VERIFICATION OF GEOTECHNICAL GROUTING- STRATEGIES AND PLANNING. Michael J. Byle, D.GE, F. ASCE

Similar documents
Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015

Ground Improvement. A Discussion on Dynamic Compaction. Chris Woods, P.E., D.GE., LEED AP BD+C Vice-President

Implementation of this Special Provision requires a complete understanding of the following documents:

Partial Factors of Safety

Hydrology. Jürg M. Matter Lamont-Doherty Earth Observatory, The Earth Institute at Columbia University. May 9, 2008

Challenges in Design and Construction of Deep Excavation With Case Studies - KVMRT in KL Limestone

Building Code of New York State

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

SITE INVESTIGATION. Foundation Engineering

Wastewater Capital Projects Management Standard Construction Specification

A Case Study: Foundation Design in Liquefiable Site

Experience of a Large Scale Unintentionally Long Surcharge on Organic Soils

Electrical Conductivity & Hydraulic Profiling. The Combining of Two Subsurface Investigation Methods (With More to Come)

NPTEL Course GROUND IMPROVEMENT USING MICROPILES

RIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil.

Bi-Directional Static Load Testing of Driven Piles

Macro Standard Penetration Test measurements Examined with a micro scale PDM device

Ground Improvement for Mitigation of Failure Risks to Existing Embankment Dams

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL

Design and Construction of Drilled Full Displacement Piles using the Penetration Resistance Method

Earthquake Reinforcement Using Jet Grouting for a Factory in Operation

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

GROUND IMPROVEMENT SITE INVESTIGATON

Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

A POORLY GRADED SAND COMPACTION CASE STUDY

Ground Improvement. Martin G. Taube, P.E., P.G. February 4, 2003

Low Mobility Grouting (LMG) and Compaction Grouting, "Application Review"

SECTION DUCTILE IRON PILES

Ground Improvement Specialists

SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015

Application of Vibro Techniques for Infrastructure Projects in India

Geotechnical Engineering Software GEO5

Conventional Field Testing Methods and Issues

Evaluating relative compaction of fills using CPT

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection

Over the last decade, drilled and postgrouted micropile foundations have

C. Installers licensed by the Geopier Foundation Company, Inc. ( will be accepted as approved installer.

SOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS

Preliminary Geotechnical Exploration Armstrong Tract Rivers Avenue and Hanahan Road North Charleston, South Carolina S&ME Project No.

Evaluation the Effectiveness of Rapid Impact Compaction (RIC) as a Ground Improvement Technique


ASSESSMENT AND MITIGATION OF LIQUEFACTION RISK FOR EXISTING BUILDING FOUNDATION

Integrity evaluation of concrete by cross-hole sonic logging in Bangladesh

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

RECORD KEEPING AND INSPECTION NOTES FOR FUTURE NEEDS

Ground Improvement Techniques: Dynamic Compaction Martin Larisch & Tim Pervan

Development of correlation between dynamic cone resistance and relative density of sand

North American Society for Trenchless Technology 2008 No-Dig Conference & Exhibition. Dallas, Texas April 27 May 2, 2008

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

PDPI 2015 STATIC ANALYSIS LATERALLY LOADED PILE DESIGN. Chapter 9

TOYO ENGINEERING INDIA LIMITED

Trenchless Pipeline Crossings

Petroleum Production Optimization

Logging solutions for optimizing field development. Well Evaluation for Coalbed Methane

FOR. by The Structural Committee of The Foundation Performance Association Houston, Texas. Document # FPA-SC-04-0

Importance and Role of Isotopes in the Petroleum Industry

GEOTECHNICAL RESISTANCE FACTORS

DEPTH EFFECTS AND VIBRATIONS ASSOCIATED WITH DYNAMIC COMPACTION CASE STUDY

RECOMMENDED PROCEDURES FOR IMPLEMENTAION OF DMG SPECIAL PUBLICATION 117 GUIDELINES FOR ANALYZING AND MITIGATING LIQUEFACTION IN CALIFORNIA

CONNECTICUT DEPARTMENT OF TRANSPORTATION GEOTECHNICAL ENGINEERING MANUAL Edition

In the event of any occurrence that does or could pose a hazard to rail traffic or the public, contact Canadian Pacific Railway at

