CLARIFICATIONS / SUBMITTALS TO THE QUERIES AS RAISED AFTER SEAC MEETING ON 11th MAR 2017 and 1st April, 2017

Similar documents
SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

Max. building height (m)

Details of Project. Underground source

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED

Mixed Landuse Project Madhav Menon University, Sector-17A, Yamuna Expressway, Greater Noida, UP PFR

Bijwasan: A World Class Station

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS

10.1 PERMITTED USES SECTION 10 SECTION 10 HIGHWAY COMMERCIAL ZONE (C2) HIGHWAY COMMERCIAL ZONE (C) J.L. Richards & Associates Limited

Field Work Exercise 1 Part 1. Task 1: Sustainability and liveability in the Wangjing Huayuandongqu Community [12 marks]

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.

SECTION 14 - GENERAL INDUSTRIAL ZONE (M2) REGULATIONS

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

Proposed Office Building at Plot no: 11 & 12 Sector 127, Noida, U.P.

ROOF TOP RAIN WATER HARVESTING. Manohar Patil

Frontage on US HWY 90

Boise City Public Works General Drainage Plan Review Requirements Checklist

CONCEPTUAL PLAN FOR 150 SEATS MEDICAL COLLEGE &750 BEDS HOSPITAL PROJECT SAGAR ROAD NEAR BINA-BHOPAL RAILWAY LINE, DIST-VIDISHA, MADHYA PRADESH

GreenCo BANGALORE INTERNATIONAL AIRPORT LIMITED, BENGALURU

Urban Rainwater Harvesting Systems: Promises and Challenges

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

Hind Energy & Coal Beneficiation (India) Ltd.

Please find attached a copy of our Traffic Memo for the proposed dental clinic at 3012 St. Joseph Blvd.

Service Level Benchmarking of

Gwinnett County Public Schools. Jim Steele Chief Operations Officer

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

CITY OF MERCER ISLAND

TECHNICAL GUIDANCE DOCUMENT APPENDICES

Water supply components

Bajaj Auto Limited. Waluj. You All

24.1 Residential Buildings on plots (other than flatted group housing)

Environmental Management Plan

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi CONCEPTUAL PLAN

STATE UNIVERSITY CONSTRUCTION FUND

Rajasthan State Pollution Control Board

Conceptual Plan Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

PRE-FEASIBILITY REPORT

The Secrets to HCM Consistency Using Simulation Models

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg.

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

ARCH-MEDES (I) CONSULTANTS PVT. LTD. Green Park Delhi

CONCEPTUAL PLAN. M/s. APOLLO HOSPITALS ENTERPRISE LTD., (Construction of Oncology Block)

Hospital Architect Consultants

CITY OF TORONTO. BY-LAW No (OMB)

Green Building Ordinance Overview

AIR QUALITY AND CLIMATE CHANGE EVALUATION GUIDANCE

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

CULTEC STORMWATER CHAMBER SYSTEMS

Project Proponent: M/S FAITH BUILDTECH PVT. LTD. EIA Consultant:

A/E Design Deliverable Checklist

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695]

CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLAN

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

Webinar: Understanding the California Plumbing Code for Greywater (Gray water) Installations

Building Information Modeling (BIM) Execution Plan

2011 Guidance Manual for Development Stormwater Quality Control Measures

Natural Gas Pipeline Crossing of Major Water Body in PHPL Ph-1B Project by Horizontal Directional Drilling (HDD) Technique

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project

Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning. Hiron Fernando, BSCE. A Thesis CIVIL ENGINEERING

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES

ARTICLE VII - OFF-STREET PARKING AND LOADING Section 7-10

Porous Asphalt Pavements w/ Stone Recharge Beds. Brandon Milar California Asphalt Pavement Association

Urban Corridor Noise Pollution: A case study of Surat city, India

Land at Penny Pot Lane, Killinghall

Auckland Transport Code of Practice 2013

THESIS PRESENTATION OUTLINE

Provläsningsexemplar / Preview. First edition

Energy Saving Analysis of High Performance Commercial Buildings in India

Cochise Hall Water Harvesting / Storm water Management - Class Project

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

PART R3-L ZONE, LOW DENSITY MULTIPLE DWELLING DISTRICT

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM

COMMERCIAL LOAD ESTIMATING. Load Estimating Level 3: Block and Zone Loads. Technical Development Program

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # )

Sarawak Energy s New Low Energy HQ And first green building in Sarawak

ENVIRONMENTAL MANAGEMENT PLAN

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Canal Park. Methodology for Landscape Performance Benefits

Sub: Submission of compliance report. Ref: Letter 1.No.21-4(67)/NCR/CGWA/ dated 16 Mar No.4-6/NCR/TS-637 dated

HCM 6th Edition Planning and Preliminary Engineering Applications Guide (PPEAG) to the HCM Bringing Back-of-the-Envelope Back.

