FOUR CORNERS POWER PLANT POST-CLOSURE PLAN (d) LINED ASH IMPOUNDMENT (LAI) FC_PostClosPlan_008_

Similar documents
POST CLOSURE PLAN. CFR (d) GERS Landfill. Pirkey Plant Hallsville, Texas. October, 2016

Lansing Generating Station Project No Closure Plan for Existing CCR Revision: 1 TABLE OF CONTENTS

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI

Written Post-Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado

Closure and Post-Closure Care Plan NRG Indian River Generating Station Indian River Landfill Phase II

Closure Plan Brame Fly Ash Pond

CLOSURE PLAN. CFR (b) Document No. GERS Stingy Run Flyash Pond. Gavin Plant Cheshire, Ohio. October, 2016

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

Closure Plan Ash Disposal Area PGE Boardman Power Plant

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

Initial Closure Plan Slag Pond. Nelson Dewey Generating Station. Wisconsin Power and Light Company. Prepared for:

ENVIRONMENTAL ENGINEERING LAND SURVEYING

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

SECTION EROSION AND SEDIMENTATION CONTROLS

Stantec Consulting Services Inc Lebanon Road, Cincinnati, OH 45241

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Annual Inspection Report Lawrence Energy Center

SECTION TRENCHING & BACKFILLING

C. Foundation stabilization for pipe and utility structures.

3.0 Planning and Submittal Requirements

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

INITIAL INSPECTION REPORT ASH LANDFILL AREA SPRINGERVILLE GENERATING STATION SPRINGERVILLE, ARIZONA

2017 Annual Inspection Report

Installation and Maintenance of Erosion Control BMPs

HAZARD POTENTIAL CLASSIFICATION REPORT

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

NAUGHTON POWER PLANT NORTH ASH POND INITIAL CLOSURE PLAN

SECTION RIPRAP, BOULDERS, AND BEDDING

General Permit No.: OHR Page 53 of 146

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

4.8. Subsurface Infiltration

Storm Drain Inlet Protection

Constructed Wetland Pond T-8

SITE DESIGN ENGINEER'S STATEMENT:

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

AEP s CCR Impoundment Closure Projects - Lessons Learned, Insights & Exemplary Practices

David Miller, P.E.- Atlanta. The New Coal Ash Regulations Wednesday, May 6, 2015

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

4.8. Subsurface Infiltration

Sediment Basin. Fe= (Depends on soil type)

Annual Inspection Report

SEPTIC SYSTEM EVALUATION AND CERTIFICATION FORM

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Standard Operating Procedure (SOP) For Sand Filter Basin (SFB) Inspection and Maintenance

The Good, The Bad, and The Ugly

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers

Stormwater Local Design Manual For Houston County, Georgia

BMP 6.4.4: Infiltration Trench

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

CITY OF MIDDLETOWN, OHIO EROSION AND SEDIMENT CONTROL RULES & REGULATIONS

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

I. Site Name and Location

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

Application For Waste Regulation (Check all that apply)

SACHSE EROSION CONTROL GUIDELINES

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

Coal Combustion Facility Assessment Report. October 20, 2010

E. STORMWATER MANAGEMENT

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities

SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

PERMEABLE INTERLOCKING PAVERS

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

Infiltration Guidelines

LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO S3N AFIN:

Closure/Post-Closure Care Plan Unit 3 AQCS Solids Landfill

FUGITIVE DUST CONTROL PLAN DUNKIRK GENERATION STATION 106 POINT DRIVE NORTH DUNKIRK, NEW YORK. PREPARED FOR: Dunkirk Power, LLC Dunkirk, New York

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

PART 1 GENERAL REQUIREMENTS

TEMPORARY SEDIMENT TRAP CODE

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

SECTION A1 EXCAVATION AND BACKFILL GENERAL

City of Augusta SIDEWALK REPLACEMENT PROGRAM

MODEL Stormwater Local Design Manual. City of Centerville

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

CCR Annual Inspection (b) for the Ash Pond at the San Miguel Plant. Revision 0

Chapter 21 Stormwater Management Bylaw

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Storm Water Pollution Prevention Plan (SWPPP) for Small Construction Sites

