CARPET FLOOR COVERING TRADE SPECIFICATION

Similar documents
VINYL TILE, SHEET & LAMINATED FLOORING TRADE SPECIFICATION

TILING SPECIFICATIONS

a new liquid screed solution from

REF : WEBSITE08. Monday, 12 December 2011

Outline NBS Specification. Protec System to PVC Single Ply (Waterproofing Only)

KOSTER AMERICAN CORPORATION

Florock Seamless Flooring Systems

Screedmaster Ultimate

Flooring and Bedding. RonaFloor SL. Self-smoothing seamless epoxy resin flooring system

Kolorines Glass Mosaic Tiles Project Specification

M40 STONE / CONCRETE / CERAMIC TILING / MOSAIC To be read with preliminaries/general conditions

Installation Guidance Note: Flotex Sheet

DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340

CARPET CARPET

Bill of Quantities PANDOMO TerrazzoBasic PANDOMO BG/BW TerrazzoBasic two layers on separating sheet or insulation

TECHNICAL BULLETIN TB147 THE INSTALLATION OF ARDEX DS40 SOUND REDUCTION MATTING IN INTERNAL INSTALLATIONS

Footfall sound dampening system for wood flooring

Geometric and Quarry Floor Tiling Installation Guide

PRODUCT DATA SHEET Sikafloor -378

DURABASE CI. Underlay mats for decoupling and sealing tiled flooring 1/5 A P P L I C A T I ONS AND FUNCTION.

Geometric and Quarry Floor Tiling Installation Guide

Sikafloor -161 is an economic, two part, solvent free, low viscosity epoxy resin, suitable for use under hot climate condition.

GENERAL SPECIFICATION FOR FIXING EXTRUDED TILES (GAIL, INTERBAU, NCI, VTIRO, ETC) ONTO INTERIOR SURFACE BEDS AND SUSPENDED SLABS

for the master tradesman Setcrete Product Guide

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017

1.3 Work shall include all reinforcement and accessories necessary to complete installation.

High viscous (thixotropic) elastic adhesive for wood flooring

ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment

USA USA USA PURE CLICK

Installation Instructions for CushionBac Renew Tiles

ITEM 458 WATERPROOFING FOR STRUCTURES

METHOD STATEMENT 001 CONCRETE BALCONY WATERPROOFING FOR DIRECT FIXED TILES

Liquid applied polyurea hybrid membrane

DURABASE CI 1/5. Underlay mats for decoupling and waterproofing tiled flooring APPLICATIONS AND FUNCTION.

SECTION MOISTURE RESISTANT/WATER-PROOF FLOORING ADHESIVE FOR CONCRETE SLABS

Two component solvent-free epoxy system for creation of self-levelling floors. Gloss <4% <70% IR4

DESCRIPTION Two-part, quick-drying, highly polymer-modified, waterproof cementitious based system for walls and floors.

GLUE-DOWN INSTALLATION VIRTUO 30 / 55

Specification for Road Works Series Waterproofing for Concrete Structures

Technical Service. INSTALLATION INSTRUCTIONS FOR TARAFLEX SPORT PRODUCTS over Gypsum base Products. This document refers to the following products:

TECHNICAL DATA SHEET SIKALEVEL 25 LATEX SELF LEVELLING 25KG

Two component solvent-free epoxy system for creation of self-levelling floors. Gloss >4% <70% 83mg IR4

CHARACTERISTICS / ADVANTAGES

Visqueen Building Products Maerdy Industrial Estate Rhymney Tredegar Gwent NP22 5PY Tel: Fax:

SECTION CONCRETE PAVING SLABS SET IN MORTAR

3M Safety-Walk. Peel-and-Stick Slip-Resistant Tapes and Treads. 3Innovation

Installation Information 2016

PART A: JOB PROCDRE FOR PLASTERING

Low Viscosity, Solvent Free Elastic Adhesive for Wood Flooring. Solvent free Odourless Recyclable tin pail EMICODE EC 1 PLUS R, very low emission