The surface water hydrology of the site has been logically divided into six phases of monitoring, analyses, and investigation as outlined below:

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

Greenhouse Gas Emission Reduction Strategies

Baseline Hillside Ordinance Correction Sheet (Ordinance No. 184,802 Effective 3/17/17)

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

The following is required for a complete permit submittal for each unit.

Smart Island Concept. Green Innovation. Eco Operations. Eco Relations. Local Environment. Environment. Global. Resource Recycling.

FORM -1 CAPITAL CITY COMMERCIAL PROJECT. Plot No. 2B, Sector 94, Noida, District: Gautam Budh Nagar, Uttar Pradesh

DR-15-11/LLA Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment

Transcription:

Prefab BHK,BHK & EWS Housing For Delhi Development Authority Pocket, Sector AA4, Narela, New Delhi FOLLOWING IS PRESENTATION OF THE CLARIFICATIONS / SUBMITTALS TO THE QUERIES AS RAISED AFTER SEAC MEETING ON th MAR 7 and st April, 7 Query : Confirmation about the latitude and longitude of the project site. Reply: The project is located at Latitude 8O 5 6.9 N & longitude 77O 6 47.5 E.

Query : Revised details of the built up area including the FAR and non- FAR components. Reply: The Area chart is furnished with all relevant break-up values Site Area (SQM) Permissible Ground Coverage (SQM) Proposed ground Coverage(SQM) Permissible FAR (SQM) Proposed FAR (SQM) FAR Break-up (SQM) 6556 @.% i.e. 65.5 @7. % i.e. 486.9 @% i.e. @ 98.78 % i.e. 75.7 BHK BHK SHOPS Addl. from CONV. AREA Total Min 5% ADD-EWS (SQM) Proposed EWS Floor Area (SQM) CONV. AREA (SQM) STILT AREA (SQM) BASEMENT AREA (SQM) BUILT-UP AREA (SQM) FAR (area) +EWS + Convenient Area +stilt Area+ Basement Area Additional for Stairs, Balcony etc. (Out of FAR) 455.4 74949.96 7.7. ----------------75.7 866.8 994.9 7.59 766.48 96.6 94.7 BHK 47.86 BHK 656.4 EWS 5669.96 Nominal change in Stilt area i.e. 9.747 Nominal change in Basement area i.e.. Total --------------------4558.95 Gross Built-up Area (SQM) Proposed Non FAR Area (SQM) = PROP. EWS FL. Area+ CONV. Area+ Stilt Area+ Basement Area+ Balcony & Stairs Etc. 94.7 + 4558.95 64595.9 Dwelling Units BHK BHK EWS TOTAL PARKING ( ECS) No. of Trees RWH pits Total Green Area (SQM) Percolated Green area (SQM) Project Cost = 8497.66 5 776 44 55 8 549 (757 Required) 656 6

Query : Revised water mass Balance Chart. Reply: Water Balance Diagram Waste water generation @ 8 % of domestic + Flushing water =44 KLD Total Water Requirement, 588 KLD Total Fresh Water Requirement, 6 KLD RECYCLED FRESH

Query 4: Revised Landscape Plan showing the percentage Of Green area and the percentage of soft Area as Prescribed in TOR. Reply: Total Green area is 656 sqm. & water perculating Soft Area is 6 sqm.

Assumptions : Vehicle Flow Rate (vph) Peak Hour Factor Heavy Vehicle % Left/Right Turns % Segment Length (ft) Speed Limit (mph) Left Turn Pocket? Avg. Travel Time (s) Avg. Stops (#/veh) Bus stops, shelters, CBD Sections: Motorised Lanes Carriageway width 4 m, Singhola side,87.7.% 5.%, Yes 5 Nil 4 m road, Narela m road, Ch. m road, IGL side Ramdev Marg side CNG Station side,49,57 76.7.7.7.%.%.% 5.% 5.% 5.%,,, Yes Yes Yes 5 5 5 Nil Nil Nil 5 + 5 m + m The peak hour traffi as per Develop e t of I tegrated Pu li Tra sport Syste y A.H. Shah,. AM/PM peaks considered same. Peak hourl assumed 5% of total daily volume. calculation done as per Auto LOS Method using model LOS+, part of the ASAP Platform

