COMPARING FUNCTIONAL AND CELLULAR LAYOUTS: SIMULATION MODELS

Similar documents
An improvement of a cellular manufacturing system design using simulation analysis

Gang Scheduling Performance on a Cluster of Non-Dedicated Workstations

Evaluation of Value and Time Based Priority Rules in a Push System

Scheduling a dynamic job shop production system with sequence-dependent setups: An experimental study

Simulation of Lean Principles Impact in a Multi-Product Supply Chain

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds

Design and Operational Analysis of Tandem AGV Systems

PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION. Raid Al-Aomar. Classic Advanced Development Systems, Inc. Troy, MI 48083, U.S.A.

Chapter 7 Entity Transfer and Steady-State Statistical Analysis

LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS

OPERATING SYSTEMS. Systems and Models. CS 3502 Spring Chapter 03

A Hit-Rate Based Dispatching Rule For Semiconductor Manufacturing

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

CHAPTER 1 INTRODUCTION

PLANNING AND CONTROL FOR A WARRANTY SERVICE FACILITY

PULL REPLENISHMENT PERFORMANCE AS A FUNCTION OF DEMAND RATES AND SETUP TIMES UNDER OPTIMAL SETTINGS. Silvanus T. Enns

Continuous Workload Control Order Release Revisited: An Assessment by Simulation

Citation for published version (APA): Land, M. J. (2004). Workload control in job shops, grasping the tap s.n.

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations

Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds.

Motivating Examples of the Power of Analytical Modeling

4 BUILDING YOUR FIRST MODEL. L4.1 Building Your First Simulation Model. Knowing is not enough; we must apply. Willing is not enough; we must do.

Minimizing Mean Tardiness in a Buffer-Constrained Dynamic Flowshop - A Comparative Study

Chapter C Waiting Lines

Journal of Business & Economics Research May 2008 Volume 6, Number 5 ABSTRACT

Resource Allocation Strategies in a 2-level Hierarchical Grid System

Analyzing Controllable Factors Influencing Cycle Time Distribution in. Semiconductor Industries. Tanushree Salvi

MATERIAL HANDLING IN FLEXIBLE MANUFACTURING SYSTEM Mr. Neeraj Nirmal 1, Mr. Neeraj Dahiya 2

Discrete Event Simulation

Numerical investigation of tradeoffs in production-inventory control policies with advance demand information

SINGLE MACHINE SEQUENCING. ISE480 Sequencing and Scheduling Fall semestre

Program Evaluation and Review Technique (PERT)

Optimising a help desk performance at a telecommunication company. Fawaz AbdulMalek* and Ali Allahverdi

1. For s, a, initialize Q ( s,

Chapter 1 INTRODUCTION TO SIMULATION

OPTIMAL ALLOCATION OF WORK IN A TWO-STEP PRODUCTION PROCESS USING CIRCULATING PALLETS. Arne Thesen

Scheduling I. Today. Next Time. ! Introduction to scheduling! Classical algorithms. ! Advanced topics on scheduling

The use of the Animate Transfer toolbar and various transportation-related modules will be illustrated in three examples in the sequel.

PERFORMANCE ANALYSIS OF CELLULAR MANUFACTURING SYSTEMS USING COLORED PETRI NETS

MODELING AND SIMULATION OF A LEAN SYSTEM. CASE STUDY OF A PAINT LINE IN A FURNITURE COMPANY

SEQUENCING & SCHEDULING

A SIMULATION MODEL TO IMPROVE WAREHOUSE OPERATIONS. Jean Philippe Gagliardi Jacques Renaud Angel Ruiz

Analysis of the job shop system with transport and setup times in deadlock-free operating conditions

AUTOSCHED TUTORIAL. Bill Lindler. AutoSimulations 655 E. Medical Drive Bountiful, Utah 84010, U.S.A.

