POROUS PAVEMENT OPERATION AND MAINTENANCE PROTOCOL

Similar documents
Permeable Pavement. Kristen Buccier Program Manager Chagrin River Watershed Partners, Inc.

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

PERMEABLE PAVER MAINTENANCE GUIDE

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers

4.2 Permeable Pavement Systems

Integrating Structural and Hydrologic Design in Permeable Pavement David R. Smith Technical Director Interlocking Concrete Pavement Institute

PERMEABLE PAVER MAINTENANCE GUIDE 1

Presentation to the 60 th Annual NJ Asphalt Paving Conference March 14, 2017 Ewing, NJ

Parking Area Maintenance

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

StormwaterWise Landscapes: Pervious Surfaces Specifications

BRADLEY UNIVERSITY. The Performance and Sustainability of Permeable Pavement Progress Report on the Work Performed Under IAPA Scholarship

DATE: December 10, 2012 REPORT NO. PW CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION

BMP 6.4.4: Infiltration Trench

Concrete Waste Management

STANDARD OPERATING PROCEDURE NO. 3 Revision No. 1 WICHITA DWIGHT D. EISENHOWER NATIONAL AIRPORT

Clean Water is Everyone s Business. A commercial & industrial property owner s guide to improving Lake Tahoe s clarity

Storm Drain Inlet Protection for Construction Sites (1060)

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

Presented by Henry L. Barbaro Stormwater Management Unit Supervisor MassDOT Highway Division

6.1 Introduction to Wastewater Issues

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Ontario Ministry of Transportation Carpool Parking Lot (Campbellville) Location: Campbellville Constructed: 2007

Alligator Cracking. Light. Medium. High

SPECIFICATIONS FOR SAND SEAL

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two.

4.8. Subsurface Infiltration

BASE CONSTRUCTION MATERIALS A Aggregate

4.8. Subsurface Infiltration

PART 1 GENERAL REQUIREMENTS

DRAFT Guidance Specification for Porous or Dense-Graded Asphalt Pavement Structures for Storm Water Management Revised July 28, 2016

SECTION UNCLASSIFIED EXCAVATION AND GRADING

Rhode Island Stormwater Design and Installation Standards Manual

Departments of Agronomy C709 Conservation Farming and Biological and Agricultural Engineering. Permanent grass cover

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Erosion & Sedimentation Control Policy

POLLUTION PREVENTION AFTER CONSTRUCTION

Liquid Road Bituminous Surface Treatment for Parking Lots

CHAPTER 12: DRAINAGE

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

The Good, The Bad, and The Ugly

Everything you need to know about Chip Seals and Fog Seals

Pollution Prevention/Good Housekeeping for Municipal Facilities

Storm Water Pollution Prevention Plan. Wastewater Treatment Facility and Streets & Parks Facility. Village of Fox River Grove, Illinois

A Design Review of Waterproofing Codes

Who is Paul Johnson? What am I going to talk about. So let s begin. Salt. April APWA and PNS North American Snow Conference

BMP #: Infiltration Basin

550 Surface Treatments

SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Inspection and Maintenance Checklist Catch Basin Inserts

BMP #: Water Quality Inserts

BIO-AQUIFER STORM SYSTEM

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

COLD IN-PLACE RECYCLING (CIR) Starting with what is there i.e. in situ materials

UPPER MILFORD TOWNSHIP DIRECTIONS TO APPLICANTS PUBLIC WORKS MAINTENANCE WORKER. General Description of Duties: Duties and Responsibilities:

Traction sand. Spillage- Septic waste, plastics. Metal Salts, pure metals carbonates

City of Martinsburg 1. TASK & DUTIES LIST AND MEASURES OF PERFORMANCE FOR: PUBLIC WORKS LABORER

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

PASER Manual Gravel Roads

TEMPORARY SEDIMENT TRAP CODE

Field Guide on. Safe Maintenance and. Work Zone Operations

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Special Provision for Hot-Mix Asphalt Prime Coat

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by:

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

APPENDIX G Fire BMPs

Constructed Wetland Use in Nonpoint Source Control

Infiltration Guidelines

Recommended Performance Guideline For Chip Seal

SECTION TRENCHING & BACKFILLING

PERMEABLE INTERLOCKING PAVERS

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

INTERLOCK BETWEEN PARTICLES AT EACH PERFORATION

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

DURO-SHIELD ROOF COATING CARE GUIDE TABLE OF CONTENTS

Ania M. Anthony, M.Sc., P. Eng. Senior Surfacing Engineer Saskatchewan Ministry of Highways and Infrastructure

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

Section 409. Chip and Fog Seals

ISO-9001:Quality Management System Progress Report

SACHSE EROSION CONTROL GUIDELINES

SKYLINE HOUSE CONDOMINIUM 3711 SOUTH GEORGE MASON DRIVE FALLS CHURCH, VIRGINIA

SECTION SITE CONCRETE

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS

Section 504. MICRO-SURFACING

SPECIFICATIONS FOR NEW WORK CHIP SEAL

Evaluation of Structural Performance of Pervious Concrete in Construction

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM

Boise City Public Works General Drainage Plan Review Requirements Checklist

C-5. Permeable Pavement

SUPPLEMENTAL SPECIFICATION HIGH PERFORMANCE CHIP SEAL

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase.

Specifier Notes: Edit the following list as required by the project. List other sections with work directly related to the floor coating.