SUMMARY OF HOURLY TRAFFIC AT INTERSECTION DURING PEAK HOURS Sl. Location/ No. Direction Equivalency factor From 4 m Hourly road, Observed Singhola side count Equivalent PCU From 4 m Observed road, Narela count side Equivalent PCU From m Observed road, Ch. count Ramdev MargEquivalent side PCU 4 From m Observed road, IGL CNGcount Station side Equivalent PCU Design Existing Traffic (7) PCU/hr* Additional Total LMV Buses Truck Motor Animal Cycles Others Total proposed resultan Service Traffic t traffic Volume s Cycles & drawn (DSV) in PCU/hr* in Scooters vehicle future, PCU/hr as s per PCU/....5 8..5.5 IRC:6hr 99, Table (for 6 lane divided) 8 6 8 8 4 6 4 8 6 4 4 4 6 4 6 4 87 49 57 76 86 59 55 77 Ma. Volume Autocapacity / mobil (MC) as capacity e per IRC ratio** LOS** 699, section 8. = DSV/.7 4 64.8 C 4 (.% utilised) 64. C 4 (4.7% utilised) 64.7 C 4 (4.5% utilised) 64. C (.6% utilised)

Query 6: Revised rain water harvesting Plan consisting the recharge bores of minimum recharge bore per 5 Sqm of Built-up area and storage capacity of minimum day of total fresh water requirement. Reply: The Collection of Rain Water on any particular plot depends on the plot area, irrespective of the built form at that plot whether utilizing FAR of or 4.The requirement of RWH pits is one per 5 sqm of plot area, cannot be on Built-up area as unfortunately and inadvertently printed in BBL. However, For pocket a 6.5 HA housing pocket, nos of RWH pits with collection chambers /tanks with desilting chambers etc. have been proposed. Each chamber shall have nos of recharge bores, further bores as per guidelines shall be provided along the storm water drain.

Query 7:The PP should submit the report incorporating a cumulative impact of the development activities of all five pockets (i.e. Pocket no., 4, 9,, & 4) on overall environment as prescribed in TOR of Pocket 9. Reply: Cumulative Data POCKET- 55 59759.854 POCKET-4 476 8786.65 POCKET-6 67 76.4 POCKET-9 47 658.98 POCKET- 65 8497.6 POCKET-4 4 976. TOTAL 9 697.8 4 7 84 59 96 468 68 584 55 776 56 58 796 648 Total Water requirement (KLD) Total waste Water Generated (KLD) Capacity Of STP (KLD) Total water recycled (KLD) Total water to be Recycled /Discharged 47. 954.4 9.8 588 9. 7467.5.7 95.4 75.4 96 44 864 5866.5 5 8 95 9 6 897. 76. 6 748.8 995. 69. 469.8 4./557 89./47 7/7 85.6/46. 8.6/6 74./47. 798.9/89. Total parking 89 97 5 888 549 74 978 Total Green Area (SQM) Total Percolated Green area (Sqm) NO. of Trees 575 9758 6 89 656 54 455 @9.46% 4 65 755 6.45 6 994 68746.45@ 6% of green area 75 (689 Required) 94.74 65 (595 Required) 877.897 5 ( 459required) 78.984 6 (57 Required) 585.58 8 (757 Required) 976.4 5 (56 Required) 879.548 85 (586 Required) 54.5965 / 44 8/ 4 9/ 4 / 57 9/ 8 59/ 67 55 88 54 4656 68 888.5 645 77.5 575 77.5 85 Total Area (SQM) Total Built-up area (SQM) Totals Units Total Populations Total Runoff to be Recharged (m /hr) No. Of RWH Pits / / 5 Bores Total Solid Waste 4 (KG/Day) Total Capacity of DG 487.5

Query 8: Geotechnical Investigation Report. Reply: Submitted Query 9: Revised Landscape clearly showing the name & no. of exiting trees, proposed trees with their location, in accordance with CPCB guidelines. Reply: No existing trees at site, proposed trees 8 nos ( min req 757)

Query : Action Plan from DDA for reuse of Treated water of STP. Reply: Undertaking from Delhi Development, as necessary, is submitted The 89 KLD excess STP treated water ( combined from poc,4,6,9, & 4) shall be disbursed in planned manner by DDA. The green area of the sector AA4 (including green strips along the roads) is about HA, which shall consume 5 KLD. Sector AA4 also shall house approx HA of land for commercial and public-semi public development, and such building types generally have negative discharge (i.e requirement of more water, because of higher flushing water component, industrial washing, cooling and HVAC etc.). DDA shall supply STP treated water to these plots / buildings which shall be approx 55 KLD. The remaining balance water shall be taken to Bio diversity parks, water bodies & parks developed and being developed in and around Narela, and also shall be supplied to construction and infrastructural works, as per requirement.

Query : Undertaking from DDA for taking Liability/responsibility w.r.t. operation & maintenance of STP, RWH and Reuse of excess treated water even after transfer of services to RWA. Reply: submitted