Client Requirements to make Particular Safety & Health Appointments

Similar documents
Managing health and safety in construction

Health and Safety Guidance - Designers Construction Design and Management Regulations 2015

Construction Waste Measurement Guide

Relevant Contracts Tax: Relevant Operations

HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE

FACT SHEET CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2015 THE PROPERTY PROFESSIONALS AUGUST 2016

The Construction (Design and Management) Regulations 2015

SAFE WORK METHOD STATEMENT

(7 February 2014 to date) OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993

CIRCULAR GENERAL PROVISIONS

The Corporation of The City of London

Infrastructure and mining services in Greenland

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

GUIDELINES FOR SUB-SYSTEM COMPLETION CERTIFICATES AND TEST RECORDS FOR ELECTRICAL INSTALLATIONS IN POTENTIALLY EXPLOSIVE ATMOSPHERES

C D M R e g u l a t i o n s

2 Ensure there are arrangements in place for managing and organising the project

your guide to completing an application for a new or replacement water connection from your property to an existing water main

Railway Interface Planning Scheme Rules (RIPS Rules)

Design Governance Rules BOP325.23

Site Rules. Regulation Excavations Page 1 of Excavations

NUCLEAR SAFETY REQUIREMENTS BSR

CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11

Managing health and safety in construction

A handbook for the construction regulations Working safely in the housing construction industry

SCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE

Wind Energy Investments Act 1)

Declarations. Director s Guidelines for the CDEM Sector (DGL13/12) Resilient New Zealand Aotearoa Manahau

Temporary Works Forum (TWf) Chairman: Bill Hewlett MA CEng FICE Secretary: John Carpenter CEng, FICE, FIStructE, CFIOSH

1. SALIENT FEATURES OF DIPLOMA PROGRAMME IN CIVIL ENGINEERING (SPL. HIGHWAY ENGINEERING)

Course in Owner Builder Compliance NTIS code: 91509NSW. Participants Guide

Health & Safety Officer. Donegal County Council

The safe management and control of Temporary Works

CITY OF EDMONTON BYLAW EMERGENCY MANAGEMENT BYLAW (CONSOLIDATED ON NOVEMBER 14, 2012)

ISO 9001:2015 ISO 14001:2015 OHSAS

CDM Regulations 2015 and 2 topical issues

your guide to completing an application for a new or replacement water connection from your property to an existing water main

Wind Energy Investments Act 1)2)

WHC-FRM-AUTHORITY TO UNDERTAKE INDUCTION FORM 3

H&S007 Level 2 and 3 Risk Health and Safety Contractor Approval Request

CHAS Assessment Standards

Mini Tender PART B External Wall Insulation, Mechanical and Electrical Installation

Control of Equipment on Masts, Towers and Rooftops BOP018.8

Intermaritime Certification Services (ICS) QUALITY MANAGEMENT SYSTEM INSTRUCTIVE FOR ISM-CODE

Work Health and Safety Management Systems and Auditing Guidelines

Construction (Design and Management) Safety Guidance Document

EARTHQUAKE- PRONE BUILDINGS POLICY

DETAILED TERMS OF REFERENCE. 1.0 Terms Of Reference: I.1 The scope of services of a consultant shall include the following categories:

CONSULTING OFFICE OF MORRIS S. FARKAS PROFESSIONAL SAFETY ENGINEER

BUILDING ACTIVITY APPLICATION PACKAGE

Guidance statement - Premises notification for the Hazardous Waste Regulations

Safety Statement Including Risk Assessment

Application for a Sewage System Permit

MANAGEMENT SYSTEMS QUOTE REQUEST FORM

HANDOVER TAKEOVER REQUIREMENTS

SAFE SYSTEM OF WORK PLAN (SSWP)

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

Hazardous. Scheme. the power behind your business

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

Permit to Work Manual

Application Pack 5. How to apply for a Connection to a Public Sewer/Lateral Drain

CODE OF PRACTICE FOR SAFETY IN ROOFWORK

Safety Method Statements and Risk Assessment

Path Construction Project Checklist

CITY OF BURNABY BYLAW NO *******

A2B. Construction (Design and Management) Regulations 2015 PRE CONSTRUCTION INFORMATION PACK (V ) PROJECT:

Managing Contractors (Scotland)

National TFS Office, Dublin City Council [NTFSO] Guidance for Completing Notification Document (Annex 1A) & Movement Document (Annex 1B)

