Joint and Common Market ITEM 4 PSEUDO TIES

Similar documents
Pseudo-Tie Congestion Overlap

NYISO/PJM Market-to-Market Coordination

PJM PROMOD Overview. August 1, PJM

MISO-PJM Interface Pricing Post Implementation Metrics and Criteria

PJM M2M Market Flow Proposal. October 2014

Outage Coordination Training MISO Training

Dispatch Signal & Locational Marginal Pricing (LMP)

Capacity Deliverability. May 27, 2015 MISO-PJM JCM

Alternatives for Addressing the Interface Pricing Flaw

Proposed Procedures to Deliver External Capacity between MISO and PJM

Two Settlement PJM /06/2016

Draft Whitepaper to Platte River Board of Directors

Summary of 2016 MISO State of the Market Report

PJM ARR and FTR Market

MISO SPP Interregional Stakeholder Advisory Committee. April 8 th, 2014 Carmel, IN

IMM Quarterly Report: Fall 2017

Energy Markets - The Basics

The Virtues of A Virtual RTO

PJM/MISO Cost Allocation For Economic Upgrades

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Joint Operating Agreement Between the Midcontinent Independent System Operator, Inc. And PJM Interconnection, L.L.C. (December 11, 2008)

Introduction to the PJM Markets

PROPOSALFOR INCLUSION OF A TRANSCO INCLUDING ENTERGY WITHIN THE SPP RTO

Federal Energy Regulatory Commission Working Paper on Standardized Transmission Service and Wholesale Electric Market Design

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017

June 28, Sw. Power Pool, Inc., 141 FERC 61,048 (2012) ( October 18 Order ), order on reh g, 142 FERC 61,205 (2013) ( March 21 Order ).

SPP at a Glance. Located in Little Rock. Approximately 600 employees

Capacity Performance Training. June 24, 2015

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal

2016 ANNUAL VRL ANALYSIS

MARKET EFFICIENCY STUDY PROCESS AND PROJECT EVALUATION TRAINING

Data Miner 2 11/20/ PJM 2017

Con Ed/PSEG Wheel Replacement Proposal A joint white paper from the New York Independent System Operator and PJM Interconnection

Schedule 9 and 10 PJM /23/2017

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)

Markets Report. Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar January 20, 2015 PJM 2015

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Midwest ISO. Prepared by: Midwest ISO Independent Market Monitor. David B. Patton, Ph.D. Potomac Economics. June Executive Summary: Introduction

Manual No. 010 Business Practices Manual Network and Commercial Models

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

Capacity Performance Training. March 16, 2015

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.

Regional Transmission and Energy Scheduling Practices

Presentation on Draft SCED RFP

Analysis of the 2019/2020 RPM Base Residual Auction

Dynamic Transfers Revised Draft Final Proposal

Introduction to RRG Drafting Team Proposal

1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Durgesh Manjure, MISO Energy September 6, 2017

Business Practice Manual for Market Operations

Locational Marginal Pricing (LMP): Basics of Nodal Price Calculation

ATTACHMENT K TRANSMISSION PLANNING PROCESS

2750 Monroe Blvd Audubon, PA

PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, Prepared by Interconnection Planning Department

STATEMENT OF WORK. Use the PJM AFC / ATC tool to calculate and post ATC values to the ComEd (MAIN) OASIS.

ConOp. Internal NYISO Controllable Lines. Concept of Operation. Scott Harvey, LECG. Document Locator:

Operations Model Follow-up. February 18, 2015

Interface Pricing Flaw in MISO and PJM

2. Market Operations Overview

155 FERC 61,111 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

LEER/TLR 5 Drill Procedure General Coordination Procedures and Drill Scenario

PJM Manual 37: Reliability Coordination Revision: 14 Effective Date: April 1, Prepared by Systems Operation Division

Benefits from Generation and Storage on the Distribution System

Job Descriptions. Title & Job Functions: Transmission Function Employees

Energy Market Uplift Sr. Task Force Update

REVENUE SUFFICIENCY GUARANTEES AND COST ALLOCATION William W. Hogan i May 25, 2006

