DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

Similar documents
Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more.

Building pit District adjacent to St.Katharinenkirche Hamburg, Germany

Diaphragm wall Construction

NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE

GeoEng2000 An International Conference on Geotechnical & Geological Engineering

Wet Speed-Mixing WSM - Soil Mixing Procedure in Twinmix Design

Soil Mechanics Lateral Earth Pressures page Lateral Earth Pressures in case of inclined ground surface or friction at wall-ground interface

ROTARY DRILLING TECHNIQUES LARGE DIAMETER

UNDERPINNING A CRANE FOUNDATION

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Water Well Decommissioning Guidelines

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

Bi-Directional Static Load Testing of Driven Piles

SECTION DUCTILE IRON PILES

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS

Combined Pile Foundation System for a Residential Complex

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd.

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

The construction of deep excavation ditch in weak soil in St. Petersburg

h Installation Manual

[Kouravand Bardpareh* et al., 5(6): July, 2016] ISSN: IC Value: 3.00 Impact Factor: 4.116

SECTION FACILITY SANITARY SEWERS

1.364 ADVANCED GEOTECHNICAL ENGINEERING HOMEWORK No. 5

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

Testing of ground anchorages for a deep excavation retaining system in Bucharest

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch

SCOPE OF WORK FOR PILING JOB

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.

DESIGN AND CONSTRUCTION OF BRITOMART INTERCHANGE. Melvyn Maylin 1 Roger Williams 2 Sue Freitag 3

Installation Information 2016

A Case Study: Foundation Design in Liquefiable Site

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

RIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil.

Recent Advances in the Selection and Use of Drilled Foundations

Steven Dapp, Ph.D., P.E. Steven Dapp, Ph.D., P.E. Dan Brown and Associates

Ground Improvement. Martin G. Taube, P.E., P.G. February 4, 2003

Project Address: Name of Person Completing Form:

NPTEL Course GROUND IMPROVEMENT USING MICROPILES

Lifting Sockets. Flat Lifting Sockets

PARSONS BRINCKERHOFF GENERAL GUIDELINES FOR DESIGN AND CONSTRUCTION OF CONCRETE DIAPHRAGM (SLURRY) WALLS. DECEMBER 2008 Revision 0

Temporary Structures. Cofferdams TOKYO INSTITUTE OF TECHNOLOGY ATCE-II ADVANCED TOPICS IN CIVIL ENGINEERING DEPARTMENT OF CIVIL ENGINEERING

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS

Design and construction of an immersed concrete tunnel using an integrated dock facility

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR DRILLED SHAFT FOUNDATIONS

SIDEWALK REPAIR GUIDE

KIEWIT FOUNDATIONS GROUP

A Design Review of Waterproofing Codes

INNOVATIVE PILE EXTRACTION TECHNIQUE OF CFA PILES FOR THE NEW HARBOR BRIDGE PROJECT

DFI DEEP FOUNDATIONS. Brazil s Megaproject Shipyard Winner of the 2010 Outstanding Project of the Year

PRODUCT DATA SHEET SikaProof Bentonite

PIANC UK Seminar Design Developments and Specification for Steel. Duncan Nicholson Arup Fellow 9/3/17 ICE London

Secoroc Rock Drilling Tools CASING ADVANCEMENT SYSTEMS

Specifications for the Construction of Secant and Tangent Pile Wall Systems using Drilled Shafts

DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

Bentoflex is a bentonitic waterproofing composite, specifically designed for use in construction, consisting of an original, patented, flexible

Redi Rock Specification and Installation Manual

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

In-plane testing of precast concrete wall panels with grouted sleeve

SikaProof Bentonite Plastic DPM overlap - Compacted Backfill Scale 1:5. Detail no: SB01 - Nov 2013

BERTHS 57, 58 AND 59 CONTAINER WHARF AT THE PORT OF OAKLAND

SECTION UNIT MASONRY SYSTEM

Aveng Ground Engineering Profile

SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket

EMBANKMENT DAM SEEPAGE MODIFICATIONS CHOICES AND CONSIDERATIONS. John W. France, PE, D.WRE 1 ABSTRACT INTRODUCTION

Zurn Z874. Trench Drain System. Installation Instructions

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

SHOTCRETE APPLICATION MANUAL

Case study of deep excavation in existing underground structure of three-story basement and diaphragm wall

Widest Selection of Grouting Equipment in the World

Introduction of a Japan Concrete Institute Guideline: Practical Guideline for Investigation, Repair and Strengthening of Cracked Concrete Structures

S.No Description Unit Quantity Rate (Rs) Amount (Rs)

KIEWIT FOUNDATIONS GROUP

SEAU 5 th Annual Education Conference 1. ASCE Concrete Provisions. Concrete Provisions. Concrete Strengths. Robert Pekelnicky, PE, SE

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT

4th International Engineering and Construction Conference - July 28, 2006

Temporary Structures. Excavations and Excavation Supports

Silvan Dam and Revisions to Adapt for Latest Developments in High CFRD Design and Construction

SIDEWALK PROBLEMS AND REPAIR

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

Concrete Slab-on-Ground

Sprayed Concrete. Solutions for Underground Construction

TECHNOLOGY. Continuous Flight Auger

Ground Improvement Piling Piled Retaining Walls Enlarged Head Piles Innovations.