Fiber Reinforced Tile and Stone Mortar

HYBRID. Pre-Laying Checks

Installation Guide LVP Glue Down

Construction. 2-part epoxy primer. Product Data

1-part elastic joint sealant and multipurpose adhesive

Bill of Quantity (BOQ)

SECTION RESILIENT SHEET FLOORING

Construction. S-Vap 5000E SA Self-adhesive Vapour Barrier. Product Description

RIW SHEETSEAL GR BENEFITS APPLICATIONS APPLIED TO

PURE INSTALLATION MANUAL

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

Caparol System PRO Data sheet

Construction. 3-part cement and epoxy combination micro mortar for surface sealing. Product Description 1 1/5. Tests

SECTION JOINT SEALANTS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

Slate Floor Tiling Installation Guide

REBOUND ACE AIR CUSHION

Terracotta and Lubelska Bricks Floor Tiling Installation Guide

Make your floor a unique artwork!

A. Section includes hydraulic-cement-based, polymer-modified, self-leveling underlayment for application below interior floor coverings.

Resin Bound and Bonded Surfacing. RonaDeck UV Rubber Granule Tree Pit Base. Resin bound rubber granule porous tree pit system.

Broadcast Parking Garage System

Contents. SUPPORTING PRODUCTS UL-Primer 24 Moisture Seal 24 Megalastic 25

STIRLING LLOYD WATERPROOFING SYSTEMS INTEGRITANK

METHOD STATEMENT SCREEDING OF FLOOR

Construction. Sikafloor N Elastic. 1-part PUR highly elastic coating. Product Data Sheet Version 29/03/2011(Corporate edition 12/08/2010)

Rapid flex one. Rapid-setting, highly polymer-modified, water/frost-resistant cementitious tile adhesive for walls and floors.

Installation Instruction

Signature Sports Flooring Installation Instructions. For SignaDeck Premium Rubber Tiles

September Saddle Flooring Systems

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound

Specialists in Acoustic Flooring and House to Flat Conversions

Non Slip Paint - Installation Guide

Product Data Sheet Sikadur -31 CF Normal Product Description Uses ruction Const Characteristics / Advantages

TECHNICAL DATA SHEET AUS-FLEX MULTI

CSI SECTION MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials

B. All work of the section shall comply with the conditions of the contract, the drawings and any special conditions forming a part of the contract.

SECTION LATEX-MODIFIED MEDIUM BED MORTAR

Safety flooring the complete system

Floor Insulation Underlayment Section Sound Control Matting

Construction. Pulastic Coating-221 W. 2 Component Polyurethane

Low cost because floor renovation can be completed the same day

RUBBER_ RUBBER_ noraplan norament nora nora

RMF Intercell. NBS Specification 2013 K41

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

Under Tile Heating Mat Installation Instructions

REGUPOL ACOUSTIC UNDERLAY COLLECTION IMPACT SOUNDPROOFING FLOORS

ENKASONIC FLOOR UNDERLAYMENT 9110

RESILIENT FLOORING: Select Step Wood

Installation Instructions. For. Tuscan Engineered 5GC. Wood Floors

CEMENTITIOUS CRYSTALLIZING WATERPROOFING PART 1 GENERAL

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

Transcription:

CARPET FLOOR COVERING TRADE SPECIFICATION GENERAL a) BDW Trading Limited Barratt Homes and David Wilson Homes are all trading names of BDW Trading Limited the Company. b) Site Conditions The Contractor is to examine the drawings, visit the site in order to ascertain position of site office, compound, electricity and water supplies and the local conditions etc as no claim for adverse site conditions will be entertained. c) Materials The Contractor must ensure that all materials are satisfactory for use and have not been subject to deterioration and confirm to the relevant BSS, if applicable or Agrément Certificates. Failure resulting from the Contractor using unsuitable or damaged materials will incur the Contractor the costs of rectifying the same. The Contractor is responsible for unloading, protecting and safe storing of all of their own materials to avoid damage and surface contamination. d) Unloading Materials It is the Contractors responsibility for unloading and storing all of their own materials. e) Sub-Contractor The Contractor must not further sub-contract any part of the Works to another Contractor without the prior knowledge and written approval of the Company. It is essential that the Contractor liaises with all other trades associated with the Works to ensure the sub-structure is installed correctly and appropriately prior to work being carried out, including but not limited to: Cleaner All floor areas are clear of any loose materials and debris in rooms requiring floor covering. Carpenter That they are aware which rooms will require door cutting / easement after fitting of flooring as included in their trade specification. Clearing & cleaning eased door waste materials off finished floor. f) Defective Workmanship All defects arising from bad workmanship by Contractors are to be remedied by the Contractor at no cost to the Company. Failure by the Contractor to carry out this contractual obligation resulting in an alternative contractor carrying out this work will incur the Contractor with the cost thereof.

g) Manufacturers Products The Contractor must make themselves aware of Manufacturer s products and fixing instructions at the tendering stage as no claim for want of knowledge will be entertained. h) Clearing Contractor is responsible for clearing up and removing waste materials resulting from executing his trade process. Failure to comply with this requirement resulting in the Company s labour performing this task will result in contra charges. Waste materials must be removed as work progresses, ensuring that all waste materials have been removed following the completion of the works. The contractor must provide us with a waste transfer licence for the appropriate disposal of their construction waste. i) Contract Conditions The Contractors attention is drawn to the Company s Conditions of Contract and General Terms. j) Group Suppliers The Contractor should be aware that the Company operates an agreed National specification with a number of suppliers; these should be listed in the enquiry letter and must be adhered to. Failure to do so may lead to the Company making a claim from the awarded Contractor for any loss of rebate. Carpet & underlay - Carpet accessories (floor grippers & carpet bars) - Entrance matting - Levelling compounds & floors primers - Abingdon Flooring LTD Unit 5a Wharfedale Business Park Edward Street Bradford BD4 9RT No group deal No group deal Norcros Harewood Street Tunstall Stoke-on-Trent ST6 5JZ No other manufacturer s products are to be specified unless otherwise stated in the following Schedule of Materials. k) Health & Safety All operatives are to be inducted on site in accordance with Barratt Health and Safety Policy. It is the responsibility of the contractor to provide their own PPE Equipment which must be worn at all times while on site. All operatives are to be in possession of a valid CSCS Card.

1. QUOTATION 1.1. The Contractor must provide a fully inclusive lump sum (labour and materials) fixed price quotation per House Type for supply and installation of Carpet floor covering works including underlay, grippers, door bars and threshold strips. 1.2. All works are to be completed in accordance with the House Type working drawings, Sales specification supplied with this specification document. The Contractors particular attention is drawn to the importance of following this information. 1.3. Your quotation for the Works is deemed to include all necessary,.3.1. all equipment and materials necessary for the complete the floor covering installation,.3.2. labour,.3.3. supply of materials to Site,.3.4. protecting materials on Site,.3.5. distributing materials to Plots.3.6. installation 1.4. The Contractor to state their extra over price, per unit, for the provision of Latex (or similar) leveling screed prior to underlay and carpet installation. 1.5. The contractor is to ensure that the sub-floor preparation as a clean, hard and dry finish free from all contamination prior to commencement. 1.6. Ground floor sub-floor construction will be trowel or power float finished concrete. 1.7. The contractor should report any defects within the sub-floor before commencing any works. 1.8. The acceptable carpet types that can be used are as the approved range detailed within the attached addendum or regional sales specification which are to be laid to Hallway, stairs, landings, bedrooms and other area where indicated, as defined within the Company s Sales & Construction Specification. 1.9. The acceptable underlay types that can be used are: Cloud 9, Duralay, Tredaire and Greenstep (or similar approved range as detailed within the attached addendum or regional sales specification) are to be laid to Hallway, stairs, landings, bedrooms and other area where indicated, as defined within the Company s Sales & Construction Specification. Underlay must have a minimum density of 80kg per m 3 and be at least 8mm thick, sponge rubber underlays must be at least 2,250gms per m 2. No underlay should be over 10mm thick

