PN Comment Period: February 9, 2015 to March 9, 2015

Similar documents
PUBLIC NOTICE. Dredging with ten-years maintenance, return flow to the waterway and upland placement. Georgica Cove, tributary of Georgica Pond

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE US Army Corps of Engineers, Honolulu District

Joint Public Notice. LOCATION: In Salmon Bay, Lake Washington Ship Canal, at Seattle, Washington.

J O I N T P U B L I C N O T I C E

Notice No Closing Date: May 12, 2017

Public Notice of Application for Permit

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)

J O I N T P U B L I C N O T I C E

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL

CESAM-RD-C April 24, 2013 PUBLIC NOTICE NO. SAM AFM JOINT PUBLIC NOTICE SAM AFM U.S. ARMY CORPS OF ENGINEERS

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:

PUBLIC NOTICE LOS ANGELES DISTRICT. APPLICATION FOR PERMIT Port of Los Angeles Berths : Wilmington Waterfront Promenade

J O I N T P U B L I C N O T I C E

JOINT PUBLIC NOTICE. April 14, 2014

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

J O I N T P U B L I C N O T I C E

Public Notice of Application for Permit

J O I N T P U B L I C N O T I C E

CESAM-RD-M February 28, 2018 PUBLIC NOTICE NO. SAM PAH JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS

J O I N T P U B L I C N O T I C E

JOINT PUBLIC NOTICE. Paul Shealy Big Man's Marina, LLC 125 Big Mans Road Leesville, SC LAKE MURRAY

JOI NT PUBLIC NOTICE

Public Notice Charlestown Road New Albany, Indiana 47150

Public Notice ISSUED: August 11, 2015 EXPIRES: September 10, 2015

THE CORPS REGULATORY AUTHORITY

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA

KIUC Pumped Storage. April 2015

Department of the Army Permit Application

Trails Permitting Process

Public Notice. This notice announces an application submitted for a Department of the Army (DA) Permit, subject to Section 404 of the Clean Water Act:

CEMVR-OD-P Joint Public Notice. Illinois Environmental Protection Agency

Navigating the U.S. Army Corps of Engineers Regulatory Process

Information for File # PRH

Public Notice of Application for Permit

Addendum to Mitigated Negative Declaration

SAN FRANCISCO DISTRICT PUBLIC NOTICE PROJECT: San Francisco Marina West Harbor Maintenance Dredging

Record of Decision for Issuing a Presidential Permit to Champlain Hudson Power Express,

NOTICE OF PREPARATION

Public Notice River Road Louisville, Kentucky Ohio River, left bank at Mile in Louisville, Jefferson County, Kentucky

Section :18,056. Scale. Legend. Building. Corral. Dam. Dugout. Gate. Graveyard. Power. Pump. Spring. Trough. Well. Windmill. Fence.

AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality

Public Notice 15 DAY PUBLIC NOTICE

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):

ACP BIOLOGICAL CONTROL MOVES TOWARD GRID RELEASE STRATEGY

Nationwide Permit General Conditions

Public Notice. East Kentucky Power Cooperative (EKPC) 4775 Lexington Road Winchester, KY

Public Notice. This notice announces an application submitted for a Department of the Army (DA) Permit, subject to Section 404 of the Clean Water Act:

Reply To: U.S. Army Corps of Engineers Attn: CEMVS-OD-F 1222 Spruce Street St. Louis, Missouri

Public Notice. 800 Mary Ingles Highway Fort Thomas, Kentucky 41075

J O I N T P U B L I C N O T I C E

15A NCAC 07H.0209 COASTAL SHORELINES (a) Description. The Coastal Shorelines category includes estuarine shorelines and public trust shorelines.

J O I N T P U B L I C N O T I C E

Federal Regulation. Copyright 2011 Gary A. Robbins. All rights reserved.

WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION. US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers and Stream Restoration Permitting

Public Notice 30 DAY PUBLIC NOTICE

Public Notice of Application for Permit

CORPS REGULATORY PROGRAM

Blanche Park Reservoir Decision Notice and Finding of No Significant Impact

PUBLIC NOTICE PROJECT: Jack McNamara Field Airport (CEC) Runway Safety Area (RSA) Project

J O I N T P U B L I C N O T I C E

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate

Public Notice US Army Corps of Engineers Fort Worth District

Preparatory Activities

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake

I THOUGHT IT WAS JUST WET LAND: A GUIDE TO ENVIRONMENTAL PERMITTING FOR AIRPORTS ROAD SCHOOL 2018 SIMON DAVIES, SENIOR SCIENTIST MARCH 7, 2018

The regulatory authorities and responsibilities of the Corps of Engineers are based on the following laws:

PUBLIC NOTICE LOS ANGELES DISTRICT. APPLICATION FOR PERMIT San Diego Yacht Club Maintenance Dredging Project

KRISTOPHER J. KRZYSTON, CEI, CEM

Appendix D - Evaluation of Interim Solutions

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Compliance with the USEPAs Section 404(b)(1) Guidelines

US Army Corps of Engineers

PROJECT INFORMATION AMEREN POWERLINE RECONSTRUCTION PROJECT April 2014

Nance County Zoning Regulations for Wind Energy Conversion Systems

Welcome to the BC Hydro public open house

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study

U.S. Army Corps of Engineers Permit Application Tips

SOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE. ADEM Form

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring

Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017

Gulf of Mexico Fishery Management Council 1/30/02 Habitat Policy. This policy shall be supported by three policy objectives which are to:

CHAPTER 7. San Dieguito River Flooding Adaptation

All Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

RECORD OF DECISION I. INTRODUCTION

Information for File #MVP MVM

The U.S. Army Corps of Engineers Regulatory Program in Georgia

US Army Corps of Engineers. Permitting Process. Chad Konickson. Chief, Southwest Section St. Paul District Regulatory Branch.

APPENDIX A. Project Scoping

Facility Site Proposed Laydown/Parking

Cross-Cutting Environmental Laws A Guide for Federal/State Project Officers

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area

Environmental Assessment Appendix G: Coastal Zone Consistency. U.S. Army Corps of Engineers New York District

NATIONWIDE PERMIT 32

Franklin County Communique to the Planning Board

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

Transcription:

Public Notice U.S. Army Corps In Reply to Application Number of Engineers CENAB-OP-RMS (Delmarva Power and Light Co/North Baltimore District Salisbury to Worcester) 2014-61657 PN 15-11 Comment Period: February 9, 2015 to March 9, 2015 THE PURPOSE OF THIS PUBLIC NOTICE IS TO SOLICIT COMMENTS FROM THE PUBLIC ABOUT THE WORK DESCRIBED BELOW. AT THIS TIME, NO DECISION HAS BEEN MADE AS TO WHETHER OR NOT A PERMIT WILL BE ISSUED. The Baltimore District has received an application for a Department of the Army (DA) permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act (33 U.S.C. 1344), as described below: APPLICANT: Delmarva Power & Light C/o Annina Hazel 401 Eagle Run Road Newark, Delaware 19714 LOCATION: In the Wicomico River and adjacent wetlands; wetlands adjacent to unnamed tributaries of the Wicomico River and adjacent wetlands; Brewington Branch and adjacent wetlands; Middle Neck Branch and adjacent wetlands; Peggy Branch and adjacent wetlands; South Prong of the Wicomico River and adjacent wetlands; Burnt Mill Branch and adjacent wetlands; the Pocomoke River and adjacent wetlands; Whaleyville Branch; Longridge Branch within an existing right of way for Circuit 6741 from North Salisbury substation on Richardson Street in Salisbury, Wicomico County, Maryland to the Worcester substation on Route 346 in Berlin, Worcester County, Maryland. WORK: The proposed project would upgrade an existing electrical line on wooden poles. The applicant proposes to cut the existing wooden poles at grade and remove to an upland disposal site; to replace approximately 20 miles of a 69 kv electrical utility line, including the replacement of wooden poles, as necessary, with 75 to 85-foot tall single-pole steel structures driven directly into the ground; 6-foot diameter self-supporting running angle with concrete foundation; or placed within a 4-foot, 4.5-foot, or 6-foot diameter poured concrete caisson. The project would include the installation of 24 new single-pole steel structures within non-tidal wetlands, resulting in permanent impacts to approximately 356 square feet of nontidal wetlands. The proposed project would also include the replacement of approximately 200 linear feet of overheard utility line approximately 28.5 feet above the mean high water level of the Wicomico River. All work is to be completed in accordance with the proposed plan(s). More detailed impact plates are available upon request. If you have any questions concerning this matter, please contact Ms. Laura Shively of this office at (410) 962-6011 or via email at laura.shively@usace.army.mil. Temporary composite interlocking mats would be utilized during construction and would result in temporary impacts to approximately 5.31 acres (231,275 square feet) of nontidal wetlands. The applicant proposes to remediate impacts to wetlands associated with the utilization of mats following completion of construction. The project includes realignment of a portion of the utility line within the existing right of way to replace existing poles within wetlands with poles in upland areas of the existing right of way to reduce impacts to wetlands for potential future maintenance.

