Study and Safety Evaluation on Chamber Blasting of Mined-Out Area in Pao-Maping Mine

Similar documents
Wind Energy And Wind Power Technology (2) By ZHANG ZHI YING?ZHAO PING?LI YIN FENG DENG

Wind Energy And Wind Power Technology (2) By ZHANG ZHI YING?ZHAO PING?LI YIN FENG DENG

New method of earthquake damage prediction of Single Building

Influence of Hot Metal Flow State to the Hearth Flow Field during Blast Furnace Tapping

Sustainable evaluation of urban buildings for safety in environment management: the case of the Taiwan 921 earthquake

Blasting in Hong Kong, A Review of Current Blasting Assessment Requirements

International Conference on Traffic Engineering and Transportation System (ICTETS 2017)

RESEARCH AND DEVELOPMENT OF THE INFORMATION MANAGEMENT SYSTEM OF AGRICULTURAL SCIENCE AND TECHNOLOGY TO FARMER BASED ON GIS

Hazards. Earthquakes. PREPARE: Kansas Hazards

Power Distribution Grid Service Restoration Software Based on Load Balancing

MINING ENGINEERING. Subject Code: MN. Course Structure. Engineering Mathematics. Vector Calculus. Differential Equations. Probability and Statistics

Changes of Clothing Distribution Logistics Management RFID Technology

Zoning Supporting Design of Deep Foundation Pit Based on Controlling Deformation of Surrounding Buildings

ASIAN JOURNAL OF CHEMISTRY

Ground pressure behavior law at fully-mechanized face in Fenxi-ShuGuang coal mine

Impellers of low specific speed centrifugal pump based on the draughting technology

The Intrinsic Safety Engineering Design Method for the Petrochemical Plant

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

Analysis of working behavior of Jinping-I Arch Dam during initial impoundment

Static Experiments Research on Multi-Layer Steel Plate Isolator Yan Hui 1, a, Zhang Lu 2,b, Dai Guanghao 3,c and Jiang Hongyuan 4,d

North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company )

Calculation and Analysis the Influence on the Cooling Water Velocity and Hot Metal Circulation to the Long Life Blast Furnace

Construction Engineering Construction Management By LI FENG QIANG ZHU BIAN GUO DAO SHENG

Assignment I Design of a Marine Outfall

Dynamic Time-history Analysis on Wind-induced Response of Light-weight Roof System

Yao Xin Sheng. Position:Distinguished Professor(Academician) Faculty:State Key Laboratory Quality Research in. Chinese medicine

1 Mold 4 Cavity Tube Bending Mold Design based on Moldflow

Application of green bio-mining technology for coal under villages in environmental protection

Base Metal and Iron Ore Mining

ADVANCED PASSIVE CONTROL TECHNIQUES FOR RETROFIT OF EXISTING BUILDINGS IN SEISMIC ZONE

Original Publication: International Journal of High-Rise Buildings Volume 1 Number 3

VIBRATION AND STRUCTURAL INTEGRITY

Quantitative Estimation Model of Solid Waste on Construction Site

Theories and techniques of coal bed methane control in China

Research on Seepage Characteristics of Asphalt Pavement Structure

Chapter 2 Research on Logistics Center Layout Based on SLP

Nonlinear Seismic Response Analysis for Hong Kong-Zhuhai-Macau Bridge

Seismic Model Test of a Hybrid High-rise Building in Shanghai

The Aizhai Suspension Bridge is

ON THE BEHAVIOR OF A STUCK CURVED PIPE JACKING

Study on Performance-based Safety Design of Chemical Facility Layout

Evaluation of structural component design in lifeof-mine

Damage-control Seismic Design of Moment-resisting RC Frame Buildings

Vulnerability assessment of areas affected by Chinese cryospheric changes in future climate change scenarios

Parameters of Solidifying Mixtures Transporting at Underground Ore Mining

Rheo-squeeze casting of semi-solid A356 aluminum alloy slurry

Key factors for warm rolled bond of 6111-aluminium strip

Available online at ScienceDirect. Procedia CIRP 29 (2015 ) The 22nd CIRP conference on Life Cycle Engineering

Genetic Algorithms-Based Model for Multi-Project Human Resource Allocation

AUTOMATIC HAZARD INSPECTION MANAGEMENT SYSTEM OF RC BUILDING

Research and Application Study on Accident-Based 3D Power Station Simulation Technology

Research on Regional Logistics Industry Development Strategy Based on System Dynamics: Take Changzhou as a Case