Sustainable sequencing of N jobs on one machine: a fuzzy approach

Motivation. Types of Scheduling

PRODUCTION PLANNING PROBLEMS IN CELLULAR MANUFACTURE

Intro to O/S Scheduling. Intro to O/S Scheduling (continued)

Paired-cell Overlapping Loops of Cards with Authorization Simulation In Job shop Environment

Simulation and Implementation Study of Robust Drum-Buffer-Rope Management System to Improve Shop Performance

Simulation of an Interdependent Metro-Bus Transit System to Analyze Bus Schedules from Passenger Perspective

Mathematical Modeling and Analysis of Finite Queueing System with Unreliable Single Server

TRAIN MAINTENANCE JEREMY LIM & HAO MAO. IEOR E4405 Production Scheduling, Spring 2017

Designing an Effective Scheduling Scheme Considering Multi-level BOM in Hybrid Job Shop

Advanced Types Of Scheduling

IMPROVING CALL CENTER OPERATIONS USING PERFORMANCE-BASED ROUTING STRATEGIES. Julie Stanley, Robert Saltzman and Vijay Mehrotra

Allocating work in process in a multiple-product CONWIP system with lost sales

(Assignment) Master of Business Administration (MBA) PGDPM Subject : Management Subject Code : PGDPM

COMPARISON OF BOTTLENECK DETECTION METHODS FOR AGV SYSTEMS. Christoph Roser Masaru Nakano Minoru Tanaka

Container Transfer Logistics at Multimodal Container Terminals

QoS-based Scheduling for Task Management in Grid Computing

People at work: Modelling human performance in shop floor for process improvement in manufacturing enterprises.

EFFECT OF CROSS OVER OPERATOR IN GENETIC ALGORITHMS ON ANTICIPATORY SCHEDULING

HS-OWL UniTS Operations management Process design

SPECIAL CONTROL CHARTS

CELLULAR BASED DISPATCH POLICIES FOR REAL-TIME VEHICLE ROUTING. February 22, Randolph Hall Boontariga Kaseemson

Life Cycle Assessment A product-oriented method for sustainability analysis. UNEP LCA Training Kit Module f Interpretation 1

MINIMIZING MEAN COMPLETION TIME IN FLOWSHOPS WITH RANDOM PROCESSING TIMES

Techniques of Operations Research

Simulation-Based Analysis and Optimisation of Planning Policies over the Product Life Cycle within the Entire Supply Chain

A neural reinforcement learning approach to learn local dispatching policies in production scheduling

Simulation Design Approach for the Selection of Alternative Commercial Passenger Aircraft Seating Configurations

Autonomous Shop Floor Control Considering Set-up Times

MANUFACTURING PROCESS MANAGEMENT USING A FLEXIBLE MODELING AND SIMULATION APPROACH. Duilio Curcio Francesco Longo Giovanni Mirabelli

Matching Supply with Demand

Energy-Efficient Scheduling of Interactive Services on Heterogeneous Multicore Processors

INTRODUCTION TO HOM. The current version of HOM addresses five key competitive advantage drivers

REDUCING SERVICE TIME AT A BUSY FAST FOOD RESTAURANT ON CAMPUS. Sara A. Curin Jeremy S. Vosko Eric W. Chan Omer Tsimhoni

Lean manufacturing concept: the main factor in improving manufacturing performance a case study

CASE STUDY: SIMULATION OF THE CALL CENTER ENVIRONMENT FOR COMPARING COMPETING CALL ROUTING TECHNOLOGIES FOR BUSINESS CASE ROI PROJECTION

PLUS VALUE STREAM MAPPING

State-Dependent Pricing and Its Economic Implications 1

Simulation of Container Queues for Port Investment Decisions

A Sequencing Heuristic to Minimize Weighted Flowtime in the Open Shop

Plant Layout and Material Handling

General Terms Measurement, Performance, Design, Theory. Keywords Dynamic load balancing, Load sharing, Pareto distribution, 1.

Transactions on the Built Environment vol 34, 1998 WIT Press, ISSN

An-Najah National University Faculty of Engineering Industrial Engineering Department. System Dynamics. Instructor: Eng.