LOCATION AND DESIGN DIVISION

Applying landforming to reclamation: A case study in Central Appalachia

STORMWATER POLLUTION PREVENTION PLAN (SWP3)

Design Specifications & Requirements Manual

Constructed Wetland Use in Nonpoint Source Control

Storm. Section. B. General Design and Drawing Standards Design

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS

Transcription:

FOUR CORNERS POWER PLANT POST-CLOSURE PLAN 257.104(d) LINED ASH IMPOUNDMENT (LAI) FC_PostClosPlan_008_20161017 Post-Closure Plan Contents 257.104(d)(1) The owner or operator of a CCR unit must prepare a written post-closure plan that includes, at a minimum, the information specified in paragraphs (d)(1)(i) through (iii) of this section. SITE INFORMATION Site Name / Address Owner Name / Address CCR Unit Location Reason for Initiating Closure Final Cover Type Closure Method CLOSURE PLAN DESCRIPTION (d)(1)(i) A description of the monitoring and maintenance activities required in paragraph (b) of this section for the CCR unit, and the frequency at which these activities will be performed. Four Corners Power Plant / 691 CR-6100, Fruitland, NM 85416 Arizona Public Service / 400 North 5 th Street, Phoenix, AZ 85004 Lined Ash Impoundment (LAI) 36 41 04 N, 108 30 12 W Known Final Receipt of Waste Evapotranspiration Cover Closure by leaving CCR in place The LAI will be closed in conjunction with the adjacent Lined Decant Water Pond and Dry Fly Ash Disposal Area (DFADA) Cells 1, 2, and 3. The units will share closure-related features, such as drainage channels and slopes. Therefore, maintenance activities will be concurrent. The LAI will be dewatered to facilitate construction of a closed-in-place grading and cover system. The final cover will be constructed over a graded and prepared subgrade. The final cover will be sloped to promote drainage and the storm water runoff will be discharged off the top slope, via sheet flow, into a drainage channel between the LAI and the DFADA. This drainage channel is part of a system of channels and sub-basins to be constructed around the perimeter of the LAI, DFADA, and LDWP that will collect runoff storm water from the closed units and run-on storm water flows. This Perimeter Drainage Channel System will ultimately outfall into a detention basin near the southwest 1

toe of the LDWP. The outside slopes and top slope of the closed configuration of the LAI will be monitored for nonnative invasive vegetation, excessive settlement, and/or excessive erosion. Excessive settlement is defined as being present where standing water is in excess of 1 foot in depth over a lateral extent of 1 acre. Excessive erosion is defined as an erosion rill or scour greater than 1 foot in depth. The maintenance activities associated with impacted areas are as follows: - Invasive Vegetation a) When invasive vegetation is observed during routine monitoring, it will be removed from the capped surface. b) If a void is created in the cap materials from vegetation removal, the void will be filled with erosion layer soil resources in accordance with the - Settlement a) The limits of the settlement area will be delineated. b) The delineated area will be filled to the final elevation with erosion layer soil resources in accordance with the Reestablishment of vegetative cover is expected to occur by natural processes. - Erosion Rills (deeper than 1 foot of erosion on a slope) a) The erosion rill will be excavated with a backhoe or track hoe to form a uniform trench width. b) The trench will be filled up to the final elevation with erosion layer soil resources in accordance with the c) The repaired erosion rill area will be 2