RETAINING WALL LEVEL BACKFILL

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

Sabah Shawkat Cabinet of Structural Engineering 2017

Earthquake Reinforcement Using Jet Grouting for a Factory in Operation

STANDARD SPECIFICATIONS SECTION TUNNELING. A. Section includes requirements for constructing tunnels 48-inch and larger diameter.

Transcription:

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com www.foundation-engineering.implenia.com

Diaphragm Walls Diaphragm wall excavation Diaphragm walls are concrete or reinforced concrete walls constructed in slurry-supported, open trenches below existing ground. Concrete is placed using the Tremie installation method or by installing pre-cast concrete panels (known as a pre-cast diaphragm wall). Diaphragm walls can be constructed to depths of 100 meters and to widths of 0.45 to 1.50 meters. Excavation pit retained by tied back diaphragm wall and partially braced by cast-in-place building floor slab. Diaphragm wall construction methods are relatively quiet and cause little or no vibration. Therefore, they are especially suitable for civil engineering projects in densely-populated inner city areas. Due to their ability to keep deformation low and provide low water permeability, diaphragm walls are also used to retain excavation pits in the direct vicinity of existing structures. If there is a deep excavation pit at the edge of an existing structure and groundwater is present, diaphragm walls are often used as the most technically and economically favorable option. They can be used for temporary support or as load-bearing elements of the final building. Diaphragm walls can be combined with any anchor and bracing system. Diaphragm wall panels are also used in deep, load-bearing soil layers as foundation elements to carry concentrated structural load in the same way as large drilled piles do. These foundation elements are known as "Barrettes". Excavation pit retained by diaphragm wall and bracing

If diaphragm are socketed into impermeable soil layers of sufficient thickness or if they are combined with seal slabs (grout injection or tremie concrete slabs) almost waterproof excavation pits are created. After reducing the initial groundwater level within the excavation, only small amounts of residual water will penetrate. Diaphragm wall excavation using hydraulic cutter disk and grab excavation Diaphragm Wall construction using grab excavation and removable Stop-End Pipes Guide wall Preliminary excavation to 1.0-1.5 meters below ground elevation to install guide walls Prior to diaphragm wall excavation, cast-in-place or pre-cast concrete guide walls are placed. These braced guide walls stabilize the soil in the upper diaphragm level and provide a stable guide-way for the grab. In addition, they also support the diaphragm wall reinforcement and provide sufficient bearing for the hydraulic jacking system to remove the Stop-End Pipes. The space between both guide walls serves as a storage space for the stabilizing fluid. Lamella excavation Using hydraulic grabs with clam shell sizes of 2.8, 3.4 or 4.2 meters, single diaphragm panels can be excavated down to tip elevation. To avoid collapsing ground, trixotropic stabilizing fluids (Bentonite slurry = clay/water slurry) are pumped into the excavated panel. Depending on ground condition and geotechnical design, several single panels can be combined to one large lamella. Hard soil, rock or obstructions can be removed using chisels in addition. Diaphragm wall chisel

Stop End Pipe Installation. To separate the single concreting phases, stop-end pipes are installed at both panel fronts. These have the same diameter as the panel s wall thickness and are removed after initial concrete setting. The remaining semicircular joint provides a very good interlock between the individual concrete panels. Slurry Refreshing. Placing of Rebar Cage Concrete Placing by Tremie Method. Simultaneously with placing concrete, slurry is pumped from the panel to be refreshed and re-used in the next panel excavation. Since the slurry is replaced by concrete, this method is called Double-Phase Method. Removal of Stop -End Pipes after concrete setting using hydraulic pipe extractors. Diaphragm Wall Joint Design There are three (3) types of joint design used for diaphragm walls constructed by the grab excavation method Steel stop-end pipes, which are removed before the concrete has set completely (as mentioned before). Concrete seeped around the stop-end pipes can be safely removed by the use of chisels. Pre-cast reinforced concrete panels, which remain in the panels as permanent stop-ends (high weight, twice the number of joints). Seeping concrete can not be removed safely. Steel joint element. This flat steel panel element contains one or two elastic joint tapes, which remain in the setting concrete after the joint element has been removed. Removal of the element can only take place after the adjacent panel was completely excavated. Diaphragm wall reinforcing cage with block-out Stop-end pipe with hydraulic pipe extractors Flat steel joint element