Developing Policies for Soil Environmental Protection in China

TECHNICAL INFORMATION ABOUT UNDERGROUND STORAGE RESERVOIRS FOR NATURAL GAS

Design Provisions for Earthquake Resistance of Structures. The Standards Institution of Israel

DESIGN AND APPLICATION OF AIR DECKS IN SURFACE BLASTING OPERATIONS 2 MODERN APPLICATIONS 2 PRODUCTION HOLES 2 DESIGN CRITERIA 3

Geo-treatments in Constructing a Tunnel in Karst Strata: Lessons Learned from the Metro Subway Project in Guangzhou, China

Unit 16 Mine Development

Flood forecasting model based on geographical information system

Study on the thermal protection performance of superalloy honeycomb panels in high-speed thermal shock environments

Application for Gas Exploration and Production

Available online at ScienceDirect. Procedia Engineering 137 (2016 ) GITSS2015

Emergency Management of Urban Major Hazards Based on Information Synergy

Overview of Method for Reducing Grounding Resistance of Substation Grounding System

Cut and fill productivity. Operating procedures. Introduction. 1. Approach of the model

Challenges in Design and Construction of Deep Excavation With Case Studies - KVMRT in KL Limestone

Tuo Shan Yan Dam and City Ningbo: Exploring the Historical Logic of Urban Water Management through a Big City of China

The Combined Model of Gray Theory and Neural Network which is based Matlab Software for Forecasting of Oil Product Demand

DYNAMIC TEST ON A MULTI TOWER CONNECTED BUILDING STRUCTURE ABSTRACT

Nonrenewable Energy Resources 5.1

STUDY ON IMPACT OF ENVIRONMENTAL PROTECTION TAX ON ENTERPRISE ENVIRONMENTAL COST. Shuting Gao, Chazhong Ge, Xiaoqiong Li, Qijia Yang, Feng Long

Original Publication: International Journal of High-Rise Buildings Volume 5 Number 3

Experimental study of plasma window 1*

BENEFITS RELATED TO THE APPLICATION OF MASS BLASTS IN OPEN CUT MINING

Research on the Influence of Infill Walls on Seismic Performance of Masonry Buildings with Bottom Frame-Shear Walls

The Route of Informationization to Promote Agricultural Modernization of Yunnan Province of China

FRICTION-BASED SLIDING BETWEEN STEEL AND STEEL, STEEL AND CONCRETE, AND WOOD AND STONE

Metro Montreal Successful operation of a state-of-the-art roadheader ATM 105-ICUTROC competing with drill & blast operation in urban tunnelling

Study on Current Protection in Distribution Network with Distributed Generation

Healthy Buildings 2017 Europe July 2-5, 2017, Lublin, Poland. Research on indoor thermal environment of stilted buildings in Chongqing, China

Vibration Generated Due To Pile Driving In Water And Soil

Soil and Water Conservation Strategies on the Red and Yellow Soils of South China

Assessment of modification level of hypoeutectic Al -Si alloys by pattern recognition of cooling curves

FEM Calculation and Optimization for the Cutting Tooth of Stump Grinder

Structural Evaluation and Strengthening Strategy for a Reinforced Concrete Commercial/Residential Complex in Northern Beirut

Solar Passive Techniques: Earth Air Tunnel

Comprehensive Benefits Evaluation of Land Use in the Shuonan Mining Area Based on Triangle Model

CIVILS QUARRING MINING high pressure rock/concrete breaking system

System Dynamics Modeling for Sustainable Water Management of a Coastal Area in Shandong Province, China

CFD/FEM Based Analysis Framework for Wind Effects on Tall Buildings in Urban Areas

Implementation of this Special Provision requires a complete understanding of the following documents:

*Corresponding author. Keywords: Logistics management specialty, Experimental course system, Local colleges and universities in Guangxi.

The Optimal Design of Beijing Bus Fares of Transit System

Seismic Response Reduction of a Building Using. Top-Story Isolation System with MR Damper

1. Hardness 2. Streak 3. Density 4. Crystal structure 5. A mineral must be a naturally occurring, inorganic. 7. c 8. f 9. a 10. d 11. g 12. e 13.

