QMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets

Similar documents
ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

25 D.L. Martin Drive Mercersburg, PA (717)

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

INTERNATIONAL STANDARD

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company.

Correlation Matrix & Change Summary

QUALITY SYSTEM MANUAL

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

Quality Manual. AARD Spring & Stamping Quality Manual

P. 1. Identify the Differences between ISO9001:2000 與 ISO9001:2008 ISO9001:2008 ISO9001:2000 版本的異同. 5 January 2009 ISO 9000 SERIES

Quality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer)

ISO 9001:2008 Quality Management System QMS Manual

Correlation matrices between ISO 9001:2008 and ISO 9001:2015

Atlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD USA Office: (410) Fax: (410)

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER

MALAYSIAN STANDARD QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS (FIRST REVISION) (ISO 9001:2008, IDT) (PUBLISHED BY STANDARDS MALAYSIA IN 2009)

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

Quality Assurance Manual, Revision F Page 1 of 20

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

CERTIFICATE OF REGISTRATION

Sections of the Standard. Evidence / Comments. (Y) / Nonconforming (NC)

Webster - Hoff Corporation. Quality Manual

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

PRODUCTS AND SERVICES:

Correspondence Between ISO 13485:2016 and 21 CFR Part 820 QMS Requirements

Vendor Qualification Survey

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS

AB. OUR ISO CONFORMANCE AUDIT QUESTIONNAIRES 8. ASSESS HOW WELL YOU CONFORM TO ISO S REMEDIAL REQUIREMENTS

Fitting ISO 9001:2000 into a 20 Element Quality System

Correspondence between ICMED criteria and ISO 13485: 2012

QUALITY SYSTEM MANUAL

Quality Manual. Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09. Reviewed by Bernard Lennon Fire and Safety Officer

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL

INTEGRATING ISO 9000 METHODOLOGIES WITH PROJECT QUALITY MANAGEMENT

QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008

Reliance Aerospace Solutions

GTG Inc. ISO 9001:2008 QMS Manual. Continuous Improvement

QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10

0. 0 TABLE OF CONTENTS

ISO/TS TECHNICAL SPECIFICATION

Issued by ISO Management Representative Signature/Date: Ken Hicks 11/09/06 GOWANDA. Electronics. PO Box 111 One Magnetics Parkway Gowanda NY, 14070

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy

FEC QUALITY MANUAL. Federal Equipment Company River Rd. Cincinnati, Ohio

Quality and Medical Devices: ISO 13485:2003

Objective Evidence Record (OER)

QUALITY MANUAL W.R. Larson Rd. P. O. Box San Antonio, Texas San Antonio, Texas (830) (210) FAX

MCBO B Jun 13. Subj: IMPLEMENTATION AND MANAGEMENT OF INTERNATIONAL ORGANIZATION OF STANDARDS QUALITY MANAGEMENT SYSTEM

Clause Map IATF 16949:2016 to ISO/TS 16949:2009

ISO AUDIT PREPARATION KIT 2016

Quality Manual QM-9001 Revision 25 May 2013

Beaver Machine. Quality Manual

QUALITY MANUAL RED CHECK DENOTES THIS IS A CONTROLLED COPY. APPROVED BY: (President) APPROVED BY: (Production Manager) APPROVED BY: (Quality Manager)

ISO 9001:2008 Quality Manual

PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK

METUCHEN CAPACITORS INCORPORATED. Quality Manual P.O. BOX HIGHWAY 35, SUITE 2 HOLMDEL NJ USA

Document ID: Revision: Date. Approved:

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008

Quality Manual ISO Cedarburg, Wisconsin Revision: L

FO-5 PR-1, FO-1,2 PR-1 EM-6 PR-1, FE-1, NA-1 FO-10 FO-7, EM-2 EM-2. ISO Environmental Management Systems - Specification Yes.

HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL. ISO 22000:2005 Quality Manual

KEVLIN CORPORATION DIVISION OF COBHAM DEFENSE ELECTRONIC SYSTEMS

BS EN ISO 9001 QUALITY ASSURANCE MANUAL

Quality Manual Revision: C Effective: 03/01/10

Quality Systems Manual

QMS CO-ORDINATOR & GENERAL PROCEDURES:-

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

A Division of Research Products Corporation

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998)

Quality Manual ISO 9001:2000

Business Management System Manual Conforms to ISO 9001:2015 Table of Contents

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY

General Document or OQE Comments SAT UNSAT

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope

DEVELOPEMENT OF A PRODUCTION ORGANIZATION EXPOSITION SCHEME TAKING INTO ACCOUNT EN9100 REQUIREMENTS

ISO/DIS 9001: 2014 comparison with ISO 9001:2008. ISO 9001:2015 Updates. (Based on Draft International Standard, DIS) ISO/DIS 9001 ISO 9001:2008

Quality Management System Manual

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

ISO 9001: 2015 Quality Management System Certification. Awareness Training

AVNET Logistics & EM Americas. Quality Manual

Moving from ISO/TS 16949:2009 to IATF 16949:2016. Transition Guide

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard.

