STAY-FORM TRANSFORMING MATERIALS. into products that make a better world

Similar documents
Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Lintel Tables Design Notes and Limitations

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division

VINYL STUCCO ACCESSORIES

CHAPTER 3 BUILDINGS WITH WOOD FRAMED EXTERIOR WALLS 301 SCOPE

Aluminum Beam Gang System

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

Including RedForm LVL, RedForm-I65, I90 and I90H Joists. Lightweight for Fast Installation. Compatible with Standard Framing

Gold Bond BRAND Gypsum Sheathing

SECTION PLATE CONNECTED WOOD TRUSSES

4 EXTREME FOUNDATION PANELS

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity

P: F: Resi-Ply FORMING SYSTEM BY DAYTON SUPERIOR

POST FRAME BUILDING STANDARDS

SPECIFICATION FOR REINFORCED SOIL WALL

Masonry Wall Bracing. A Simplified Approach To Bracing Masonry Walls Under Construction. Masonry Bracing Task Force.

JC Code & Construction Consultants, Inc. Advanced Training: The FBC & ASTM C 1063

YOUR LITE-DECK SECTIONS

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University

Elevated Slab Sequence

Bridge Beams/Girders

DIVISION: METALS SECTION: STEEL DECKING REPORT HOLDER: EPIC METALS CORPORATION 11 TALBOT AVENUE RANKIN, PENNSYLVANIA 15104

BY DAYTON SUPERIOR. FormRight FORMING SYSTEM

DeckFast DAYTONSUPERIOR.COM FORMING. Shoring System

A Guide for the Interpretation of Structural Design Options for Residential Concrete Structures

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

Inlets & Catch Basins

User Guide MEGALITE 01FDL34

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication...

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

CTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures.

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Series 400 Structural repair system that doubles the strength of the original timber pile. SeaShield Marine Systems. Features

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

BEARING METAL STUD FRAMING

FrameFast Shoring System

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

SECTION CAST-IN-PLACE CONCRETE

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

BUILDING BULLETIN One and Two Family Dwellings Decks and Residential Access Ramps

FORMDECK. constructions. constructions

STEEL STUD, TRIMS AND ACCESSORIES FOR DRYWALL CONSTRUCTION MONTREAL TORONTO CALGARY EDMONTON VANCOUVER THE STRENGTH WITHIN

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

Foundation Systems 1, spread foundations. What s the point? What types? The foundation s primary purpose is:

TITEN HD Heavy Duty Screw Anchor for Concrete & Masonry

Quantity Take-off. 17ft. 63ft If the dimension are the centerline the calculation are easy. The Length of Trench equals = = 207 ft

Construction Procedures

Design of Rigid Pavements

SPECIFICATION GUIDELINE

CONSTRUCTION PROCEDURES. AWWA D110 Type I Prestressed Concrete Tanks

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

SECTION 1043 FENCE MATERIAL

Project Address: Name of Person Completing Form:

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series

Components. Jacks 2 Leg Assembly. Jacks. Typical Frame

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

LIFE SCIENCES BUILDING STRUCTURAL CONCEPTS AND EXISTING CONDITIONS

Delivering Reliability. Electrical Vaults. Power & Energy-Underground Structures

Integral Waterproofing

LUX Specifications. Section S - Preformed Steel Siding

Lightweight Steel Framing. Composite DeltaStud Load Tables

PRECAST CONCRETE PRODUCTS

Smarter. Safer. Leaner.

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

Technical Data Sheet: The Corrugated HC-Omega

ANALYSIS AND DESIGN OF MOMENT RESISTING MIDWALL BY THE STEEL NETWORK, INC.

Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade

DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS

Section 906. STRUCTURAL STEEL

ES230 Strength of Materials Exam 6 - Compilation Prof. Kurtz, ES230 STRENGTH OF MATERIALS Exam 6 Wednesday, April 26, 2017, 7pm

1. Cast-in-place concrete is specified in Section

Prefabricated Light Weight Steel Structures. Systems Guide WALLS, FLOORS, TRUSSES

Concrete weighs about 150 pounds per cubic foot

1. Section , Concrete Reinforcement and Embedded Assemblies. B. ACI 530/ASCE 5 - Building Code Requirements for Masonry Structures

Reinforced Concrete Design. A Fundamental Approach - Fifth Edition

REINFORCING TABLES INSTALLATION MANUAL

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

AND ACCESSORIES FOR DRYWALL CONSTRUCTION

INSULATION RETROFIT DESIGN ENERGY SOLUTIONS CENTRE YUKON GOVERNMENT

USE OF 500 GRADE STEEL IN THE DESIGN OF REINFORCED CONCRETE SLAB. Prof. M. Shafiul Bari, Ph.D Department of Civil Engg., BUET