MULTI-LEVEL FORTIFICATION INTENSITIES SEISMIC PERFORMANCE ASSESSMENT FOR REINFORCED CONCRETE FRAME- SHEAR WALL STRUCTURE WITH VISCOUS DAMPERS

Research Article Field Experiments for Wind Loads on a Low-Rise Building with Adjustable Pitch

Background, Pattern and Policy of China for Developing Circular Economy

Comparison of the Non-Ideal Shock Energies of Sensitised and Unsensitised Bulk ANFO-Emulsion Blends in Intermediate Blasthole Diameters

Transcription:

Study and Safety Evaluation on Chamber Blasting of Mined-Out Area in Pao-Maping Mine Zancheng Chen School of Civil and Environmental Engineering, University of Science and Technology Beijing, Beijing, China, 100083 Email: portil888@126.com Abstract: A comprehensive study on topographical and geological conditions, current situation of exploration, storage characteristics of the mined-out s, and the environment condition of the mine in Pao-Maping Mine was carried out. The millisecond controlled blasting technology was utilized to weaken the influence to the surface building and underground facilities induced by the explosion. Additionally, impact caused by shock wave on the critical facilities in the mine was assessed systemically. Simultaneously, the mine ventilation system should be entirely tested and maintained before blasting, to ensure the mine restoration production after the chamber bursting. Besides, safety test should be conducted on the poisonous gas in the mine after the chamber blasting. Keywords: underground mine; mined-out ; chamber blasting; million-second blasting; mine ventilation; safety assessment 1. Introduction Blasting vibration wave will affect or endanger the security of building and related facilities, in many occasions; blast vibration is often one of the most important factors which determine the blasting design and construction [1]. The research methods of blasting vibration wave attenuation laws can be divided into: fluctuations in law, numerical method, data fitting method and the method of Sadauskas [2-12]. In the actual design progress of chamber blasting, the key of the design is to reduce the largest amount of drugs at a single-round in order to prevent the building or structures around the burst source and the important facilities from the bursting.at the same time, to optimize the layout of the chamber, the form of charge and millisecond blasting can prevent the destructive effects of shock waves [13-17]. 2. Project Overview Lanping Lead-Zinc is a world famous super-large Pb-Zn deposit and China s largest Lead-Zinc. The mine is located in Lanping Bai Pumi Autonomous County of Yunnan Province Jinding town. The geographic coordinate is latitude 26 24', longitude 99 25'.The distance from the mining to Dali(Xiaguan) is 250km and there are many highways to Dali. The entire mining is divided into 7 ore blocks such as Jiaya Hill, Fengzi Hill, Beichang and Paomaping. Paomaping mine, affiliated with Yunan Jinding Zinc Industry Co,Ltd, is one of the major mines. Since the investment subjects was too much in the initial mining, the mining construction lacked of unified planning. The investors worked each for himself, resulting in the disorderly production of the construction and waste of resources.during this period, a high 54m and 110000m 3 in volume mined-out is formed at the Paomaping block. This mined-out brings huge security risks to thedeep exploitation of more than 600 million tons of geological reserves. The main objectives of the mined-out chamber blasting are: we adopt tunnel excavation and arrange a strip-shaped chamber beside the mined-out in order to avalanche certain volume wall rock from the top of the mined-out to form a buffer layer to ensure the exploitation of the mineral resources under the mined-out efficient and safety. 3 The Chamber Millisecond Blasting of Paomaping Mined-Out Area According to the shape and contour of Paomaping minedout, surrounding environment and underground conditions, layout stip-shaped chambers along the top of the mined-out contour line, a total of 12 strip-shaped chambers. The compound floor plan of layout of the strip-shaped chamber blasting in the mined-out is shown in Figure 1. According to the wall rock of Paomaping mined-out mechanics testing, computed from the equation of the blasting powder factor and blasting experience, we take blasting powder factor of this chamber blasting K=1.6Kg/m3. During the chamber blasting, because there is a strong folder on the rock at the bottom of the chamber in the mined-out, we take the largest explosion index. When the underlying charge has been exploded and the middle and upper detonation, the rock mass relative to bottom rock mass is facing more space, so it takes the bottom of charge n = 1.0, middle charge from n = 0.8, the upper charge from n = 0.75. In the design of chamber blasting of Paomaping, the fracture radius of blasting craters is divided into up fracture radius and down fracture radius. Through the analysis of rele- 412

