Application for Permission to Extend the Operating Period and Application for Approval of Construction Plans of Unit 3 at Mihama Nuclear Power Station

Similar documents
Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development

Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident. Ryodai NAKAI Japan Atomic Energy Agency

Concepts and Features of ATMEA1 TM as the latest 1100 MWe-class 3-Loop PWR Plant

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea

Non Destructive Inspection Technology for Thermal Power Plants

Appendix B. Aging Management Programs and Activities

The 2011 Tohoku Pacific Earthquake and Current Status of Nuclear Power Stations

AGEING MANAGEMENT ASSESSMENT

Safety enhancement of NPPs in China after Fukushima Accident

DESIGN AND SAFETY PRINCIPLES LEONTI CHALOYAN DEPUTY CHIEF ENGINEER ON MODERNIZATION

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

NRC INSPECTION MANUAL INSPECTION PROCEDURE 35065

P Boiling Water Reactor Vessel and Internals Program (BWRVIP)

STRENGTH ANALYSES OF NUCLEAR POWER PLANT PRESSURE EQUIPMENT

Implementation of the Rules for the Continued Operation in Korea

AP1000 European 19. Probabilistic Risk Assessment Design Control Document

COLD NEUTRON SOURCE AT CMRR

CLASSIFICATION OF SYSTEMS, STRUCTURES AND COMPONENTS OF A NUCLEAR FACILITY

HPR1000: ADVANCED PWR WITH ACTIVE AND PASSIVE SAFETY FEATURES

Module 05 WWER/ VVER (Russian designed Pressurized Water Reactors)

STRUCTURAL RADIATION SAFETY AT A NUCLEAR FACILITY

The Westinghouse Advanced Passive Pressurized Water Reactor, AP1000 TM. Roger Schène Director,Engineering Services

Current Status and Future Challenges of Innovative Reactors Development in Japan

Dry storage systems and aging management

The risk of reactor pressure vessel material degradation Doel-3/Tihange-2

Preparedness at PFBR Kalpakkam to meet the challenges due to Natural events Prabhat Kumar, Project Director, PFBR, Director construction BHAVINI

Reactor Technology: Materials, Fuel and Safety. Dr. Tony Williams

German contribution on the safety assessment of research reactors

Pressurized Thermal Shock Potential at Palisades

NuScale SMR Technology

Improvements Needed in Nuclear Power Plant Probabilistic Risk Assessments: Lessons Learned from Fukushima

Post-Fukushima Assessment of the AP1000 Plant

Westinghouse s plant for the Nuclear Renaissance : AP1000. AP1000 Advanced Passive Plant

NUCLEAR FUEL AND REACTOR

Lifting Appliances of Ships and Offshore Installations

Evolution of an LNG Terminal: Senboku Terminal of Osaka Gas

Westinghouse AP1000. Reactor

Available online at ScienceDirect. Procedia Engineering 86 (2014 )

DECOMMISSIONING PROGRAMS AND TECHNOLOGY DEVELOPMENT IN JAPAN ATOMIC ENERGY RESEARCH INSTITUTE

Present Status of Kyoto University Research Reactor, KUR

European level recommendations Sect. in NAcP 2 Generic recommendation for WENRA, Finland participates and follows the work.

Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety. Trieste,12-23 October 2015

Advanced Design of Mitsubishi PWR Plant for Nuclear Renaissance

Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 ( the Act ) and

Training Certification Categories

CAREM: AN INNOVATIVE-INTEGRATED PWR

Lessons Learned from Fukushima Daiichi Nuclear Power Station Accident and Consequent Safety Improvements

1. Korean Regulatory Framework and Technical Standards applied to Site Selection and Safety Review for NPPs

Chapter VI. VI.Situation regarding efforts to address lessons learned (28 items)

COMPLETE REVISION April Process Industry Practices Piping. PIP PNC00004 Piping Stress Analysis Criteria for ASME B31.

NUCLEAR ENERGY MATERIALS AND REACTORS - Vol. II - Advanced Gas Cooled Reactors - Tim McKeen

Seismic Reliability Evaluation of Electrical Power Transmission Systems and its Effect on Core Damage Frequency

Workgroup Thermohydraulics. The thermohydraulic laboratory

Fast Corrosion Screening Technique Saturation Low Frequency Eddy Current

Safety Standards. of the Nuclear Safety Standards Commission (KTA)

Development of Phosphoric Acid Fuel Cell Stack

Risks of Nuclear Ageing

INL/EXT Key Design Requirements for the High Temperature Gascooled Reactor Nuclear Heat Supply System

Journal of American Science 2014;10(2) Burn-up credit in criticality safety of PWR spent fuel.