The System Slotted Deflection Track (pat# 5,913,788)

City of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209)

Single & Back-to-Back StiffWall Column Product Profile

ACCEPTANCE CRITERIA FOR METAL PLASTER BASES (LATH) PREFACE

Estimating Guide For Concrete Tilt-up Wall Using

Tips For Designing Constructable Concrete Buildings

Section II Subfloor Guidelines & Specifications Page Chapter 4 Wood Subfloor Guidelines 23 Chapter 5 Concrete Subfloor Guidelines 26 Chapter 6

Aluma EasySet Continuing Innovation from Aluma S ystems

SECTION CHAIN-LINK FENCES AND GATES 02821/1

Copyright. magazine. CFS Load Bearing Construction

Concrete Formwork Systems

Design of Semi gravity Retaining Walls

HAMBRO COMPOSITE FLOOR SYSTEM

Bonner Bridge Replacement Update:

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options

Transcription:

STAY-FORM TRANSFORMING MATERIALS into products that make a better world

TABLE OF CONTENTS Product Information... Page 1 Blindside Walls...Pages 2-4 Bulkheads...Page 5 Pile Caps...Page 6 Grade Beams... Page 7 Ductbanks...Page 8 Bridges...Page 9 Shotcrete... Page 10 Test Data...Pages 11-12 Installation Notes...Page 13 STAYS IN PLACE 35% LABOR SAVINGS NO STRIPPING OF FORMS QUALITY PRODUCTS AROUND THE GLOBE ALABAMA METAL INDUSTRIES CORPORATION 3245 Fayette Avenue Birmingham, AL 35208 Phone (205) 787-2611 (800) 366-2642 Fax (205) 786-6527 www.amicoglobal.com

PRODUCT INFORMATION Stay-Form is produced from hot-dipped galvanized sheet steel per ASTM-A653 Weight V-Ribs Sheet size Pallet 11.9 lbs. per sheet 3/4 deep and 3 7/8 on center 27 wide x 96 long* (18 sq. ft. per sheet) 250 sheets per pallet (4500 sq. ft.) Expanded mesh between solid ribs 96 (-0 /+½ ) 7 spaces @ 3 7 /8 = 27 (-0 /+¼ ) 3/4 rib height (8 ribs) Features & Benefits Reduced labor cost no stripping costs (bracing only) No scabbling in preparation for the next pour No cost for the disposal of plywood or transporting conventional forms for future use Lightweight sheets are easy to work with (install, cut, bend, etc.) Easy rebar and conduit penetrations Visual inspection of concrete pour and consolidation Retains surrounding soil while forming below grade structures Permits water to run out of formwork during concrete pour Applications Blindside Walls Pile Caps & Grade Beams Bulkheads Keyways Ductbanks Shotcrete Backstop 1

BLINDSIDE WALLS When a contractor has to form a concrete wall within a few inches of an existing structure, Stay- Form is an excellent product. By utilizing Stay- Form with rebar studs, hook ties, and a modular form system, a one-sided form or blindside wall can be constructed. If you do not have the luxury or room to strip formwork, Stay-Form is the right product for the job. The V ribs run perpendicular to the vertical rebar studs which gives the Stay-Form the rigidity to withstand the concrete pressures (see detail). Stay-Form can be slit with tin snips or handheld grinder to accommodate the rebar hook tie (see detail). Stay-Form is commonly used for concrete pour rates of 4 to 7 feet per hour.* To see more examples of blindside wall applications, visit www.amicoglobal.com and click on Project Photos. *Reference Guidelines for Loading & Bracing Spacings chart on page 12. 2

BLINDSIDE WALLS Blindside Wall Form Using Stay-Form NOTES: 1. Wire tie Stay-Form to rebar every other rib. 2. The Stay-Form ribs go into the pour. 3. Lap Stay-Form sheets over a rebar support. 4. Vertical lap (2 ribs minimum). 5. Recommended pour rate is 4 to 7 per hour.* 6. Do not vibrate previous lift by more than 6. 7. Where sheets lap, use 16-gauge tie wire or sheet metal screws with a minimum 3/8 head. 8. Stay-Form is compatible with self-consolidating concrete. *Horizontal lap 4-8 minimum (see stud spacing chart on page 12) Conventional Form or plywood Stay-Form Snap Tie Bracket Anchor rebar into footings Footing Reference Guidelines for Loading & Bracing Spacings chart on page 12. 3