1.10. All Carpet and underlay are to be laid using Wilton Royal approved accessories and used in accordance with the manufacturer s instructions, specification and recommendations. 1.11. All edges of flooring are to be tensioned onto gripper rods which have been fixed in accordance with the manufacturer s instructions and specification. Glue and screw only to stairs. 1.12. A heavy-duty ribbed entrance mat should be installed in each plot normally of 1m 2. This should be available in either beige or anthracite. 2 PREPARATION 2.1 In preparing concrete bases, the flooring contractor must ensure the base is sufficiently dry, clean, free from contamination (efflorescence, laitance, dirt, oil, grease or other materials incompatible with the bedding) and smooth to receive mortar bed. Any hollow or uneven areas are to be notified to the Site Manager for appropriate repair by the original Contractor. Dusty or porous concrete/screeds should be thoroughly dry brushed and then primed with Norcros Prime Bond diluted 1: 4 with water or similar. 2.2 New concrete must be cured for a minimum 6 weeks before application of a cement sand screed. Where a smoothing under-layment is required, a type recommended by Norcros or other appropriate specialist is to be used, additionally it must applied to the base and allowed to dry for a minimum of three weeks before fixing Carpet floor covering unless otherwise specified by the screed manufacturer. 2.3 All secondary backed carpets must be fitted with sound reducing underlay, to a minimum of BS EN ISO 140-8 / BS ISO 717-2 2.4 Power floated finishes are to be cleaned and dust-free in readiness to receive a slurry bonding coat comprising of 2 parts cement-based adhesive to 1 part Norcros Prime Bond. 2.5 When fitting floor covering to under stairs, cupboards and airing cupboards maintain due care and attention to health and safety. 2.6 For floor coverings, no seams/strips to rooms under 5m wide use correct width roll. Please check with the site manager if you have concerns over the locations of possible seems/stitching. 2.7 Mastic from skirting installation or soundproofing mastic should not be cut away from skirting please see site manager for rectification. 2.8 If underfloor heating is specified and has been installed the tog rating of the carpet plus the underlay must not exceed 2.4 tog (or as advised by the underfloor heating supplier) and adjusted accordingly.

3. COMPLETION 3.1. Following completion all completed areas are to be adequately protected, kept clean and clear of traffic or permit only light traffic for the next 10 days. 3.2. Ensure skirting is undamaged and is clean after installation. 3.3. Gaps between the skirting & floor finish must not exceed 3mm 3.4. Site manager to check and sign off upon completion and to check installation of protection materials. 3.5. Carpet to be fully vacuumed after fitting, ensuring all fibers that have been released from the pile with foot traffic at installation are removed. 3.6. All cut pile carpets can be subject to a shading effect. This is not a manufacturing defect but could be light reflecting from unequal crushing of the pile during installation. If you have installation issues please make the site manager aware as soon as possible.

CARPET FLOOR COVERING TRADE SPECIFICATION AGREEMENT This Specification Agreement relates specifically to the Company s development at.. I confirm that I have read and understood the foregoing Specification and that my prices include for all items contained therein and will "Remain Fixed" for a period of:... as outlined in the Enquiry letter. SIGNED: FOR AND ON BEHALF OF:.. DATE:. N.B. The contractor is to sign this Agreement and return it with his Quotation. Any prices received without this Agreement will be excluded from consideration. Revised: Rev 1 July 2017 Rev A 1 January 2018