XII. Lessons Learned From the Accident Thus Far

Examples of Evaluation and Improvement in Seismic Capacity for Existing Plant Facilities

Radiation Control in the Core Shroud Replacement Project of Fukushima-Daiichi NPS Unit #2

1. vapours or gases subject to pressures greater than 0.5 bar, 2. vapours at such temperatures that their vapour pressure is greater than 0.5 bar.

Post-Fukushima Action Plan in Korea. WNU-SI 2011, August 11 Christ Church, Oxford

PROBABILISTIC SAFETY ANALYSIS IN SAFETY MANAGEMENT OF NUCLEAR POWER PLANTS

Poland Nuclear Program EPR Flamanville 3

NRC Participation and Perspectives on Codes and Standards for Nuclear Construction

APR1400 Safe, Reliable Technology

Risks Associated with Shutdown in PWRs

Material Properties Measurement

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C SAFETY EVALUATION REPORT

NUCLEAR POWER NEW NUCLEAR POWER PLANTS IN 2012

Verification of the MELCOR Code Against SCDAP/RELAP5 for Severe Accident Analysis

Isolation Condenser; water evaporation in the tank and steam into the air. Atmosphere (in Severe Accident Management, both P/S and M/S)

Current Status of Research and Development on System Integration Technology for Connection between HTGR and Hydrogen Production System at JAEA

SPECIFICATION FOR SPHERICAL VESSELS (PROJECT STANDARDS AND SPECIFICATIONS)

Use of PSA to Support the Safety Management of Nuclear Power Plants

Environmental Qualification of

PRESS CONFERENCE. 3 September Jean-Bernard LÉVY Chairman and CEO. Xavier URSAT Group Senior Executive VP - New Nuclear Projects and Engineering

Randy Lockwood, Senior Vice President CMD 18-H6.1A. PICKERING NUCLEAR GENERATING STATION Part I Hearing Licence Renewal April 4, 2018

Pulsed Eddy-Current (PEC) Inspection through Insulation

PIPEWORK INSULATION. 14/ Page 1 of 10 Pipework Insulation Rev D

SEVERE ACCIDENT FEATURES OF THE ALTERNATIVE PLANT DESIGNS FOR NEW NUCLEAR POWER PLANTS IN FINLAND

CAREM Prototype Construction and Licensing Status

Status of the FRM-II Project at Garching. Hans-Jürgen Didier, Gunter Wierheim Siemens AG, Power Generation (KWU), D Erlangen

July 29, 2011 R. William Borchardt, Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC

Seismic isolation of LFR Reactor Buildings

IV. Occurrence and Development of the Accident at the Fukushima Nuclear Power Stations

RELAP5/MOD3.2 INVESTIGATION OF A VVER-440 STEAM GENERATOR HEADER COVER LIFTING

BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION

Cast steel: Group of ASTM standards for steel castings and forgings

The Pipelines Regulations, 2000

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE (Draft was issued as DG-1134, dated October 2006)

Best practices for preparing vessel internals segmentation projects

A REPORT ON CANADA S LARGEST CLEAN POWER PROJECT DARLINGTON REFURBISHMENT

EXPERIMENTS ON THE PERFORMANCE SENSITIVITY OF THE PASSIVE RESIDUAL HEAT REMOVAL SYSTEM OF AN ADVANCED INTEGRAL TYPE REACTOR

Contents of summary. 1. Introduction

Transcription:

November 26, 2015 The Kansai Electric Power Co., Inc. Application for Permission to Extend the Operating Period and Application for Approval of Construction Plans of Unit 3 at Mihama Nuclear Power Station The Kansai Electric Power Co., Inc. (Code: 9503) 6-16 Nakanoshima 3-chome, Kita-ku, Osaka (URL http://www.kepco.co.jp) Company Representative: Makoto Yagi, President and Director Contact: Yoshikazu Matsuda, General Manager, Office of Accounting and Finance Tel: +81-6-6441-8821 Today, we submitted to the Nuclear Regulation Authority (NRA) an application for permission to extend the operating period and application for approval of construction plans of Unit 3 at Mihama Nuclear Power Station. It is specified by the Act on the Regulation of Nuclear Source Material, Nuclear Fuel Material and Reactors *1 that the operating period of a nuclear power station shall be 40 years from the date of commencement of operation. Upon expiration, however, it may be extended for a further 20 years as an upper limit subject to permission of the NRA which may be granted only once. Since it is required that the application for permission to extend the operating period shall be accompanied by the results of a Special Inspection, we have been conducting the Special Inspection of the object equipment such as reactor pressure vessels and containment vessels of Unit 3 at Mihama Nuclear Power Station since May 16, 2015. As a result, we verified that the integrity of such equipment. We conducted an evaluation of aging management technology including the results of the Special Inspection and formulated a long-term maintenance management policy. As a result, we verified that a 60-year operating period should be credible without any problem. Such being the circumstance, today we submitted to NRA an application to prolong the operating period of Unit 3 at Mihama Nuclear Power Station up to 60 years and also submitted an application for approval to changes in technical specs of nuclear reactor facility on the assumption of extended operation beyond the specified operation period of 40 years. 1

We submitted an application for change in reactor installation permit of Unit 3 at Mihama Nuclear Power Station on March 17, 2015. Then, out of the component documents required for application for approval of construction plans, we put together the basic design policy, important item table showing equipment specification and so on, and attached materials and drawings such as analysis curves used for aseismic safety evaluation based on the standard seismic motion with a maximum acceleration of 993 gal, and submitted them to the NRA. We will continue to make our best efforts to improve safety and reliability of nuclear power stations and utilize nuclear power generation as an important power source with understanding of the local community and all those concerned. *1 Item 3-32 of Article 43 of the Act on the Regulation of Nuclear Source Material, Nuclear Fuel Material and Reactors (Operating Period, etc.) The period during which a licensee of power reactor operation may operate a power reactor that he/she has installed shall be forty years from the day on which construction work for installing said power reactor has passed the pre-operation test for the first time. (2) The period set forth in the preceding paragraph may be extended only once upon the expiration thereof by obtaining the approval of the Nuclear Regulation Authority. (3) The period to be extended pursuant to the provision of the preceding paragraph shall not exceed the period specified by Cabinet Order as not exceeding 20 years. (4) Any licensee of power reactor operation who intends to obtain the approval set forth in paragraph (2) shall make an application for the approval to the Nuclear Regulation Authority, pursuant to the provisions of the Ordinance of the NRA. (5) The Nuclear Regulation Authority may grant the approval set forth in the preceding paragraph, only in the case that it finds, in light of the status of deterioration of the reactor and any other equipment as a result of their longterm operation, that the power reactor for which the application for the approval set forth in said paragraph is made conforms with the standards specified by the Ordinance of the NRA as the standards for ensuring safety during the period to be extended pursuant to the provision of paragraph (2). Attachment 1: Results of Special Inspection of Unit 3 Mihama Power Station Attachment 2: Outline of Evaluation of Aging Management Technology for Unit 3 Mihama Nuclear Power Station Attachment 3: Evaluation Results of Aging Management Technology of Unit 3 Mihama Power Station Attachment 4: Outline of Application for Approval of Construction Plans of Unit 3 at Mihama Nuclear Power Station 2

Results of Special Inspection of Unit 3 of the Mihama Power Station Attachment 1 Inspection of Reactor Pressure Vessel Nondestructive tests and visual inspections made on the core region of the reactor pressure vessel, etc. confirmed that no abnormalities such as defects exist. Primary coolant nozzle corner part (eddy current test) July 4 through July 13 Inspection of Containment Vessel Visual inspections on the inner and outer surfaces of steel plates of the containment vessel confirmed no abnormalities in the coatings. Containment vessel steel plate (visual inspection) May 16 through August 11 External barrier Inspection of Concrete Structures Inspections of core samples of concrete taken from the reactor containment facilities and the like confirmed the absence of abnormalities in strength and shielding effects. data were collected: May 18 through August 3 Reactor auxiliary building Reactor auxiliary building Core region: Base metal and welded part (ultrasonic test) Welded part and inner surface June 16 through June 30 In-core instrumentation cylinder (eddy current test, visual inspection) July 23 through July 30 Turbine building (turbine frame) Inner concrete Foundation of reactor containment facility Reactor containment facility, reactor auxiliary building, etc. (Core sample test) Inspection period*: May 16, 2015 through November 26, 2015 Inspection results: No abnormalities observed May 16, 2015 through November 26, 2015