Rolling Horizon Approach for Aircraft Scheduling in the Terminal Control Area of Busy Airports

SCHEDULING IN MANUFACTURING SYSTEMS

Allocating work in process in a multiple-product CONWIP system with lost sales

Crowe Critical Appraisal Tool (CCAT) User Guide

Getting the Best 300mm Fab Using the Right Design and Build Process. Presented on SEMI ITRS

An Agent-Based Scheduling Framework for Flexible Manufacturing Systems

CROSS-DOCKING: SCHEDULING OF INCOMING AND OUTGOING SEMI TRAILERS

Production Scheduling

Regional Development and Inequality of Income Distribution

Measurement and Scaling Concepts

Midterm for CpE/EE/PEP 345 Modeling and Simulation Stevens Institute of Technology Fall 2003

Berth allocation planning in Seville inland port by simulation and optimisation

Transcription:

ISSN 1726-4529 Int j simul model 8 (2009) 4, 215-224 Professional paper COMPARING FUNCTIONAL AND CELLULAR LAYOUTS: SIMULATION MODELS Jerbi, A. * ; Chtourou, H. *,** & Maalej, A. Y. * * Laboratoire des Systèmes Electro-Mécaniques, Ecole Nationale d Ingénieurs de Sfax, BP W 3038, Sfax, Tunisia ** Département de technologie, Institut Préparatoire aux études d Ingénieurs de Sfax, Rte Menzel Chaker Km 0.5, Sfax 3018, Tunisia E-Mail: jerbi_a@yahoo.fr, hedi.chtourou@ipeis.rnu.tn, aref.maalej@enis.rnu.tn Abstract The cellular layout has been compared to the traditional functional layout in numerous studies. Most of them are based on simulation modelling. Nevertheless, they generally suffer from the lack of detail in describing their simulation models. The exclusion or the lack of information of key parameters could be serious limitations to any simulation study. The main purpose of this work is the development of comprehensive FL and CL simulation models and their use for illustrating the dependence of the layout performance comparison on the settings of factors either overlooked or kept constant by several simulation studies. Simulation results clearly establish the influence of part type routings, cellular queuing strategy and job overlapping on the ranking of the two layouts. (Received in June 2009, accepted in August 2009. This paper was with the authors 1 month for 1 revision.) Key Words: Manufacturing Systems, Cellular Layout, Functional Layout, Simulation 1. INTRODUCTION Since its apparition and the spreading out of the group technology concept, the cellular layout (CL) has been compared to the traditional functional layout (FL). Analytical models and empirical research have often been used for the two manufacturing system (MS) layout patterns. However, the major part of the literature devoted to FL-CL comparison is based on simulation modelling. Results reported by comparative simulation studies vary widely. Indeed, some researches reported that the FL is always superior to the CL with regard to all used performance measures [1-3]. In contrast, further researches found the CL superior to the FL in all operating conditions [4], [5]. Some other simulation studies established that each layout could outperform the other in some particular experimental conditions [6-10]. This divergence in the conclusions is referred as the cellular manufacturing paradox [11]. [12] studied this paradox as it emerged from a number of comparative simulation studies. It identified a number of objectivity flaws responsible for the conflicting conclusions. Prior to this study, [11] and [13] reviewed and analyzed a number of FL-CL comparative studies. Their works simply reported the major findings of some published studies without any critical objectivity assessment. In fact, it appeared from [12] results that some parameter settings, such as under sizing transfer times or excluding job overlapping in CL, biases the comparison in favour of the FL. On the other hand, some other settings favour the CL. Among these settings, machine duplication and very high transfer times can be mentioned. Besides, the same study pointed out the fact that many potentially influential factors were considered constant throughout some of the simulation investigations. In addition, according to the same study, some of the DOI:10.2507/IJSIMM08(4)4.147 215