B213 2265.877 B212 2265.777 2260 2274 B211 2265.313 出矿口 B209 2262.222 放矿口通 2272 中段 B210 2265.178 放矿口放矿口 溜矿口 ( 上通 2295 中段 ) 通下中段 放矿口 Y=215.3485 X=200.7395 网络孔 2255.5 水仓 2274 2268 Proceedings of the 10th Conference on Man-Machine-Environment System Engineering vant information, it is almost used in the open-air blasting. We choose the facture radius for the open-aire chamber blasting as the the fracture radius in the design of mined-out chamber blasting, so the blasting security is high and the statistical data from this blasting is relatively conservative. Its parameters of the chamber blasting in Paomaoping mined-out are shown in Table 1. 4 The Security Assessment of Chamber Millisecond Blasting Detonator Network In order to ensure the reliability and security of detonator network when Paomaping mined-out chamber blasting, each drug room equipped with one main detonation body, between each host detonation body it useed two sets of independent systems of the non-detonator initiation network, between the primary and secondary detonation body and the drug rooms at the same section it used the double strand detonating cord series. The delay time interval of chamber blasting was 110ms, the chamber blasting network diagram is shown in Figure 2. G F E D C B H 空区 1# 井空区 2281 G F E D C B H G-3 G-2 G-1 E-3 E-2 E-1 double joint blasting fuse (a)1# double flash detonator Table 1. The parameter list of chamber Blasting of Mined-out in Pao-Maping Mine Blasting action index Figure 1. The compound layout plan of strip charge Chamber blasting Number of the chamber Minimum burden specific charge (kg/m 3 ) charging density (t/m) charge (t) Explosion cavity radius Fracture radius D-3 D-2 D-1 B-3 B-2 B-1 double joint blasting fuse B1 1 12 1.6 0.23 2.995 0.95 16.97 double flash detonator B2 0.8 12 1.6 0.18 2.354 0.84 15.37 B3 0.75 12 1.6 0.17 2.236 0.82 15 D1 1 12 1.6 0.23 2.995 0.95 16.97 D2 0.8 12 1.6 0.18 2.354 0.84 15.37 D3 0.75 12 1.6 0.17 2.236 0.82 15 E1 1 12 1.6 0.23 2.995 0.95 16.97 E2 0.8 12 1.6 0.18 2.354 0.84 15.37 E3 0.75 12 1.6 0.17 2.236 0.82 15 G1 1 12 1.6 0.23 2.995 0.95 16.97 G2 0.8 12 1.6 0.18 2.354 0.84 15.37 G3 0.75 12 1.6 0.17 2.236 0.82 15 (b)2# Fgure 2. The network diagram of chamber blasting 5 The Vibration Impact Assessment on Surface Structures Resulted from Chamber Blasting In order to demonstrate the security of chamber blasting in Paomaping ore mined and to undertake detailed investigations on surface structures, careful study and analysis was carried mainly on the blasting vibration for buildings and structures within 1000 meters away from the explosion source according to the on-site measurement investigation and theoretical analysis, among which the nearest distance from the house to explosion source is only 675 meters. GPS72 was applied to measure the location for buildings and structures above the Paomaping ore 413