If diaphragm walls are constructed using the hydro-cutter technique, stop- end pipes do not need to be installed. After the primary panel set sufficiently, the secondary panel excavation will slightly cut into the fresh concrete to ensure a tight overlap during the concrete placement. Excavation Double rope grabs as well as grabs guided by telescoping Kelly bars are commonly used for excavation in soils. Hydro-cutters can be employed for rock as well as soft soil excavations. They continuously cut into one panel by sucking the soil-bentonite slurry at the cutter head while replacing it with fresh bentonite at the panel s top. Construction sequence Two different construction techniques, the alternating method (or Pilgrim) and the continuous method can be distinguished for excavation. During the alternating method, only primary panels will be placed leaving out the following secondary panels. Following the first primary panels, gaps will be closed by the adjacent secondary panels. Primary and secondary panels will have different sizes due to the use of stop end pipes. During the continuous excavation method (Endless Panel), all the panels are excavated in one continuous process. Therefore they all have the same size. Concrete placement at a diaphragm wall panel Two phase construction using the alternating method Hydro-cutter head

Cut-off Walls Cut-off wall applications Cut-off walls are vertical slurry walls with very low water permeability to minimize the ground water flow. In contrast to the known load-bearing, impermeable retaining walls such as: Cut-off wall Rostock, Warnowquerung Concrete secant pile walls Reinforced two-phase diaphragm walls Sheet pile walls Cut-off wall site set up are cut-off walls mostly without any load-bearing function. The following cut-off wall types can be distinguished: Cut-off walls constructed using diaphragm wall techniques Secant pile walls from concrete of slurry Thin slurry walls Injection walls Jet-Grouting walls Freezing walls They can be used as: Cut-off walls underneath water dams with core seals in areas of permeable soils to socket into lower impermeable layers to prevent undercurrent Cut-off walls for watertight excavation pits outside of the load-bearing retaining structure to minimize water inflow into the pit Cut-off walls to enclose brown fields and contaminated areas with penetration into lower impermeable soil layers

Cut-off walls constructed using diaphragm wall techniques If slurry walls are intended to act as cut-off walls without any load bearing function, a mixture of water, bentonite, cement and maybe filler can be used. This slurry remains in the excavated panel and hydrates. It also remains as a plastic seal, so that the wall can follow small displacements in the soil without cracking. Since the slurry remains in the panel, this is called the Single-Phase technique. Slurry wall excavation, DW Rostock, Warnowquerung Installation of plastic liner sheet, combination cut-off Wall, Central Waste Dump, Huenxe After completion of the guide wall, the excavation proceeds with: One long-boom excavator (max. depth of 10m) Or by the use of slurry wall grabs or hydro-cutters Using the single-phase technique, panel depth is limited due to the relatively short time from placing and setting of the suspension. In deeper panels, the Two-Phase technique is used to construct a slurry wall. Construction is similar to the cast in-situ diaphragm wall installation. After completion of the panel s excavation, the actual sealant slurry will replace the stabilizing bentonite fluid. This sealant has to be placed using the slurry-displacement or tremie method and needs to have a 0.75 to/m³ higher unit weight than the bentonite slurry to replace it. To improve permeability and contaminant resistance, combination cut-off walls can be installed using the Single-Phase system. Sheet piles or plastic liner sheets can be installed within a bentonite-cement-slurry wall. Cut-off Wallh head cover

Cut-off walls with embedded sheet piles or structural beams being constructed using the single phase method can also be used as "water- tight" excavation pits. In the process the sheet piles or beams act as load transferring elements and will extend to required depth below the excavation pit. The Cut-off wall as sealing element will only penetrate the artificial seal slab or reach down to the natural impermeable soil layer. Sheet pile or beam walls can be tied back. Cut-off wall with embedded sheet pile wall as retaining wall for an excavation pit, Salzufer, Berlin Cut-off wall with embedded H-beam wall as retaining wall for an excavation pit, TG Seestern, Duesseldorf Watertight excavation pit

Thin Slurry Walls Thin slurry walls also can act as vertical cut-off walls to retain horizontal groundwater flow. In contrast to cut-off walls constructed using the diaphragm wall technique (replacing the soil by slurry sealant), thin slurry walls displace the soils using a vibrated steel profile. During the extraction process, sealants are injected into the created cavities. Drivable soils, such as sands and gravels, are required for this installation method. The created slurry wall thickness depends on the shape of the steel profile used and the soil conditions. Thickness varies between 5 cm in sands and 20 cm in gravel. In combination with high-pressure jet grouting, wall thickness of up to 30 cm can be achieved. A continuous wall is created by overlapping single penetration elements installed one after another by the vibrated steel profile. A guide plate attached at the beam`s flange is running down the already completed web of the previous panel. This ensures the correct overlap to the previous panel. Construction of a vibrated thin slurry wall, Doemitz Vibro-beam Thin vibro slurry wall