Application of an under-seal followed by a 2 layer of asphalt 25

Street Repair Division Types of major maintenance repairs: Restoration Grinding and pulverizing an asphalt street Recycling of the old base and surface material into the new street Application of an under-seal followed by a 2 layer of asphalt Full-Depth Repairs Partial replacement of street/alley pavements 26

Service Maintenance Areas Primary intake of Service Requests (311) Routine maintenance Pothole repair Radio dispatch for roadway emergencies Street/alley repair Roadside drainage Inlet cleaning Illegal dumping Guardrail repair Mowing of surplus property Night operations Fire Response Right-of-way cleaning in CBD Sanding oil spills Traffic control at accidents 27

Flood Control Funded by Storm Water $7M FY06-07 Provide flood protection by maintaining and operating the Trinity River Levee System 30 miles of levees 16 pump stations 63 pumps Protects 10,000 acres or 17% of the City s tax base Monitor 41 flooded roadway warning sites on roadways prone to localized flooding General maintenance: 117 miles of creeks 51 miles of lined channels 58 acres of detention/retention basins Mowing of the floodway, levees, and sumps 28

Contracts, Finance, and Inspections Mowing of medians and right-of-ways 1600 acres per cycle 18-19 cycles annually Street sweeping for major thoroughfares 2,186 gutter miles monthly Litter pick-up Collect and remove 1,500 cubic yards of litter annually Preventative maintenance treatments Slurry sealant for residential streets Prevents water infiltration 105 lane miles annually Micro surfacing for high traffic thoroughfares Prevents water infiltration 120 lane miles annually 29