mined and to take pictures of these buildings and structures, so as to achieve an accurate understanding of the surface buildings. The measurement process revealed that besides the adit, inclined shaft and buildings and structures near the shaft there are mud, wood and brick houses, transformers, air compressor, hoisters, explosive room, tailings dam and the concentrator and so on. The rest are Yi people living halfway down the hill.as Paomaping ore is surrounded by two small villages and scattered families distributed on hillside, the houses are generally made of earth and wood. In this case, the structure of these houses is very simple and some of the houses even bearing crack. Please refer to Picture 3 for house distribution around the Paomaping ore. The blasting vibration speed is closely related to mass of explosive as well as the distance. When the blasting propagation velocity in medium of engineering rock mass surrounding exceeds a fixed number, the mine rock would produce displacement and dislocation. According to the analysis and research of the geological data, on-site investigation and blasting experience, the maximum vibration speed of this chamber blasting in Paomaping ore to the houses which are nearest to explosive source is 0.35cm/s. Only the speed for the houses near shafts (within the scope of the exploitation state) is faster than 0.5cm/s, while others are all below the speed 0.5cm/s. Therefore, the chamber blasting in mined would bring no effects to surface buildings which belong to Yi nationality, and it proves that this chamber blasting is safe. Figure 3. The house of circumjacent dweller in Pao-Maping Mine 6 The Vibration Impact Assessment on the Main Underground Facilities Resulted from Chamber Blasting Through field survey and research the main facilities around the outline of Paomaping mined-out are: hoisters, pumps, air compressors, air pipes, cables and so on. Hoisters, pumps and air compressors should be specially protected when chamber blasting, however these important facilities are basically located in the adit of the important roadways. For the safety assessment of the influence of blasting vibration to the important facilities, the velocity of blasting vibration at important access adit in Paomaping mined-out when chamber blasting is shown in figure 4. The velocity of blasting vibration(cm/s) 30 25 20 15 10 5 0 B-1 B-2 B-3 D-1 D-2 D-3 E-1 E-2 E-3 G-1 G-2 G-3 Number of the chamber At the upper adit of 6# inclined shaft At the down adit of 6# inclined shaft At the upper adit of 6# second inclined shaft At the down adit of 6# second inclined shaft At the upper adit of 5# inclined shaft At the down adit of 5# inclined shaft At the upper adit of 3# inclined shaft At the down adit of 3# inclined shaft At the upper adit of 2-4# second inclined shaft At the down adit of 2-4# second inclined shaft At the upper adit of NO.1 of the 2-4# three inclined shaft At the down adit of NO.1 of the 2-4# three inclined shaft At the upper adit of NO.2 of the 2-4# three inclined shaft At the down adit of NO.2 of the 2-4# three inclined shaft At the upper adit of 7# inclined shaft At the down adit of 7# inclined shaft At the upper adit of 7# second inclined shaft At the down adit of 7# second inclined shaft At the upper adit of 8# inclined shaft At the down adit of 8# inclined shaft At the upper adit of 2-4# three inclined shaft At the down adit of 2-4# three inclined shaft At the upper adit of 2-4# four inclined shaft At the down adit of 2-4# four inclined shaft Figure 4. The velocity of blasting vibration important access adit From Figure 1 we can know: when Paomaping mined-out takes chamber blasting, the largest velocity of blasting vibration was at the down adit of 7# second inclined shaft among all of the access adits. It is 27.6cm/s.Basically, air compressors and hoisters are located in the vicinity of important access adits, according to the relevant blasting criteria we can know : air compressors, pumps and hoisters are safe when chamber blasting. 7 The Effect Analysis of Paomaping Ore Mined-Out Area Chamber Millisecond Blasting Considering Paomaping Mine mined-out geological terrain conditions, the exploitation status quo, the mined-out existing characteristics and the environmental conditions on the surface and underground, taking millisecond blasting for the mined-out chamber blasting in order to control the damage of vibration-wave and shock-wave to the buildings, structures and key facilities was determined. In order to verify the vibration hazards of the mined-out chamber blasting and according the actual situation of blasting, 3 IDTS 3850 blasting vibration recorder instruments were respectively emplaced at measuring point 1 near the shaft, point 2 near the inclined shaft and point 3 near the adit receding in the distance. The vibration velocities of each of the measuring point were respectively shown in Figure 5, Figure 6 and Figure 7 below. From Figure1, Figure 2, and Figure 3 we can see that when Paomaping chamber blasting, the velocity of blasting vibration near the shaft was bigger than the safety vibration velocity of houses on the surface. But according to the requirements of Paomaping mine, the safety of lives and property of local residents should be taken into consideration in the blasting design. The houses in the 414

