HIGH-SALINITY, HIGH-PERFORMANCE PACKERS

Similar documents
WESTERN ENERGY PRODUCTS & SERVICES (WEPS) SWELLABLE PACKERS

Coiled Tubing for Downhole Applications

COMPLETIONS WFXØ VØ-RATED OPENHOLE GRAVEL- PACK SYSTEM

Reactive Perforating: The New Ballistic Frontier That s Revolutionizing Well Completions

Solid-Expandable Systems. The Key to Economical Recovery in Mature Fields

Improved Production from Horizontal Wells in the Bakken

WELL RECORD INSTRUCTIONS (Unconventional Operators only)

Overview of Completions

Cased Hole Sand Control Essentials. Fluids, Equipment, Tools, and Displacement Services

Isolating Potential Flow Zones During Well Construction

Liner Hanger Selection. A Guide for Drilling and Completion Engineers

Green Energy Oilfield Services, LLC

Remotely Operated Cementing Methods for Drilling with Liner Installations. Steve Rosenberg, Global Drilling Reliability Manager

MetalSkin Cased-Hole Liner System

INTERNATIONAL PERFORATING SYMPOSIUM 2014

Drilling Rams. Maintain well control and seal annular spaces with trusted, rugged drilling rams

SHALE FACTS. Production cycle. Ensuring safe and responsible operations

Sand control case histories: Shape memory polymers, resins, shunt tubes

Drilling-with-Liner (DwL ) System Drill the Undrillable

Shale Projects Becoming Globally Important U.S. Shale Oil & Gas Experience Extrapolates Globally

SPE Copyright 2012, Society of Petroleum Engineers

Shale Development: Understanding and Mitigating Risks Associated with Well Construction and Hydraulic Fracturing

Water Issues Relating to Unconventional Oil and Gas Production

CEMENT EVALUATION ITS NOT JUST ABOUT A BOND LOG GLEN BENGE SENIOR ADVISOR CEMENTING PRESSURE PUMPING

Specification for Drill Through Equipment Rotating Control Devices 1. DRAFT Specification for Drill Through Equipment Rotating Control Devices

DEEPA TM Stimulation of Natural Fracture Networks in Austin Chalk

Titanium Production Tubing for HPHT Oil & Gas Wells. Jonathan Parry Chevron Jim Grauman TIMET

MACKERAL OIL TOOLS PVT. LTD.

ULTRALIFT DEEPWATER GAS-LIFT SYSTEMS

Overview of Offshore Well Completions

OIL AND GAS DOCKET NO

Natural Gas A Game Changer

Cement Plug Placement and Integrity Mechanical Cementing Service

SteadyState Continuous Flow System

Practical Cementing Technique to Repair Severe Casing Damage David Cirer, Erick Arze, Juan Manuel Moggia, Ruben Hector Soto, Pan American Energy.

WELL CONTROL THE RISING EAST NOVEMBER/DECEMBER INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS Drilling

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection

Statewide Rule 10 : Downhole Commingling

Water Use and Conservation in Barnett Shale Energy Development

CT Reverse Circulating - Basics

Swell Packer case histories. FORCE Stavanger, April 2004 Rune Freyer

2015 Global Petroleum Technologies Limited.

Date of Issue: August 2017 Affected Publication: API Specification 16A, Specification for Drill-through Equipment, Fourth Edition, April 2017

IPS More than just Penetration: Perforation Design for Naturally Completed and Stimulated Wells

This presentation is based upon work supported by the Department of Energy National Energy Technology Laboratory under DE FC26 05NT42590 and was

Overview. ESTMZ Enhanced Single-Trip Multizone FracPac System

The Influence of Titanium Properties on the Design and Application of Downhole Oil & Gas Equipment. Mitchell Dziekonski Titanium Engineers, Inc.

Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals

HTHP Gas Production Casing Cementing Michael Davis, SPE, Drill Science Corp.