BORED MICROPILES. I.S.M 2009 London (10 th to 13 th may) 9 th International worksop on micropiles - by A. Jaubertou -

A CASE HISTORY ON DESIGN, CONSTRUCTION, AND PERFORMANCE OF STONE COLUMN GROUND IMPROVEMENT BENEATH AN MSE EMBANKMENT

New (? Logging) Developments in Reservoir Monitoring

Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications

Subsurface Distribution of ZVI/EHC Slurry Validating Radius of Influence. Josephine Molin, PeroxyChem October

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

Ground Improvement Piling Piled Retaining Walls Enlarged Head Piles Innovations.

PIANC UK Seminar Design Developments and Specification for Steel. Duncan Nicholson Arup Fellow 9/3/17 ICE London

SCDOT Geotechnical Manual Updates. Nicholas E. Harman, MS PE

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement

CHAPTER 9 - PILE FOUNDATIONS TABLE OF CONTENTS OVERVIEW OF PILE FOUNDATION DESIGN GUIDELINES FOR FOUNDATION DESIGN REPORT PREPARATION

Design Guideline for Gravity Systems in Soil Type 1. January 2009

UPDATED 04 OCT GEOTECHNICAL INVESTIGATIONS

Geotechnical Engineering Report

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING

CE 240 Soil Mechanics & Foundations Lecture 4.1. Soil Compaction: Field work (Das, Ch. 5)

SECTION2 Drainage Control for Surface Mines. Some Technical Aspects of Open Pit Mine Dewatering

Vibroflot Modular Product Range

Example of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil

Overview Sonic Drilling Technology

HEAP CHARACTERIZATION AND MONITORING WITH ELECTRICAL RESISTIVITY FOR OPTIMIZING SECONDARY LEACHING

Subsurface Investigation Report

Chartered Professional Engineer (Geotechnical) Body of Knowledge and Skills

Water Well Decommissioning Guidelines

HIGH BRIDGE AREA ROADWAY SLIDE, LETCHWORTH STATE PARK PORTAGEVILLE, NEW YORK

Geotechnical Engineering Report

Hydraulic Fracturing Test Site (HFTS)

CONCENTRATE AND BRINE MANAGEMENT THROUGH DEEP WELL INJECTION. Abstract

Innovative Soil Reinforcement Method to Control Static and Seismic Settlements

STORMWATER MANAGEMENT. 158 Attachment 2. Borough of Perkasie

Jet Grouting Experience at Posey Webster Street Tubes Seismic Retrofit Project

Behavior of Surrounding Soil during Construction and Its Countermeasures Using Pipe Jacking Method in Deep Strata

Ravi Sundaram. Cengrs Geotechnica Pvt. Ltd. Noida A-100 Sector 63, Noida Ph: (O): (M):

Carbon Dioxide Capture and Sequestration in Deep Geological Formations

Effective Stress Design For Floodwalls on Deep Foundations

Transcription:

VERIFICATION OF GEOTECHNICAL GROUTING- STRATEGIES AND PLANNING Michael J. Byle, D.GE, F. ASCE

Verification of Geotechnical Grouting was published By the ASCE Committee on Grouting in 1995 It is still available and still has useful information

OUTLINE Overview of grouting methods Identifying Basis for Verification Guidelines for planning verification Methods for verification Summary

Overview of Grouting Methods

Permeation Grouting

Permeation Grouting

Rock Joint Grouting

Permeation Grouting

Compaction Grouting Water Table Compacted zone

Compaction Grouting

Jet Grouting

Deep Mixing

Deep Mixing

Hot Melts Injection of a molten solid that solidifies in the ground Predominantly Bitumen Used to control high volume water flows

Hot Bitumen Grouting

Verification is Important Verification provides a basis for: Measuring success Payment for performance based contracting Modifying the means and methods during construction Satisfying third parties Insurance companies Financial institutions Owners

