BEST PRACTICES ON ENERGY EFFICIENCY

Similar documents
KALYANI STEELS LIMITED

Essar Steel (I) Ltd. Hazira

Production Facilities and Automotive Steel Grades from JSW Steel. 2 nd Automotive Steel Summit, Pune 15 th September, 2017

Technical and economic aspects of production and use of DRI in integrated steel works

Challenges and limiting factors for the Recycling of steel scrap in Europe

Capacity Enhancements and new Developments at Emirates Steel

TOTAL WATER MANAGEMENT

Application Form for Secondary Steel Sector Awards 2018 [FY ]

Benchmarking for Enhancing Competitiveness of Indian Steel Plants

TOTAL WATER MANAGEMENT IN THE STEEL INDUSTRY. By N. Ramachandran, Ion Exchange (India) Ltd

JSW STEEL COATED PRODUCTS LTD Kalmeshwar (Maharashtra)

EVALUATION OF THE POSSIBILITY TO UTILIZE BIOMASS IN FINNISH BLAST FURNACE IRONMAKING

Energy Saving & Breakthrough Technologies. Dr Ladislav Horvath Zhang Jiagang, Jiangsu, China, August 1, 2013

CO2 Capture in the Steel Industry Review of the Current State of Art

Application Form for Secondary Steel Sector Awards 2018 [FY ]

Summary of findings from HYBRIT Pre-Feasibility Study

USIMINAS Tokyo, 16 th and 17 th of July

Energy Conservation. Work Shop on Knowledge exchange Platform on Best practices in Iron & Steel Industry. By MCJ Energy Engineers Pvt Ltd

Energy saving by direct rolling of hot billets through high speed casters

ENERGY ANALYSIS OF THE STEEL MAKING INDUSTRY

14 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY AUDITORS August, 2013

CO2 Capture in an Integrated Steel Mill

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

GHG Reduction Activities of POSCO

Advanced Master Course Process Technology of Metals

Energy consumption, waste heat utilisation and pollution control in ferro alloy industry

For each ton of molten pig iron, you need: 2600 lbs iron ore or iron ore pellets, 1000 lbs coke 300 lbs of flux (slag, dolomite, limestone, etc).

ArcelorMittal South Africa

Paribesh Bhavan, A / 118, Nilakantha Nagar, Unit VIII, Bhubaneswar

STEEL AUTHORITY OF INDIA LIMITED Performance Highlights H1 & Q2 FY

Energy Efficiency in the Thai Steel Sector : ISIT S Efficiency Action Plan. By Mr. Hin Navawongse Advisor Iron and Steel Institute of Thailand

Best Practices Adopted By Shriram Alkali & Chemicals Jhagadia To improve Energy Efficiency. Navin Jaiswal Addl General Manager DCM Shriram Ltd

Lecture 17 Alternative Charge Materials in EAF

Manufacture of Iron & Steel. Prepared By: John Cawley

RATING OF THE STEEL SECTOR. How we did it

CCS and CCU. their Role in the Mitigation of Greenhouse Gas Emissions from Energy Intensive Industry

Development of a method for analysing energy, environmental and economic efficiency for an integrated steel plant

STEELMAKING. New standards in productivity, quality and efficiency

ENERGY EFFICIENCY BENCHMARKING FOR CEMENT INDUSTRY- IMPROVEMENT OPPORTUNITIES

EAF Technology and process

Jindal Shadeed Iron and Steel 5 year s of DRI Operation - -

BHUSHAN LIMITED THE MODIFICATION CUM EXPANSION OF EXISTING INTREGRATED STEEL PLANT AT RENGALI (ORISSA) TO 2.2 MTPA

ENERGIRON DRI PLANTS FLEXIBILITY FOR ANY STEELMAKING REQUIREMENT

SINGHAL ENTERPRISES PRIVATE LIMITED

EAF Steelmaking in North America An Overview

RELIANCE INDUSTRIES LIMITED NAGOTHANE MANUFACTURING DIVISION

Tata Steel India Analyst Day 2017 Sustainability Session 5 th October 2017

Energy Efficiency in the Steel Industry

KHOUZESTAN STEEL CO. Khouzestan Steel Co. Crude Steel Index

Although the BF-BOF route of iron and steelmaking accounts for

Bankable Techno-Economic Feasibility Report for 3.0 Mt/yr Integrated Steel Plant at Nagarnar, Chhattisgarh

Metal 2003 May Hradec nad Moravici, Czech Republic. CONARC - All purpose Steelmaking by SMS Demag By: K. Schmale; D.