LAW No. 2003/11 ON THE LAW ON ROADS. The Assembly of Kosovo,

COMPANY APPLICATION, SEWAGE INSTALLATIONS FIELD

NZQA registered unit standard version 3 Page 1 of 5

Istnieje tekst jednolity Construction Law z dnia 7 lipca 1994 r. (Dz.U. tłum. gb Nr 89, poz. 414)

ORDINANCE ON TECHNICAL REQUIREMENTS FOR CABLE DUCTS

Control, Safe Use and Operation of Plant and Equipment

Supervision of Trainees Holding a Limited Certificate

CIVIL BREADTH Exam Specifications

An introduction to. pipe jacking

Aircraft Manufacturing Organisations Certification

The Construction Industry Labour Relations Act, 1992

Test Agreement Test Description: FTTC Customer Trial

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015

Ensure your own actions reduce risks to health and safety

Transport Sector Portfolio

An overview of the Standard for Infrastructure Procurement and Delivery Management

Careers List Professional Careers in Construction

Act of 4 August 1996 on well-being of workers in the performance of their work (Belgian Official Gazette 18 September 1996)

Want construction work done safely?

Annex F Scoping Checklist

Community and Renewable Energy Scheme Project Development Toolkit Planning Module

Lead Management Program for Building Maintenance and Construction Projects. Office of Environmental Health and Safety University of Toronto

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

SPECIFICATION FOR NOISE MITIGATION

Guidance on Independent Assessment. Rail Industry Guidance Note. Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

An overview of CDM 2016 the UK experience.

Construction OS&H Project planning and control for safe OS&H

Challenges of Sustainable Infrastructure AAEES UCI

BYLAW NO.09/036 BEING A BYLAW OF THE REGIONAL MUNICIPALITY OF WOOD BUFFALO TO ESTABLISH A MUNICIPAL EMERGENCY MANAGEMENT AGENCY

Public Procurement Act

1 Determine the legal framework of OHS in the workplace

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE

Transcription:

Client Requirements to make Particular Safety & Health Appointments REVISED IN ACCORDANCE WITH THE SAFETY HEALTH AND WELFARE AT WORK (CONSTRUCTION) REGULATIONS 2013.

> Contents Form 1...... Client Checklist - Does the project involve Construction Work? Form 2...... Client Checklist - Is a PSDP / PSCS Appointment Necessary? Form 3...... Client Checklist - Does the Project Involve a Particular Risk? Form 4...... Client Project Safety and Health Checklist............ Flow Chart - PSDP / PSCS Appointment Form 5...... Template form for appointment of Project Supervisor for the Design Process (PSDP) Form 6...... Template form for appointment of Project Supervisor for the Construction Stage (PSCS) Form 7...... Template form for Completion / Termination of appointment of Project Supervisor for the Design Process (PSDP) Form 8...... Template form for the Completion / Termination of appointment of Project Supervisor for Construction (PSCS) > This document is aimed mainly at clients completing commercial type projects. For clients requirements on domestic type projects, see www.hsa.ie. The purpose of this document is to allow any individual to assess whether they are carrying out, or arranging to carry out construction work and then whether they have a requirement to appoint a Project Supervisor Design Process (at or before the commencement of design) and a Project Supervisor Construction Stage (before the commencement of construction work) under the Safety, Health and Welfare at Work (Construction) Regulations 2013 and or the Safety Health and Welfare at Work Act 2005. It is advisable to complete this document for every potential project that may require such statutory appointments. This document provides evidence that Statutory Duties were considered.

