DESIGN REGISTRATION GUIDELINES FOR NUCLEAR PRESSURE RETAINING SYSTEMS AND COMPONENTS

Similar documents
Pressure Equipment Repair and Alteration Requirements

Boilers and Pressure Vessels Safety Program CODE ADOPTION DOCUMENT AMENDMENT

QUALIFICATIONS NEEDED TO DESIGN, CONSTRUCT AND MANUFACTURE NUCLEAR SYSTEMS AND EQUIPMENT. Cosmos M. Voutsinos, P.Eng.

Accreditation of Hot Tap Organizations

THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 ( the Act ) and

An Actual reading of 100 PPM (not air free sample) in the flue indicates that the CO level of the appliance exceeds the acceptable level.

CNSC Oversight of Counterfeit, Fraudulent and Suspect Items

Welding Performance Qualification Test Administrators GUIDE FOR APPLICANTS

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

Pressure Piping Construction Requirements

MATERIAL SPECIFICATION FOR STEEL REINFORCEMENT FOR CONCRETE

DEVELOPMENT SERVICES PO Box 1110 Tampa, FL Date: May 12, Interested Parties. John L. Barrios, CBO, Building Official

NRC Participation and Perspectives on Codes and Standards for Nuclear Construction

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Reliability Programs for Nuclear Power Plants

2004 NBIC Interpretations

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

Woodstoves, Fireplaces, Chimneys & Outdoor Solid Fuel Combustion Appliances

Quality Control and Quality Assurance for Installation of Steel Deck

CONSTRUCTION SPECIFICATION FOR STEEL REINFORCEMENT FOR CONCRETE

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition

Washington Association of Building Officials. Standard 1702 Steel Fabricator Registration Program

GUIDE FOR ASME REVIEW TEAMS FOR REVIEW OF APPLICANTS FOR ASME RP CERTIFICATE OF AUTHORIZATION. The American Society of Mechanical Engineers

Inspection and Quality Assurance Requirements for Metal Plate Connected Wood Trusses. Educational Overview

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

1.07 SUPPLEMENTS PRODUCTS (NOT USED) EXECUTION (NOT USED) END OF SECTION

GUIDE. DWWP Amendments Licence Amendments Licence Renewals & New System Applications. Municipal Residential Drinking Water Systems

Regulations on Work Permits for Contractors Performing Assembly, Dismantling, and Maintenance of Temporary Facilities in Buildings and at Outdoor

Terms of Reference for Assessment of Water System Infrastructure and Water Supply Sources for Semi-Public Water Systems

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

SECTION BID FORM LICK RUN INTERCEPTOR REHABILITATION

BUILDING PERMIT GUIDELINES - RESIDENTIAL

Conformity Assessment. Dan Cheetham BPV Requirements 4/12/16

BUILDING PERMIT APPLICATION GUIDE FOR HOMEOWNERS

Conformity Assessment. Dan Cheetham BPV Topics of Interest 2016 Certification 360

ASME CODE CHANGES 2015 EDITION

AECON POWERS THE INDUSTRY

Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines

RESIDENTIAL BOILERS CERTIFICATION PROGRAM

Environmental Information Form

Main Steam & T/G Systems, Safety

ADMINISTRATION CHAPTER 1

NOTICE ON NUCLEAR SCOPE STATEMENTS

WELDING BUREAU OFFICE OF PUBLIC SAFETY

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS

Presented by: Gary Scribner Manager of Technical Services. Shanghai April The National Board of Boiler and Pressure Vessel Inspectors

Professional Corporation Application for Registration (Form 4-6C)

The Future of Ice Arena Refrigeration B-Certificate Chief s & Operators

Application for a Sewage System Permit

ASME As a Help to Export! Our Topic today: Nuclear Quality Assurance ASME NQA 1

JULY 10, 2013 INTRODUCTION

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations

Main Building Auditorium

Draft Regulatory Guide DG-1080 (Proposed Revision 3 of Regulatory Guide 1.149)

PART UIG THE ASME CODE FOR IMPREGNATED GRAPHITE PRESSURE VESSELS

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

Safety Pre-Qualification Application Process

APPLICATION OF ASME CODE CASES 2284, 2278 & 2290 FOR USE IN THE PROVINCE OF ALBERTA

Management System Standards in the Canadian Nuclear Industry

ALL-IN-ONE CLOUD BASED CITIZEN SERVICE PLATFORM FOR PERMITTING, LICENSING, INSPECTIONS, AND ENFORCEMENT

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL AC172. April 2017 (Effective June 1, 2017) PREFACE

PLANNING AND EVALUATION PRELIMINARY DESIGN

CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS

The following is required for a complete permit submittal for each unit.

BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION

JOHN WOOD UNCONTROLLED COPY: THE JOHN WOOD COMPANY PO BOX HIGHLAND AVENUE OAKS, PENNSYLVANIA 19456

Customs-related aspects of the Rotterdam Convention Switzerland s experience. Secretariat of the Rotterdam Convention. Switzerland s experience

RESIDENTIAL BOILERS CERTIFICATION PROGRAM

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

Code on Nuclear Air and Gas Treatment

North Atlantic ENGINEERING STANDARD SPECIFICATION 1/7 REV. QUALITY SLAG BOWL WELDING AND QUALITY REQUIREMENTS. Approved by.