STEELMAKING PROCESS GASES UTILIZATION

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

Dr. Joseph J Poveromo, Raw Materials & Ironmaking Global Consulting DR Pellet Quality & MENA Applications

Magnetite A Higher Grade Blast Furnace Feed and its Potential Benefits for the Ironmaker

DRI Production Using Coke Oven Gas (COG): Results of the MIDREX Thermal Reactor System TM (TRS ) Testing and Future Commercial Application

Examples in Material Flow Analysis

at Sarora Village, Tilda Tehsil, Raipur District, Chhattisgarh in 64 acres of land. Now

The HIsarna Ironmaking Process

Seminar on Low Carbon Technologies, Szentendre, October 2016

Lake Erie Works 2010 Annual Toxics Reduction Report (O. Reg. 455/09)

Installation of Praxair s CoJet Gas Injection System at Sumikin Steel and other EAFs with Hot Metal Charges

Potential Impacts on the Energy System at the Integrated Steelwork by Changing Injection Coal Types to the Blast Furnace

Canada. Iron and Steel Sector - PI Specifics

Presentation on Excellence in Energy Management-2017

High-Carbon DRI: the feeding material to improve performances and decrease

COMPETITIVE STEEL PRODUCTION

Gold Standard Passport CONTENTS

GUJARAT STATE FERTILIZERS & CHEMICALS LTD.

ArcelorMittal Saldanha Works Analyst visit. 14 October 2011

Executive Summary. Ton / day. Iron Ore Barajamda / Banspani area Non coking Coal

DRI Direct Reduced Iron

ENCON IN THERMAL SYSTEM

IMPLEMENTATION OF ISO 50001:2011 & BEST PROJECTS ON ENERGY THE RAMCO CEMENTS LIMITED JAYANTHIPURAM

SALE OF 0.5 MTPA MINI BLAST FURNACE COMPLEX. (Southeast Asia)

Technology Compendium. Energy saving Opportunities. Iron & Steel Sector. August 2013

CLEAN DEVELOPMENT MECHANISM PROPOSED NEW METHODOLOGY: BASELINE (CDM-NMB) Version 02 - in effect as of: 15 July 2005

Guidelines for Selecting Pellet Plant Technology I. Cameron, M. Huerta, J. Bolen M. Okrutny, K. O Leary

Energy Conservation of Boiler Feed Pump by Differential Pressure Auto Scoop Control Method (Audit & Result Analysis)

PRE FEASIBILITY REPORT

Productive recycling of basic oxygen furnace sludge in integrated steel plant

API Ispat & Powertech Pvt. Ltd.

EAF burdening How can EAF burdening best utilise DRI? Rutger Gyllenram Kobolde & Partners

RELIANCE INDUSTRIES LIMITED Vadodara Manufacturing Division Vadodara (Gujarat)

DEVELOPMENTS IN IRONMAKING AND OPPORTUNITIES FOR POWER GENERATION

JSC "Ural Steel" (Russia)

Introduction. 1. MIDREX R process

Expression of Interest

Expression of Interest

EXPRESSIONS OF INTEREST ADHUNIK GROUP OF COMPANIES PROCESS DOCUMENT. Corporate Debtors Under Resolution Process

GASIFICATION AND THE MIDREX DIRECT REDUCTION PROCESS

MAHAN ALUMINIUM Dist. Singrauli (Madhya Pradesh)

Basic Facility Information for Toxics Reduction Act (TRA) 455/09 ArcelorMittal Dofasco

Welcome to. Kendal Power Station

NEW FEATURES OF DRI TECHNOLOGY ENERGIRON FACILITIES AND HIGH-C DRI IN MINIMILLS. DARIO PAULUZZI Sales Manager, DANIELI CENTRO METALLICS

Feasibility study of JCM project for energy saving. technologies for iron and steel industry in India. Abstract

Performance Analysis of Cement manufacturing Industry

Steel Industry Technology Roadmap. Barriers and Pathways for Yield Improvements. by Energetics, Inc. for the American Iron and Steel Institute

Techno-economic aspects of alternative metallic charges in EAF steelmaking

Transcription:

BEST PRACTICES ON ENERGY EFFICIENCY << Energy Management >> JSW Steel Limited, Dolvi Works

Key Themes: Lowest Energy Consuming unit amongst Integrated Steel Plant in India Continuously Improving Energy Efficiency for each of the production units Usage of Innovative process & equipment technologies for the manufacturing Continuous endeavor to utilize energy waste: either in form of process waste and /or hidden chemical & thermal energy Energy sources optimization for Input cost efficiency Energy Management center for proper monitoring & control

Coke BF Gas Sinter Steel Scrap DR I Calcined lime Oxygen Oxygen Jetty Iron ore Iron Ore fines Fluxes Coke/ Coal Lime Stone Pallet LCP SIP Oxygen Oxygen Plant Oxygen Pallet RMHS Iron ore Blast furnace Hot Metal SMS Liquid Steel Hot Strip Mill Caster Slab Rolling Mill Power Plant Iron ore fines COG Gas Sinter Oxygen Scrap Yard Coil Yard HR Coil Railway Siding Coke Oven Coal Pellet Plant Iron ore Steel Scrap 4