> FORM 1 - Client Checklist Does this project involve construction work? Assessment Completed by: : Construction Work Yes No (a) The carrying out of any building, civil engineering or engineering construction work, other than drilling and extraction in the extractive industries and includes but is not limited to each of the following; The doing of one or more of the following with respect to a structure (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) (b) (c) (d) (e) Construction Alteration Conversion Fitting out Commissioning Renovation Repair Upkeep redecoration or other maintenance (including cleaning which involves the use of water or an abrasive at high pressure or the use of substances or preparations classified as corrosive or toxic in accordance Regulation (EC) No. 1272/2008 of the European Parliament and of the Council on the Classification, Labelling and Packaging of substances and mixtures or of the European Communities (Classification, Packaging and Labelling of Dangerous Preparations) Regulations 2004 (S.I. No. 62 of 2004); de-commissioning, demolition or dismantling Any other activity that may be construed to be construction work the preparation for an intended structure *, including but not limited to site clearance, exploration, investigation (but not site survey) and excavation, and the laying or installing of the foundations of an intended structure; the assembly of prefabricated elements to form a structure *, or the disassembly of prefabricated elements which, immediately before such disassembly, formed a structure; the removal of a structure * or part of a structure or of any product or waste resulting from demolition or dismantling of a structure or disassembly of prefabricated elements which, immediately before such disassembly, formed a structure; the installation, commissioning, maintenance, repair or removal of mechanical, electrical, gas, compressed air, hydraulic, telecommunication and computer systems, or similar services which are normally fixed within or to a structure *; If Yes to any, construction work is being carried out proceed to PSDP / PSCS Appointment Checklist - Form 2. If No to all, construction work is not being carried out, the Safety, Health and Welfare at Work (Construction) Regulations 2013 do not apply. Client Assessment of Requirements to make Particular Safety & Health Appointments * Structure - (a)building, railway line or siding, tramway line, dock harbour, inland navigation system, tunnel, bridge, viaduct, waterworks, reservoir, pipe-line, underground or overground cables, aqueduct, sewer, sewage works, gasholder, road, airfield, sea defence works, river works, drainage works, earthworks, lagoon, dam, wall, caisson, mast, tower, pylon, underground tank, earth retaining element or assembly of elements or assembly of elements designed to preserve or alter any natural feature, and any other structure similar to the foregoing. (b)any formwork, falsework, scaffold or other elements or assembly of elements designed or used to provide support or means of access during construction works or (c) Any fixed plant in respect of work which is installation, commissioning, de-commissioning or dismantling. 2

> FORM 2 - Client Checklist PSDP / PSCS Appointment Assessment Completed by: 1. Is the Work to last longer than 30 working days? Yes No Appoint a PSDP and PSCS Notify HSA (AF1) Preliminary safety and health plan is required 2. Is the Work to last longer than 500 persons days? Yes No Appoint a PSDP and PSCS Notify HSA (AF1) Preliminary safety and health plan is required 3. Does the work involve a particular risk? Yes Appoint a PSDP and PSCS Preliminary safety and health plan is required Client Assessment of Requirements to make Particular Safety & Health Appointments No What is the particular risk? SEE FORM 3 4. Is there more than one contractor? Yes No No PSDP or PSCS is required Appoint a PSDP and PSCS 3

> FORM 3 Client Checklist Does this project involve a particular risk? Assessment Completed by: Work Involving Particular Risks (As listed in Schedule 1 of the SHWW (Construction) Regulations 2013) Note : Non-Exhaustive List Yes No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 a b c Work which puts persons at work at risk of falling from a height * burial under earthfalls * engulfment in swampland * Work which puts persons at work at risk from chemical or biological substances constituting a particular danger to the safety and health of such persons or involving a statutory requirement for health monitoring. Work with ionising radiation requiring the designation of controlled or supervised areas as defined in Council Directive 96/29/Euratom. Work near high voltage power lines. Work exposing persons at work to the risk of drowning. Work on wells, underground earthworks and tunnels. Work carried out by divers at work having a system of air supply. Work carried out in a caisson with a compressed-air atmosphere. Work involving the use of explosives. Work involving the assembly or dismantling of heavy prefabricated components. Other examples of non exhaustive risks that may constitute Particular Risks in a specific environment Yes No Work in or adjacent to a live area where contact and interaction with users, staff, public or traffic is possible * Work involving the creation of dust which could lead to Nosocomial Invasive Aspergillosis Work involving the use of a naked flame * Work in proximity to live existing services which could harm workers or of which the continuity of service is critical to the operation of the facility Other non-exhaustive Particular Risks (As prescribed by the assessor) Yes No * where the risk is particularly aggravated by the nature of the work or processes used or by the environment at the place of work or construction site. Client Assessment of Requirements to make Particular Safety & Health Appointments 4