Planning for Verification Verification Objective 1. Liquefaction resistance 2. Cutoff of Seepage 3. Resultant bearing capacity 4. Settlement Reduction 5. Structural support (i.e. underpinning) Factors Monitored 1. Soil Stiffness 2. Presence of grout 3. Grout Stiffness 4. Overall ground strength 5. In-Place grout quality 6. Resultant Permeability 7. Size and shape of injected mass 8. Temperature

Using Correlated Properties Desired Properties Defining limits of grout intrusion In-situ grout compressive strength Settlement Correlated Properties Electrical conductivity/resistivity Magnetic properties Seismic wave velocity Blow count resistance Ground movement Acoustic emissions Stiffness Static penetration resistance

Using Correlated Properties Desired Properties Hydraulic Cutoff Permeability Reduction Sealing Leaks Correlated Properties In situ permeability Groundwater gradients grout permeability Electrical conductivity/resistivity Acoustic emissions

Basis for Verification In situ values will differ from ex situ test results Variability in the formation will result in variability of the grout injection and properties Recognize that in many instances it will not be possible to measure the property of concern

Consider Verification During Pre- Design Subsurface Characterization Forms the baseline from which to assess improvement Provides insight into appropriate verification methods Identifies parameters essential for verification Consider multiphased investigation to permit focused investigation prior to final design Helps to select verifiable grouting methods

Verification Considerations in Investigation Characterize site variability or outstanding uncertainty of site conditions Special parameters needed for verification (electrical, chemical, geophysical, etc) Improve detail of characterization to anticipate potential verification problems May use special tools and techniques Geophysics seismic, resistivity, gravimetric, etc. In situ tests CPT, SPT, DMT, Permeameters, etc. Investigation may need refinement as the design develops

Investigation Should Identify Parameters for Verification of Grouting Understanding how grouting may alter any of these parameters is essential to planning verification Permeability Grain Size Distribution Compressibility Void Ratio/Relative Density Electrical Resistivity Seismic Wave Velocity Soil Contrasts Soil/Groundwater Chemistry

Basic Fundamentals to Begin Planning Verification Physical limits of strata Groundwater level and flow Range of variability Stratification Subsurface structures Obstructions (boulders, rubble, etc.)

Verification Tools and Techniques

Grouting as Verification o Range Detection Pipes for Jet Grouting o Deflection measurements during grouting o Pressure/volume relationships o Aparent Lugeon Method o LMG Pressure Response o Digital real-time methods are now commercially available

Swing Tube Cylinder 1 Grout Line Cylinder 2 Hopper 1 Stroke Process Repeated Volume of Grout

Cumulative Envelope Volume of Grout Courtesy Moore and Taber

Hydraulic Fracture Envelope Volume of Grout

Direct Sampling o Coring o Test Excavations o Directly measure properties of sampled materials o Some materials difficult to sample omay not measure intended objective o Consider spatial variability vs. sample size

Coring Coring success is material dependent Core deviation from grout mass may be a problem and should be validated with inclinometer Cored samples can be tested in laboratory

Coring Jet Grouted Fill

Physical Examination Appropriate where the presence and distribution of the grout is an effective indicator of performance (i.e. inclusions) Requires excavation of grout mass or extraction Usually destructive Appropriate for Test Sections for Critical Applications and for Support of Excavation

Element Extraction

Direct Examination Photo Courtesy of Sam Bandimere

Test Excavation

In Situ Modulus Tests o Includes DMT and PMT o Measure deflection under lateral or radial loading o Good for some sands, silts, clays o Can be correlated to density oaffected by residual stresses

Settlement Plates/Points o Measure elevation or change in elevation at a given point o Usually used to measure heave or settlement o Accuracy depends on the method of survey o Where settlement control is the goal, this is very effective, but after the fact

Load Testing o Usually for structural elements o Can be done on subgrades with plates o Directly measure deflection under loading to calculate modulus ocan measure bearing capacity if failure is achieved

Penetration Resistance Commonly used - Cone Penetrometer and SPT Relatively inexpensive Accuracy and repeatability dependent on method and personnel Widely accepted Can be correlated to density Not many correlations for modified ground Influenced by residual stresses

Density Tests Include - Sand Cone, Rubber Balloon, Drive Cylinder Method, Nuclear Densometer Require excavation or exposed surface Nuclear density gage relies on empirical correlation of radiation transmission to density Reliable but difficult to use