Virginia Walsh, PhD, P.G. Ed Rectenwald, P.G. February 25, 2016

C H E M I X. Delivering Cesium Formate to the Oil & Gas Industry. Stocks available immediately for direct sale S.G. 2.20

Division Mandates. Supervise the drilling, operation, and maintenance of wells to prevent damage to life, health, property, and natural resources.

Barrier verification and leakage risk. Dave Gardner, IRIS Norwegian Oil and Gas Plug & Abandonment Seminar October 18 th 2017

Screenless Sand Control Completions. New dimensions in sand management

Easy to Use A7 Saves You Time and Money

Steam Injection. Dr. Helmy Sayyouh Petroleum Engineering Cairo University

CAMShale. Fracturing fluid delivery and flowback service

Nodal Analysis Approach in Minimizing Pressure Losses to Improve Well Productivity

Water Utility Science Water Math and Hydraulics 050. Name: Date:

Well abandonment procedures and perforation with a slotted charge for cement squeeze applications

I ndependent D rilling E ngineering A xel S perber

Optional Drill Pipe Products

Laboratory Apparatus Improves Simulation of Lost Circulation Conditions

6 DRILLING AND COMPLETIONS

Seal 9 barrier verification by xlot and Communication test

Water Management Planning in the Eagle Ford Shale Play

AADE-03-NTCE-20. SLURRY DEVELOPMENT Slurry development was governed by two main constraints; namely TRRC requirements and operational constraints.

Case Study Casing Path Well An Effective Method to Deal with Cascading Water

Experience with Propellant Well Stimulation

Plugs and Profiles. Types Running Pulling Problems

CONCENTRATE AND BRINE MANAGEMENT THROUGH DEEP WELL INJECTION. Abstract

Deepwater: Drilling Trouble Zones and Well Integrity. Ron Sweatman HALLIBURTON RPSEA Forum at University of Southern California November 29, 2006

NGWA s Water Well Construction Standard: ANSI/NGWA 01-14

Offshore Completion Systems

Evolution of the Haynesville Shale Development: A Case History of XTO Energy s Operations Methods

ENDURA DUAL-STRING SECTION MILL. Set a rock-to-rock barrier and know that it s done right. WELL ABANDONMENT

Aqua Clear Aqua Clear multi-lobal cross section of individual filaments has more micro-voids giving higher dirt holding capacity and lower resistance

SPECIFICATION Insulated Steam Injection Tubing Revision 6, dated 24 July 2011

Field Loading Procedures Drill Pipe Cutters

DTE Energy Barnett Shale Overview. April 6, 2006

Enhanced Oil Recovery Institute IOR/EOR Conference Jackson, Wyoming September 10 & 11, 2012

SPE Copyright 2013, Society of Petroleum Engineers

Colorado Oil and Gas Conservation Commission

Horizontal Well Spacing and Hydraulic Fracturing Design Optimization: A Case Study on Utica-Point Pleasant Shale Play

Parker Engineered Materials Group Elastomers 101

Producing a well. Folie 1

STALLION OILFIELD SERVICES

C900/RJ. CertainTeed. PVC Pipe. with CertainTeed s proven Certa-Lok restrained joint system. Directional Drilling

Water Dependency of Geothermal Power Generation Systems

Dynamic MudCap Drilling in the Granite Wash Formation. Kurt A. Shipley

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER).

Autumn Conference September Le Collectionneur-Arc-de-Triomphe Paris

H 12 Heavy Duty Modern Tripod 8 Seat Swing Heavy Duty Hangers

Mechanism of Excessive Water Production in an Iranian Offshore Oilfield

Carbon Dioxide Capture and Sequestration in Deep Geological Formations

Reservoir Engineering

Colorado Oil and Gas Conservation Commission

PipeLife Jet Stream, Inc. Post Office Box 190 Siloam Springs, AR O F

Common Oil & Gas Environmental Issues

Transcription:

HIGH-SALINITY, HIGH-PERFORMANCE PACKERS

LEADING THE PACK IN COMPLETIONS Nothing is predictable in the oilfield. Maximizing production and minimizing costs is a balancing act. In challenging, unconventional environments, it s important that you have a partner who understands how to get the job done efficiently and effectively. Nine Energy Service is that partner.

