Progress Report on the Implementation of the Strategic Intermodal System (SIS)

Similar documents
Florida. Logistics & Distribution Industry Edition. Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics

Florida. Manufacturing Industry Edition. Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics

Division of Emergency Management Shelter Retrofit Report CURRENT SITUATION

Please mail or fax completed applications and all required documentation to:

RFT Annual Conference Florida Solid Waste Management: State of the State June 12 st, 2017 Tim Townsend, Steve Laux, Malak Anshassi, Matthew Morse

2016 Reuse Inventory ii

Stakeholder Working Group Meeting Florida Solid Waste Management: State of the State

Strategic Intermodal System

Dipping Vat Removal--Limiting Liability

Environmental and Historical Considerations Informational Guide

2. County Government Structure in Florida

Florida Department of TRANSPORTATION Florida Transportation Plan (FTP) and Strategic Intermodal System (SIS) Strategic Plan Updates

U.S. DEPARTMENT OF HUD 04/11/2017 STATE: FLORIDA HOUSING TRUST FUND INCOME LIMITS

Canaveral Port Authority: Rail Extension Update

Florida Freight Supplychain Intermodal Model

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012

Inland Port Cargo Complex

Chapter 6: Regional Transportation

Justification Review. Public Transportation Program. Florida Department of Transportation

Southeast Florida Freight and Goods Movement Update Treasure Coast Regional Planning Council September 16, 2011

FLORIDA DEPARTMENT OF ECONOMIC OPPORTUNITY AGRICULTURAL SERVICES OUTREACH PLAN PROGRAM YEAR 2014

TRANSPORTATION 101 Today and Tomorrow. Moving People and Goods

Working with Transportation Concurrency Exception Areas

Using Local Transit On-Board Surveys for State-Level Measurement

The Florida Beaches Habitat Conservation Plan

Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc.

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE

Surveying Florida MPO Readiness to Incorporate Innovative Technologies into Long Range Transportation Plans

STATE OF FLORIDA OFFICE OF THE GOVERNOR EXECUTIVE ORDER NUMBER (Emergency Management-Tropical Storm Emily)

Strategies for Preserving Freight Activity Centers

CRTPA Regional Mobility Plan Attachment 1 Agenda Item 4E Page 1 of 11

WATER LEVELS IN ARTESIAN AND NONARTESIAN AQUIFERS OF FLORIDA, STATE OF FLORIDA STATE-BOARD OF CONSERVATION

2017 Regional Load & Resource Plan

LOUISIANA FREIGHT MOBILITY PLAN Donald Vary. March 1, 2016

ARKANSAS. Long Range Intermodal Transportation Plan. LRITP Stakeholder Meetings. June 27-30, 2016

US 27 Transportation Alternatives Study

(e) Agricultural Outreach Plan (AOP)

Valuing the Ecosystem Services of Florida s Forest Conservation Programs: The Economic Benefits of Protecting Water Quality 1

COMMITMENT FINANCIALLY FEASIBLE PROJECTS. move people create jobs strengthen communities

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Chapter 1 Introduction

FREIGHT CORRIDORS AND GATEWAYS: DEVELOPMENT APPROACH AND EVALUATION CRITERIA COMPARISON IN NORTH AMERICA AND THE EUROPEAN UNION

The Legislature Could Consider Several Options for Establishing More Uniform Regional Boundaries

REGIONAL MULTIMODAL TRANSPORTATION PLAN FOR NORTHEAST FLORIDA CREATING REGIONAL CONNECTIONS

INTERSTATE CORRIDOR PLANNING

Presentation to DATA on VTrans 2040 / HB2. October 21, 2015

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

Are We Prepared for the Energy Movements? JEANNIE BECKETT THE BECKETT GROUP ENERGY EXPORT PERMITTING IN THE NW JUNE SEA-TAC CONFERENCE CENTER

SPACE COAST TRANSPORTATION PLANNING ORGANIZATION

ES-1. Central Florida Freight Corridor (US 27/SR 60) Multimodal Mobility Enhancement Improvements. Project Name

Florida Transportation Modeling. Table 1 Top Five Priorities by Market Segment RANK PUBLIC SECTOR PRIVATE SECTOR

