CITY OF COEUR D'ALENE Residential Permit Application

Similar documents
Residential Building Permit Application

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

Each proposed project will be reviewed for compliance with the following codes as applicable.

BUILDING CODES & DESIGN CRITERIA

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

One and Two Family Additions

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

Applying for Permits to build a new house in Linn County

Residential Accessory Structures & Room Additions

Minimum Requirements For One & Two Family Structures FBC 6 th Edition (2017)

RESIDENTIAL BUILDING PLAN REQUIREMENTS

BUILDING PERMIT APPLICATION

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION

Last Updated March 15, 2016

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Required Information for Permit Issuance

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

CONSTRUCTION CODE PERMIT INFORMATION

Basement Renovation Guide For Residential Dwellings

BASEMENT FINISH CONSTRUCTION

A homeowners/applicants guide to understanding and making application for a building permit.

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

A HOMEOWNER S GUIDE TO ACCESSORY DWELLING UNITS

RESIDENTIAL BUILDING REQUIREMENTS

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

Advanced Ventilation for Residential applications FBC Res 2010.

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

RESIDENTIAL CONSTRUCTION PERMIT FEES

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction.

Truth in Sale of Housing Disclosure Report NOTICE - Read Entire Report Carefully. This is not a Buyer's Inspection!

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

PIKES PEAK REGIONAL BUILDING DEPARTMENT

RESIDENTIAL BUILDING PERMIT CHECKLIST FOR THE CITY OF SANTA ROSA

Residential New Home Requirements 200 South Main Blue Ridge, Texas

Administrative Changes

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

2012 IRC Sections R303 R310 Building Planning II

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

City Planning & Development - Development Services (CPD-DS) 414 E. 12th Street 5 th Floor Kansas City, Missouri Telephone (816)

General Residential Code Requirements

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Single Family Detached home submittal Workbook

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

PRE-FABRICATED HOUSING

R vertical and horizontal.

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

RESIDENTIAL 1 & 2 FAMILY PERMIT APPLICATION

City of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209)

Legalization of Dwelling Units Installed Without a Permit SCREENING FORM No fee to file

Homes. Plan Review Input Form. Office Use: P l an Rev iew Contro l Nu mb er

An Applicant s Guide to Residential Building Permits.

Inspection Report. 1 of 8

Guide to Residential Permits and Inspections

SAN MIGUEL COUNTY & TOWN OF MOUNTAIN VILLAGE BUILDING DEPARTMENTS PRESCRIPTIVE ENERGY CODE & GREEN BUILDING STANDARD

Building Guide. Colorado Chapter of the International Code Council

Boulder City NV Prepared by (Print Name) Signature Date

Table of Contents. Page Title

City of Roman Forest

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

Residential Accessory Structure Application Packet (Carport, Shed, Garage, Pool)

Davis Frame Co., Inc. Construction Budget Considerations

Compliance Certificate

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

A/E Design Deliverable Checklist

Chapter 1: Compliance

The following materials and documents are required in order for you to obtain a Building Permit:

2003 International Residential Building Code

City of Owatonna Residential Plan Submittal Checklist

The Inspection Process. Waxhaw N.C.

The following is required for a complete permit submittal for each unit.

District of Barriere A GUIDE TO BUILDING PERMITS

NEW HOME CONSTRUCTION June 2017

Report SEG W / March 2014 Right-Sized Residence Manual J Street, Oak Park, IL Prepared by: Tracy Savoy

THE DEVELOPMENT REVIEW BOARD. 1. New construction or relocation of single-family homes, including mobile/modular and manufactured homes.

LEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction

Storm Damage Assessment Report For: 1234 Example Street., Houston, TX 77002

Building a Detached Garage

Fast Track Re-Roof Permit Checklist

Page 3 of 12. Inspected Describe. Explained. Health & Safety. Maj. Def. Examiner Notes STRUCTURE N/A. Financial Impact. Impact.

