Online Payment for CTO

Similar documents
CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

STANDARD OPERATING PROCEDURE

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

Title. Green Government Initiative March 20 22, 2013

PRE-FEASIBILITY REPORT

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination

PROCEDURE FOR THE ISSUANCE (INITIAL AND RENEWAL) OF ENVIRONMENTAL PERMIT / NO OBJECTION CERTIFICATE (NOC) # Type of Permit Applicability

Sound waste management

THE HAZARDOUS WASTES (MANAGEMENT AND HANDLING) RULES, 1989

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

Hind Energy & Coal Beneficiation (India) Ltd.

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management

NTPC SAIL POWER COMPANY LTD (A Joint Venture of NTPC & SAIL) Captive Power Plant -II, D.S.P. Complex, Durgapur , Dist- Burdwan(W. B.

GOVERNMENT OF TAMIL NADU INDUSTRIES DEPARTMENT. Notification

THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999

Metropolitan District Commission

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002

Major changes proposed in the Bio- Medical Waste Management Rules, 2016 and its likely implication

Municipal Solid Waste Management Policy in Thailand. Pollution Control Department (PCD) Ministry of Natural Resources and Environment Thailand

HAZARDOUS WASTES (MANAGEMENT AND HANDLING) RULES, 1989

REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m.

WASTE MANAGEMENT Concrete actions taken and specific progress made in implementation

(SIGNATURE OF THE APPLICANT)

Revision of Directive 2008/98/EC on waste (Waste Framework Directive) and of Directive 1999/31/EC on landfill of waste. A EURELECTRIC position paper

Application for Gas Exploration and Production

Terms of Reference. Application type: External vacancy Job Title: Category: Duty station:

Introduction of Green Hotel Eco-label. MNCCI, Sustainable Production and Consumption Department

Division of Surface Water Annual Sewage Sludge Report Instructions for Completing and Submitting an Annual Sewage Sludge Report

Environment Impact Assessment (EIA) Notification 2006

Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators

Renewable Heat Incentive Schemes. Neil Witney Renewable Heat Premium Payment

Session 3 case study: Improving corporate decisionmaking by valuing ecosystems James Griffiths, WBCSD

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.

CRADLE-TO-GATE LIFE CYCLE INVENTORY ANALYSIS FOR BIO-MATE COMPOSTING SYSTEM

PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD

Ministry of Environment and Forests Notification New Delhi, the 4 th February ( As amended up to )

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

ORGANIC CERTIFICATION PROCESS IN NON-EU COUNTRIES

4.0 INDUSTRIAL/COMMERCIAL DISCHARGE PERMITS

GOVERNMENT OF ORISSA

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

Records Disposal Schedule Charles Darwin University Procurement Services Charles Darwin University

NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY

Draft - Smart City Proposal. Kalyan Dombivli Municipal Corporation

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

Class III Composting Facility Requirements

DOCUMENT FOR EMPANELMENT OF ARCHITECTS FOR THE PERIOD This document consists of the following

The One Stop Shop Working in Practice

Sustainable Rhineland-Palatinate - Our Circular Economy and Energy Strategies until 2030

Self-Evaluation/Audit Checklist for Food Supplement Manufacturers

جباتن فربندهارأن TREASURY DEPARTMENT MINISTRY OF FINANCE

Toyama Framework on Material Cycles

Biomass Power Generation Resource and Infrastructure Requirements. Idaho Forest Restoration Partnership Conference, Boise, Idaho February 1, 2012

The WWF Paper Scorecard Manual

Green Buildings and Greening Infrastructure; a Shared Framework? Dr Rodney Milford Programme Manager; cidb October 2011

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

7. REFER VANS (Refrigerated Transport):

Project Proposal For Establishment

VENDOR APPRAISAL FORM PROJECTS & DEVELOPMENT INDIA LIMITED

Land Use Planning in Colorado

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

Hind Energy & Coal Beneficiation (India) Ltd.

Bihar Renewable Energy Development Agency. Expression of Interest (EOI)

3R Portfolio - Good Practices to Promote the 3Rs - Country: Thailand

ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

Recycling Electronics: Summary of Federal Efforts. Kim Bartels EPA Region 8 Pollution Prevention Program July 2009

Sl.NO. Particulars Unit EMD Amount 1 Supply & Installation of Automatic Milk Fat 120 No s 1,00,000-00

Resource efficiency in Sweden

COMMERCIAL STUDIES (63)

Annual Hazardous Waste Receiver Report

AGENT INSTITUTION Presentation

Checklist of Authorization for handling Bio Medical Waste

(To be printed on stamp paper, signed and stamped on each page and duly notarized by an empanelled Notary Public)

MCDR INSPECTION REPORT

Leonardo Piccinetti E4Business

YOUR CERTIFICATION PROCESS EXPLAINED

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS

New York State Unified Solar Permit Expedited Solar Permit Process for Small-Scale Roof-Mounted Residential and Commercial Solar Electric

SOLAR PANEL INSTALLATION NYC Department of Buildings

July EI&RE - Via Montefeltro, MILANO P.IVA

Waste management in the Netherlands. Herman Huisman RWS Environment

ENVIRONMENTAL REGULATIONS AND MANAGEMENT OF SPENT POT LINING (SPL) WASTE GENERATED FROM ALUMINIUM INDUSTRY. Dr. B. Sengupta