South Florida East Coast Corridor (SFECC) Study

Oklahoma Long Range Transportation Plan

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

PINELLAS COUNTY MOBILITY PLAN SUMMARY REPORT

The Emergence of. Florida s Seaports and Inland Ports. Florida League of Cities - International Relations Committee November 17, 2011

Pinellas County Metropolitan Planning Organization 2035 Long Range Transportation Plan Environmental Resource Evaluation Methodology

CareerSource Florida Board Meeting February 8, 2017

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

NCDOT Overview. Nick Tennyson, Chief Deputy Secretary March 4, 2015

HB2 Implementation Policy Guide

THE REGION S PLAN POLICY FRAMEWORK. August 2015

American Farmland Trust FLORIDA'S GROWTH MANAGEMENT PLANS: WILL AGRICULTURE SURVIVE?

VISION. 4. Vision. 31 Page

SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE. Sustainable Communities & Transportation Planning

CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT

Local Planning for Economic Development: Florida's Growth Management Act in Practice

2016 Mid-Continent Transportation Research Symposium, October 24-25, Donna Brown-Martin, Director Bureau of Planning and Economic Development

South Boston. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Florida Gas Transmission Section #3 Hydrostatic Test

Trans-Texas Corridor-35 Update

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

Appendix S. Monitoring Performance. Monitoring Performance. Appendix Contents

Mega Projects at WSDOT

FHWA FREIGHT PERFORMANCE MEASURES WORKSHOP. May 2012

ODOT Asset Management Plan 0

Miami-Dade Transit. Alice N. Bravo, P.E. Director. Miami-Dade Transit 1

Commonwealth Transportation Board Sean T. Connaughton 1401 East Broad Street (804) Chairman Richmond, Virginia Fax: (804)

Florida Water Environment Association Utility Council

The Economic Return on Transportation Investments

Los Angeles Area Chamber of Commerce, 08/05/14

With the challenges facing Washington s transportation

Environmental Benefits of Transportation Planning & Future Freight Policy. AAPA Energy and Environment Seminar Chicago September 17, 2014

Port St. Joe FLORIDA. Strategic Opportunities for Port St. Joe s Emerging Port. Panama Canal

Florida Transportation Systems Management and Operations. Strategic Plan

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

TEXAS TRANSPORTATION PLAN

Port Everglades. is South Florida s Powerhouse Port. Presented to American Association of Port Authorities Environment Committee. September 17, 2015

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 552

Solid Waste Study Update

TRANS-TEXAS CORRIDOR-35 CURRENT ISSUES

TEXAS MEXICO TRANSPORTATION BORDER MASTER PLAN UPDATE

St. Johns River Water Management District

Morris County Freight Profile

LAND USE POLICIES BY COMMUNITY DESIGNATION

East Central Florida Corridor Evaluation Study Project Advisory Group Meeting #1 June 9, 2016 Meeting Summary

A long-term, comprehensive solution

HB2 Implementation Policy Guide

URBAN CENTER COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES URBAN CENTER

ADVANCE ECONOMIC DEVELOPMENT Machelle Watkins, Transportation Planning Director. Tracker MEASURES OF DEPARTMENTAL PERFORMANCE

Transcription:

Progress Report on the Implementation of the Strategic Intermodal System (SIS) Supplement to the Review of the Department of Transportation Tentative Work Program FY 2006/07 through 2010/11 Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 1

This page intentionally left blank. Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 2