WARWICK TOWNSHIP Dept. of Planning & Zoning

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Application Requirements for obtaining a Building Permit

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

2014 Commercial Plan Submittal Checklist

Hardin County Planning and Development Commission

Medina County Building Department

CITY OF GLENDALE RESIDENTIAL PLAN SUBMITTAL CHECKLIST REQUIREMENTS FOR CUSTOM HOMES

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

Typical Finished Basement Details

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

BUILDING PERMIT SUBMITTAL REQUIREMENTS LIMITED AGRICULTURAL BUILDINGS

KITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)

Inspection of New One- and Two- Family Dwellings

BUILDING PERMIT BASICS

Transcription:

CITY OF COEUR D'ALENE Residential Permit Application Job Address: N S E W ST AVE DR RD PL LN CIR CT WY LP Legal Description: LOT BLOCK SUBDIVISION Value of Work $ Describe work: Type of Work: New Home Addition to Home Interior Remodel Finish Basement New Garage/Shop Accessory dwelling unit (ADU) Detached Storage (not a garage or shop) Porch Deck Patio Cover Fire Damage Repair Designated Mfg Home Other Total Square Footage (including basement and garage): Description of Lot: Lot on a Hillside (15% or greater) Building in Flood Plain Owner: Contact Person Phone Fax Address(C/S/Z): E-mail Contractor: Contact Person Phone Fax Address (C/S/Z): E-mail Contractor Registration No. Expiration date: Draftsman/Architect: Contact Person Phone Fax Address (C/S/Z): E-mail Engineer: Contact Person Phone Fax Address (C/S/Z): E-mail I understand that separate electrical, plumbing, and mechanical permits may be required. I understand that homes built on hillsides and in floodplains may require additional design information and may have additional construction requirements. Owner/Authorized Agent Date Staff to complete: Submittal Date: Time: Plan Review Fee: Accepted By: Revised 12.30.14

CITY OF COEUR D'ALENE Mechanical Permit Application Use of building: Commercial Residential Job Address: Owner: Address: City/Zip: Phone: Fax: E-Mail Mech Contractor: _ Address: City/Zip: Phone: Lic. # Exp Date Fax: E-Mail Describe work: NONE/NO MECHANICAL WORK Mechanical Requirements: ACCA Manuals J and D worksheets Plan showing locations, sizes & specific fittings of system Manufacturer s data sheets for proposed HVAC appliances Tutorial available at http://www.acca.org/speedsheet Software available for purchase at http://www.acca.org/store ResCheck/ComCheck see www.energycodes.gov/ Signature Date Description of Item # of items Fee Totals Processing Fee 1 $ 35 $ 35 Air Handler < 10,000 CFM x 12 Air Handler > 10,000 CFM x 20 Ductwork (any) x 8 Boiler/Refrig 1-100M BTU x 16 Boiler/Refrig 100-500M BTU x 29 Boiler/Refrig 501-1000M BTU x 40 Boiler/Refrig 1,001-1750M BTU x 59 Boiler/Refrig > 1750M BTU x 98 Clothes Dryer x 16 Electric Furnace x 16 Evaporative Coolers x 12 Gas Equipment < 100,000 BTU x 16 Gas Equipment > 100,000 BTU x 20 Gas Log x 16 Gas Piping (each outlet) x 2 Gas Water Heater Venting x 8 Heat Pump & A/C 0-3 tons x 16 Heat Pump & A/C 4-15 tons x 29 Heat Pump & A/C 16-30 tons x 40 Heat Pump & A/C 31-50 tons x 59 Heat Pump & A/C > 50 tons x 98 Miscellaneous (not covered elsewhere) x 26 Manufactured Home Gas Hook-up x 16 Range (Gas) x 16 Radiant Heat (# of Items equals zones) x 8 Type I Hood (per 12 or portion thereof) x 12 Type II Hood (Typical Residential) x 12 VAV Units/Duct Heater x 8 Ventilating Fans x 8 Gas Insert x 20 Fireplace Insert x 20 Woodstove x 20 Water Heater Specialty Plumbing Contractor Lic. #: x 8 TOTAL PERMIT FEE $ Revised 12/30/2014