Applications Using Stay-Form and AMICO Blindside Wall Ties Cut a slit in the Stay-Form using metal snips. After hook tie has been inserted through the slit in the Stay-Form engage the rebar stud. Slide keeper into place. Ties are available up to 48 long. Double Waler The lumber dimension A for a double waler is 8¼-inches to accomodate the general thickness of 5/8 or 3/4-in plywood, two widths of 2x4 s and 1/2-in for the snap tie bracket. Single Waler The lumber dimension A for a single waler is 4-11/16 inches to accomodate the general thickness of 5/8 or 3/4-inch plywood, one width of 2x4 and 1/2-in for the snap tie bracket. 4

BULKHEADS Stay-Form is an excellent product for forming bulkheads because it does not have to be stripped out after the concrete pour. (Plywood and modular forms have to be stripped.) There is also no scrabbling required in order to prepare the surface for the next pour. Rebar or metal fabricated bracings are left in place no stripping is required. The sheets are lightweight and can easily be bent to form a keyway. Stay-Form can be cut in order to accommodate any rebar or conduit penetrations. Visual inspection of the concrete consolidation is also accomplished due to the openings in the mesh. Test reports prove that when forming bulkheads, Stay-Form provides 21% greater shear bond strength to concrete than does plywood. To see more examples of bulkhead applications, visit www.amicoglobal.com and click on Project Photos. 5

PILE CAPS When forming below grade structures like a pile cap, Stay-Form can save a considerable amount of time and labor. You have no labor for stripping forms. If rebar or metal is used for bracing, it stays in place. (Wood bracing has to be removed.) Some contractors backfill around the Stay-Form prior to the pour therefore they minimize bracing and prevent a blowout of the form. Contractors can cut the V ribs in order to bend the sheets to any shape. During the concrete pour any water in the form will run out of the Stay-Form as it is displaced by the concrete (no pumping it out). Concrete finish is not a concern since backfill or a slab-on-grade concrete pour is a typical design with a pile cap foundation. To see more examples of pile cap applications, visit www.amicoglobal.com and click on Project Photos. 6

GRADE BEAMS Grade beams are easily formed using Stay-Form and rebar or lumber as bracing. Some contractors prefer to backfill 75 to 90 percent up the grade beam prior to the concrete pour in order to minimize the required bracing. Backfilling acts as the bracing which will stop the formwork from spreading during the pour. Attaching with tie wire around the Stay-Form ribs and rebar or lumber makes installation easy. Since the Stay-Form is not stripped, the excavation required is less than what would be needed using conventional formwork. Some contractors use Stay-Form to hold the surrounding soil from falling in on the grade beam excavation and reinforcing steel. To see more examples of grade beam applications, visit www.amicoglobal.com and click on Project Photos. 7

DUCTBANKS Electrical contractors find it easier to form ductbanks with Stay-Form than with plywood or conventional forming systems. The learning curve to train personnel how to install Stay-Form is quick, and the labor savings are significant due to the fact that form stripping is not necessary. Attaching Stay-Form to rebar supports is easily accomplished with tie wire. Attaching a 2x4 (from rebar to rebar) across the top of the ductbank prevents the formwork from spreading during the pour. Visual inspection of the concrete consolidation is also an advantage when using Stay-Form in order to avoid honeycombing. To see more examples of ductbank applications, visit www.amicoglobal.com and click on Project Photos. 8

BRIDGES Contractors frequently use Stay-Form on bridge projects to form footings, edge forms and bulkheads. When building a cast-in-place segmental box girder bridge, forming the bulkheads has significant labor savings because the bulkhead does not have to be stripped. Test reports prove that when forming a bulkhead, Stay-Form provides 21% greater shear bond strength to concrete than does plywood. Unlike plywood-formed bulkheads, Stay-Form bulkheads do not require scabbling of the concrete. This means additional labor savings. To see more examples of bridge applications, visit www.amicoglobal.com and click on Project Photos. 9

SHOTCRETE Using Stay-Form as a backstop for shotcrete applications has many advantages. It can be bent to any radius and is easily wire-tied to the reinforcing steel that will form the structure. The open herringbone mesh and V ribs do a great job in catching the shotcrete while minimizing the amount of rebound. To visually see both sides of the shotcrete formwork is advantageous. The lightweight sheets are user-friendly to install for any shotcrete application. Contractors can shotcrete one side of the formwork one day and the other side the following day. To see more examples of shotcrete applications, visit www.amicoglobal.com and click on Project Photos. 10