The Florida Transportation Commission Charge The Florida Transportation Commission is required by law to conduct an annual in-depth evaluation of the Tentative Work Program for compliance with all applicable laws and departmental policies. During the 2005 Legislative Session, through passage of HB 1681, the Transportation Commission was presented with an additional charge. As part of the annual Tentative Work Program evaluation, the Commission must conduct an annual assessment of the progress that the department and its transportation partners have made in realizing the goals of economic development, improved mobility, and increased intermodal connectivity of the Strategic Intermodal System (SIS). This assessment must be presented to the Governor and Legislature no later than 14 days after the regular session begins. The link between investments in transportation infrastructure and the resulting positive impact on the economy is well documented, and we know that for every dollar the Department invests in Florida's transportation infrastructure yields $5.50 in economic return. However, the mechanisms are not yet in place to meet the intent of this legislation. The methodology for conducting the annual assessment of the SIS is evolving. This first assessment will focus primarily on funding and commitment levels. Since the SIS was initially designated in 2003 and the Strategic Intermodal System Plan was just released in January of 2005, baseline measures from which to assess progress towards the three goals of economic development, improved mobility, and increased intermodal connectivity have yet to be completed. The Department is currently working towards the development of mobility measures, which will be one tool used to identify progress towards these goals. The Commission will continue working along with the Department to identify baseline data and develop metrics which can be employed during the next annual assessment. What is the Strategic Intermodal System (SIS)? An efficient, interconnected transportation system is critical to Florida s economic prosperity and its ability to com- Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 3

pete in the domestic and global economies. Interregional highways, the rail network and terminals, seaports and waterways, airports and the spaceport are the backbone of Florida s transportation system. These transportation facilities provide the primary means for long-distance movement of goods and services between Florida and markets in other states and nations. As the new century begins, Florida s transportation system needs to continue to evolve. To meet the needs of residents, visitors, and businesses in today s global economy, all modes must work together as a system to support the types of trips that are most critical to Florida s economy. Freight and goods need to move securely and reliably between shippers and receivers within Florida, and between Florida and other states and nations. Florida s airports, seaports, rail and bus terminals and the spaceport are important hubs for these transportation flows. Florida s highways, rail lines and waterways are critical corridors for linking these markets. These interregional, interstate and international transportation facilities are essential to the state s future economic growth and quality of life. For these reasons, the Florida Department of Transportation (FDOT), working with private and public sector partners statewide, created Florida s Strategic Intermodal System a statewide network of high-priority transportation facilities that support transportation between regions within Florida as well as between Florida and other states and nations. The Strategic Intermodal System, commonly known as the SIS, will enhance Florida s economic competitiveness by focusing limited state resources on the most significant transportation facilities. The SIS represents a fundamental shift in the way Florida develops and makes investments in its transportation system. To fully realize the potential of the SIS, more emphasis will be placed on regional and corridor-level planning that coordinates multimodal improvements on many types of facilities involving many partners. Improvements to the design and operation of individual SIS facilities will be viewed from a broader perspective and will be analyzed systematically to determine which combination of investments will result in the greatest improvements to the transportation system for interregional, interstate and international trips. Particular attention will be given to improving the intermodal connectors between hubs and corridors and with the planning of regional and local systems so that all aspects of trips from door to door are addressed. The SIS will be planned in a more proactive manner, so that transportation investments support statewide goals related to high-tech job growth, trade development, rural development, urban revitalization and environmental preservation. Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 4

The FDOT will take the lead in planning and managing the SIS, and strengthened regional partnerships will provide a structure for identifying and implementing regional priorities in both urban and rural areas. The SIS also will encourage a new level of partnership between the public and private sectors to plan and implement major transportation projects. SIS Goals The first goal of the SIS reflects FDOT s highest priority, safety. This goal also acknowledges the importance of enhancing the security of the transportation system for both people and freight. The second SIS goal is to preserve and effectively manage the existing transportation infrastructure before expanding the system. The third goal emphasizes improvements in the mobility of people and freight on Florida s transportation system from beginning to end. Efficient operations of the SIS will help FDOT and its partners make the most of limited transportation funding. The fourth goal of the SIS, economic competitiveness, will focus transportation investments in areas that benefit Florida s existing businesses and help attract high-wage jobs and new types of businesses to the state. The fifth and final goal relates to initiatives to support quality of life goals and minimize the impacts of the transportation system on the environment. SIS Development Process In December 2000, the 2020 Florida Transportation Plan (FTP), in recognition of rising concerns about system performance and as a culmination of similar calls from many of FDOT s partners, set a specific objective to establish, construct, and manage Florida s Strategic Intermodal System. Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 5

