EB 2678K Compliance Checklist

Similar documents
LT Industries SQFR 101

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6

SUPPLIER EVALUATION CHECKLIST

SUPPLIER QUALITY PROCUREMENT REQUIREMENTS

Quality Management System

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

Quality System Document DOC #

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

General Purchase Order Requirements

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

Supplier Quality Manual

RC-9000 Supplier Quality System Requirements

SUPPLIER QUALITY REQUIREMENTS (SQR S)

SUPPLIER QUALITY CODES

Altech Machining, Inc. Terms and Conditions

Product Order Quality Requirements Meggitt (Orange County), Inc.

Vendor Qualification Survey

Supplier Quality Requirements

SHELTON INDUSTRIAL PATTERN INC.

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Structural Systems Solutions Quality Clauses

INSPECTION SYSTEM REQUIREMENTS

Quality Supplier Requirements for Beckwith Electric Co., Inc.

How to Set Up a Quality Assurance System A Step by Step Guide to Quality Control Management System

SUPPLIER QUALITY ASSESSMENT

TITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100)

INS QA Programme Requirements

In case of of differences or inconsistencies with texts in the Main Contract, the stipulations in this Appendix I will prevail.

Procurement Standard Text Codes Revision I - Dated 20 April, 2005

Title: PROCUREMENT QUALITY REQUIREMENTS CWCDS Dayton, OH

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

SUPPLIER QUALITY ASSURANCE REQUIREMENTS MANUAL

QUALITY ASSURANCE MANUAL

External Provider Quality Requirements QCS-001 Processing Sources

FEC QUALITY MANUAL. Federal Equipment Company River Rd. Cincinnati, Ohio

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual

Vendor Qualification Quality Audit Checklist

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Report number A0436 PRODUCT REQUIREMENTS FOR SELLERS OF BOEING DESIGNED DETAIL PARTS AND NON-FUNCTIONAL MINOR ASSEMBLIES

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

Quality Clauses F Rev. I West Brooks Avenue North Las Vegas, NV Phone (702) Fax (702)

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope

LM Logistic Services Quality Notes Conversion Chart

Name: Title: Phone: Fax:

EVANS CAPACITOR COMPANY

Plan QAQ Supplier Quality Requirements (Rev 13)

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

Houston Precision Fasteners Supplier Quality Requirements SQR-001. Revision: M Date: 04/07/16

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

2.2. The Seller shall be responsible for achieving and maintaining a quality performance level of either:

QUALITY MANUAL QM0492 AS9100 SUPPLEMENT II

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

GRMA-032-PRO-00 Page 1 of 8

Supplier Quality Assurance Requirements

Quality Manual ISO 9001:2000

QUALITY MANUAL RED CHECK DENOTES THIS IS A CONTROLLED COPY. APPROVED BY: (President) APPROVED BY: (Production Manager) APPROVED BY: (Quality Manager)

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL

Appendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items

Supplier Quality Requirements Q Clauses

Purpose Defines and explains quality requirements for supplier and supplier s sub-tiers on product purchased.

UNCONTROLLED IF PRINTED 2 of 13

Purchase Order Quality Notes, Terms & Conditions PFM Revision K (9/9/2014)

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

Supplier Handbook. Partnering for tomorrow. This supplier handbook is a guide for conducting business with Chemring Ordnance

Orbital ATK QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER

Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK

2. GENERAL REQUIREMENTS

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy

Executive Instruments Inc.

ECIA Distributor Counterfeit Product Mitigation Internal Audit Checklist

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

QUALITY ASSURANCE PROVISIONS (QAP)

ALTA Precision Inc. Quality Procedure

An UNSAT here would require a STOP WORK and an investigation into what has been delivered to NNS will be required.

Quality Assurance Provisions

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

CERTIFICATE OF REGISTRATION

PMA Quality Assurance Manual Rev. 2 Date 12 Feb 2016

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

Nonconforming Material System Procedure

Approved Supplier Guidance

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CORPORATE QUALITY MANUAL

SUPPLIER QUALITY REQUIREMENTS QA-401

QUALITY SYSTEM MANUAL

Supplemental Purchase Order Conditions

a. Are the foundry s employees trained and familiar with portions of the system applicable to their position?