reviewed studies failed to describe their simulation models with a sufficient amount of detail. The lack of data concerning important factors or excluding these factors from the simulation investigation could be serious limitations to any simulation study. The main purpose of this research is to develop comprehensive FL and CL simulation models using the commercial simulation software Arena 7.0. These models are then used to illustrate the dependence of the layout performance comparison on the settings of factors either overlooked or kept constant by several studies. The remainder of this paper is organized as follows: the next section presents taxonomy of foremost used performance measures in the main published simulation studies concerned with FL-CL comparison. This section also discusses the main used factors. The third section presents some general simulation features, needed for modelling both layouts. Then, sections 4 and 5 respectively detail the particularities of the developed FL and the CL simulation models. Next, section 6 presents a simulation study illustrating the dependence of the comparison results on several parameters, often overlooked in the literature. The final section encloses the general conclusion and the future work prospects. 2. LITERATURE REVIEW 2.1 Performance measures The Work In Process (WIP) is one of the most popular performance measures used in the FL- CL comparative studies [1-4], [6-8], [10]. This measure characterizes the fluidity of the material flow in the system. It has been mainly measured by the number of parts in the system or by summing up the average setup and process times of all parts either being processed or waiting in the different MS queues. The Mean Flow Time (MFT) constitutes the other most popular measure used in FL-CL comparative studies [1], [3], [4], [6-10]. The MFT is the average time that every job remains in the system in order to be manufactured. It also characterizes the system flow fluidity. In addition, researchers used Mean Tardiness (MT) and Mean Earliness (ME) as due date related performance measures [3], [8]. The first is taken as the average, over all tardy jobs, of the difference between actual delivery date and the promised due date. The second is similarly obtained for all early jobs. [3] also uses the percentage of tardy jobs and the percentage of early jobs. FL-CL comparative studies consider several other performance measures. The system throughput is usually considered as a productivity measure. It is the average number of parts exiting the system by time unit [2], [9]. In addition, some studies use the average machine utilization rate [2], [7], [8], the operator utilization rate [2], the average set up time to process time ratio [10] or the mean queue waiting time as performance indicators [5]. Maximising the first two measures ensure a high degree of resource exploitation whereas minimising the third or the fourth measure enhances the efficiency of the MS piloting. 2.2 Main experimental factors The studied MSs are characterized by a number of machines ranging from 12 to 30. These are either arranged into departments or else into manufacturing cells. Following the FL structure, the shop is composed of d departments D i (i = 1,, d) each of them includes M n functionally equivalent machines. In contrast, the CL, based on the group technology, is composed of c independent manufacturing cells C j (j = 1,, c). Each one of these cells is a cluster of M f different machines dedicated to a number of similar part types. In the studied MSs, the 216

number of departments ranges between 4 and 15 whereas the number of cells ranges between 3 and 5. The Degree of Decomposability (DD) of the part machine matrix translates the feasibility of the decomposition of the MS into independent cells. Indeed, the more the product/machine matrix is diagonal the more the decomposability is feasible. The majority of the comparison studies considered very high degrees of decomposability leading to completely independent cells. Products are identified by two indicators, which are the type (t) and the family (f). In fact, different product types are regrouped into families according to the similarity of their manufacturing process. The studied systems were designed for a demand pattern comprising 3 to 80 product types belonging to a number of families varying from 3 to 10. Each product type requires a number of manufacturing operations (mopt) ranging between 2 and 25. Jobs arrive to the MS following the InterArrival Time (IAT) that represent essentially the demand rate of the MS. A large part of authors generated this time by common probabilistic distributions. Others used a constant interarrival time. Once jobs arrive into a department or a cell they are made waiting in a queue until the required machine becomes available. These jobs are then sequenced in order to establish the priority of jobs and the order in which they will be processed. This order is specified by a scheduling rule or a priority rule. Common rules include First Come First Served (FCFS), Shortest Processing Time (SPT), Earliest Due Date (EDD) and Repetitive Lots (RL). As for the IAT, several studies modelled the Processing Time (PT) and Setup Time (ST) by different probabilistic laws. Others formulated ST as a fraction of PT. In addition, if a machine is set up for a specific job type and then it should be set for another type of the same family, the nominal setup time for the second job should be reduced by the reduction time factor (δ). Products are generally manufactured and transported in batches (BS) which size ranges between 5 and 250 parts in order to reduce the number of machines' setup and transport between workstations. Nevertheless, different MSs use the operations overlapping as a transfer mode that allows simultaneous execution of different operations on the same batch. Therefore, they exploit the proximity of cell machines in the cellular layout and transferred products by part. Neither operator s number nor skill was considered in the quasi totality of FL-CL comparative studies. Indeed, the mainstream of literature assumes that an operator is affected to every machine. 3. GENERAL SIMULATION FEATURES Both FL and CL layouts are modelled for simulation using the commercial simulation software Arena 7.0 [14-16]. This tool integrates all the functions needed for simulation including animation, analysis of input and output data. Every MS model consists of the four main components described in the following subsections. 3.1 Manufacturing orders launching and attribute assignation Manufacturing orders (MOs), also called jobs, are launched by Create modules that permit to define jobs interarrival times following an appropriate probabilistic rule as well as their batch size. Jobs of each part type are launched by a dedicated Create module. As soon as jobs are initiated, several characteristics are attributed to them using the Assign module. 217