Key milestones in the development of the SIS include the following: May 2001 Establishment of a Multimodal Team composed of FDOT representatives of all modes and functional areas and key partners to initiate implementation of the SIS Strategic Plan. February 2002 FDOT convened a 41-member Steering Committee representing 31 statewide transportation partners to establish policies for determining which transportation facilities should comprise the SIS. December 2002 The Steering Committee issued its final report to the Governor, Legislature and Secretary of Transportation recommending criteria and thresholds for designating key elements of the SIS, as well as guidance to FDOT and its partners for initiating implementation. July 2003 Governor Bush signed into law CS/SB 676, which formally established the SIS and adopted designation criteria recommended by the Steering Committee. The law also created a new Statewide Intermodal Transportation Advisory Council (SITAC) to advise FDOT on intermodal transportation. July 2004 Governor Bush signed into law CS/SB 1456, which made all SIS facilities eligible for state transportation funding, authorized FDOT to allocate at least 50 percent of new discretionary funding for highway capacity to the SIS and identified revenue sources for annual SIS funding. August 2004 Governor Bush announced the funding of 36 SIS projects, with emphasis on improving connections between SIS hubs and corridors. September 2004 The Secretary of Transportation adopted criteria for designating SIS connectors. January 2005 Secretary of Transportation transmitted the initial SIS Strategic Plan to the Governor and Legislature. Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 6

July 2005 Governor Bush signed into Law SB 360 revising the state s growth management process and providing an additional $4.7 billion in funding for the SIS over the next 10 years. SIS Designation the Legislature declares that the designation of a strategic intermodal system, composed of facilities and services of statewide and interregional significance, will efficiently serve the mobility needs of Florida s citizens, businesses, and visitors and will help Florida become a worldwide economic leader, enhance economic prosperity and competitiveness, enrich quality of life, and reflect responsible environmental stewardship. To that end, it is the intent of the Legislature that the Strategic Intermodal System (SIS) consists of transportation facilities that meet a strategic and essential state interest and that limited resources available for the implementation of statewide and interregional transportation priorities be focused on that system. s. 339.61(2), F.S SIS facilities and services are those most critical to Florida s transportation system and economy; generally, they support the major flows of interregional, interstate, and international trips. Emerging SIS hubs and corridors are designated using the same measures of transportation and economic activity as the SIS, but with lower thresholds. Emerging SIS facilities also are designated based on their ability to serve clusters of transportation-intensive industries in fast-growing economic regions. The SIS includes three different types of facilities, each of which forms one component of an interconnected transportation system: Hubs are ports and terminals that move goods or people between Florida regions or between Florida and other markets in the United States and the rest of the world. These include commercial service airports, deepwater seaports, spaceports, interregional rail and bus terminals and freight rail terminals. Corridors are highways, rail lines and waterways that connect major markets within Florida or between Florida and other states or nations. Intermodal connectors are highways, rail lines or waterways that connect hubs and corridors. Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 7

Criteria for designating the SIS (from this point forward, references to SIS include both SIS and Emerging SIS facilities, unless otherwise noted) hubs and corridors are based on available national or industry standards for measures of transportation and economic activity. For example, airport designation is based on the number of passengers or the total freight tonnage handled by each airport; highway designation is based in part on the average number of passenger vehicles and trucks that use the highway each day. The majority of the criteria are based on percentages of total U.S. activity, so that they can be easily adjusted to reflect growth or decline in activity levels nationally. The emphasis is on interregional, interstate and international travel and transport, using the economic region definitions developed by Enterprise Florida in Florida s Strategic Plan for Economic Development. The designation of intermodal connectors were identified using criteria that indicate the ability of each connector to provide efficient, reliable, and direct access between each hub and the nearest or most appropriate SIS corridor. Current Status of the SIS Mandated by the 2003 Legislature, the SIS is a statewide system of high priority transportation facilities that play a critical role in moving people and goods to and from other states and nations, as well as between major economic regions in Florida. It includes the state s major commercial airports and seaports, the spaceport, and major rail freight terminals, passenger terminals, rail corridors, waterways, and highways. There is also a secondary designation for emerging SIS facilities which do not currently meet adopted SIS criteria, but are experiencing growing levels of activity. The SIS carries more than 99% of all enplaned commercial air passengers in the state, virtually 100% of all waterborne freight tonnage, almost 100% of all freight moving on the rail system, and more than 68% of all truck traffic and 54% of total traffic on the State Highway System. In July 2004, the Legislature enacted and Governor Bush signed SB 1456, which provided the basic framework for funding future improvements to the SIS. SB 1456 implemented several key policy changes. It reinforced 2003 legislation that identified the SIS as the state s and FDOT s highest priority for transportation capacity. It stipulated that at least 50 percent of new discretionary highway funds should be allocated to SIS improvements. It identified Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 8