As part of the planning process for the proposed project, steps were taken to ensure avoidance and minimization of impacts to waters of the United States to the maximum extent practicable. The majority of the project would be replacement of existing poles in close proximity to the original wooden pole position. Portions of the utility line were re-aligned within the existing right of way to reduce the number of poles within wetlands and to reduce impacts to waters of the United States. The new single-pole steel structures are proposed in close proximity to current pole locations to reduce impacts to existing wetland habitat and the existing poles would be cut at the substrate and disposed at an off-site location to reduce permanent impacts and soil disturbance within wetland areas. The applicant has proposed to remediate all temporary access impacts following completion of the work. Compensatory mitigation is not being proposed by the applicant for permanent impacts to nontidal wetlands. The purpose of the project is to improve electrical supply to meet local electricity demands. The Magnuson-Stevens Fishery Conservation and Management Act (MSFCMA), as amended by the Sustainable Fisheries Act of 1996 (Public Law 04-267), requires all Federal agencies to consult with the National Marine Fisheries Service (NMFS) on all actions, or proposed actions, permitted, funded, or undertaken by the agency that may adversely effect essential fish habitat (EFH). The project site does not lie in or adjacent to EFH as described under the MSFCMA. The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, and, in general, the needs and welfare of the people. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments provided will become part of the public record for this action. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written comments concerning the work described above related to the factors listed above or other pertinent factors must be received by the District Engineer, U.S. Army Corps of Engineers, Baltimore District, PO Box 1715, Baltimore, Maryland 21203-1715, within the comment period as specified above to receive consideration. The applicant is required to obtain a water quality certification in accordance with Section 401 of the Clean Water Act from the Maryland Department of the Environment. Any written comments concerning the work described above which relate to water quality certification must be received by -2-

the Wetlands and Waterways Program, Maryland Department of the Environment, 1800 Washington Blvd. Suite 430, Baltimore, Maryland 21230 within the comment period as specified above to receive consideration. The 401 certifying agency has a statutory limit of one year to make its decision. The applicant has certified in this application that the proposed activity complies with and will be conducted in a manner consistent with the Maryland Coastal Zone Program. This certification statement is available for inspection in the District Office; however, public comments relating to consistency must be received by the Coastal Zone Division, Maryland Department of the Environment, 1800 Washington Blvd. Suite 430, Baltimore, Maryland 21230, within the comment period as specified above. It should be noted that CZ Division has a statutory limit of 6 months in which to make its consistency determination. The applicant must obtain any State or local government permits, which may be required. A preliminary review of this application indicates that the proposed work will not affect listed species or their critical habitat pursuant to Section 7 of the Endangered Species Act as amended. As the evaluation of this application continues, additional information may become available which could modify this preliminary determination. Review of the latest published version of the National Register of Historic Places indicates that no registered properties listed as eligible for inclusion therein are located at the site of the proposed work. Currently unknown archeological, scientific, prehistoric, or historical data may be lost or destroyed by the work to be accomplished under the requested permit. The evaluation of the impact of the work described above on the public interest will include application of the guidelines promulgated by the Administrator, U.S. Environmental Protection Agency, under authority of Section 404 of the Clean Water Act. Any person who has an interest, which may be adversely affected by the issuance of this permit, may request a public hearing. The District Engineer must receive the request, which must be in writing, U.S. Army Corps of Engineers, Baltimore District, PO Box 1715, Baltimore, Maryland 21203-1715, within the comment period as specified as above to receive consideration. Also, it must clearly state forth the interest that may be adversely affected by this activity in the manner in which the interest may be adversely affected. It is requested that you communicate the foregoing information concerning the proposed work to any persons known by you to be interested and not being known to this office, who did not receive a copy of this notice. FOR THE DISTRICT ENGINEER: Kathy B. Anderson Chief, Maryland Section Southern -3-

Legend / Field Identified Wetlands Right of Way NAD 1983 UTM Zone 18N Sources: Esri, DeLorme, NAVTEQ, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, and the GIS User Community 111-A North Gold Drive Robbinsville, New Jersey 08691 (609) 259-8200 (609) 259-8288 (fax) Figure 1 - Project Overview Delmarva Power & Light North Salisbury to Worcester (6741) 69kV Rebuild Project Wicomico & Worcester Counties Maryland Date: 15 December 2014