QUALITY MANUAL Revision H

20 September 2017 Document No. QM-ISO revision T ASTRONAUTICS CORPORATION OF AMERICA S. AS 9100 and FAA QUALITY MANUAL. Proprietary Notice

Electronics. Document: QUALITY MANUAL. Revision: W. Date: 08/22/2016

QUALITY MANUAL. IFS DOCUMENT CLASS: QLTY-100 IFS DOCUMENT NUMBER: QM4.2.2 PAGE 2 of 27 EFFECTIVE DATE: 30 MAY 2017 REV Q

BS2482 TIMBER BOARDS ASSESSMENT REPORT. Assessment Summary

EN39 TUBE ASSESSMENT REPORT. Assessment Summary

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual

Summary of ISO 9001:2015 New and Changed Requirements

ANCHOR ISO9001:2008 RPR-002 MARINE SERVICES REQUIRED PROCEDURE RECORDS CONTROL

CORPORATE QUALITY MANUAL

DOCUMENTATION FOR QUALITY MANAGEMENT SYSTEM AS PER IS/ISO 9001 : 2015

ISO 14001:2015 Gap Analysis Check Sheet

ISO 9001 QUALITY MANUAL

Transcription:

QMS Roles, Responsibility and Authority Process Clause Activities Records Required Responsibility Authority Deadline Clause 4: Process Development 4.1 Develop processes and sequence, operation controls of processes, develop control of outsourced process, Set measurable targets for the processes and analyze processes. Quality policy 4.2.1 Define quality policy The Steering committee Objectives and targets Establish the QMS objectives, target and programmes. Establish and implement documented procedure required by the standard and the organization Quality Manual 4.2.2 Maintain quality manual Define Scope and justification of exclusions and activities in 4.1. Documented procedure or refer to them Description of interaction of processes Document and record control 4.2.3 Control all document Establish and implement document control procedure to fulfill clauses 4.2.3a-g Control of record 4.2.4 Control Ensure are legible, readily identifiable and retrievable Establish and implement documented procedure to define controls for identifying, storing, protecting, retrieving, retaining and disposing. Document control Records MR March 10 CEO MR MR March 20 IT, and all HODs IT April 24 IT, and all HODs IT April 24 Clause 5: Management responsibilities 5.1 Quality Policy, Objectives, conduct management review and provide resources for QMS The Steering committee CEO

Customer focus 5.2 Determine customer requirement and meet it. Activities in 7.2.1 and 8.2.1 Quality policy 5.3 Ensure quality policy include commitment to comply with QMS Develop procedure for setting and reviewing objectives. Communicate quality policy throughout the organization. Review quality policy to ensure continuing suitability. Quality objectives 5.4.1 Set quality objectives and targets at all Roles responsibilities and authority levels and functions` 5.5.1 Define roles responsibilities and authorities and communicate them within the organization Management Representative 5.5.2 Appoint MR with addition job description as stated in the clause 5.5.2 Internal communication 5.5.3 Establish appropriate communication process and implement the processes Management Review 5.6.1-5.6.3 Set management review (MR) time and interval, conduct Management Review at agreed interval in accordance with the review input and output in clauses 5.6.2 and 5.6.3 Management Review meeting minute The Steering committee The Steering committee CEO CEO MR March Done MR May 8 CEO June 10 Clause 6: Provision of resources 6.1 Provide resources to Implement and continuously improve QMS and satisfy customers Competency, training and awareness 6.2.2 Conduct job analysis, Identify training needs, provide and develop trainings, evaluate training, Keep training record Records of education, skills, training and experience CEO/ Finance Dept On-going HR dept HRM March

Create awareness of the job relevance and importance to QMS Infrastructure 6.3 Provide and maintain building, workspace, utilities, process equipments (hardware of software) and other supporting services (transport, communication of information). Work environment 6.4 Manage and maintain the work environment such as physical, environmental and other factors like noise, temperature, lighting, humidity or weather Incident Record All HODs Admin, Finance, I.T and maintenance Departments HSE, Admin and Finance Maintenance April 10 HSE March Clause 7: Planning of service realization Determination of service requirement Review of service requirement Customer communication 7.1 Develop process and documents for service realization, Determine product requirement, Determine verification, validation, measurement and testing activities for service acceptance 7.2.1 Determine customer requirement, Regulatory requirement and other requirements 7.2.2 Review service requirement prior to commitment to render services, define service requirement, resolve changes/ changing service requirement 7.2.3 Develop procedure for customer communication and communicate with respect to services information, customers feedback and complaints. Records demonstrating that the products (and realization processes) meet all customer and legal requirements. Records of the review of product requirements prior to realization Dept Dept Dept Dept 7.3 Design and Development 7.3.1-7.3.7 This clause is excluded because the N/A