revenue sources for funding that are estimated to provide at least $100 million each year specifically for SIS facilities and services. It also made all SIS facilities eligible for state transportation funding, regardless of their ownership. Consistent with this legislative action and based on input from the Florida Transportation Commission, the Statewide Intermodal Transportation Advisory Council, and other partners FDOT has adopted an investment policy to implement this funding framework. This policy specifies that FDOT will: Allocate 75 percent of discretionary capacity funds to the SIS and Emerging SIS (the 75 percent level to be reached by FY 14/15). Ensure a reasonable distribution of funds between the SIS and Emerging SIS and among economic regions. Increase the state s emphasis on regional travel and transport. Continue the state s commitment to the safety and preservation of Florida s transportation system. Address the state s support for non-highway modes. Senate Bill 360, passed by the Florida Legislature during the 2005 Legislative session and signed into law by the Governor, updates Florida s growth management framework and is intended to Close the Gap between new development and construction of needed transportation infrastructure. The bill provides increased funding through new and existing capital investment programs, which includes funding for SIS projects. The Department established criteria for the use of these Growth Management funds; which are: Projects are consistent with adopted local government comprehensive planes; They are identified as a backlogged facility; They support mobility within a designated infill area, redevelopment and revitalization area, and municipal district; and Provide improved alternatives for moving goods. Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 9

As a result of this legislation, the bill will provide an additional $7.5 billion in product over a ten year period. Approximately $4.1 billion of the growth management funds are programmed in this Tentative Work Program. Of the $4.1 billion, approximately $2.5 billion is programmed on the Strategic Intermodal System. Funding is distributed across all SIS modes. The Tentative Work Program has a total of $10.6 billion from all funding sources programmed on the SIS for capacity improvements, which includes construction, right of way acquisition and product support phases. This is 67.0% of the total capacity improvement program of $15.9 billion. Of this $10.6 billion for capacity improvements on the SIS, $9.3 billion is programmed for highway capacity improvements, and $356.8 million for aviation, $254.6 million for seaport, $565.9 million for rail, and $166.1 million for intermodal capacity improvements. The charts on the following pages are based on programmed commitment levels over the five years of this Tentative Work Program. The Department operates on a commitment budget. That is, the appropriations received from the legislature each year are for the planned commitment of funds. The actual disbursement of the committed funds may occur over a period of months or years. The State s total investment in SIS and Emerging SIS facilities since the System s designation on July 1, 2003, including actual investment and planned investment through this Tentative Work Program, has been approximately $17.9 billion. Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 10

Programmed Capacity Funds in the FY 2006/07-2010/11 Tentative Work Program SIS Capacity - $10,628.0 67.0% Non-SIS Capacity - $5,225.0 33.0% (in Millions) 06/07 07/08 08/09 09/10 10/11 Total SIS Capacity $2,540.2 $2,161.5 $1,824.5 $1,969.7 $2,132.1 $10,628.0 Non-SIS Capacity $1,570.9 $906.0 $853.0 $806.3 $1,088.8 $5,225.0 Total $4,111.1 $3,067.5 $2,677.5 $2,776.0 $3,220.9 $15,853.0 Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 11

Programmed SIS Capacity Funds by Program Area Highway Capacity - $9,284.6 Aviation Capacity - $356.8 3.4% Seaports Capacity - $254.6 2.4% Rail Capacity - $565.9 5.3% 87.4% Intermodal Capacity - $166.1 1.6% (in Millions) 06/07 07/08 08/09 09/10 10/11 Total Aviation Capacity $77.5 $65.0 $110.9 $56.9 $46.5 $356.8 Seaports Capacity $36.5 $68.0 $48.2 $49.6 $52.3 $254.6 Rail Capacity $126.9 $81.0 $104.8 $128.5 $124.7 $565.9 Intermodal Capacity $29.5 $38.1 $31.8 $45.1 $21.6 $166.1 Highway Capacity $2,269.8 $1,909.4 $1,528.8 $1,689.6 $1,887.0 $9,284.6 Total $2,540.2 $2,161.5 $1,824.5 $1,969.7 $2,132.1 $10,628.0 Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 12