These characteristics are mainly job s type and family. Routings, process and setup times on each machine type belonging to their routings are also assigned to jobs by the same module. 3.2 Part transfer Parts are transferred, either individually or in batch, between physical locations in which they should undergo the required successive manufacturing operations. These locations, modelled by the Station modules, are either machines in CL or departments in FL. Transfer is modelled by modules permitting to prescribe destinations as well as transfer times. These modules permit to use one of the previously defined jobs attributes, namely its Sequence, in order to prescribe the next destination. The Job Sequence corresponds to its routing expressed as a list of stations. These stations are associated either to departments in the FL or to the cell machines in the CL. 3.3 Part manufacturing A machine is modelled by a Process module, associated to a Station module determining the physical location of the machine and a Resource module representing the capacity and the availability of the machine itself. In fact, the Process module seizes the associated resource for the required period of time and then releases it, so it becomes again available for manufacturing another job. The period of time during which the machine resource is busy corresponds to the PT of the part being processed as well as the required machine ST if the machine was set for a different part type. The ST, when applicable, is weighed by the setup reduction factor δ whenever the part type belongs to the family of the last processed one. 3.4 Material flow Two manufacturing strategies could be followed for the parts flow in the shops. In the first, job overlapping is allowed. This means that parts of the same batch could be processed simultaneously on the different machines of a department or a cell, depending on the used layout. In the second, overlapping is not permitted. Hence, all parts of the same batch are processed on the same machine of the cell or department before being transferred collectively to the next machine or department prescribed by their routing. In all cases, batches should be split by Separate modules before accessing Process modules. Batch reconstitution for transfer is performed using Batch modules. 3.5 Statistics collection Before leaving the MS, every job should go through an Assign module for computing and updating the parameters defined as performance measures. The acquired data is then stored in an Excel file using a Readwrite module for eventual treatment and analysis. 4. FL MODEL The functional layout model is mainly composed of three parts: MO launching, Machine departments and System exit (see Fig. 1). 218

MO launching Machine departments Create 1 Assign 1 Create 2 Assign 2 Create i Assign i Create N Assign N System exit Exit PM export Batch PM updating Department D1 Department D2 Department Di Department Dd Figure 1: Overview of the FL model. MOs of each part type are launched by dedicated Create and Assign modules. The generated parts are then grouped into batches before being routed to the corresponding department to their first manufacturing step. Once a job enters a department, it waits in a queue modelled by the Hold module and governed by a rule that could be FCFS, SPT or any other priority rule specified by the user. In this study, the RL priority rule is used for both FL and CL models. This rule aims at minimising the setup times on the machines by prioritising jobs of the same type than the job just processed on one of the department machines. If no matched job is found, jobs of the same family are selected. If still no matched job is found, the queue is scanned for a job type different from those being processed on the others department machines. Finally, the selection procedure is switched to the FCFS priority rule if the prior searches fail to produce a candidate. The Hold module releases the prioritized job of the waiting queue when, at least, one machine is available. The released job is then transferred to the Machine selection submodel. This sub-model is responsible for selecting one among the available department machines. The logic of this sub-model is coherent with the waiting queue priority rule. Hence, it routes the released job to the appropriate machine according to the RL. In addition, when job overlapping is permitted, parts batches are split just before accessing the department queue. Hence, parts become independent and could be dispatched to several machines of the same department to be processed simultaneously (see Fig. 2). On the other hand, if overlapping is not adopted, every parts batch is split only when it reaches the machine assigned to its processing (see Fig. 3). In both cases, batches are reconstituted after processing and before the transfer to next manufacturing step. The combination of the overlapping strategy, the machine selection process and the waiting queue priority rule define the shop scheduling policy. Separate Di Hold Di Machine M1 Machine M2 Machine selection.. Priority adjustment Batch Di Machine Mi Machine Mn Figure 2: Overview of an FL department model with overlapping. 219