organization does not design or develop services. Purchasing 7.4.1 Ensure service conform to requirements, Evaluate and select suppliers according to meet organizational requirement, Develop criteria/procedure for selection, evaluation and re-evaluation of suppliers Purchasing information 7.4.2 Develop purchasing information to include: -Requirement for approval of products, procedures, processes and equipment -Requirement for qualification of personnel -Ensure adequate purchase requirement Verification of purchased products Control of service provision Validation of processes for service provision before communication with customers 7.4.3 Develop procedure to Inspect, verify or ensure purchased product meet purchase requirement. 7.5.1 Control the planning and provisions of service: Provide information about your services Provide work instructions Use suitable equipment Provide and use monitoring and measuring equipment Monitor and measure service delivery Implement delivery and post delivery activities 7.5.2 Where a process cannot be monitored, you : Validate the processes Defined criteria for process review and approval Approve equipment and qualification of Supplier evaluation and selection Record of verification or purchased product Validation of process for production and service provision Department Department Department Dept Dept

Identification and traceability personnel develop validation methods and procedures 7.5.3 Develop suitable means or procedure to identify product throughout the service realization. Identify product status throughout service realization Control the unique identification of the product. Customer property 7.5.4 Identify and protect customer property in your custody Report loss of customer property to the customer. Generate corrective action Keep record Preservation of product 7.5.5 Preserve product during internal processing ( identifying, handling, packaging, storage and protection) and Control of monitoring and measuring equipment delivery 7.6 Determine the type of monitoring and measurement to be undertaken and equipment to be used. Develop monitoring and measure processes and procedures Calibrate/ verify or both measuring equipment at regular interval or prior to use. Keep record of basis of calibration Label measurement equipment to identify its calibration status. Protect measuring equipment from unnecessary adjustments, damages and deterioration during handling, maintenance and storage Product Identification and traceability Records of loss or damage to customer property Record of basis of calibration and verification Record of result of calibration Dept Security and operations Dept. Dept Maintenance Department Operation and PFSO Maintenance manager

Measurement analysis and Improvement Keep record of validation of previous measuring result after discovering inaccurate measurement result 8.1 Develop processes and procedures for monitoring, Measuring analysis and improving QNS Determine applicable methods- including statistical techniques- and extent of use Customer satisfaction 8.2.1 Monitor regularly customer perception as to meeting customer requirements Determine the methods of obtaining and using information Dept. April 24 Internal audit 8.2.2 Conduct internal audit at planned interval Determine audit criteria, scope, frequency and methods Develop procedure for defining responsibilities and requirement for planning auditing, establishing record and reporting results Keep record of audit and their result HOD of the audited department shall ensure the implementation of corrective actions without delays. Follow up on corrective action. Monitoring and measurement of processes Monitoring and measurement of services 8.2.3 Develop procedure and techniques for monitoring and measuring QMS processes Implement corrective actions for process failures. 8.2.4 Monitor and measure services provision at appropriate stage in the service provision process to ensure customer requirements have been met Record shall indicate the person authorizing delivery to customer. Internal audit Records of product conformity to requirements and release to customer Lead auditor and All HODs(Internal department Dept. Lead Auditor April- 5 May manager April 10 April 10

Withhold service delivery until clause 7.1 is fulfilled. Control of nonconforming product 8.3 Identify and control no-conforming service Develop and implement procedure for defining controls and assigning responsibilities for dealing with nonconforming products Deal with non conforming product Re-verify corrected non-conformity to demonstrate conformance to customer requirement Keep record of non-conforming product and the corrective actions taken. Analysis of data 8.4 Determine, collect and analyses appropriate data to evaluate the effectiveness of the QMS and potential improvements. Information to be generated from analysis: Customer satisfaction Conformity to product requirement Characteristics and trends of processes and products and preventive actions Suppliers feedback Records of Nonconforming products department Dept. manager April 24 April 24 Continual improvement 8.5.1 Continually improve the effectiveness of QMS through quality policy and objectives, audit results, analysis of data, corrective and preventive actions and management reviews Corrective action 8.5.2 Take actions to eliminate cause of nonconformities Develop procedure to: review nonconformities (including customer complaints) Corrective action Lead auditor and All HODs(Internal Lead auditor and All HODs(Internal MR Lead Auditor May 6-June 6 May 6-June 6

Determine causes of and actions to eliminate causes of nonconformities Take corrective actions Keep record Review the effectiveness of corrective actions taken Preventive action 8.5.3 Take actions to eliminate potential cause of nonconformities Develop procedure to: Determine potential nonconformities and their causes Evaluate the need for action to prevent nonconformities Determine and implement actions needed Keep of action taken Review the effectiveness of preventive actions taken Preventive action Lead Auditor and All HODs(Internal MR May 6-June 6