Programmed SIS Capacity Funds by SIS vs. Emerging SIS SIS Capacity - $10,245.0 96.4% Emerging SIS Capacity - $383.0 3.6% (in Millions) 06/07 07/08 08/09 09/10 10/11 Total SIS Capacity $2,435.9 $2,121.4 $1,695.1 $1,960.0 $2,032.6 $10,245.0 Emerging SIS Capacity $104.3 $40.1 $129.4 $9.7 $99.5 $383.0 Total $2,540.2 $2,161.5 $1,824.5 $1,969.7 $2,132.1 $10,628.0 Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 13

District SIS Investment Plan Maps Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 14

4 SIS INVESTMENT PLAN 60 POLK LEGEND District 1 State of Florida Department of Transportation DRAFT 27 Programmed Capacity Improvements 17 2005/06 FIHS 5 year Adopted Work Program (As of July 1, 2005) MANATEE 64 HARDEE OKEECHOBEE 2005/06 Adopted SIS Growth Management Program (As of December 19, 2005) 27 441 Planned Capacity Improvement 75 70 HIGHLANDS 2006/07 FIHS 5 year Tentative Work Program (As of January 3, 2006) SARASOTA Existing Conditions DESOTO GLADES 2 lane roads 4 lane roads 6 & 6+ lane roads Other State roads Planned roads Railroad CHARLOTTE SIS Airport SIS Seaports 80 Urban Areas-2000 Census HENDRY LEE 75 COLLIER 0 70 140 280 420 Miles Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 15

SIS INVESTMENT PLAN 1 NASSAU 95 District 2 State of Florida Department of Transportation 75 HAMILTON LEGEND DRAFT 10 COLUMBIA DUVAL Programmed Capacity Improvements MADISON BAKER 2005/06 FIHS 5 year Adopted Work Program (As of July 1, 2005) 9A 2005/06 Adopted SIS Growth Management Program (As of December 19, 2005) 19 TAYLOR SUWANNEE 10 Planned Capacity Improvement UNION 301 295 2006/07 FIHS 5 year Tentative Work Program (As of January 3, 2006) LAFAYETTE BRADFORD CLAY 95 Existing Conditions ST.JOHNS 2 lane roads 4 lane roads 6 & 6+ lane roads Other State roads Planned roads Railroad DIXIE GILCHRIST ALACHUA PUTNAM SIS Airport Emerging SIS Airport 26 75 20 SIS Seaports Urban Areas-2000 Census 27A LEVY 19 0 4.5 9 18 27 Miles Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 16

!! SIS INVESTMENT PLAN LEGEND District 3 State of Florida Department of Transportation DRAFT Programmed Capacity Improvements Escambia 2005/06 FIHS 5 year Adopted Work Program (As of July 1, 2005) 29 Santa Rosa Okaloosa Walton Holmes OP 79 Jackson 2005/06 Adopted SIS Growth Management Program (As of December 19, 2005) í 10 OP 87 331 110 " OP 85 "! "! I4 I4 98 í Washington Calhoun " Bay 231! " I4 OP 77 10 Gulf Liberty Franklin Gadsden Leon Wakulla "! 319 I4 10 19 Jefferson Planned Capacity Improvement 2006/07 FIHS 5 year Tentative Work Program (As of January 3, 2006) Existing Conditions 2 lane roads 4 lane roads 6 & 6+ lane roads Other State roads I4 í Emerging SIS Airport Emerging SIS Seaports Planned roads Railroad Urban Areas-2000 Census 0 75 150 300 450 Miles Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 17