TEST DATA Physical Properties of Stay-Form Description Standard Grade #66 Galvanized Sheet Thickness Sheet Dimensions 0.0217 in. (0.5512mm) 27 x 96 in. (686mm x 2438mm) Weight 0.66 lbs/ft 2 (3.22 kg/m 2 ) Yield Strength 27.63 ksi (190.50 MPa) Yield Strain 0.00297 Ultimate Strength 50.28 ksi (346.68 MPa) Ultimate Strain 0.25 Modulus of Elasticity (E) 29,500 ksi (203,400 MPa) This data is based on results from testing conducted by an independent testing lab. For more information on the details of the testing, contact AMICO at 800-366-2642. No proper concrete mix will flow through the openings in Stay-Form on its own. 1) Residual rain water in the form is forced out through the openings in the form. 2) During vibration the blossoming of cement through the openings will show the applicator consolidation is complete and affords the removal of any air pockets. 3) The surface of the Stay-Form after concrete placement is roughened and ready for the next pour. Scabbling or roughening of the exposed surface is not necessary saving valuable time and labor. 11

TEST DATA Stay-Form, when used for bulkheads, outperforms traditional plywood for shear bond strength by as much as 21%. Carlson Testing, Inc. P.O. Box 23814 Tigard, Oregon 97281 Phone (503) 684-3460 Fax (503) 684-0954 Shear Bond Strength (Modified ASTM C482): B-Matte B-Matte Shear Stay-Form Stay-Form Shear Test Age Total Load Bond Strength Total Load Bond Strength 5/6 day 15,725 lb. 244.6 psi 26,700 lb. 414.9 psi 13/14 day 12,750 lb. 200.3 psi 16,200 lb. 249.7 psi 27/28 day 15,200 lb. 238.9 psi 19,525 lb. 303.9 psi The 5/6 day shear bond test data indicated that the Stay-Form #66 test was 41% greater than that of the identically cast test specimen using the B-Matte form board material. The 13/14 day shear bond test data indicated that the Stay-Form #66 test was 20% greater than that of the identically cast test specimen using the B-Matte form board material. The 27/28 day shear bond test data indicated that the Stay-Form #66 test was 21% greater than that of the identically cast test specimen using the B-Matte form board material. Guidelines for Loading & Bracing Spacings Stay-Form #66 Bracing Spacing (in. o.c.) 24 18 12 Lateral Loading (psf) 1200 1200 1600 Liquid Head (ft.) 8 8 10 Pour rate (ft./hour) 4 4 7 Maximum Deflection (in.) 1¼ ¾ 1 /8 Recommended lap (in.) 8 6 4 Recommended ties at lap (both ribs) 2 2 1 12

INSTALLATION NOTES The AMICO rule of thumb is to brace Stay-Form like you would a piece of plywood. The use of rebar, strongbacks, walers, kickers, etc. (location, size and spacing) is similar to that for conventional forming methods per ACI 347, Guide to Formwork for Concrete. Installation Recommendations: The Stay-Form ribs face into the concrete pour 4-8 minimum lap between running Stay-Form sheets 2-rib minimum lap between stacked Stay-Form sheets Attach Stay-Form to bracing with wire, staples, roofing nails or other mechanical fasteners. Tie wire around rib and bracing is recommended. Bracing where sheets lap is also recommended. Cut Stay-Form sheets with a hand-held grinder, cutoff saw, abrasive blade or metal snips. Notch ribs to bend and make virtually any form shape. Stay-Form Sheet Tie Wire Lap Detail 96 Two Rib Minimum Lap x x x x x x x x x x x x 27 2 Maximum Spacing 4-8 Minimum Lap (Bracing at lap is recommended) NOTE: X denotes 16-gauge tie wire or sheet metal screws 13

AMICO locations UNITED STATES Birmingham, AL 800-366-2642 Bourbonnais, IL 800-238-0322 Dayton, TX 800-622-5765 Fontana, CA 800-962-0100 Houston, TX 800-433-9945 Lakeland, FL 800-487-2511 Orem, UT 800-645-0340 CANADA Burlington, ON 800-663-4474 Edmonton, AB 855-724-7283 Montreal, QC 800-463-3255 Vancouver, BC 800-665-4474 Seasafe Lafayette, LA 800-326-8842 Diamond Perforated Visalia, CA 800-642-4334 Erdle Perforated Charlotte, NC 800-438-4467 Rochester, NY 800-627-4700 Visit www.amicoglobal.com to view or download data sheets, request a catalog, request LEED information or receive technical assistance. AMICO reserves the right to improve or otherwise change a product design without notice. This catalog is effective 9/1/16 and supersedes all previous information and publications. 9/1/2016-2,000