Outline of Evaluation of Aging Management Technology for Unit 3 at Mihama Nuclear Power Station Attachment 2 1. Evaluation of Aging Management Technology It is specified by the Act on the Regulation of Nuclear Source Material, Nuclear Fuel Material and Reactors that aging deterioration of equipment, structures, etc. with safety functions in nuclear facilities shall be technically evaluated, and a policy of long-term maintenance that should be conducted for an extended period (20 years after the expected 40-year service life of the plant) shall be formulated based on the results of this evaluation. 2. Evaluation of Aging Management Technology based on the Results of the Special Inspection of Unit 3, Mihama (Evaluation of Deterioration) *1 Based on the results of the Special Inspection of Unit 3 at the Mihama Nuclear Power Station, and past operating experiences, latest findings, etc., it was evaluated whether aging events such as corrosion, fatigue damage and thinning had occurred in equipment, structures, etc. with safety functions in Unit 3, Mihama *2, and whether such events would occur in future operation. In addition, an evaluation was conducted to confirm whether the integrity of equipment and structures that may experience an aging event could be ensured by current maintenance activities 60 years after the startup of the Units, assuming the state of deterioration at that time. 4. Flow of Evaluation of Aging Management Technology Evaluation on the assumption of operation Reactor pressure vessel, steam generator, turbine, filling/high-pressure injection pump (intermittent operation), residual heat removal pump, air-cooled emergency generator, etc. Reactor pressure vessel: Neutron irradiation embrittlement Low-voltage cable: Insulation degradation Residual heat removal pump: Heat aging, etc. [Case of reactor pressure vessel] In consideration of neutron irradiation embrittlement, monitoring test pieces have been removed four times. Based on the results of these monitoring tests, it was confirmed that there were no problems in the safety of the reactors. Evaluation of aging management technology Extraction of important safety related equipment and structures *4 Extraction of deterioration events to be focused on *5 Results of the Special Inspection Evaluation of cold shutdown integrity Reactor pressure vessel, steam generator, filling/high-pressure injection pump, residual heat removal pump Extraction of equipment necessary for maintaining cold shutdown [Case of residual heat removal pump motor] The yearly operating time of the pump motor is longer than that assumed for intermittent operation, but because the interval between insulation diagnoses is shortened according to the years of operation, it is also a suitable method for inspecting the pump motor and verifying its integrity in cold shutdown. [Result of Evaluation of Aging Management Technology] It was confirmed that the integrity of equipment and structures of the whole plant would be ensured over the long term by continuing the current maintenance activities for equipment, structures, etc. with safety functions, and by taking additional maintenance action with some of the equipment and structures. Evaluation of aging events Seismic safety evaluation Tsunami safety evaluation Evaluation of aging events *6 Seismic safety evaluation Tsunami safety evaluation 3. Long-term Maintenance Policy (Maintenance Policy) *1 Maintenance measures that were extracted and should be added as a result of the evaluation of aging management technology are summarized below as a long-term maintenance policy that should be implemented for 20 years beyond the 40-year expected service-life of the plant. Implementation timing *3 Mid- and long-term Content 5th investigation of the reactor pressure vessel using a monitoring test piece *1 Documents attached with the application for permission to extend the operating period *2 Subject to this review are approximately 3,400 pieces of equipment, such as important safety related equipment and structures (pumps, vessels, pipes, valve, buildings, flood protection works, etc.) and permanently-installed equipment for responding to major accidents (air-cooled emergency generators, passive autocatalytic recombiners, etc.) *3 For Mihama Unit 3, mid- and long-term mean 10 years from December 1, 2016. Formulation of long-term maintenance policy *4 Class 1 and 2 equipment and structures as defined in the Regulatory Guide for Reviewing Classification of Importance of Safety Functions for Light Water Nuclear Power Reactor Facilities (important safety related equipment and structures), and permanently-installed equipment for responding to major accidents were extracted as subjects to this review. *5 Combinations of aging events and areas were extracted based on the Appendix of the Atomic Energy Society of Japan s Code on Implementation and Review of Nuclear Power Plant Aging Management Programs. *6 In the evaluation of cold shutdown integrity, events with more severely advanced deterioration than in normal operation were extracted. 5. Application for Permission to Extend the Operating Period An application for permission to extend the operating period was submitted to the NRA, accompanied by the Report on Results of Special Inspection, the Evaluation Report on State of Deterioration (evaluation of aging management technology) and the Policy on Maintenance Management (long-term maintenance policy).

