Rural diffuse pollution plan for Scotland ( )

Similar documents
Improving the condition of Solway Tweed s water environment Tweed area management plan

SEPA Diffuse Pollution Priority Catchment Work. Bruce McCleary Catchment Coordinator Land Unit, SEPA

Response to SEPA s Flood Risk Management (Scotland) Act 2009 consultation: Planning for floods planning for the future

Improving the quality of Scotland s water environment Orkney and Shetland area management plan

1. Purpose and scope. 2. When to consult SEPA

Eye Water and Berwick coastal catchment profiles

Stephen Field welcomed the group to the meeting and introduced Peter Pollard as the new Water and Land Unit Manager and future Chair of DPMAG.

Water Framework Directive Water for Life and Livelihoods

South West Peak Slowing the Flow Project Manager

Water of Leith catchment profile

Technical Briefing: Water Framework Directive

TWEED CATCHMENT MANAGEMENT PLAN Contents

Current condition and challenges for the future: Scotland river basin district. A public consultation

Land Management and Flooding. Where are we now?

Asset Management Group GROUP MANAGER ACTING MANAGER LAND MANAGEMENT TEAM LEADER NATURAL ASSETS MANAGEMENT SENIOR LAND SENIOR LAND LAND MANAGEMENT

The EU Water Framework Directive

Site Improvement Plan. Ford Moss SAC. Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future

Scotland s National Food and Drink Policy is underpinned by five work streams:

In March 2014, the WGII report on Impacts, Adaptation and Vulnerability, which forms part of the IPCC 5th assessment, will be published.

Regulatory Method (WAT-RM-21)

Scotland s outdoors Our Natural Health Service. naturalhealthservice.scot

IMPEL s Strategic Work Programme

SCOTCH WHISKY SECTOR PLAN

Further information on the River Don catchment can be found on SEPA s interactive map at

This job description may be amended from time to time dependent on job requirements and Service provision. Marketing Officer, Economic Growth

Job Specification London s Air Ambulance

WE PROVIDE A SEWERAGE SERVICE THAT DEALS EFFECTIVELY WITH SEWAGE AND HEAVY RAINFALL

Framework for the use of Research and Development

Scottish Aquaculture A Fresh Start A Consultation on the Renewed Strategic Framework for Scottish Aquaculture. 5 th November 2008

Updated April Defra s approach to biosecurity

Supporting Guidance (WAT-SG-85)

COMMON IMPLEMENTATION STRATEGY FOR THE WATER FRAMEWORK DIRECTIVE (2000/60/EC)

CAP Post Key issues from the Environmental Pillar

National Park Authority DRAFT Corporate Risk Register Original Rating ski hoi ore ore Action(s) to transfer, tolerate, treat and/or Risk

Achieving Healthy Catchments

The role of the natural heritage in generating and supporting employment opportunities in Scotland

Objectives Implications / comments

Innovation a Shared Vision

Environment Agency Update

Agricultural Catchments Programme A Policy Perspective

CICM Professional Qualifications. Money & Debt Advice Syllabus

Health and safety objectives.

The Water Framework Directive (2000/60/CE)

Loch Melfort UKS Last Edited 01/06/11 Page 1. Loch Melfort. Report Reference Number 81

Registered as a Scottish Charity - No. SC Job Description

Job Description. Compliance Officer (Data Protection) Compliance and Quality Manager N/A. Responsible for line managing

The Future for Scotland s Waters GUIDING PRINCIPLES ON THE TECHNICAL REQUIREMENTS OF THE WATER FRAMEWORK DIRECTIVE

ENVIRONMENTAL PERFORMANCE REVIEW OF ICELAND

Credit Valley Conservation (CVC) Board of Directors. Chief Administrative Officer (CAO) Watershed Knowledge. Watershed Management

The Socio-Economic Duty: A Consultation Response from Child Poverty Action Group Scotland.

Dienst Landelijk Gebied

Strategic Plan

Blue Growth and Blue and Green Infrastructure

Registered as a Scottish Charity - No. SC Job Description. Grade 8, Salary commences 25,339 per annum

How can we work together to protect our environment?

