Review of Project Nominated for CSLF Recognition: Al Reyadah CCUS Project Arafat Al Yafei - Abu Dhabi Carbon Capture Company - Al Reyadah United Arab Emirates 1 st May 2017 Projects Interaction & Review Team (PIRT)
Al Reyadah - Abu Dhabi CCUS Project Al Reyadah is a pioneering initiative and a Knowledge Hub for Abu Dhabi in CCUS Technology, and it is a working platform for future CCUS Projects United Arab Emirates (UAE) (2 of 17)
(3 of 17) Al Reyadah Combating Global Warming & Abu Dhabi s Sustainability
Project Objective 1) Reduce Carbon Footprint of Abu Dhabi 2) Enhance Oil Recovery in Subsurface Reservoirs 3) Liberate critically important Natural Gas used in Oil fields for Pressure Maintenance 4) Operate a Commercially Self-Sustaining CCUS Facility which Captures Flue Gas CO2 from a Steel Plant, processes to the required Specification, Pressurizes and delivers to Oil fields for Injection for CO2-EOR (4 of 17)
Al Reyadah - Abu Dhabi Carbon Capture Company Phase-I: Emirates Steel (5 of 17) Al Reyadah: ME s 1 st Company mandated to develop Commercial Scale CCUS Projects Enhance Oil/Gas Production with CO2-EOR, while extending Abu Dhabi s Oil Fields Life Liberate Natural Gas for Power Generation Contribute to Reducing UAE s Carbon Emissions
Al Reyadah Mandate Mandate: (6 of 17) Al Reyadah is a new ADNOC OPCO specialized in CO2 Supply To manage the CO2 supply to both ADNOC s Onshore & Offshore assets for CO2-EOR requirements Create a CO2 Network & Hub in order to achieve flexibility between CO2 Supply and Injection requirements like GASCO supplying HC Gas Share learning from a pool of strategic technical advisors from an array of various specialists and scientists including; US DoE, GASCO R&D, ADNOC R&D, Masdar Institute, PI, Khalifa University, and various other technical institutes, organizations and major Oil/Gas Companies & Service Providers Vision: To maximize profitability by a robust CO2 Master Plan to ensure ADNOC s OPCOs CO2 EOR Pilots & Development Plans Commitments while contributing Sales Gas to the Government s future energy and reducing Carbon Footprint. Mission: Efficiently provide OPCOs the required CO2 volumes in a timely manner and at the right location with optimized new technologies and CO2 price
CO2 Phased Development Strategy in Oil Field The strategy is to breakdown the overall objective into phased developments/projects in order to gain experience in surface and subsurface aspects of CO2 EOR, operations and mitigate risk. 2024 2018 2017 2009 2003 (7 of 17) Subsurface - CO2-EOR
Field CO2-EOR Injection Project - 2017-Onward CO2 injected in an existing Onshore Development Project in the Oil/Water Transition Zone to Enhance Oil Recovery Continuous CO2 Injection Rate: 24-40 MMscfd 6 CO2 Injectors / 3 Oil Producers / 3 Observers Line drive pattern / Well spacing 750m Wells Orientation Future CO2 Future CO2 Expansion -3 Expansion- 2 Onshore Field Future CO2 Expansion 1 st CO2 Pilot in middle east (8 of 17) Subsurface - CO2-EOR 8
CO2-EOR Project - RMP Times Laps Saturation logs PLT/DTS CO2 Analyzer /WHS Corrosion Log Caliper Temp. Noise logging WH&DH Gages (Pressure) Critical metering ifield Coring Track CO2 Miscible Front (Reservoir) Monitor Saturation Changes (Reservoir) Monitor CO2 Production (Surface) Quantify Areal/Vertical Sweep Eff. (Reservoir) Measure residual oil saturation (Reservoir) Down Hole Production/Injection Perf. (Well Bore) Monitor Corrosion (Well Bore) Identify Asfalten+Scale Deposition (Well Bore) Identify Formation Damage (Well Bore) Monitor Well Injectivity (Well Bore) Monitor Well Prod. Perf. (Surface and Downhole) Monitor CO2 Purity (Surface) Intelligent Asset Operations Model (IAOM) will continue to be implemented, which provides full monitoring in real time and control of all wellheads and CPP from the control room (9 of 17) Subsurface - CO2-EOR
CO2-EOR Project - Production/Injection Project Oil Rate Mbd CO2 Inj. Rate MMscfd Planed Continuous CO2 10-12 24/40 CO2 Sequestration: ~>400 BSCF Volume of CO2 will be sequestrated into the reservoir by 2060 (10 of 17) Subsurface - CO2-EOR
CO2 Dehydration & Compression Facility ESNAAD CO2 Dehydration & Compression Facilities ESI-1 ESI-2 (11 of 17)
Direct Reduced Iron (DRI) Process CO2 is generated by Process of Direct Reduced Iron (DRI) Methane Gas is reformed to a H 2 & CO Syn Gas Iron Ore (Fe 2 O 3 ) is reduced to Iron (Fe) in reactor, producing CO 2 & H 2 O waste CO 2 is removed via a traditional MEA Amine Absorption System CO 2 rich waste stream (>99% dry) is available for the CCS Project Steel Making CCUS (12 of 17) Process Objective: Capture 800 KT/Y byproduct CO2 emitted from ES DRI plants and deliver it to ADNOC Oil Fields for use in EOR
CO2 Transmission Pipeline - Location ESNAAD - Mussaffa To ADCO Bab Field 8 X65 API5L carbon steel buried pipeline designed for 245barg with Telecoms, SCADA, CCTV & Leak Detection running over buried fibre optics ADCO Rumaitha Field Rumaitha Metering Station: Custody Mass Transfer Meter (Coriolis Meter), complete with Gas Chromatograph and Moisture Analyser (13 of 17)
Construction of CO2 Pipeline CCS Facility Mussafah Section 8 X65 API5L Carbon Steel buried pipeline designed for 245barg 2 Block Valve Stations for emergency venting of CO2 in case of pipeline leak Remote isolation and maintenance blowdown facilities Pipeline Safety: Telecoms, SCADA, CCTV and Leak Detection running over buried fibre optics Rumaitha Section (14 of 17)
Al Reyadah Future Potential Growth Abu Dhabi CCUS Project is Al Reyadah s Phase-I (CO2 Source: Emirates Steel) of an integrated CCUS network linking industrial emitters with oil fields. Overall CCUS network is expected to multiply over 20 folds as a result of establishing the CCUS economic sector. (15 of 17)
Al Reyadah - Abu Dhabi Carbon Carbon Capture Company Phase-I: Emirates Steel - Highlights & Summary World s 1 st fully Commercial CO2 Capture Project from Steel Industry (Emirates Steel) Captures 800,000 T of CO2 at Emirate Steel, compresses & dehydrates and Transports through a 43 km Pipeline for injection into ADNOC oil wells for CO2-EOR Operates Highest Pressure (240 bar) CO2 Pipeline in the World Combats Climate Change by eliminating CO2 equivalent to 170,000 cars emission Commercially Self-Sustaining project with no Governmental Subsidies Working towards Multiple Industrial scale CCUS Projects & CO2 Pipeline Network/Hub aimed at reducing the carbon footprint in line with Abu Dhabi vision 2030 Driven by the requirement to Capture CO2 from Multiple Industries & the high potential availability of CO2 storage Current CO2 Supply Potential: 1.6 Bscfd (ADNOC group & industrial sources in Abu Dhabi which is expected to increase due to the expected increase in sour gas production and the new expected power plants) (16 of 17)