Figure 5. The velocity of blasting vibration in the first Monitoring Figure 6. The velocity of blasting vibration in the secend Monitoring Figure 7. The velocity of blasting vibration in the third Monitoring mine can be ignored and there are traces of destruction is pemitted. The main objectives of layout seismic points near Paomaping mine inclined shaft are: to ensure that the vibration velocity of the nearest house from the explosive source is no more than the request in "Blasting Safety Regulations", there are houses of local residents only within the distance from the inclined shaft adit to explosive source. The measuring point near the mouth of adit in Paomaping mine can verify the reasonability of blasting design in depth, and can take simple system regression with the other two measuring points to demonstrate the scope of blasting vibration hazards further. 8 Ventilation Safety Assessment on Chamber Millisecond Blasting The chamber blasting on mined would produce substantial toxic and harmful gases, so it is quite difficult to return to safety standards in short time. With the purpose of ensuring the safety of the chamber blasting, detailed inspection and maintenance should be carried on the whole ventilation system. In this case, the ventilation system can be in a safe and high-efficient operation status after the chamber blasting. Before the workers resume the operation under the mine, inspection on toxic and harmful gases at all key locations underground should be conducted by the safety monitoring personnel. Only when every indicator reached the level of safety standard, the underground operation can be fully resumed. Then the mechanical forced ventilation would be in operation in continuous 24 hours after the chamber blasting. The blasting safety technical personnel would be in charge of inspecting the safety standards of the toxic and harmful gases for every point of operation underground from the top step by step. By means of consecutive 8 hours inspection, the Paomaping ore can finally be ensured to resume operation safely. 9 Conclusions 1) According to current situation of the exploitation in Paomaping ore, the morphology in mined and the environment condition surrounding the mined, the selection of chamber blasting has controlled and reduced the hazard to the buildings and structures on and under the mine brought by blasting vibration. 2) When the chamber blasting was applied to Paomaping ore mined, the vibration speed of the surface houses is lees than 0.5cm/s, which is within the national safety vibration standards. So it revealed that this chamber blasting made no serious effects to the houses of villagers. 3) The safety assessment on chamber blasting in Paomaping ore mined, revealed that the buildings and structures would not be damaged by blasting vibration. Only the facilities close to explosion source would be affected by blasting vibration, so it requires strengthening the protection on important equipment underground. (4) After the chamber blasting, in order to ensure the restoration of safe operation underground, mechanical forced ventilation was applied to timely discharge the toxic and harmful gases under the mine produced by chamber blasting. References [1] Li Hong-tao,Shu Da-qiang.Influential factors analysis of blasting vibration attenuation law[j]. Engineering Journal of Wuhan University, 2005,38(1): 79-82. [2] Yan Chang-bin,Xu Guo-yuan,Li Xi-bing.Stability analysis of mined-out s influended by blasting vibbration with FLAC^3D[J].Chinese Journal of Rock Mechanics and Engineering, 2005,24(16): 2894-2899. [3] Jin Jing, Shang Xiao-jiang, DING Hua. Investigation of Numerical Method of the Vibration Response of Underground Structure[J]. Acta Armamentarii, 2008,29(1): 85-89. [4] HAOH,MAGW,ZHOUYX.Numerical simulation of underground explosions[j].international Journal of Blasting and Fragmentation,1998,2(51:383 395. [5] Tan Wen-hui, Qiao Lan. Numerical simulation of blasting vibration on highway-slope stability [J].Chinese Journal of Rock Mechanics and Engineering, 2005,24(A01): 4837-4842. [6] Lu Tao, SHI Yong-qiang, Huang Cheng,et al.study on attenuation parameters of blasting vibration by nonlinear regression 415

analysis[j]. Rock and Soil Mechanics, 2007,28(9): 1871-1878 [7] The National Standard Compilation Group of People s Republic of China.Safety Regulaitons For Blasting (GB6722-2003) [S]. Beijing:China Architecture and Building Press,2003. [8] Wang Xu-guang,Yu Ya-lun,Liu Dian-zhong.Blasting the implementation of safety regulations manual[m],beijing: China Communications Press,2004 [9] Dong Zhao-xing,Shao Peng.Engineeirng blasting[m].beijing: China Architecture and Building Press,2005 [10] [10]Engineering Blasting Committee of Chinese Mechanics Institute.Engineering blasting[m]. Beijing:Metallurgy IndustryPress. 1992, 285-289. [11] Ye Zhou-yuan,Zhou Zhi-hua.Optimized calculation for safe distance of blasting vibration[j].china Safety Science Journal,2005,15(3):57-60 [12] Zang Xiu-ping,Wang Hong.Preliminary exploration of the velocity attenuation equation form of blast vibration[j].metal Mine,2002,(4):36-37 [13] Zang Xiu-ping,Liu Sheng-kuan,Dong Tao.Study onthe attenuation model of the vibration parameter induced by explosives[j].non-ferrous Metal(Mine),2005,57(5):31-33. [14] Ling Tong-hua, Li Xi-bing, Wang Gui-yao. A study on initiative control of blast vibration damages[j]. Rock and Soil Mechanics, 2007, 28(7): 1439-1442. [15] Fu Shi-gen,Xu Kai-li.Predicting of blast vibration effect and reduceing vibration measures[j]. Journal of Safety Science and Technology, 2006, 2( 6): 45-48. [16] Yang Wei-zhong,Li Jian-hua,Chen He.Prevention and Control of Vibration and Shock Wave Damages Caused by Underground Large Blasting in Tongken Mine[J]. Mining Research and Development, 2006, 2( 6): 45-48. [17] Jiao Yong-bin, Gao Sai-hong,Deng Fei,et al.test of Earthquake Induced by 260 t Charge Chamber Blasting and the Vibration Reduction Measures[J].Mining Research and Development, 2006, 26(4): 83-85. 416