Creating a paradigm shift in water quality monitoring

Biodiversity Net Gain Good practice principles for development

Blueprint for the 2019 Price Review in Wales. Delivering for Future Generations through the Price Review

Outer Hebrides Local/Area Advisory Group Minutes of meeting on 14/06/2017. Comhairle nan Eilean Siar. Stornoway and Balivanich (linked by VC)

Job Profile. JOB FAMILY: Program

PRINCIPAL ACCOUNTABILITIES

Public Sector Climate Change Duties 2016 Summary Report: The Scottish Children's Reporter Administration. Required TABLE OF CONTENTS

Improvement Programme for England s Natura 2000 Sites (IPENS) Planning for the future. Programme Report a summary of the programme findings

Customer Engagement Strategy

Welcome to Best Employers Eastern Region 2018

Communications and Engagement Strategy. Claire Riley, Director of Communications from Northumbria Healthcare NHS Foundation Trust

JOB DESCRIPTION. Monitoring and Control Officer. Economy, Transport & Environment

Biodiversity Priorities for Ireland ( ) Andy Bleasdale

JOB DESCRIPTION AMNESTY INTERNATIONAL INTERNATIONAL SECRETARIAT (AIIS)

SEAFOOD FIRST STEPS GUIDELINES GLOBAL SEAFOOD CHARTER FOR COMPANIES. Wetjens Dimmlich/WWF

WORCESTERSHIRE MENTAL HEALTH PARTNERSHIP NHS TRUST

Job Description FareShare East Anglia Development Manager

EXPERTS IN ENERGY EFFICIENCY CONSULTANCY

Creative Scotland Job Information Pack Screen Commission Officer

FOREWORD [by the Minister for Environment, Climate Change and Land Reform]

SA Water Strategic Plan Delivering water and wastewater services in efficient, responsive, sustainable and accountable ways

EU Water Framework Directive

EurEau the European voice of the water sector. DANVA Congress Aarhus, May 2017

Report. Detailing the scope of Scotland s food and drink waste prevention targets

Flexible Workforce Development Fund ( ) Guidance for Levy-paying Employers

Job title: Diversity & Inclusion Manager. Grade: PO 5. Role code: EBC0470. Status: Police Staff. Main purpose of the role:

Again, for ease of reading, all adults taking part in the Training Scheme are referred to as learners.

Common Implementation Strategy for the Water Framework Directive (2000/60/EC)

Argyll and Lochaber area management plan catchment summaries

WFD implementation : some feedback from France

PARTNERSHIP SELF ASSESSMENT GUIDANCE & QUESTIONNAIRE JUNE 2009

ASSET MANAGEMENT SERVICES

Sustainability & Environmental Management Policy

NZ POLICE CORE COMPETENCIES. Communicate, Partner, Solve, Deliver, Lead, Innovate, Develop HOW WE DO THINGS: OUR CORE COMPETENCIES

Strategic Priorities and Objectives Statement to Ofwat issued under section 2B of the Water Industry Act 1991

Guidelines for Global Action on Peatlands (GAP)

Royal Botanic Gardens, Kew. Rolling Strategic Business Plan Executive Summary

Friends of the Earth Strategic Plan Final (Nov 2008)

The Cam and Ely Ouse Management Catchment Figure 1 - River Ouse looking towards Ely Cathedral, Cambridgeshire

The Personal Star: Qualities in Action. For internal use only. Not for use with customers.

WATER RESOURCES MANAGEMENT IN THE DANUBE RIVER BASIN. Prof. Dr. Laszlo Vermes

JOB DESCRIPTION. Community Led Local Development (CLLD) Programme Manager. The four CLLD Local Action Groups across Cornwall (Functional Management)

Spoil and Water. Irish Ports Association Conference Ciaran Callan Dublin Port Company. 26 th September 2008

Alison Duffy, Brian D Arcy, Neil Berwick, Rebecca Wade, Roshni Jose (Abertay University) Drew Hill (Transport Scotland) Les Watson, Andy Hemingway

ENVIRONMENT VISION 2030

Transcription:

Rural diffuse pollution plan for Scotland (2015-2021) 1

1. Introduction It is important that key stakeholders in Scotland work in a co-ordinated way to reduce diffuse pollution from rural sources. The river basin management plans (RBMPs) for the Scotland and the Solway Tweed river basin districts set out our ambition to improve from 62% of water bodies in Scotland at good status to 88% by 2027, and 93% in the longer term (as some measures will take time to deliver good status). This implementation plan will be key to delivering improvement of these water bodies and protected areas by enabling stakeholders from a range of sectors and organisations to co-ordinate activities and resources to tackle rural diffuse pollution. It will also help to ensure that resources are used efficiently. The delivery of this plan is the responsibility of the Diffuse Pollution Management Advisory Group (DPMAG) which was set up on the request of the Scottish Government at the start of the first RBMP cycle. Now that the principles and approaches introduced in the first RBMP cycle are wellestablished, the role of DPMAG is evolving toward the role of a project management group that will ensure the effective delivery of this rural diffuse pollution plan. The group will focus on planning, coordinating, implementing and tracking the delivery of these measures. This plan will be reviewed regularly through the river basin management planning cycle. Extract from the Scotland river basin management plan Scotland is renowned worldwide for the environmental quality of its river, lochs, wetlands and seas. They are some of the country s greatest natural assets; attracting visitors, contributing to the health and well-being of its people, supporting a rich diversity of wildlife and providing for the sustainable growth of its economy. Maintaining this enviable reputation is important for Scotland s continued economic success and well-being. 2