Section 2 Area of Disturbance Delmarva Power and Light Company 69 kv Transmission Line Rebuild North Salisbury (Wicomico County) to Worcester (Worcester County), MD Wetland Permanent Impact (Sq. Ft) Matting (Sq. Ft) Impact Reduction Wetland Buffer Wetland Buffer (Sq. Ft.) A 0 0 34,176 6,049 B 0 15.9 2,356 1,967 C 0 0 0 1,075* D 0 0 0 0 E 0 0 0 0 F 0 0 6,215 830 G 15.9 0 14,548 3,613 H** 0 33.17 6,159 8,940 25.12 I 12.56 0 2,734 350 J 0 12.56 3,244 6,218 K 75.36 12.56 36,372 7,075 L** 14.73 4.91 20,643 4,117 4.91 M 9.82 0 3,869 5,295 N 50.24 0 17,161 1,931 O 0 0 0 1,031 P 0 12.56 1,012 1,224 Q** 0 12.56 3,470 1,606 12.56 R 28.26 12.56 3,001 2,110 S 100.31 0 66,790 9,093 T 49.07 0 9,525 1,600 Totals 356 117 231,275 63,049 43 Notes: Permanent impact includes the total area of directly embedded poles and/or the area of concrete foundations on which poles are placed. Wetland matting will be employed as a best management practice * Based on 12/18/14 site inspection with USACE, Wetland C is not under USACE jurisdiction. Matting will be utilized but is excluded from impact calculations. * *= denotes reduction of impact Wetland H Poles #77 and #79 will be relocated out of wetland, resulting in 25.12 square foot reduction in permanent wetland impact. Wetland L Pole #141 will be relocated to the east, out of wetland, resulting in 4.91 square foot reduction in permanent wetland impact Wetland Q Pole #285 will be relocated to the west, out of wetland but within the wetland buffer, resulting in a 12.56 square foot reduction in permanent wetland impact.

PI 66+25.89-0 10'01" PI 84+61.34-0 10'49" PI 93+18.56-1 28'22" 70+00 PLS-CADD Drawing 14 PI 70+58.02 0 04'21" Name Wetland C PI 74+82.98 0 05'51" PI 79+13.89 0 03'57" Name Wetland D 80+00 Name Wetland D 18 PI 88+91.64 0 03'58" 90+00 20 15 16 17 19 100.0 ft. North Horiz. Scale 20.0 ft. Vert. Scale 150 14 Design-110' TSDC-D-110-C ht=103.00 ele=33.27 15 Design-95' TSDC-D-95-C ht=88.08 ele=34.51 16 Design-95' TSDC-D-95-C ht=88.08 ele=32.64 17 Design-110' TSDC-D-110-C ht=103.00 ele=28.18 18 Design-110' TSDC-D-110-C ht=103.00 ele=27.30 19 Design-95' TSDC-D-95-C ht=88.08 ele=27.95 20 Design-95' TSDC-D-95-C ht=88.08 ele=29.36 150 101.98 434 125 90.23 87.05 423 87.05 431 101.98 547 101.98 430 90.23 144 Fiber 0.676" OPGW 90.23 87.05 427 87.05 125 100 72.73 75.39 63.80 75.39 63.80 72.73 954 kcmil 45/7 Rail ACSR 72.73 75.39 63.80 75.42 63.83 100 75 54.23 35.60 51.39 39.68 51.39 39.68 54.23 954 kcmil 45/7 Rail ACSR 54.23 51.39 39.68 51.42 39.68 75 35.60 35.60 954 kcmil 45/7 Rail ACSR 50 PI -0 10'01" PI 0 04'21" PI 0 05'51" PI 0 03'57" 954 kcmil 37/0 Magnolia AAC 3 Energized phases, 1 Neutral PI -0 10'49" 50 25 25 0 0 65+00 70+00 75+00 80+00 85+00 90+00 PI 0 03'58" PI -1 28'22" 28` Ground Elevation 28.5` of clearance to MHW 27` Ground Elevation Mean High Water 3.45` STATIC: 0.676" OPGW 8-23: RS 391 DESIGN TEN. 5500# lbs @ NESC HEAVY Initial RS: DISPLAY TEMP 120 F Conductor: 954 45/7 ACSR Rail 8-23: RS 389 DESIGN TEN. 8500# lbs @ NESC HEAVY Initial RS: DISPLAY TEMP 257 F NOTES: 1) 31.95` Clearance Line (28.5` Clearance with addition of 3.45` MHW) 2) 3) 4) INFORMATION ONLY CONCEPT FOR REVIEW FOR APPROVAL FOR MANUFACTURE FOR CONSTRUCTION AS BUILT A 1/20/2015 CIRCUIT 6741 Rebuild ECW BTF JFC REV. DATE DESCRIPTION ENGINEERED BY DRAWN BY CHECKED BY APPROVED BY SEAL DELMARVA POWER NORTH SALISBURY TO WORCESTER 69 KV TRANSMISSION LINE CIRCUIT 6741 WICOMICO RIVER CROSSING PLAN & PROFILE SHEETS NSW-6741-TL02 SHEET 1 OF 1 REV. A