Transcription:

POROUS PAVEMENT OPERATION AND MAINTENANCE PROTOCOL San Diego County Facilities PREPARED FOR: County of San Diego Department of General Services 5555 Overland Avenue San Diego, CA, 92123 PREPARED BY: Cahill Associates Environmental Consultants 104 South High Street West Chester, PA 19382 www.thcahill.com P: 610-696-4150 F: 610-696-8608

POROUS PAVEMENT OPERATION AND MAINTENANCE PROTOCOL General Maintenance With minimal maintenance, porous bituminous asphalt can function effectively for well over 20 years. The primary goal of porous pavement maintenance is to prevent the pavement surface and/or the underlying infiltration bed from being clogged with fine sediments. To keep the system clean throughout the year and prolong its lifespan, the pavement surface should be vacuumed biannually with a commercial cleaning unit. Pavement washing systems or compressed air units are not recommended. All inlet structures within or draining to the infiltration beds should also be cleaned out on a biannual basis. Figure 1: Routine and adequate maintenance has allowed the porous asphalt parking lot at the Morris Arboretum to still be effective 20 years after installation. Planted areas adjacent to porous pavement should be well maintained to prevent soil washout onto the pavement. If any washout does occur it should be cleaned off the pavement immediately to prevent further clogging of the pores. Furthermore, if any bare spots or eroded areas are observed within the planted areas, they should be replanted and/or stabilized at once. Planted areas should be inspected on a semi-annual basis. All trash and other litter that is observed during these inspections should be removed. 1

Figure 2: Example of soil wash-on/dumping from unstabilized landscaping. Superficial dirt does not necessarily clog the pavement voids. However, dirt that is ground in repeatedly by tires can lead to clogging. Therefore, trucks or other heavy vehicles should be prevented from tracking or spilling dirt onto the pavement. Furthermore, all construction or hazardous materials carriers should be prohibited from entering a porous pavement lot. Vacuuming There are a variety of pavement vacuuming units and services available on the market today. Elgin, Schwarze, and Tymco are three examples of acceptable vacuum manufacturers that are generally used by local cleaning companies. These units contain a blower system that generates a high velocity air column, which forces the air against the pavement at an angle, creating a 'peeling or 'knifing' effect. The high volume air blast loosens the debris from the pavement surface, then transports it across the width of the sweeping head and lifts it into the containment hopper via a suction tube. Thus, sediment and debris are loosened from the pavement and sucked into the unit. Recent studies have also revealed the usefulness of powerwashing porous pavements with clean water and then immediate vacuuming. Combinations of power-washing and vacuuming techniques have proved effective in cleaning both organic clogging as well as sandy clogging. Research in Florida found that a power head cone nozzle that concentrated the water in a narrowly rotating cone worked best. 2

Figure 3: Photo of Elgin Whirlwind Vacuum Air Sweeper, example of effective vacuuming device Winter Maintenance Winter maintenance for a porous parking lot is certainly necessary, though it is usually less intense than that required for a standard asphalt lot. By its very nature, a porous pavement system with subsurface aggregate bed has superior snow melting characteristics than does standard pavement. Therefore, ice and light snow accumulation are generally not as problematic. However, snow will likely still accumulate during heavier storms. Abrasives such as sand or cinders should not be applied on or adjacent to the porous pavement surface. Snow plowing is fine, provided it is done carefully (i.e. by setting the blade slightly higher than usual, one inch is usually acceptable). Salt is acceptable for use as a deicer on the porous pavement, although a non-toxic, organic deicer, applied either as a blended, magnesium chloride-based liquid product or as pretreated salt, is preferable from an environmental standpoint. Acceptable products include Magic-O, Ice B Gone, and Geomelt, among others. 3

Figures 4 and 5: Neither the porous asphalt parking lot at the University of Rhode Island nor the one at the Ford Rouge Plant in Dearborn, Michigan have experienced significant snow accumulations on the pavement after multiple harsh winters. 4

Repairs Potholes in the porous pavement are extremely unlikely, though settling might occur if a soft spot in the subgrade is not removed during construction. For damaged areas of less than 50 square feet, a declivity could be patched by any means suitable with standard pavement, with the loss of porosity of that area generally considered insignificant. The declivity can also be filled with porous mix. If an area greater than 50 SF is in need of repair, approval of patch type must be sought from either the engineer or owner. Under no circumstance is the pavement surface to ever be seal coated. Any required repair of drainage structures should be done promptly to ensure continued proper functioning of the system. Figure 6: Standard bituminous patch in porous asphalt parking lot. This lot was constructed with an unmodified porous mix (i.e. no polymer modification) and had rutted in the center of the aisle due to construction traffic. 5

Summary of Maintenance Concerns o Prevent Clogging of Pavement Surface with Sediment Vacuum pavement twice per year Maintain planted areas adjacent to pavement Immediately clean any soil deposited on pavement Do not allow construction staging, soil/mulch storage, etc. on unprotected pavement surface Clean inlets draining to the subsurface bed twice per year o Snow/Ice Removal Porous pavement systems generally perform better and require less treatment than standard pavements Do not apply abrasives such as sand or cinders on or adjacent to porous pavement Snow plowing is fine but should be done carefully (i.e. set the blade slightly higher than usual) Salt application is acceptable, although more environmentally-benign deicers are preferable o Repairs Inspect for pavement rutting/raveling on an annual basis (some minor ruts may occur in the porous pavement from stationary wheel rotation) Surface should never be seal-coated Damaged areas less than 50 square feet can be patched with porous or standard asphalt Larger areas should be patched with an approved porous asphalt o Miscellaneous Descriptive signage is recommended to maintain institutional memory of porous pavement If properly maintained, porous pavements can last for well over 20 years. In the event that maintenance of the porous 6

pavement is neglected and it becomes clogged, the Owner shall vacuum the lot until the original permeability is restored. If the original permeability of the lot cannot be restored, the pavement should be removed and replaced with a new porous mix. 7