Specific Energy Consumption Summary for FY2012-13 and 2013-14 Sr. No Plants GCal/TP (2011-12) GCal/TP (2012-13) GCal/TP (2013-14) Diff between last two years (%) 1 Sponge Iron 2.724 2.710 2.990 10.33 2 Sinter Plant 0.607 0.567 0.689 21.16 3 Blast Furnace 3.745 3.760 3.502-6.91 4 SMS 1.001 0.914 0.831-8.75 5 Caster 0.014 0.015 0.016 0 6 Mill 0.301 0.305 0.289-6.55 7 Aux & Losses 0.482 0.506 0.21-59.2 Upstream Plants 1 Coke Making unit 0.351 0.326 0.334 3.06 2 Pellet Making unit 0.170 0.283 0.235-17.66 Total Gcal 9.395 9.385 9.096-3.09

Sr no. PLANT 1 Sponge Iron 2 Sinter Plant 3 Blast Furnace 4 SMS Source Optimization Operation Discipline High productivity Process/System Change Increasing the DRI metallization from 94% to 94.5% to reduce the melting Power in EAF by 2 kwh/mt of DRI used. At Sinter plant- Installation of VVVF drives- 2nos. at pump motors has saved 1.73 lacs kwh per year 1.At Blast furnace -Reduced usage of lump ore at Blast furnace and usage of pellet and sinter only reduced the fuel rate by 5 kg/thm. 1.At SMS- Exploration of suitable technology to recover waste heat from EAF off gases has been initiated in steel melting area. Waste Utilization Natural gas Cons reduced by 10% using COG(Gcal/tcs reduced by 0.002) BFG Flaring reduced from 47% to 18%. Overall change in energy consumption(%) 5 Caster 0 6 Mill 7 Aux & Losses UPSTREAM At Hot Rolling Mill- Optimization of the logic of run speed for coiler -1 & Coiler-2 drives when running at no load has resulted in energy saving of 2.16 Lacs kwh per annum Oxygen venting reduced by 34% BF Gas flaring reduced by 56% NG Cons reduced by 3.5%(Gcal/tcs reduced by 0.012) 10.33 21.16-6.91-8.75-6.55-59.28 1 Coke Oven 2 Pellet Plant 0.012 Gcal/tcs 0.048 Gcal/tcs

BF Gas MNm3 Percentage Potential waste utilization and innovation BF Gas: BF Gas Flare Financial Year Flare Value Saved Gcal Remarks 2012-13 47 % - 2013-14 18 % 0.32 By installing power plant 2014-15 14% 0.027 By efficient round the clock Gas Monitoring 2015-16 3% 0.076 Will install Gas Holder 3500 BF Gas Generation Vs Flaring Trend 60.00% 3000 2500 50% 2651 49% 2313 44% 2396 47% 2682 3126 50.00% 40.00% 2000 30.00% 1500 1325 1272 1000 1132 1055 18% 20.00% 500 549 10.00% 0 2009-10 2010-11 2011-12 2012-13 2013-14 FINANCIAL YEAR 0.00% Gas Generated Gas Flared % of BFG Flare

Major Investment - 55 MW Power Plant Project start date : 09.09.2011 Commissioning date : 19.03.2013 Project Cost Technology (BTG) : Rs.182 Cr : DF Power System Boiler Main features Blast Furnace Gas fired Single drum boiler with capacity of 204 TPH steam at 540 deg C (SH) & 114 kg/cm2. Steam Turbine (1no.)- HP turbine (104 Kg/cm2), 3000 RPM & Single Casting with condenser. Generator (1no.)- 53.4 MW, 66.87 MVA, 3510A. Turbine 8

In plant Initiatives Sr. No Initiatives Location User Benefits 1. 53.5 MW Power Plant Power Plant Grid Saving energy upto 0.32GCal/tcs 2. Coal Injection Usage (PCI) Blast Furnace Blast Furnace Cost reduction per ton of hot metal 3. Gas expansion turbine Blast Furnace Grid 5 MW power 4 Auto ON/OFF control to torpedo tilting suction motor Steel melting Shop Steel melting Shop Net Power saving of 989 KW per day 5 Auto ON/OFF control to Air cooling fan using PLC logic Steel melting Shop (GCP) Steel melting Shop (GCP) Net Power saving of 906 KW per day

GAS DISRIBUTION NETWORK NG CPP BF CO SIP TF GMS PELLET SINTER GMS: Gas mixing station ; CPP-Captive Power Plant ; NG-Natural Gas BF-Blast furnace; CO-coke oven ; SIP-Sponge iron Plant ; TF- Tunnel furnace