EPRI QUALITY PROGRAM MANUAL

Purchasing Quality Clauses

- Rev 4 Date

DOC UNITED LAUNCH ALLIANCES QUALITY CLAUSES

ASA-100 QUALITY MANUAL

QUALITY MANUAL Revision H

Transcription:

A. GENERAL 1. Is the supplier aware that materials and workmanship forming part of this or any order, may be inspected and tested at any time and place before, during and after manufacture by Purchaser and/or Government Inspection? (2678K, Para. 8.1) 2. Is the supplier aware of specification effectivity requirements and that the purchase order will denote the applicable specification and drawing revisions, although not necessarily the latest available? (2678K, Para. 3.1) 3. Is the supplier aware that any change to the design of the item(s) being procured under this purchase order will require the approval of the Purchaser? (2678K, Para. 4.1) 4. Does the supplier understand that, in all cases, the purchase order takes precedence in conflicts and disputes, including existing specification or drawing requirements? (2678K, Overview) B. APPLICABLE FORMS 1. Has the supplier been instructed in the proper usage of Vendor Information Requests (VIR, EB Form 84-00-2205) for interpretations, drawings or specification changes, nonconforming acceptance and repair welding authorization? (2678K, Para.1.1(a)) 2. Does the supplier understand that, when denoted in the purchase order, welding and NDT procedures, special processes and radiographic film require Purchaser approval as documented on a Vendor Procedure Approval Request? (VPAR, EB Form 84-00- 2974) (2678K, Para.1.1(b)) October 2010 Page 1 of 8

3. Is the supplier aware that timely and effective corrective action responses to Purchaser initiated Supplier Corrective Action Reports (SCAR, EB Form 84-00-4496) are mandatory? (2678K, Para. 1.1(c)) C. RECORDS 1. Is the supplier aware that all Objective Quality Evidence pertaining to supplied material must be retained for a period of 7 years after completion of the purchase order and shall be made available to the Purchaser within 36 hours upon request? (2678K, Para. 2.4) 2. Does the supplier understand that test reports and/or other verification of conformance documents need to be signed and dated by the seller s authorized representative? (2678K, Para.2.2(d)) 3. Is the supplier aware that erasures or obliterations of information on Quality records is prohibited and that corrections must be made in ink by drawing a single line through the incorrect entry and be dated and initialed by authorized personnel? (2678K, Para.2.3) D. ADDITIONAL CONTROLS: 1. Are controls in place to prohibit contact with functional mercury for any component supplied to the Purchaser? Is the supplier cognizant of the required documentation that attests this is so? 2. Is the supplier cognizant that Electric Boat prohibits the usage of seamed pipe for any shipyard component? (2678K, Para. 5.7) 3. Does the supplier understand that he assumes all responsibility when work is performed to unapproved drawings? (2678K, Para. 3.2) October 2010 Page 2 of 8

4. Is the supplier aware of their responsibility in regards to malpractice prevention? (If program is in place, complete section E.) Explain: 5. Is the supplier aware of their responsibility in regards to security awareness and control of defense sensitive information? (If program is in place, complete E.) How is this controlled? 6. Do suppliers that manufacture their own fasteners per MIL-S-1222H, comply with System 22 inspection methods? (MIL-S-1222H, FED- STD-H28/20) 7. Do suppliers that provide MIL-S-1222H fasteners that were manufactured by a sub-tier supplier pass on and verify sub-tier supplier compliance with System 22 inspection methods? (MIL-S- 1222H, FED-STD-H28/20) E. MALPRACTICE AND SECURITY AWARENESS 1. Is there a division or company policy or statement on management s position concerning malpractice? 2. Do division or company rules specifically address malpractice prevention as a condition of employment? 3. Are letters to employees or posters utilized to inform personnel about malpractice and its consequences? October 2010 Page 3 of 8