CITY OF COEUR D'ALENE Residential Plan Submittal Minimums 1. A plan review fee based on the value of the job is due in the form of cash or check at the time of permit submittal. 2. Submittals are required to be an electronic PDF file. 3. Building and Mechanical applications must be fully completed. 4. Site plan. A drawing representation of the property line, structure(s) on the property and the distance from all structures to the property lines. Distance between structures should also be included. Distinguish between existing and proposed structures and driveways or approaches. North Arrow for bearings. 5. Floor Plan for each level of the house including the garage. Identify each room. Show smoke detector locations. One smoke detector is required in each bedroom, outside each sleeping area and at least 1 per level of the house. Show carbon monoxide detector locations. One shall be installed outside of each sleeping area in the immediate vicinity of the bedrooms. 6. The height of any proposed buildings or accessory structures from grade to peak is required to be reflected on the plan. 7. Plan details. The details should be complete enough for the plans examiner to be able to look at your plan and perform the construction of the project. Details would include such items as elevations, roof plan, framing plans, spacing, joist hangers, joist size and spacing, flashing, ledgers, beam size and type. 8. Zoning: R-1 R-3 R-5 R-8 R-12 R-17 MH-8 DC PUD: Infill overlay district: DO-N DO-E MO Hillside 9. All headers and beams location including type, size and connections. 10. Foundation plan with cross sections of footings, pads, wall reinforcement, anchor bolts, hold downs and sill plates. Include deck and patio details. 11. Floor framing details. Show beams, joists type, size, spacing and installation details. 12. Roof framing plan and details or truss layout and datasheets, include over-framing details. 13. Furnace and hot water heater location. 14. Egress windows. Provide at least one egress window in every bedroom and at least one on each level. 15. All braced wall panel types. Show locations and details of installation, including engineered design. 16. Shear / Braced Wall Plan. 17. Attic access. Should be 22 x30 (not allowed in closets smaller then 5 x 7 ) 18. Crawl space access. Should be 18 x 24 min (22 x30 min if access to mechanical equipment) 19. One-hour fire resistive separation detail between house and garage. 20. Energy Calculations (PDF 2009 IECC): Including percentage of glazing, U-factor of windows, R-values of basement, slab, crawl, floors, exterior walls and ceilings. Website: www.energycodes.gov Tech support: techsupport@becp.pnl.gov I acknowledge all the submittal minimums marked above are included either on the drawings or with the application for plan review. Completed By Date Revised 7/20/2016

SAMPLE SITE PLAN 50 10 Proposed Deck 30 x 5 5 5 Proposed Garage 40 20 New Driveway NORTH Existing House 5 Alley 15 50 25 Property Line 30 PUBLIC OR PRIVATE STREET The Site Plan and/or Floor Plan can be hand drawn. Please make sure if using pencil, the line is dark enough for scanning. Kitchen SAMPLE FLOOR PLAN Entry Living Room Main Level Bedroom bathroom bedroom EGRESS WINDOW Basement Open unfinished space (indicate any rooms) EGRESS WINDOW Storage room