Evaluation Results of Aging Management Technology of Unit 3 at Mihama Nuclear Power Station Attachment 3 Evaluation of Aging Management Technology: Fitness-for-service assessment in connection with aging events such as fatigue and neutron irradiation embrittlement, and adequacy confirmation of current maintenance practices for important safety-related equipment and structures* of nuclear reactor facilities subject to 60-year service * Important safety-related equipment and structures of nuclear reactor facilities subject to 60-year service (approximately 3,400) Results of Technical Assessment (Examples) and Policy on Maintenance Management Results of evaluation of aging management technology in black Policy on long-term maintenance management indicated in blue [Embrittlement of Reactor Pressure Vessel due to Neutron Radiation] Investigations using a monitoring test piece (prediction of degradation) were conducted four times and confirmed that neutron irradiation embrittlement poses no problems to structural integrity and that the current maintenance practices are adequate. 5th investigation of reactor pressure vessel using the monitoring test piece [Low-cycle Fatigue of Piping] No potential damage was observed. The adequacy of current maintenance practices has been confirmed. Evaluation based on past operating records will be continued. Reactor pressure vessel Pressurizer Steam generator Steam Feed water Turbine Air-cooled emergency generator Generator Main transformer Condenser [Insulation Degradation of Cable] No insulation problems were observed in normal operation or accident-simulating tests. Maintenance activities such as the measurement of insulation resistance will be continued. Outside barrier (concrete) Primary coolant pump Feed water pump Electric motor driven auxiliary feed water pump Circulation water pump To drainage Cooling water (seawater) Condensate tank [Electrical Penetration*] Periodic measurement of insulation resistance and other measurements and tests on similar equipment have confirmed longterm integrity. Current maintenance activities will be continued. * Electrical penetrations refer to penetrations in the containment vessel provided for cables that transmit and receive signals, and the like. [Secondary System Carbon Steel Piping] It has been confirmed that the current practices for managing pipe wall thinning (measurement and evaluation of wall thickness and replacement of piping) are adequate. Seismic safety based on wall thinning has been confirmed. The same practices for managing wall thinning will be continued..

Application of the next time and after Application of this time Outline of Application for Approval of Construction Plans of Unit 3 at Mihama Nuclear Power Station Attachment 4 [What s the application for approval of construction plans?] This is a procedure based on the Act on the Regulation of Nuclear Source Material, Nuclear Fuel Material and Reactors (Article 43 of the Act on the Regulation of Nuclear Source Material, Nuclear Fuel Material and Reactors). It is applied for the NRA to examine that the technological standard is satisfied by the nuclear reactor facility designed in detail based on the basic design of nuclear reactor facilities specified in the application for permission for nuclear reactor s installation change. <Background of application for approval of construction plans of Unit 3 at Mihama Nuclear Power Station> 1) March 17, 2015: Change in reactor installation permit was applied for. 2) November 26, 2015: Approval of construction plans was applied for. <Outline of Application for Approval of Construction Plans of Unit 3 at Mihama Nuclear Power Station> Component documents Description No. of applicable facilities Major facilities applied for Basic design policy Important item table Attached materials Attached drawings Basic design policy Important item table Attached materials (including some evaluation of earthquake resistance and strength) Attached drawings Draw up the basic design policy of the facilities. Create an important item table showing the name, type, capacity, dimensions, and so on of each facility. Create materials such as analysis curves used for the aseismic safety evaluation based on the basic seismic motion with a maximum acceleration of 993 gal. Create detailed drawings of each facility Strength of each facility is to be evaluated. Aseismic safety of each facility is to be evaluated as reflecting each facility s standard seismic motion with a maximum acceleration of 993 gal. Approximately 380 facilities 1) Nuclear reactor cooling system facility Permanent alternative low-pressure injection pump Mobile alternative low-pressure injection pump Nuclear reactor bottom cavity injection pump 2) Measurement control system facility Nuclear reactor bottom cavity water-level gauge 3) Nuclear reactor storage facility Hydrogen recombination device of static catalyst type 4) Emergency power supply facility Air-cooled emergency power generator Power supply car 5) Emergency response office