2. The strategy This section provides an overview of the strategic approach DPMAG has developed to mitigate rural diffuse pollution and to achieve our RBMP objectives. The strategy for the second river basin management planning cycle (2015-2021) will involve national co-ordination and management of the implementation plan via DPMAG. As with the first river basin management plans (2009-2015) Scotland will need to: continue to improve understanding of the cause of rural diffuse pollution co-ordinate resources, not only within SEPA but also with other public bodies develop and deliver a communication strategy and implementation plan for Scotland monitor the resultant changes in behaviour and in the environment. Some actions within the plan will be delivered at a national scale, others will be more relevant to the local scale. The strategy will rely on a mix of effective communications, economic drivers and regulation. Much of the evidence gathered during delivery of the first river basin management plan will be used as our evidence for the period 2015-2021. The figure below summarises how we expect the delivery of these various elements to result in land managers changing behaviours and existing management practices to address rural diffuse pollution issues on their land: Figure 1: Summary Diffuse Pollution Strategy To ensure we target resources to where they are needed, we have identified water bodies impacted by rural diffuse pollution. These have been prioritised on the potential they have for impacting upon drinking water supplies, shellfish waters, bathing water, habitats / species important on a European scale and ecosystem services. The high priority for action has been given to those areas with the greatest impact on human health (i.e. drinking water protected areas and catchments draining to bathing waters). During the prioritisation process SEPA also identified catchments which were smaller and where the farming was much less intensive. In these areas the cycle 1 priority catchment approach was 3

not considered suitable; however these areas still require measures to mitigate rural diffuse pollution. To distinguish these catchments from the priority catchments they have been given the name Focus Areas. As in cycle 1, it is still the intention to have a two tiered approach to delivery, with a national awareness-raising campaign and work on the ground to target improvement to water bodies in all priority catchments and focus areas (Figure 2). Figure 2 Overall strategy Tier 1: National campaign of awareness raising Tier 2: Targeted approach for priority catchments and focus areas Land manager workshops, promotion of Farming and Water Scotland messages; training courses, best practice guides, and engagement and inspection by SEARS partners on land out-with our targeted areas. This approach will aim to prevent deterioration of water bodies and may improve some that are very close to the boundary Priority catchments : awareness raising, 1 to 1 farm visit and if required revisit to non-compliant farm Focus areas: May involve evidence gathering and monitoring, local awareness raising and land manager visits similar to priority catchment delivery. 4

3. Actions to mitigate rural diffuse pollution This section provides an overview of the approach DPMAG members will take to mitigate diffuse pollution. RBMP1 Priority catchments The approach SEPA started working in these catchments in 2009. The approach included a catchment walk, awareness raising of diffuse pollution issues and site visits. At the end of the first River Basin Management Planning cycle, a good rate of compliance has been achieved in these catchments, however there are still some non-compliance issues that have not been addressed after the third re-visit. SEPA has developed in consultation with DPMAG members an enforcement approach to tackle the remaining non-compliance in these catchments. Where Map1: RBMP 1 Priority Catchments 5

Priority catchment approach Who is doing what? - SEPA will continue with revisits to non-compliant farms in these 14 catchments using the 3 rd revisit to initiate enforcement actions if required - NFUS and SLE will inform their members in these catchments of SEPA s enforcement policy and where possible help to encourage compliance with the regulatory requirements. RBMP2 Priority catchments The approach The priority catchment approach is described below. Awareness raising Land manager engagement 1 to 1 visits Land manager engagement: revisit Each catchment co-ordinator will work with stakeholder groups (NFUS, SLE, Fishery boards etc) within each catchment and the SRUC to deliver targeted key messages to the land managers in these areas. SEPA will work with farming organisations to arrange workshops and events, while offering support and guidance. SEPA will continue with 1 to 1 engagement visits with land managers. To enable more catchments to be visited in cycle 2, SEPA staff will take a risk based approach in identifying the area to be visited. The visits will include a steading inspection and walking 50% of the farmed land. The areas of land (fields) identified for walking will be risk assessed based on the risk to the water environment from the land use in each field. This will enable two visits to be undertaken in one day. The findings from the visit will be fed back verbally to the land manager, identifying non-compliant issues and/or where pollution was observed in the areas inspected. Land managers will be encouraged to inspect the remainder of their land mass, not inspected by SEPA, looking for non-compliances. Areas of good practice will also be discussed. This verbal feedback will be reinforced with a letter. During the feedback, links will be made to SRDP / Scottish Water measures and other appropriate funding sources to effect improvements above and beyond regulatory compliance. Given the observed behavioural change of land managers to improve their activities by the 1 st revisit in cycle 1, it is SEPA s intention to carry out only a single revisit to non-compliant farms before initiating enforcement action. If a land manager has taken no action towards compliance by the time of SEPA s revisit, the most appropriate enforcement powers available to effect behaviour change at this time will be applied In addition to the priority catchment approach, SEPA will carry out extra monitoring in Bathing Waters catchments that are at risk of failing the new Bathing Waters Directive to identify and implement measures to mitigate the impact on the Bathing Waters. Where In addition to the 14 first cycle priority catchments, a further 43 catchments have been identified as priority catchments. Initially, the focus will be on catchments impacting on Bathing Waters. 6