Indian River 95 LEGEND SIS INVESTMENT PLAN District 4 State of Florida Department of Transportation DRAFT St. Lucie 70 Programmed Capacity Improvements 2005/06 FIHS 5 year Adopted Work Program (As of July 1, 2005) 2005/06 Adopted SIS Growth Management Program (As of December 19, 2005) 95 91 Planned Capacity Improvement Martin 2006/07 FIHS 5 year Tentative Work Program (As of January 3, 2006) 710 Existing Conditions 2 lane roads 4 lane roads 6 & 6+ lane roads Other State roads Planned roads Railroad SIS Airport 80 SIS Seaports Palm Beach Urban Areas-2000 Census 91 95 27 Broward 869 75 0 4 8 16 24 595 Miles 95 Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 18

" " "!!!!! FLAGLER SIS INVESTMENT PLAN 27 75 301 MARION 17 OP 40 4 95 VOLUSIA I4 LEGEND District 5 State of Florida Department of Transportation DRAFT Programmed Capacity Improvements 2005/06 FIHS 5 year Adopted Work Program (As of July 1, 2005) 2005/06 Adopted SIS Growth Management Program (As of December 19, 2005) SUMTER OP 44 I4 Planned Capacity Improvement 2006/07 FIHS 5 year Tentative Work Program (As of January 3, 2006) LAKE 27 " " ST 429 ST 408 ST 417 I4 SEMINOLE ORANGE ST 528 BREVARD í Existing Conditions " I4 í 2 lane roads 4 lane roads 6 & 6+ lane roads Other State roads SIS Airport Emerging SIS Airport SIS Seaports Urban Areas-2000 Census Planned roads Railroad OSCEOLA BREVARD OP 60 0 75 150 300 450 Miles Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 19

75 826 997 27 95 924 821 SIS INVESTMENT PLAN District 6 State of Florida Department of Transportation 826 112 LEGEND DRAFT 836 Programmed Capacity Improvements 2005/06 FIHS 5 year Adopted Work Program (As of July 1, 2005) 2005/06 Adopted SIS Growth Management Program (As of December 19, 2005) MIAMI-DADE Planned Capacity Improvement 874 2006/07 FIHS 5 year Tentative Work Program (As of January 3, 2006) Existing Conditions 2 lane roads 4 lane roads 6 & 6+ lane roads Other State roads Planned roads Railroad SIS Airport SIS Seaports Urban Areas-2000 Census 0 1.5 3 6 9 1 Miles Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 20

19 44 CITRUS LEGEND SIS INVESTMENT PLAN District 7 State of Florida Department of Transportation DRAFT Programmed Capacity Improvements HERNANDO 2005/06 FIHS 5 year Adopted Work Program (As of July 1, 2005) 2005/06 Adopted SIS Growth Management Program (As of December 19, 2005) 50 Planned Capacity Improvement 2006/07 FIHS 5 year Tentative Work Program (As of January 3, 2006) 75 589 Existing Conditions PASCO 2 lane roads 4 lane roads 6 & 6+ lane roads Other State roads Planned roads Railroad SIS Airport SIS Seaports 19 Urban Areas-2000 Census 4 60 PINELLAS HILLSBOROUGH 0 3.5 7 14 21 Miles Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 21

FLAGLER 95 75 MARION SIS INVESTMENT PLAN VOLUSIA 4 Turnpike Enterprise CITRUS LAKE State of Florida Department of Transportation HERNANDO SUMTER SEMINOLE ORANGE LEGEND DRAFT PASCO Programmed Capacity Improvements 4 OSCEOLA BREVARD 2005/06 FIHS 5 year Adopted Work Program (As of July 1, 2005) POLK PINELLAS HILLSBOROUGH INDIAN RIVER Planned Capacity Improvement 275 MANATEE HARDEE OKEECHOBEE 95 2006/07 FIHS 5 year Tentative Work Program (As of January 3, 2006) 98 ST.LUCIE 75 SARASOTA 17 DESOTO CHARLOTTE 27 GLADES HIGHLANDS MARTIN Existing Conditions 2 lane roads 4 lane roads 6 & 6+ lane roads Other State roads Planned roads Railroad LEE HENDRY PALM BEACH Urban Areas-2000 Census BROWARD 75 COLLIER 75 95 997 MONROE MIAMI-DADE 821 1 0 10 20 40 60 Miles Supplement to the Review of the Tentative Work Program FY 2006/07-2010/11 Page 22