The Pipelines Regulations, 2000

REFERENCE SYLLABUS. for WELDING EXAMINER & WELDING EXAMINER IN TRAINING CERTIFICATES OF COMPETENCY EXAMINATIONS

ASME Code, Section VIII, Division 1: DESIGN AND FABRICATION OF PRESSURE VESSELS Presenter: Fahim Shadid

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

The Role of the National Nuclear Regulator in the Regulation of Pressure Equipment used in the South African Nuclear Industry

1. For trained Secretaries of PACS: 9 posts (including 6 posts of back log of reserved sub-categories)

OWNER S AFFIDAVIT. I, certify that I am the owner of the property described as: ADDRESS: LOT: BLOCK: SUBDIVISION:

Content Copy Of Original

CLASS III MEDICAL DEVICE LICENCE AMENDMENT APPLICATION FORM (disponible en français)

Materials and Qualification Procedures for Ships

Swagelok Nuclear Capabilities. swagelok.com

A Guide to Ventilation Requirements for Uranium Mines and Mills

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

A/E REVIEW CHECKLIST STEAM GENERATION

CSA Group Products, Processes and Services Scheme

Fuels Safety Program. Oil and Gas Pipeline Systems Code Adoption Document Amendment

Clothes Washer Verification Program Procedural Guide February 2012 Version 1.0

Supplier Quality Terms & Conditions

Australian Standard. Non-destructive testing Radiography of welded butt joints in metal. Part 1: Methods of test AS

APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES

A REPORT ON CANADA S LARGEST CLEAN POWER PROJECT DARLINGTON REFURBISHMENT

Application for a Sewage System Permit

Oil and Gas Contractor QA/QC Plan Sample Selected pages (not a complete plan)

Pipeline Transportation Systems for Liquids and Slurries

LC 16 SITE PLANS, DESIGNS AND SPECIFICATIONS

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

Transcription:

Boilers and Pressure Vessels Safety Division Technical Standards & Safety Authority 14th Floor, Centre Tower 3300 Bloor Street West Toronto, Ontario Canada M8X 2X4 www.tssa.org DESIGN REGISTRATION GUIDELINES FOR NUCLEAR PRESSURE RETAINING SYSTEMS AND COMPONENTS 1. Scope: This document contains guidelines for the registration of pressure retaining systems and components in CANDU nuclear power plants, and may also be used for the registration of pressure retaining systems and components in research reactors and isotope producing reactors and for offshore nuclear power plants where an agreement for the registration services by the Technical Standards and Safety Authority (TSSA) exists. The design, fabrication, welding, quality assurance, installation, examination, testing and inspection of nuclear pressure retaining systems and components are governed by the following legislation, codes and standards: Canadian Nuclear Safety Act and Regulations for nuclear facilities in Canada Technical Standards and Safety Act, 2000, (Act) and Regulations for Boilers and Pressure Vessels Regulations), and Boilers and Pressure Vessels Safety Code Adoption Document (CAD) dated June 1, 2001 Canadian Standards Association Standards CAN/CSA-N285.0-95 and CSA B51-97 American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Codes The effective date of the Code and Standards must be established in accordance with CAN/CSA-N285.0-95. The definitions of terms in this document are as per above CSA Standards. This document explains these requirements and is not a substitute for the governing documents themselves. In case of conflict between the requirements of this document and the applicable Act, Standard or Code, the requirement of the applicable Act, Standard or Code shall take precedence. 2. General: Effective May 5, 1997, the Ministry of Consumer and Commercial Relations (MCCR) designated the Technical Standards and Safety Authority (TSSA) as the administrative authority for the administration and enforcement of the Act, Regulations and CAD. The services previously provided by the Technical Standards Division of MCCR are now being provided by TSSA. TSSA has introduced the use of a Services Agreement which must be signed by the design registration applicant before a Canadian Registration Number (CRN) can be issued. The Agreement incorporates general industry practice and details the terms and conditions for which the services are provided by TSSA to the applicant. Where services provided by TSSA are limited to design registration only, the applicant must utilize an authorized inspection agency for third party fabrication inspection and quality assurance program verification. Page 1 of 6