Generator Contingency & RAS Modeling

ISO New England Available Transfer Capability. Implementation Document. Version 1.0

Capacity Resource versus Energy Resource

Functional Entity Roles and Responsibilities

PJM Black Start Replacement Process RTO Wide Black Start RFP Review Plan

FERC NOPR on Fast Start Pricing. Market Subcommittee January 12, 2017

Real Flow A Preliminary Proposal for a Flowbased Congestion Management System. July 20, 2000

Capacity Accreditation and External Resource Zones 06/30/2016

LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The

1 Descriptions of Functions Overview of Market Operations

Section 5: Network Integration Transmission Service Accounting. 5.1 Network Integration Transmission Service Accounting Overview

Electricity Transmission Congestion Costs: A Review of Recent Reports

Day-ahead ahead Scheduling Reserve (DASR) Market

SPP EIS Market Training. Markets 301

Demand Response. Overview. Recommendations

Contingency Modeling Enhancements Issue Paper

Internal NYISO HVDC Controllable Line Scheduling. Concept of Operation. LECG Staff

Load RSG Exemptions Emergency Procedures. October 29, 2013

December 11, 2013 VIA ELECTRONIC FILING

2014 State of the Market

Regional Cooperation of US States on Electric Transmission Issues

SPP EIS Market Overview. Western Visitors

2018 Draft Policy Initiatives Roadmap. Market and Infrastructure Policy December 7, 2017

Wes Yeomans Vice President Operations Management Committee May 31, 2017 COPYRIGHT NYISO ALL RIGHTS RESERVED

PSE&G/ConEd Wheel Modeling

Officer Certification Form Discussion

Business Practice Manual for Market Operations

LOAD SERVING ENTITIES PJM REGION

Risk-Based Registration Technical Justification. August 26, 2014

Local Market Power Mitigation Enhancements

2018 Open Access Transmission Tariff (OATT) Rate Case

Analysis of the 2017/2018 RPM Base Residual Auction

PJM ExSchedule User Guide

LMP Implementation in New England

Committed Offer: Offer on which a resource was scheduled by the Office of the Interconnection for a particular clock hour for the Operating Day.

Transcription:

Joint and Common Market ITEM 4 PSEUDO TIES

Agenda 1. Overview 2. Background 3. PJM Update 4. MISO Update 5. Congestion Overlap Solution 6. Next Steps 2

Overview Purpose Provide a status update on MISO-PJM pseudo ties Goals Implement near-term pseudo-tie administration enhancements Address long-term enhancements/alternatives for pseudo tie challenges Key Takeaways MISO and PJM implementing enhanced pseudo-tie administration processes PJM enhancing pseudo-tie capacity requirements MISO and PJM jointly developing solution for congestion overlap to resolve Section 206 Complaints 3

Background PJM and MISO have reliably administered a significant increase in pseudo-ties (2061 MW) for 2016-2017 planning year Congestion Overlap issue has led to FERC complaints Additional administrative enhancements being implemented for 2017-2018 planning year and beyond Long term goals address all pseudo-ties and pseudo-tie processes 4

Common Issues Reliability Local reliability concerns (MISO) Increased interregional outage coordination (PJM) EMS modeling (PJM) Markets Pseudo-Tie Congestion Overlap (PJM and MISO) 5

MISO Pseudo Tie Administration Update MISO s Pseudo-tie Agreement will be filed at FERC in the near term Agreement outlines requirements between market participants and MISO for pseudo-ties Pseudo-tie Business Practice Manual is available on the MISO website in the under review section 6

MISO Remaining Issues Reliability Host RTO / RC may be unable to effectively control its transmission system without sufficient generation control Markets Out-of-merit dispatch for local reliability concerns Planning Transmission service request evaluation process Unit retirements Compliance NERC, NAESB, JOA and Tariff implications 7

PJM Overview: Main Challenges Network Model Expansions - EMS and Markets Modeling Challenges adhering to NERC and FERC compliance standards Planning Analysis External entity planning analysis comparability to PJM planning criteria Congestion Management Local and Regional external system Congestion Management challenges