BASIC INFORMATION QUESTIONNAIRE

P.G.D.E.M. (Semester II) Examination, : NATURAL RESOURCE MANAGEMENT (2005 Pattern) (Old) Time : 3 Hours Max. Marks : 60

Webinar Series for Comprehensive Plan Updates. Comprehensive Planning for Solar Energy Systems

Omron Group Green Procurement Standards

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE

Application for Air License to Operate Air Pollution Source Not to be used for a State of Florida Air Permit Application

Schemes of Waste Management Q&A

GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS

Keynote: National Perspective on Construction and Demolition. Gary Sondermeyer

Transfrontier shipment of NORM waste

Himachal Pradesh State Pollution Control Board

Community Right-to-Know Program (CRTK)

Overview of the Bureau of Waste Management. Solid Waste Advisory Committee May 16, 2013

The European position By Ella Stengler

CON 509: APPLICATION FOR A RESOURCE CONSENT UNDER THE RESOURCE MANAGEMENT ACT 1991

Transcription:

Online Payment for CTO

Documents to be uploaded for CTO

General Product_ Fe e to pay online W Emiss./Disch. Air Emission Documents for CTO-to uplpoad online Print( Air Water ) Documents Details Statement showing measures taken for increasing tree and forest cover.* Statement showing measures taken for Improving content of surface water bodies* Statement showing measures taken for uplifting ground water table* Statement showing measures taken for controlling Inevitable pollution: Reports of AAQR, SMR, NLR, EAR, etc in support* Statement showing measures taken for preventing pollution at the points where it may occur: Material balance in support.* Compliance report of previous NOC/CTO Scheme of Rain water harvesting & water budget

Online payment for CTE

Documents to be uploaded for CTE

General Product Fee to pay online W Emiss./Disch. Air Emission Documents for CTE to upload online Print(Form) Documents Details Agreement unit raw material supplier Other Certificate production figures duly certified by District mining officer Certificate from DFO for distance of forest Details of pollution control Measures Details of production process Land use map/lay out plan Survey Map Site location map Project Report Environmental Clearance for project under EIA Notification/ Site to forest distance for Non-EIA Project and outside Industrial Area/ Certificate of Industrial Area Development Authority for Non-EIA Project. Application fee in the form of Demand Draft Report showing project cost Measures for increasing tree and forest cover. Measures for Improving content of surface water bodies Measures for uplifting ground water table Measures for controlling Inevitable pollution Measures for preventing pollution at the points where it may occur. Production process

Digital Register

Online Payment for Authorization under Bio-Medical Waste(M & H) Rule,1998

Online Payment for Authorisation under Hazardous Waste (Management,Handling & Transboundary Movement)Rule,2008

Documents to be uploaded for Authorization under Hazardous Waste (Management,Handling & Transboundary Movement)Rule,2008

General Details Product Details Fee to pay online Hazardous Waste Details Details Files to upload online Detailed proposal of the facility (to be attached) to include: Attach flow diagram of manufacturing process showing input and output in terms of products ans waste generated including for captive power generation and demineralised water: Location of Site(Provide Map): Details of Processing Technology: Site clearance (from local authority): Utilization programme for waste processed (Product utilization): Method of disposal (details in brief be given): Nature and composition of waste: Methodology and operational details of landfilling/incineration: Measures to be taken for prevention and control of environmental pollution including treatment of leachate: Measures to be taken for safety of workers working in the plant: Fields marked * are mandatory

Documents to be uploaded for Authorisation under Bio-MedicalWaste (Management &Handling)Rule,1998 Document Applicable For Document Name Copy of agreement Partnership Deed/ Proprietorship Certificate Method Of Liquid Waste Treatment Compliance Report Of Previous Authorization Affidavit For Bed Capacity Maintenance of record(photocopies of the slips to be upload) Site plan and location plan in case of new hospital applying for the first time Annual Report (previous calendar year) in case of Renewal Save Document Path

Documents to be up loaded foe Authorisation under MSW (M & H )Rule,2000 General Municipal Solid Waste Nodal Officer Details ( Officer authorised by the municipal authority or agency responsible for operation of processing or disposal facility): Name of Nodal officer*: Designation of Nodal officer*: Authorization Applied for*: Setting up & operation of waste processing facility Setting up & operation of disposal facility Authorization Type:* fresh application Renewal application Processing of waste Location of Site*: Quantity of waste to be processed per day*: Quantity : Unit : Measures to be taken for prevention and control of environmental pollution*: Measures to be taken for safety of workers working in the plant*: m1 m1 Investme on Project (In Lakhs)*: Expected Return from Project (In Laks)*: Name of Waste Processing Technology*: Details of Processing Technology: Site clearence (from Local Authority): Details of agreement between municipal authority and operating agency: Utilization programme for waste processed (Product utilization): Methodology for disposal of waste processing rejects

(quantity and quality): Disposal of Waste Number of sites indentified: Quantity of waste to be disposed per day: Quantity : Unit : Nature of waste: Composition of waste: Details of Existing Site under Operation: Measures taken to check enviornmental pollution*: m1 Layout maps of site: Details of methodology or criteria followed for site selection: Methodology and operational details of landfilling: Do You Want To Save The Application as Completed I