Hold Di Separate M1 Machine M1 Batch M1 Separate M2 Machine M2 Batch M2 Machine selection Priority adjustment Separate Mi Machine Mi Batch Mi Separate Mn Machine Mn Batch Mn Figure 3: Overview of an FL department model without overlapping. 5. CL MODEL The CL model is composed of c sub-models corresponding to the c MS cells. Each sub-model is composed of three parts: MO launching, Machine cells and Cell exit (see Fig. 4). MO launching Cell Ci general queue Create 1 Assign 1 Separate Ci Hold Ci Create 2 Assign 2 Create i Assign i Batch Hold M1 Machine M1 Cell Ci machines Hold M2 Machine M2 Create j Assign j Hold Mi MachineMi Priority adjustment Exit PM export Cell Ci exit PM updating Batch Hold Mf Machine Mf Figure 4: Overview of a cell C i model with overlapping. MOs of each part type belonging to the cell part type family are launched by dedicated Create and Assign modules. The generated parts are then grouped in batches before being routed to the machine corresponding to their first manufacturing step. Each machine has its own waiting queue governed by a specified priority rule. An additional general cell queue could also be implemented. Such a queue holds parts until their first routing step machine becomes available before being inserted into the cell. Both queues are governed by the same RL priority rule. Once a machine becomes idle, a double stage strategy is adopted for the job selection. Jobs are first selected from the machine queue. Once this queue is void, jobs are selected from the general cell queue. As for FL, process overlapping could be allowed. In this case, batches are dissociated since they leave the cell general queue. Hence, every part follows its manufacturing routing without waiting for the other batch parts. Batches are finally reconstituted just before the cell exit (see Fig. 4). On the other hand, if overlapping is not adopted, every batch is split only when it reaches the machine assigned to its processing. Batches are then reconstituted after processing and before the transfer to next manufacturing step (see Fig. 5). 220

Create 1 Assign 1 MO launching Cell Ci general queue Hold Ci Create 2 Assign 2 Create i Assign i Batch Hold M1 Separate M1 Machine M1 Cell Ci machines Batch M1 Hold M2 Separate M2 Machine M2 Batch M2 Create j Assign j Hold Mi. SeparateMi MachineMi Batch Mi Priority adjustment Exit Cell Ci exit PM export PM updating Hold Mf Separate Mf Machine Mf Batch Mf Figure 5: Overview of a cell C i model without overlapping. 6. SIMULATION STUDY 6.1 Scope The developed simulation models are used to illustrate the dependence of the FL-CL comparison results on several parameters often overlooked in the literature. These factors are part type routings, cell queuing strategy and job overlapping strategy. Hence, three simulation experiments are carried out. Table I summarises characteristics of both layouts. Table I: MS characteristics. Characteristic Value No. of parts / families 30 Parts / 5 part families Family size 6 parts/family No. of machines 30 No. of cells 5 No. of departments 8 Cell size 4~8 machines/cell Labour 30 operators Functional department size 3~4 machines/department No. of operations/part 2~6 Batch size 50 parts Job interarrival times Exponential distribution with mean = 630 min Process times Normally distributed with mean = 20 min and variance = 2.5 min Setup times Normally distributed with mean = 100 min and variance = 12.5 min Setup reduction factor 0.5 Transfer times Uniformly distributed (1~5 min) for CL Uniformly distributed (1~15 min) for FL Job sequencing rule Repetitive lots The first experiment studies the effect of part type routing on comparison results using three surrogate sets of routings in both layouts. In the first routing set, every part type requires from 2 to 6 operations. The second set is obtained by altering the first while conserving the 221