PJM Pseudo Tie Administration Update PJM has proposed the following for the treatment of new external resources. Modeling Requirements Limitation on the electrical distance a resource can be from PJM and be able to provide capacity. Network models for PJM and external area need to be aligned for potential coordinated flowgates. Deliverability Analysis Require that external capacity resources have firm transmission service that was studied using the standards that PJM applies for internal resources. Market Requirements Require that for external capacity resources, PJM obtains firm rights for its impacts. Require that resource does not result in less than optional dispatch, as a result of being the only resource with any impact on additional coordinated flowgates. (1.5% Test) 9

PJM Pseudo Tie Administration Update (cont.) PJM has proposed the following for treatment of existing external resources* External resource owners with long term contracts with PJM load may be permitted to participate for the life of the asset Evidence needed of a long-term contract or equivalent documented agreement with internal PJM load to sell the capacity and energy of the external resource 10 years or longer and was entered into on or before June 1, 2016 External resource owners without long term contracts with PJM load may be permitted to participate for the next two RPM auctions (thru 2021/2022 Delivery Year) *Subject to Operational Deliverability 10

PJM Status Update PJM Stakeholders approved proposed rules for treatment of new pseudo-tie requests but did not approve proposed rules for treatment of existing pseudo-tie requests PJM to seek Board recommendation for FERC filing Pending FERC approval, PJM will apply the new rules effective with the May 2017 Base Residual Auction PJM is also pursuing a requirement for pseudo-tie resources and external balancing authorities to sign a pro-forma pseudo tie agreement, which is currently under current review, to be filed with FERC.

Congestion Overlap: Overview Purpose Explain the issue Explain the solution Discuss path forward Key Takeaways MISO and PJM have developed short-term and long-term solutions to address the congestion overlap in the associated markets and in Market-To-Market coordination and associated settlements. Solutions provide rebates in appropriate markets for congestion overlap, adjusts market-to-market settlements better to reflect charges, and enhances pseudo-tie scheduling and settlements to improve market administration and alignment of congestion charges and rebates. 12

Congestion Overlap: Issue Explanation Native Balancing Authority Area (NBA) Attaining Balancing Authority Area (ABA) Transmission Congestion Charge: The NBA assesses explicit congestion charges based on the transaction volumes and the Marginal Congestion Components (MCCs) at the source Generator and the ABA Interface. Charges are currently based on Real-Time LMPs. Transmission Congestion Rebate: To the extent the Market Participant holds FTRs in the NBA s market, the NBA allocates congestion rebates based and the MCCs at the source and the ABA Interface. Rebates are based on Day-Ahead LMPs. Transmission Congestion Charge: The ABA assesses congestion charges based on MCCs at the source Generator and the Load. This includes congestion costs associated with the path between the source Generation and the NBA Interface, the source of the Congestion Overlap. The charges may be based on either Day-Ahead or Real-Time, depending on when the generation is scheduled. Transmission Congestion Rebate: To the extent the Market Participant holds FTRs in the ABA s market, the ABA allocates congestion rebates based on the MCCs at the NBA Interface and the Load. Rebates are based on Day-Ahead LMPs. Potential Congestion Overlap: Market transactions/offers may face overlapping congestion charges between source Generation and ABA Interface. 13

Congestion Overlap: Issue Elaboration Pseudo-Tie Discussion Generation resources that implement interchange via pseudo-tie between the Native BA and Attaining BA schedule and/or offer only in the ABA energy market. The transactions or offers are assessed charges based on the scheduled volume/offer and the Marginal Congestion Component (MCC) for the locational marginal prices (LMPs). Native BA assessed Transmission Usage Charges are comparable to those assessed to dynamic scheduled interchange. Pseudo-tie Transmission Customers are afforded the similar treatment as dynamic schedules with respect to Transmission Rights. The Congestion Overlap occurs on the pseudo-tie transaction path between the source Generation and sink Interface for congestion associated with Reciprocal Coordinated Flowgates coordinated between the RTOs under Market-To-Market. For Market-to-Market Coordination, the Pseudo-Tie transaction is included in the Market Flow calculation of the Attaining BA, and therefore may result in payments from the ABA to the NBA for congestion relief. 14

