Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A Company Information Company Name : Facility Name : Person Name * : Designation * : Premise Name : Road Name : Area / Locality : City : Wardha power company limited B-2,Warora Growth Centre Rohit Kumar Upadhyay General Manager B-2,Warora Growth Centre MIDC warora Warora Chandrapur Pin code : 442907 Region : Chandrapur Telephone No * : 07176285130 FAX No : 07176285125 Email Id * : Industry Category * : Industry Sub- Category * : Date of Last Environmental statement submitted online: Consent No: rohitkumar.u@ksk.co.in Red Thermal Power Plants NA BO/CAC-Cell/Chandrapur/CAC-156 Consent Issue Date: 3/10/2015 Consent Valid Upto Date: Submission Of Financial Year: Year Of Establishment : Industry Type * : 8/31/2015 09/29/2015 2007 LSI (Large Scale Industry) mah.ecobharat.com/cp_company_formv_preview.aspx 1/6
Industry Sub-Type * : Manufacturer Production Product/By-Product Name Consent Quantity Actual Quantity Unit Electricity 4730400.000 1172527.000 MWatt PART B 1) Water Consumption m3/day Water Consumption for Consent Actual Quantity Quantity 1 Process 0.000 0.000 2 Cooling 37836.000 7198.000 3 Domestic 540.000 148.000 4 All Others 5 Total 38376.000 7346.000 6 Total water consumption as per cess bill for the year (m3/annum) Particulars Consent Quantity Actual Quantity 1 Daily quantity of trade effluent from the factory 7128.000 1273.600 2 Daily quantity of sewage effluent from the factory 528.000 117.900 3 Daily quantity of treated effluent 0.000 1391.500 2) Product Wise Process Water Consumption (cubic meter of process water per unit of product) Name of Products During the Previous During the Current Financial (Production) year 1 Electricity 1.980 2.290 3) Raw material Consumption (Consumption of raw material per unit of product) Name of Raw During the Previous During the Current Unit Materials Name 1 Coal 0.686 0.682 per unit of product MetricTon 4) Fuel Consumption Fuel Name Consent Quantity Actual Quantity Unit 1 Coal 2628000.000 799896.000 per annum MetricTon PART C mah.ecobharat.com/cp_company_formv_preview.aspx 2/6
Parameter Details for WATER - mass/day (Kg/day) 1 ph 7.100 2 Suspended Solids 47.172 33.900 mg/l 3 BOD 3 Days 23.099 16.600 mg/l 4 COD 70.549 50.700 mg/l 5 Oil and Grease 0.000 0.000 mg/l 6 TDS 1468.033 1055.000 mg/l 7 Chlorides 206.499 148.400 mg/l 8 Sulphates 399.500 287.100 mg/l 9 DO 0.000 0.000 mg/l Parameters Quantity Of Pollutant Discharged(mass/day) Range Standard Actual Parameter Details for STACK stack1 Particulates 569.200 38.000 SO2 8942.600 597.000 CO 56.200 3.800 NOx 1677.700 112.000 stack2 Particulates 0.000 0.000 SO2 0.000 0.000 CO 0.000 0.000 NOx 0.000 0.000 stack3 Particulates 549.500 35.700 SO2 5935.700 581.200 CO 150.500 9.800 mah.ecobharat.com/cp_company_formv_preview.aspx 3/6
NOx 1676.700 109.100 stack4 Particulates 549.300 35.800 SO2 9010.300 575.600 CO 143.400 9.100 NOx 1712.000 108.400 PART D - Hazardous Waste [as specified under Hazardous Waste (Management, Handling and Transboundary Movement) Rules, 2008] 1) From Process Category no: Type of waste Consent Quantity 1 5.1 Used / spent oil 48.000 Unit Kilo Liter During Previous 16.200 13.900 During Current 2) From Pollution Control Facility Category no: Type of waste Consent Quantity Unit During Previous During Current PART E - Solid Waste [as specified under Hazardous Waste (Management, Handling and Transboundary Movement) Rules, 2008] 1) From Process Type of Consent During Previous During Financial Waste Quantity Year Year Unit 1 Fly ash 757010.000 425876.000 216479.400 MetricTon 2 Bottom Ash 189435.000 90027.600 54119.800 MetricTon 3 2) From Pollution Control Facility Type of Waste Consent Quantity During Previous Year During Financial Year Unit mah.ecobharat.com/cp_company_formv_preview.aspx 4/6
PART F Hazardous Waste Type of Hazardous Waste Qty of Hazardous Consistency of Hazardous Disposal Generated Waste Waste 1 5.1 Used / spent oil 13.900 Liquid Sell Solid Waste Type of Solid Waste Qty of Solid Consistency of Solid Generated Waste Waste Disposal 1 Fly ash 216479.400 Solid Reuse 2 Bottom Ash 54119.800 Solid Onsite Captive Land Fill PART G Impact of the pollution abatement measures taken on conservation of natural resources and on the cost of production. Reduction in Reduction in Reduction Reduction in Fuel and Capital Reduction in Water in Raw Power Description Solvent Investment Maintainance Consumption Material Consumption Consumption (Rs) (Rs) (M3/day) (Kg) (KWH) (Kg/day) PART H Additional measures/ investment proposal for environmental protection abatement of pollution, prevention of pollution. Description Environmental Protection Measures Capital Investment (Rs) 1 To maintain clean and green environment in around the plant premises, to control emission levels Reduce 64222292.000 PART I Any other particulars for improving the quality of the environment. Development of Greenbelt in around the plant premises is continued to maintain clean & green environment. Development of Gardens on open spaces available with in the plant premises is continued for beautification of the plant premises. characters * Maximum 200 mah.ecobharat.com/cp_company_formv_preview.aspx 5/6
Print Copyright 2010 EcoFriend & Co. Powered by Wisync Technologies Pvt. Ltd. mah.ecobharat.com/cp_company_formv_preview.aspx 6/6