Map 2: RBMP 2 Priority Catchments Who is doing what? SEPA will be responsible for planning and undertaking the inspection programme for each priority catchment. Each catchment will have an identified catchment co-ordinator (point of contact) whom stakeholders can contact at any time. Forestry Commission Scotland will undertake inspections and awareness raising in catchment with forestry land use SGRPID will assess and promote SRDP application in priority catchments 7

NFUS & SLE will support engagement with land owners in priority catchments Focus Areas The approach The focus areas are smaller areas with less intensive land use. The approach in these areas will have to be tailored to the land use and impact on the water environment. We have identified 5 categories of focus areas: Focus areas that impact on Protecting Drinking Water Areas Focus areas that cause a WFD downgrade on a water body Focus areas that cause a downgrade on protected conservation areas Focus areas that cause a downgrade on Shellfish waters Focus areas where the land use is mainly forestry. In many cases, the first step will be to identify accurately the sources of rural diffuse pollution by carrying out further investigation and/or monitoring. Once the sources of the major pressures have been identified, the most appropriate package of measures will be implemented. This could include awareness raising events, mailshots to householders or farm visits. Where Map 3: Focus Areas 8

Who is doing what? SEPA will lead improvement in the 7 focus areas that have been identified because of rural diffuse pollution impact on water bodies. SEPA will lead improvement in the shellfish Waters Focus areas by working with others stakeholders to identify the pressures and the appropriate package of measures. Scottish Water will lead improvement in the focus areas which impact on Drinking Waters Protected areas. SNH will lead improvements within those focus areas which have been identified as being in unfavourable condition due to rural diffuse pollution. SNH and FCS will work with other stakeholders in the focus areas which impact on protected conservation areas and where forestry is the dominant /significant land use. National campaign The approach To prevent deterioration in water bodies and deliver improvements generally, a number of awareness raising campaigns and a national inspection programme will be implemented. Who is doing what? SEPA and SRUC will continue to work together to implement and further develop the diffuse pollution awareness raising campaign for the agricultural sector- Farming and Water Scotland NFUS and SLE will advise SEPA, SRUC and others on how best to interact with the agricultural sector and support the engagement with the sector. Forestry Commission Scotland will lead the development and implementation of the diffuse pollution awareness raising campaign for the forestry sector. This includes further development and promotion of the Forestry and Water Scotland brand, Know the Rules Guide, mind the gap sticker and guidance videos. CONFOR and Forestry contracting association will advise on how best to interact with the private forestry sector and support the engagement with the sector. Scottish Golf will advise on how best to interact with the Golf sector and support the engagement with the sector. RPID, SNH and FCS will undertake rural diffuse pollution inspection as part of their national inspection programme where appropriate. SEPA will provide training on diffuse pollution for RPID, SNH and FCS staff undertaking diffuse pollution inspections. Working in Partnership This plan aims to set out the various roles and responsibilities that are integral to the successful delivery of the plan. Whilst these are generally set out on an individual organisation basis, a key element of the successful implementation of the plan involves partnership working. The challenge for meeting the objectives and targets set out within the river basin plans is a shared goal for Scottish Government, SEPA, SNH, Scottish Water, FCS, responsible authorities and sector representatives. It is only by working together, providing support and where appropriate taking the lead that we can achieve these objectives and make use of the opportunity to contribute to our wider goals such as biodiversity, resilience to climate change and sustainable land use. The membership of DPMAG has been established with the delivery of the diffuse pollution plan specifically in mind. As such the required skills, level of expertise and specialist knowledge which is required to implement the plan exists within the membership and organisations represented. Only by making best use of this expertise and targeting combined resources effectively can we 9

maximise opportunities to achieve multiple benefits and make the best use of the resources available. 10