> FORM 4 - Client Project Safety and Health Checklist Assessment Completed by: Tick the appropriate box as tasks are completed. Note: You may need to discuss some of these tasks with the PSDP and/or PSCS. 1.1 1.2 1.3 1.4 1.5 1.6 1.7 Section 1 - Procurement of the design team and PSDP Have you assessed the health and safety competency and resources of the PSDP appointed by you? (e.g., have they outlined 1. measures to ensure co-operation and co-ordination between designers ie. meetings etc. 2. measures to ensure the Principles of Prevention will be obesrved in design packages, are there adequate resources etc?) Have you appointed the PSDP in writing? Has the PSDP confirmed acceptance of the PSDP role in writing? Has the Safety and Health competence and resources of designers been assessed? Is there a written agreement with every designer appointed by you? Does the project need to be notified to the Health and Safety Authority? If yes to 1.6 above, have you completed AF1 form and issued this to the Health and Safety Authority? Tick when task is completed Section 2 Design Process Client Assessment of Requirements to make Particular Safety & Health Appointments 2.1 2.2 2.3 2.4 2.5 3.1 3.2 3.3 3.4 3.5 3.6 3.7 4.1 4.2 4.3 4.4 Have you Issued the existing Safety File (if it exists) to the design team and PSDP? Have you issued all relevant information to the design team and PSDP? Have the design team and PSDP identified and assessed particular risks?incl. residual risks that may remain in post handover exit? Has the format for the Safety File been agreed with the PSDP? Has the PSDP prepared the preliminary Safety and Health Plan incl. reference to measures re. particular risks? Section 3 Procurement of the contractor and PSCS Has the preliminary Safety and Health Plan been issued to those tendering for therole of PSCS or in the case of domestic work issued upon appointment of the PSCS? Has the Safety and Health competence and resources of contractors your have appointed been assessed? Have you appointed the Contractor in writing? Have you assessed the health and safety competency and resources of the PSCS? Have you appointed the PSCS in writing? Has the PSCS confirmed acceptance of the PSCS role in writing? Has the PSCS completed AF2 form and issued this to the Health and Safety Authority? Section 4 Construction and completion stage Has the PSCS developed the Safety & Health Plan and made reference to measures to organise co-operation between contractors and co-ordinate their activities on site? This is not a clients legal obligation and is suggested for guidance purposes. Is health and safety managed on site and discussed at site meetings? Is there evidence of coordination & communication between contractors. This is not a clients legal obligation and is suggested for guidance purposes. Is there checking and corrective action taken on site? This is not a clients legal obligation and is suggested for guidance purposes. At the completion of the project have you received the Safety File from the PSDP? 5

> Flow Chart - PSDP / PSCS Appointment When DO YOU have to appoint a PSDP / PSCS? Is the work to last longer than 30 days? YES Appoint PSDP PSCS Prepare PH & S Plan Notify HSA NO Is the work to last longer than 500 person days? YES Appoint PSDP PSCS Prepare PH & S Plan Notify HSA NO Does the work involve a particular risk? NO Is there more than one contractor? NO NO PSDP or PSCS required YES YES Appoint PSDP PSCS Appoint PSDP PSCS Prepare PH & S Plan Client Assessment of Requirements to make Particular Safety & Health Appointments 6

> FORM 5 - Template form for appointment of Project Supervisor for the Design Process (PSDP) in accordance with the Safety, Health and Welfare at Work (Construction) Regulations 2013 Client: Department: Section: Authorised Representative: Position: Location: Stage: : Project Supervisor for the Design Process: Is hereby appointed Project Supervisor for the Design Process for the above project By or on behalf of Client Project Supervisor for the Design Process: Hereby accepts the appointment as Project Supervisor for the Design Process for the above project. Authorised Representative: Position: By or on behalf of Project Supervisor for the Design Process 7

> FORM 6 - Template form for appointment of Project Supervisor for the Construction Stage (PSCS) in accordance with the Safety, Health and Welfare at Work (Construction) Regulations 2013 Client: Department: Section: Authorised Representative: Position: Location: Stage: : Project Supervisor for the Construction Stage: Is hereby appointed Project Supervisor for the Construction Stage for the above project By or on behalf of Client Project Supervisor for the Construction Stage: Hereby accepts the appointment as Project Supervisor for the Construction Stage for the above project. Authorised Representative: Position: By or on behalf of Project Supervisor for the Construction Stage 8

> FORM 7 - Template form for the Completion/Termination of appointment of Project Supervisor for Design Process (PSDP) in accordance with the Safety, Health and Welfare at Work (Construction) Regulations 2013 This form is intended to be used by agreement Client: Department: Section: Authorised Representative: Position: Location: Stage: : Project Supervisor for the Design Process: Reason for termination of Appointment as PSDP Appointment as Project Supervisor for the Design Process for the above project is hereby completed / terminated. By or on behalf of Client By or on behalf of PSDP 9

> FORM 8 - Template form for the Completion / Termination of Appointment of Project Supervisor for Construction (PSCS) in accordance with the Safety, Health and Welfare at Work (Construction) Regulations 2013 Client: Department: Section: Authorised Representative: Position: Location: Stage: : Project Supervisor for the Construction Stage: Reason for termination of Appointment as PSCS Appointment as Project Supervisor for the Construction Stage for the above project is hereby completed / terminated. By or on behalf of Client By or on behalf of PSCS 10

This form may be freely used without restriction. It cannot be amended, altered or re-branded without the written consent of the copyright holders. The Construction Safety Partnership. Publication date Dec 2013.