monitored for the recurrence of rills. If rills reappear, then the site will be assessed for additional measures of erosion resistance. - Erosion Scour (deeper than 1 foot of erosion along the bottom of a channel) a) The limits of the erosion scour area will be delineated. b) The delineated area will be filled up to the final elevation with erosion layer soil resources in accordance with the c) Based on the cause of the erosion scour, riprap armoring may be deployed over the area to prevent recurring scouring of the cap materials. The drainage channel will be monitored for excessive erosion and sediment build-up. Within the riprap-lined portion of the channel, excessive erosion is defined as displaced riprap with exposed underlying geotextile. Within the soil cement-lined portion of the channel, excessive erosion is not anticipated. However, excessive erosion is defined as broken soil cement with exposed soil subgrade. The maintenance activities associated with the drainage channel are as follows: - Erosion Within the Riprap-Lined Portions of Channel, if applicable (exposed geotextile) a) The exposed geotextile will be inspected for damage, with damaged materials being repaired in accordance with the Specifications. b) The riprap materials will be replaced in accordance with the original construction Specifications. c) If it is determined that the erosion is due to side channel inflow, Engineering Personnel will inspect the channel to determine the corrective 3

action, which may include one of the following: i. Regrading adjacent to the channel to prevent the side channel inflow. ii. Addition of a controlled side channel inflow (e.g. a scupper or energy dissipation feature). - Erosion Within the Soil Cement-Lined Channel, if applicable (deeper than 6 inches) a) The limits of the erosion rill will be delineated. b) The edges and bottom of the rill will be clean cut/chipped to create vertical edges and a flat bottom over the delineated area. c) The prepared area will be filled with a cementitious material (i.e. grout or concrete) with a minimum 7-day compressive strength of 1,100 pounds per square inch (psi). Cementitious materials shall be constructed in accordance with the original construction Specifications. - Sediment Build-up a) If excessive sediment buildup is observed (blockage of 1/3 of the channel cross-section), the sediment will be removed from the channel. b) If the sediment build-up is caused by a side channel flow, an additional sediment trap consisting of a riprap apron may be constructed at the discretion of APS. In accordance with 257.104(d)(2)(iii), this initial written closure plan will be amended to provide additional details after the final engineering design for the grading and cover system is completed. The initial version of the closure plan reflects the information and planning available at the time of issuance. 4

(d)(1)(ii) The name, address, telephone number, Neal Brown and email address of the person or office to Arizona Public Service contact about the facility during the post-closure 400 North 5 th Street care period. Phoenix, AZ 85004 (602) 250-1000 (d)(1)(iii) A description of the planned uses of the Currently, APS does not intend to utilize the closed property during the post-closure period. LAI for any purpose during the post-closure period. Post-closure use of the property shall not disturb APS may install a fence around the perimeter of the integrity of the final cover, liner(s), or any the CCR Unit to prevent unauthorized access other component of the containment system, or and/or disturbance of the side and top slopes, the function of the monitoring systems unless impounded areas, and drainage features. Access necessary to comply with the requirements in this will only be granted for inspections, maintenance, subpart. Any other disturbance is allowed if the and repairs. owner or operator of the CCR unit demonstrates that disturbance of the final cover, liner, or other component of the containment system, including any removal of CCR, will not increase the potential threat to human health or the environment. The demonstration must be certified by a qualified professional engineer, and notification shall be provided to the State Director that the demonstration has been placed in the operating record and on the owners or operator s publicly accessible internet site. POST-CLOSURE SCHEDULE APS will conduct post-closure care for 30 years after completion of construction activities. For the first 5 years, APS will perform the monitoring activities described in this report on a quarterly basis. Additionally, APS will monitor for storm water related damage after significant storm events. After the first 5 years and throughout the remaining 25 years, APS will perform the monitoring activities described in this report on an annual basis and after significant storm events. 5

Certification Statement 40 CFR 257.104(d)(4) Post-Closure Plan for CCR Surface Impoundment CCR Unit: Arizona Public Service; Four Corners Power Plant; Lined Ash Impoundment I, Alexander W. Gourlay, being a Registered Professional Engineer in good standing in the State of New Mexico, do hereby certify, to the best of my knowledge, information, and belief, that the information contained in this certification has been prepared in accordance with the accepted practice of engineering. I certify, for the above-referenced CCR Unit, that the information contained in the initial post-closure plan dated October 17, 2016 meets the requirements of 40 CFR 257.104. Alexander W. Gourlay, P.E. Printed Name August 26, 2016 Date