Congestion Overlap: Solution Native Balancing Authority Area (NBA) Attaining Balancing Authority Area (ABA) Phase 1 (Tentatively June 1, 2017) The RTOs will adjust Market-to-Market settlement rules to account for Market Flows associated with the pseudo-ties from the source Generator to the Interface, this will ensure the Attaining BA has sufficient revenue to provide refunds. To address the Congestion Overlap, the Attaining BA will provide a rebate of congestion between the source Generator and the Interface associated with M2M constraints when the M2M constraint binds in both the Native and Attaining BA. Phase 2 (Tentatively June 1, 2018) Future systems, Tariff and JOA enhancements will allow for scheduling and settlement of pseudo-tie transactions in the Native BA s Day-Ahead Market, in order to more effectively coordinate, administer markets, and align congestion charges with available hedges. 15

Simplified Examples Dynamic Schedule Current Pseudo Tie Proposed Pseudo Tie LMP NBA Gen $25.00 $25.00 $25.00 NBA Interface $35.00 $35.00 $35.00 ABA Gen N/A $25.00 $25.00 ABA Interface $35.00 $35.00 $35.00 ABA Load $44.00 $44.00 $44.00 Schedule/Volumes Schedule/ Offer Volume 100 100 100 NBA FTR Gen-Int Path 100 100 100 ABA FTR Int-Load Path 100 100 100 NBA Settlements LMP @ Gen $(2,500.00) $(2,500.00) $(2,500.00) LMP @ Interface $3,500.00 $3,500.00 $3,500.00 Congestion Charge (Credit) $1,000.00 $1,000.00 $1,000.00 FTR Congestion Rebate $(1,000.00) $(1,000.00) $(1,000.00) ABA Settlements LMP @ Load $4,400.00 $4,400.00 $4,400.00 LMP @ Interface $(3,500.00) $(2,500.00) $(2,500.00) Congestion Charge (Credit) $900.00 $1,900.00 $1,900.00 FTR Congestion Rebate $(900.00) $ (900.00) $(900.00) Proposed Congestion Rebate $- $- $ (1,000.00) Total MP Compensation $- $1,000.00 $- M2M M2M Settlement N/A $1,000.00 $- 16

Next Steps RTOs discuss solutions with Section 206 parties to explore resolution outside FERC RTOs to continue solution development and share details with stakeholders 17

Possible Next Steps Timeline Due Date Who Action March 1, 2017 MISO, PJM Develop Short-Term and Long-Term solution to Congestion Overlap. April 1, 2017 MISO, PJM, Stakeholders MISO and PJM complete work with stakeholders, including Complainants on Solutions to Congestion Overlap and Double Charge. File Tariff and JOA changes with FERC as appropriate. May 1, 2017 MISO, PJM Deliver changes to JOA and Settlement Systems with a target implementation of June 1, 2017 June 1, 2017 MISO, PJM Implement Short Term Solutions June 2017 May 2018 MISO, PJM Deliver and implement Long Term Solutions June 2017 May 2018 MISO, SPP Deliver Short and Long Term Solutions 18

Contacts Stakeholder feedback send comments to: Kevin Vannoy kvannoy@misoenergy.org Tim Horger Tim.Horger@pjm.com 19

Appendix: Congestion Double Counting Native Balancing Authority Area (NBA) Attaining Balancing Authority Area (ABA) Where: MCC PS_GEN Is the Marginal Congestion Component of LMP for the Pseudo-Tie Generator s Commercial Pricing Node in NBA MCC ABA_INT Is the Marginal Congestion Component of LMP for NBA s ABA Interface Commercial Pricing Node MCC NBA_INT Is the Marginal Congestion Component of LMP for ABA S NBA Interface Commercial Pricing Node MCC GEN Is the Marginal Congestion Component of LMP for the Pseudo-Tie Generator s Commercial Pricing Node in ABA MCC LOAD Is the Marginal Congestion Component of LMP for the Load s Commercial Pricing Node in ABA 20