Plate Load Test Appropriate for applications where changes in the strength of the soil, grouted soil is measurable and useful for evaluating grouting effectiveness Measurement is limited by the plate size

Geophysical Methods

Terrain Conductivity

Terrain Conductivity Electro-magnetic method Coil induces alternating electric current in the ground Second coil detects magnetic field generated by alternating current in the ground Conductivity varies inversely to the ratio of the primary to secondary coil field strength and the square of the distance between the coils

Ground Penetrating Radar

GPR Pros Identifies contrast in electrical properties of materials Low cost Good shallow resolution in granular soils Voids are high contrast objects for GPR and show up well Cons Limited depth Most soils - several feet Optimal conditions 10-15 feet Will not work in high attenuation soils Clay Micaceous soils and rock May not resolve grout

Magnetic Survey

Utilize Magnetometers and Gradiometer to measure changes in the earth s magnetic field The magnetic field intensity is measured on a grid, plotted and contoured Anomalies indicated by steep gradients or closed contours Interpretation can be difficult Same sensitivities as Terrain Conductivity Best for metallic or magnetically constrasting materials (additive to grout may be advisable) Magnetics

Resistivity (+) (-)

Electrical Resistivty Applies voltage across two electrodes Measures resistance across inner electrodes Depth is dependent upon electrode spacing Larger spacings equal larger depth Result is average over depth Only useful where there are contrasts in the electrical properties of the materials to be tested (e.g. grout and soil, soil and rock, grout and rock, grout and groundwater, etc.)

Micro-gravity Measures the strength of the earth s gravitational field at discrete points Plots results to identify areas of low gravity that imply deeper rock, or voids Test is sensitive to vibration Requires corrections for terrain Good for resolving large voids or areas of voids in otherwise sound rock Relatively high cost; readings are slow

Seismic Refraction Reflection

Seismic Refraction Detects contrast in stiffness of materials Reasonable cost Good resolution in most materials Best if done as a before and after Easy to identify large soft zones or voids Limitations Cannot detect soft layers beneath stiff layers Difficult to interpret if highly irregular surface (pinnacles can lead to pulse inversion) Resolution decreases with depth May not be able to resolve grout Traffic and construction produce noise that can limit quality of results

Seismic reflection Pros Good resolution in most materials Measures soil/rock stiffness Easier to interpret (Voids are always low velocity zones) Effective at greater depth than refraction Can detect soft layers beneath stiff layers Cons Cost requires large number of data points Difficult to interpret if highly irregular surface (pinnacles can lead to pulse inversion) Resolution decreases with depth Small voids in high velocity material may be invisible May not be able to resolve grout

Borehole methods Virtually all of the methods discussed can be done in and between boreholes Vertically within boreholes (borehole logging methods) Diagonally from ground surface to borehole (up-hole or down-hole methods) Horizontally between boreholes (cross-hole methods) Many limitations of methods can be overcome by adjusting spacing or depth of boreholes Borehole drilling and sampling gives a true answer at each borehole that can be used to calibrate the geophysical data

Crosshole Geophysics

Crosshole Tomography

TOMOGRAPHY A process of imaging based on wave phenomenon. (similar to a CAT Scan) A graphical numerical model is created to produce the same result as the data collected This requires a large amount of data A forward model is used to assess the likelihood of success A model of expected conditions is created The ability of the system to detect the conditions is tested by simulation The resulting information is used to select the appropriate methods and arrangement for the field test.

Resistivity tomography

Seismic Tomography

Multiple Tools There is no magic bullet Each site is unique Combining methods of verification can produce a superior result Grout monitoring together with a sampling method and a geophysical method can provide a more complete picture

Planning for Verification 1. Identify need for grouting early, preferably during investigation stages 2. Identify goals of grouting and what it is possible and necessary to verify 3. Determine the mechanism and properties of the grout in-place as compared to the substrate 4. Select methods that can detect relevant properties 5. Use them in combination to best effect

Planning for Verification 7. Use a qualified inspector 8. Record and report everything 9. Plan on the unexpected a) Evaluate the results as the work progresses b) Adjust methods as needed to assure good results