4. Does the division or company have a training program for new employees and a refresher program for existing personnel which addresses the subject of malpractice? 5. Is malpractice addressed in routine meetings similar to safety, security or profitability meetings? 6. Are internal audits conducted during off-shift and weekend activities? 7. Is there a close monitoring of new hires (of the first several months) until the new employee stabilizes? 8. In your discussions with the first line supervisors, do you feel that they are familiar with management s position on malpractice and understand the consequences? 9. Are records documented satisfactorily? Name? Date? In ink? Free of omissions? F. GENERAL WORKMANSHIP / QUALITY PRACTICES: 1. Does the supplier practice good workmanship habits with respect to product cleanliness? (i.e.: free from foreign objects, chips, burrs, construction debris, etc.) 2. Does the supplier maintain cleanliness during assembly, test and packaging? October 2010 Page 4 of 8

3. Does the supplier have a Purchaser approved cleanliness/flushing procedure? If Yes, Procedure #: a. Does the supplier comply with sample testing requirements of the approved procedure? b. Is sampling done in-house or performed by an outside agency? Explain: 4. Does the supplier maintain cleanliness and provide for protection of test equipment? 5. Does the supplier s inspection department verify cleanliness prior to packaging and shipping? 6. Does the supplier have a documented system for maintaining system/component cleanliness integrity? G. MATERIAL CONTROL: 1. Does the supplier s quality control system provide evidence of inspection status at all times during material processing? (MIL-I-45208, Para. 3.5) 2. Does the supplier s material control system provide accountability for the number of pieces that are manufactured, tested, scrapped and rejected? (2678K, Appendix A, Para. 5.3(c) and MIL-I-45208 Para. 3.2) October 2010 Page 5 of 8

3. Does the supplier s material control system document when material is worked or heat treated, resulting in changes to mechanical properties and is it uniquely marked or re-identified to provide traceability to the final condition? (2678K, Para. 5.6 and Appendix A, Para. 5.2) H. AUDITS: 1. Does the supplier maintain an internal (and when required for Level 1 material, an external) audit program of manufacturing processes? (2678K, Para. 10.2) 2. Does the supplier use a preplanned checklist with audit elements, with a review sheet to document the degree of compliance found during audits? (2678K, Para. 10.2) 3. Do the supplier s quality control records provide evidence of an internal audit program? Is the evaluation comprehensive and effective? (2678K, Para. 10.1) 4. Does the supplier maintain records of audits and inspections at subtier facilities? (2678K, Para. 10.2) October 2010 Page 6 of 8

I. LEVEL 1 MATERIAL: 1. Is the supplier aware of the requirement for an independent quality representative over check of purchase orders to sub-tier suppliers to ensure that all applicable purchaser requirements are included? (2678K, Appendix A, Para. 3.2) 2. Does the supplier s quality system assure that the sub-tier documentation includes original mill and applicable material processor certifications? (2678K, Appendix A, Para. 8.2) 3. Does the supplier segregate raw materials of different alloys, types and conditions to ensure they do not become commingled? (2678K, Appendix A, Para. 4.1) 4. Does the supplier maintain a positive identification system for material traceability that extends throughout all manufacturing processes including outsourcing? (2678K, Appendix A, Para. 5.0) 5. Does the material identification system require items to be deemed nonconforming when traceability markings are lost? Is a procedure in place for re-establishing traceability, including obtaining Purchaser approval of the procedure used for re-establishing traceability? (2678K, Appendix A, Para. 5.4) 6. Does the supplier maintain a clear and concise trail of documentation for finished products from parent material through all subsequent process operations? (2678K, Appendix A, Para. 6.0) October 2010 Page 7 of 8

7. Does the supplier s receiving inspection records denote review of test reports and subtier manufacturing records to assure positive material traceability? (2678K, Appendix A, Para. 3.3) 8. Does the supplier retain all records of material processing and testing, for a period of seven years after contract completion, and request Purchaser disposition instructions thereafter? (2678K, Para. 2.4 and 2.5) 9. Is the supplier aware that when Level 1 Material is supplied by a sub-tier, that there is to be an established and maintained audit program for sub-tier suppliers? (2678K, Appendix A, Section 9.1) a. Is the sub-tier audit program for Level 1 Material adequate? Explain: 10. Does the supplier have the capability to perform generic alloy identity testing to assure material is of a specified metallurgical group? (2678K, Appendix A, Para. 8.1) a. Is the program adequately controlled? Explain: Auditor: Date October 2010 Page 8 of 8