Waste Gas utilization CO Gas Utilization Plants 2013-14 2014-15 Remarks Cost Benefits Pellet NIL 12000 Nm3/Hr Replacing NG 2,40,000 Rs/hr SIP NIL 12000 Nm3/Hr Replacing NG 2,40,000 Rs/hr Tunnel Furnace NIL 8000 Nm3/Hr Replacing NG 1,60,000 Rs/hr Total NIL 32000 Nm3/Hr 6,40,000 Rs/hr

Substitution of Natural Gas by COG at Tunnel Furnace Waste minimization : Utilization of Coke Oven Gas for Process Heating Impact

10% Substitution of Natural Gas by COG at SIP Waste minimization : Utilization of Coke Oven Gas for Process Heating

MAJOR ACHIEVMENTS 1. At Hot Rolling Mill- Optimization of the logic of run speed for coiler -1 & Coiler-2 drives when running at no load has resulted in energy saving of 2.16 Lacs kwh per annum. 2. At Blast furnace -Reduced usage of lump ore at Blast furnace and usage of pellet and sinter only reduced the fuel rate by 5 kg/thm. 3. At Sinter plant- Installation of VVVF drives- 2nos. at pump motors has saved 1.73 lacs kwh per year. 4. At Coke Oven- Utilization of Coke oven gas from 1.0 mtpa coke oven plant for process heating in place of conventional fossil fuels. 5. At Mill- RLNG (Reliquified Natural Gas) has been replaced by COG in Tunnel Furnace at Mill, Ladle heating at steel making, Tundish heating at caster and boilers at HSM, Pellet Plant, Blast Furnace & Sinter plant. 6. At SIP- Utilization of coke oven gas to reduce/ substitute approximately 20% of the natural gas in the DRI production. 7. At SMS- Exploration of suitable technology to recover waste heat from EAF off gases has been initiated in steel melting area.

MAJOR ACHIEVEMENTS (continued) 8. DRI plant Enhancing the Reducing gas temperature to 970-980 Deg.C to optimized the reducing gas flow thereby reducing energy consumption by 0.008 GCal/Mt Increasing the DRI metallization from 94% to 94.5% to reduce the melting Power in EAF by 2 kwh/mt of DRI used. Stopping the CO-5 dust collection system water supply pump (PU-E78) by meeting the requirement from existing Hot water pump PU-E66. (Power savings by (288 kwh /Day) Stopping additional pump Pu-E12 used for diverting SIP Process blow down water to SMS slag cooling by using available head from PU-E97 pump, thereby reducing the Power consumption by 120 kwh/day Fixing the transparent sheets in Instrument air compressor house & Fire pump station, thereby reducing the Power consumption by 45 kwh/day.

Trends of Specific Energy Consumption and CO2 emission 6.6 2.22 6.5 2.2 2.2 6.4 6.3 2.18 2.18 6.2 2.16 6.1 6 6.547 6.516 2.128 2.14 5.9 2.12 5.8 5.7 5.919 2.1 5.6 FY 11-12 FY 12-13 FY 13-14 Specific Energy Consumption (SEC) CO2-(carbon dioxide) 2.08

Dolvi Railway Siding Railway Siding at Dolvi Project start date : Oct 2012 Commissioning date : 24.06.2013 Project Cost : Rs.50 Cr. Dolvi Railway Siding Facility - Railway siding at Dolvi works Main features 1.0 MTPA Handling Capacity 3.5 km broad gauge track length. 2500 MT rake capacity Rake size is 43 nos. of wagons. Wagon loading is three coils/wagon Benefits No interruption in dispatch during Ganapti festival Reduction in road traffic congestion Reduction of 24016 tons/year of CO2 emmission. 17

BF Gas Iron Ore Phase -1 Expansion Coal Coke Iron Ore & Fluxes Scenario- 2015 Pellet Plant 4 MTPA Coke Oven 1 MTPA Sinter Plant 2.8 MTPA Sinter Plant 2.24 MTPA NG Sponge Iron Plant 1.6 MTPA Blast Furnace 3.5 2 MTPA LCP 1200 TPD Cal. Lime DRI SMS (Con-Arc) 4.0 5.0 MTPA Hot Metal Billet Caster 1.5 MTPA Liquid Steel Thin Slab Caster 3.3 MTPA 55 MW Power Plant Billet Bar Mill 1.5 MTPA Hot Strip Mill 3.3 MTPA Slab Bars 1 MTPA Railway Siding HRC 18 18

Pradeep Agarwal DY. GENERAL MANAGER-Energy Management JSW Steel Limited, Dolvi Works Maharashtra, India - 402107 Mobile: +91 8108162672 Agarwal.Pradeep@jsw.in