PROOF OF PERFORMANCE Nine boasts a proven track record of successfully running more than 3,000 liner packer assemblies, 13,000 frac sleeves, and 64,000 swell packers and hydro-mechanical packers. TRUSTED PARTNERS Anadarko Petroleum Carrizo Oil & Gas ConocoPhillips Continental Resources EOG Resources Hess Corporation Marathon Oil Oasis Petroleum OXY Samson Resources SM Energy Statoil XTO Energy Zavanna

TIME EQUALS MONEY. SAVE BOTH. Fluid change out costs time and money. Our Swell Seal Packer is designed to cut that time practically in half. What s more, our product delivers tailored deployment times, high swell volumes, exotic brine compatibility, and oil/ water/combination elements. FEATURES Available in water, oil and hybrid reactive rubber compounds Elastomer is bonded to the mandrel integral assembly Element lengths up to 30 feet Approximate rating of 1,200 psi/1 foot of elastomer Available in API mandrel sizes and grades Casing weight compatible with liner Casing thread compatible with liner Custom rubber diameters for specific applications Provides for adequate run in hole time Reacts quickly when on depth Temperature range of 100 F to 360 F (dependent on type of compound) APPLICATIONS Multi-stage fracturing Multi-lateral isolation Well construction Aquifer protection Micro-annulus control Primary isolation Solid expandable tubulars Completions ICD/screen/expandable screen isolation Reservoir compartmentalization Acid stimulation Slotted/pre-drilled liners Inflatable/mechanical packer back-up

NINE: SOLUTIONS THAT ARE SECOND TO NONE At Nine Energy Service, we don t offer off-the-shelf solutions. We customize completion solutions for each product, and provide the tools and knowledge to deliver the lowest costs and highest efficiencies. Nine is the first company with a high-salinity swellable packer in the Bakken. Our custom-made packers provide swell times that are twice as fast as our competitors in high salinity fluids. While most Rubber OD (inches) PERFORMANCE OF WATER SWELL AT 158 F IN 26% w/v NaCl 6.625 6.500 6.375 6.260 6.125 6.000 5.875 5.750 0 10 20 30 40 50 60 70 80 90 100 Time (days) swell packers require changing out fluids for fresh water, ours swells in fully saturated brine. SWELL SEAL COMPETITOR WATER SWELL This unique capability eliminates the need for hauling and storing freshwater and disposing of wellbore fluid, while saving significant time on the rig. Our product also provides stable performance in fresh water and oil based fuilds with no loss of Custom-made swellable packer designed for each application Up to 26 percent salinity / Fully saturated brine 295 percent swell volume performance and final swell volume.

TESTING: PERFORMANCE UNDER PRESSURE When you require solutions fast, you need products you can trust. The Swell Seal Packer is rigorously tested to ensure it meets our high performance and safety standards so it is ready to go when you are. REACTIVE TESTING All testing carried in full scale where possible Measured in three places every hour until required OD seal is met 24-hour round-the-clock testing Swell speed testing to confirm safe deployment window Single element differential pressure testing Testing facility capability up to 20,000 Psi/up to 400 Implementing AWES OHZI Recommended Practices 1-ft. and 5-ft. bonded-to-pipe test element mandrels 1:1 scaled to base pipe Text fixture ID 1:1 scaled to packer seat Swelled in customer fluid or approved alternative at required temperature Tested with swelling fluid, single-end, at temperature with electronic data acquisition 1-ft. and 5-ft. results allow for interpolation Current process can be adapted to include 10-ft.+ bonded-to-pipe test mandrels

NINEENERGYSERVICE.COM