number of manufacturing operations per part type. The third set of routings corresponds to the first with a lowered number of manufacturing operations per part type. All sets present full cell independence. In the second experiment, a version of the CL model without general cell waiting queues is compared to the basic CL and FL models. Using this modified version, every job is directly routed to the first machine of its routing even if this machine is not idle. The third and final experiment aims at investigating the effect of job overlapping on comparison results. Hence, FL-CL comparison is undertaken in two contexts in which overlapping is first allowed and then blocked. 6.2 Simulation setup The independent replications method is adopted for statistics collection. So, every simulation run has 15 replications. Each replication is 1.000.000 minutes long. Observations are collected for two performance measures: throughput time and mean flow time. The first measure is essentially used for warm up period detection. Nevertheless, FL-CL comparison is based on the second measure. Analysis of the simulation output using the Yucesan initialization bias in simulation output detection method shows that the steady state is reached when the simulation length is 200.000 minutes [17]. As for the second performance measure, 95 % confidence interval (CI) is considered. Therefore, in this study, a difference between two MFT measures is considered significant only when there is no overlap between their respective 95 % confidence intervals. The confidence interval can be calculated using Eq. 1 [18]: σ CI = m ± t (1) n where m is the average MFT over the n the number of replications, t is the factor obtained from standard student table required for the risk α, σ is the MFT standard deviation. In this study the risk α is equal to 0.05 (1-0.95) and n is equal to 15. The corresponding factor t is so equal to 2.14. 6.3 Results Simulation results for the first experiment, depicted in Table II, clearly establish the influence of part type routings on the simulation results. Indeed, with the first routing the CL's MFT is 9.4 % lower than the FL's MFT. The superiority between layouts is though annulled by the second routing since the two layouts generate significantly equivalent MFT. On the other hand, the third routing inverts the superiority between CL and FL and the FL generate an MFT 22 % lower than the CL's MFT. Therefore, the superiority of a layout over the second could be reversed when the part routing set is altered. For the second experiment, results show that the elimination of the cell general queue decreases the gap between the performances of the two layouts. Indeed, when the general queue is used in the CL, this layout outperforms the FL and the difference between the two layouts MFT reaches 134 minutes whereas the same difference is not significant when the general queue used in the CL (see Table II). Finally, results of the last experiment clearly reveal, that job overlapping influences the comparison results. Indeed the FL generates an MFT 5.75 % lower than the CL's MFT if job overlapping is allowed. On the opposite, CL outperforms the FL in case of job overlapping not allowed (see Table II). 222