CITY OF COEUR D ALENE Residential HVAC System Design Form Building Permit No. Please COMPLETE ALL Fields Below (For new dwellings submitted for building permits after 01-01-2010) DESIGNATED CONTACT PERSON Name: Phone: Cell: E-mail: Mechanical Contractor: REQUIRED ATTACHMENTS ATTACHED License Number: Phone Number: E-mail: Job Address: HVAC LOAD CALCULATIONS (from worksheet; Per 2012 IRC M1401.3) Design Conditions: Building Construction Information: Winter Design Conditions: Building: Outdoor Temperature Number of Bedrooms Indoor Temperature Conditioned Floor Area sq ft Total Heat Loss btu Number of Occupants bedrooms + 1 Summer Design Conditions: Windows: Outdoor Temperature Eave Overhang Depth ft Indoor Temperature U Factor Latent Heat Gain # Skylights: Total Heat Gain btu Direction Orientation of Front Door: HVAC EQUIPMENT SELECTION (Per 2012 IRC M1401.3) Heating Equipment Data: Cooling Equipment Data: Blower Data: Equipment Type Equipment Type Heating cfm Manufacturer Manufacturer Cooling cfm Model Number Model Number Static Pressure Heating Capacity Cooling Capacity HVAC DUCT DISTRIBUTION DESIGN (Per 2012 IRC M1601.1) Design Airflow Longest Supply Run Trunk Type (circle 1): Branch Type (circle 1): External Static Pressure Longest Return Run duct board, flex, duct board, flex, Pressure Losses Total Effective Length sheet metal, other: sheet metal, other: Available Static Pressure Friction Rate (Available Static Pressure = ESP-CP) (Friction Rate = ASP x 100 / TEL) The load calculations, equipment selection, and duct system design were performed based on the plans as submitted for a Building Permit. The system will be installed in the field per the approved equipment and duct design. CONTRACTOR (Please Print) Contractor Signature: _ Date 12/5/14 1. Manufacturer s Performance Data Sheets Yes 2. Manual D Worksheets Yes 3. Duct Distribution Line Drawing Yes 4. Choose one (1) of the following: * If Home qualifies for MJ1AE form base on Abridged Edition Checklist a) Manual J1 Form & Worksheets Yes -ORb) MJ1AE Form & Worksheets* Yes -ORc) Other Approved Form & Worksheets Yes

CITY OF COEUR D'ALENE Street Tree Requirements New Construction City ordinances require the planting of one street tree per street frontage for new construction of duplexes and single-family dwellings. Note that corner lots would require two street trees one per frontage. A $300 fee per street frontage will be collected when a building permit is issued. A request for a refund of the $300 fee can be submitted when one of the following conditions have been met: 1. Retention of existing trees within the right-of-way; 2. Purchase and planting of one street per frontage at time of application of Certificate of Occupancy; 3. Purchase and planting of a street tree(s) within 6 months of issuance of Certificate of Occupancy. The attached brochure outlines the ordinance requirement, provides information on selecting and planting trees, and includes an application for a refund of the fee. The following information is needed for your property: Property Address or Parcel Number: Number of frontages Signature: Date: Application for Refund Contractors or homeowners can apply for refund at the time of application for Certificate of Occupancy. Homeowners have six months after issuance of a C.O., to apply for a refund. Property Location / Address Refund to be mailed to: Contractor (name& address) Homeowner (name & address) Signature Date Submit to: City of Coeur d Alene Attn: Urban Forestry 710 E. Mullan Avenue Coeur d Alene, ID 83814 For questions related to Urban Forestry, please contact Katie Kosanke at (208) 769-2266. 12/31/2014

CITY OF COEUR D ALENE Building Department BUILDING PERMIT ADDENDUM CONTRACTOR REGISTRATION EXEMPTION DECLARATION Effective immediately the City of Coeur d Alene will not accept a building permit application unless the applicant provides proof of contractor registration as required by Idaho Code 54-5209 or is exempt from the registration requirement. This requirement can be satisfied in one of the following ways: Enter your current Idaho Contractor s Registration number and expiration date on the face of the application and attach a copy of your registration card or other documentation from the Contractor Board establishing that you are currently registered. Complete the following addendum by indicating that you are exempt from the registration as provided by Idaho Code 54-5205. In order to complete the addendum you must identify the basis for your exempt status including a reference to the Idaho Code subsection creating the exemption. I certify, under penalty of perjury, that I am exempt from the contractor registration requirement of I.C. 54-5209. I am exempt because, which is established as an exemption by I. C. 54-5205. I understand that acting in the capacity of a contractor within the meaning of Idaho Code Chapter 54 Title 52 without a current registration with the Idaho Bureau of Occupation Licenses or without being exempt as defined by Idaho Code 54-5205, is a misdemeanor punishable by a fine not to exceed one thousand dollars ($1,000) or by imprisonment in the county jail for a term not to exceed six months, or both. Name: (Please Print) Signature: Date: Revised 12.4.14