Table II: Simulation results (MFT confidence interval). EXPERIMENT I: part type routing effect MFT FL MFT CL Routing m σ CI m σ CI First set 1558 14 [1550 1566] 1424 13 [1417 1431] Second set 1534 13 [1527 1541] 1537 21 [1525 1549] Third set 1162 7 [1158 1166] 1417 18 [1407 1427] EXPERIMENT II: cellular queuing strategy MFT FL MFT CL Cell m σ CI m σ CI With general queue 1424 13 [1417 1431] 1558 14 [1550 1566] Without general queue 1546 12 [1540 1552] EXPERIMENT III: overlapping effect Overlapping MFT FL MFT CL m σ CI m σ CI Not allowed 1558 14 [1550 1566] 1424 13 [1417 1431] Allowed 3891 25 [3877 3905] 4115 20 [4104 4126] Notes: m average MFT (min), σ MFT standard deviation (min), CI Confidence Interval (min). 7. CONCLUSION AND FUTURE WORK This paper focuses on the functional and cellular layout comparison. It mainly presents comprehensive simulation models for both layouts. These models are then used to illustrate how some parameters, often overlooked in FL-CL comparison studies, can influence comparison between layouts results. Indeed, the simulation results proved that part type routings, cell queuing strategy and job overlapping strategy affect the relative superiority of the two layouts. Undergoing work focuses on investigation of other parameters effects on the system performances. Besides, developed layout models in this study are being used in establishing an objective simulation-based comparison methodology. Such a methodology is based on the Taguchi method for robust experimental design. REFERENCES [1] Morris, J. S.; Tersine, R. J. (1990). A simulation analysis of factors influencing the attractiveness of group technology cellular layouts, Management Science, Vol. 36, No. 12, 1567-1578 [2] Morris, J. S.; Tersine, R. J. (1994). A simulation comparison of process and cellular layouts in a dual resource constrained environment, Computers and Industrial Engineering, Vol. 26, No. 4, 733-741 [3] Jensen, J. B.; Malhotra, M. K.; Philipoom, P. R. (1996). Machine dedication and process flexibility in a group technology environment, Journal of Operations Management, Vol. 14, No. 1, 19-39 [4] Shafer, S. M.; Charnes, J. M. (1992). Cellular versus functional layouts under a variety of shop operating conditions, Decision Sciences, Vol. 24, No. 3, 665-681 223

[5] Pitchuka, L. N.; Adil, G. K.; Ananthakumar, U. (2006). Effect of the conversion of the functional layout to a cellular layout on the queue time performance: some new insights, International Journal of Advanced Manufacturing Technology, Vol. 31, No. 5/6, 594-601 [6] Suresh, N. C.; Meredith, J. R. (1994). Coping with the loss of pooling synergy in cellular manufacturing systems, Management Science, Vol. 40, No. 4, 466-483 [7] Shafer, S. M.; Charnes, J. M. (1995). A simulation analysis of factors influencing loading practices in cellular manufacturing, International Journal of Production Research, Vol. 33, No. 1, 279-290 [8] Farrington, P. A.; Nazametz, J. W. (1998). Evaluation of the performance domain of cellular and functional layouts, Computers and Industrial Engineering, Vol. 34, No. 1, 91-101 [9] Faizul, H.; Douglas, A. H.; Zubair, M. M. (2001). A simulation analysis of factors influencing the flow time and through-put performance of functional and cellular layouts, Integrated Manufacturing Systems, Vol. 12, No. 4, 285-295 [10] Li, J. (2003). Improving the performance of job shop manufacturing with demand-pull production control by reducing set-up/processing time variability, International journal of Production Economics, Vol. 84, No. 3, 255-270 [11] Shambu, G.; Suresh, N. C.; Pegels, C. C. (1996). Performance evaluation of cellular manufacturing systems: a taxonomy and review of research, International Journal of Operations & Production Management, Vol. 16, No. 8, 81-103 [12] Chtourou, H.; Jerbi, A.; Maalej, A. Y. (2008). The cellular manufacturing paradox: a critical review of simulation, Journal of Manufacturing Technology Management, Vol. 19, No. 5, 591-606 [13] Agarwal, A.; Sarkis, J. (1998). A review and analysis of comparative performance studies on functional and cellular manufacturing layouts, Computers and Industrial Engineering, Vol. 34, No. 1, 77-89 [14] Arena Standard User's Guide (2002). Doc ID ARENAS-UM001C-EN-P, Rockwell Software Inc. [15] Kelton, W. D.; Sadowski, R. P.; Sadowski, D. A. (2002). Simulation with Arena, McGraw-Hill, New York [16] Jerbi, A.; Chtourou, H.; Maalej, A. Y. (2006). Functional VS Cellular layout: using simulation as a comparison tool, The Third International Conference on Advances in Mechanical Engineering and Mechanics, Hammamet, Tunisia [17] Yucesan, E. (1993). Randomization tests for initialization bias in simulation output, Naval Research Logistics Quarterly, Vol. 40, 643-663 [18] Kiefer, J. (1977). Conditional Confidence Statements and Confidence Estimators (with discussion), Journal of the American Statistical Association, Vol. 72, 789-827 224