The design registration application should be submitted to: Technical Standards and Safety Authority (TSSA) Boilers and Pressure Vessels Safety Division Attn: Design Registration Coordinator 3300 Bloor Street West 14th Floor, Centre Tower Toronto, Ontario M8X 2X4 To obtain a copy of the Services Agreement and accredited inspection agencies list, you may log onto our website at www.tssa.org, or call (416) 734-3299, or by fax at (416) 231-6183. 3. Documentation: Two sets of supporting documents describing and demonstrating the acceptability of the design must be included with a design registration submission. Table 1 of CAN/CSA-N285.0-95 should be consulted. Documents which may be required are listed below: 1. System Classification List (SCL) or Classification Form approved by the Canadian Nuclear Safety Commission (CNSC) 2. System Flow Sheet 3. Drawings or Catalogue 4. System Design Documents or Design Specifications 5. Design Report 6. Statutory Declaration 7. Capacity Certification Test Report 8. Load Capacity Data Sheet 9. Overpressure Protection Report (OPPR) For example, for the registration of Nuclear Class 1, 2 and 3 systems, only the documents numbered 1, 2, 4, 5 and 9 are required. The submitter should ensure that the contents and the certification of these documents conform with the requirements of CAN/CSA-N285.0-95 and the applicable sections of the ASME Boiler and Pressure Vessel Code. For Class 6 piping system registration refer to Appendix B attached. The registration application, for piping systems, must be made by the licensee. When the application is not from the licensee, a transmittal letter must be supplied by the licensee identifying the applicant is acting on behalf of the licensee. Designs submitted to TSSA for registration are reviewed, and if accepted, a CRN is issued with one set of stamped documents returned to the applicant. Reasons for rejection are discussed with the applicant. 4. Quality Assurance: The manufacturer must maintain a quality assurance program meeting the requirements of CAN/CSA-N285.0-95. The quality assurance program must have been verified by an acceptable authority. ASME and TSSA certificate holders within the scope of their certificate of authorization or accreditation are acceptable. 5. Reconciliation for Previously Registered Components & Component Supports Registered items can continue to be fabricated under the CRN issued provided: 1. The terms of the registration, that is the organization the CRN has been issued to, design criteria, and location if specified remain unchanged, Page 2 of 6

2. and the manufacturer s quality assurance program remains valid under the terms in section 4 of this document. An item which was previously registered for a specified location may be accepted for a new location primarily on the basis of prior documentation provided there is no change to the design conditions as listed below. In such cases, a reconciliation statement shall be provided by the organization to which the CRN was issued in a format attached with this document, along with one set of the revised documentation (see Appendix A ). The following design conditions must be considered: Code effective date; if the code effective date is not the same, a full evaluation of code changes must be performed Design loading, including seismic requirement(s) Environmental requirement(s) Interfacing system(s) Operability, maintainability, and reliability requirements For other changes, a revision to the original registration is required. Two sets of revised documents including identification of the original CRN and a description of the revision are to be submitted. Appendices: A and B Attachments: None file: Nuclear pressure retaining systems gde.doc Page 3 of 6

Appendix A Registered Component/Component Support Design Reconciliation Statement I, the undersigned, being a registered professional engineer, competent in the applicable field of design and related nuclear plant requirements, hereby certify to the best of my knowledge and belief that the following documentation, referenced in the design submission registered under CRN for plant location. Design specification Design drawing Design report Certified capacity test report Other and is revised and referenced in the following documents for plant location, Design specification Design drawing Design report Certified capacity test report Other have been duly evaluated. The changes meet the requirements of CSA Standard N285.0-95, and with the relevant requirements of the ASME Boiler and Pressure Vessel Code. There is no change in the classification, and the original design conditions envelope the conditions of the new location. The component/component support shall be fabricated in a facility with a valid quality assurance program as required in CAN/CSA-N285.0-95. Certified and Signed by: Date: Page 4 of 6

Appendix B GUIDELINES FOR REGISTRATION OF CLASS 6 PIPING SYSTEMS FOR A CNSC NUCLEAR LICENSED FACILITY LOCATED IN ONTARIO Submissions: Design submittals for Class 6 piping systems registrations, in accordance with CSA B51 shall include the following documents: Letter of application; CNSC approved System Classification List (SCL); Flow diagrams (in triplicate); General arrangement or isometric piping drawings; Specifications; Calculations. Letter of Application: Application for registration must be made by the licensee. When the application is not from the licensee, a transmittal letter must be supplied by the licensee identifying the applicant is acting on behalf of the licensee. The letter of application must include a return address, the name and telephone number of a person who can be contacted for information, the location of the installation and a list of drawings submitted. Also, an estimate of the overall length of piping being installed should be indicated. Drawings: General information required on these drawings shall include, but is not limited to, the following: Construction Code Information i.e. ASME B31.1 or B31.3 latest Edition and Addenda; Design Pressure; Design Temperature; Test Pressure and Type of Test; Service Fluid Information (e.g. Air, Water, Steam or specific Gas or Liquid); Safety/Relief Valve Setting and Location, or statement regarding overpressure protection. Specifications: Pipe specification shall indicate, as a minimum, the following: Pipe line identification; Pipe size and schedule; Pipe material (in accordance with ASME or ASTM material specification); Fitting(s) classification, identification and rating; (For details see TSSA s Guidelines for the Registration of Non-Nuclear fittings in the Province of Ontario. Also note Appendix E of this Guideline, for the requirements for flexible hose assemblies) Statement attesting that only registered fittings are used; Pipe joining methods and details (welding, brazing, or others); Non-destructive examination (NDE); Statement describing maximum support spacing and type, and anchor location. Page 5 of 6

Appendix B Continued Calculations: Calculations need to address: Flexibility; Thermal expansion/contraction; Vibration; Seisimic; and Any other applicable loads. General Information: To help expedite registration, folded and relevant drawings should be submitted. Reproducible, e.g. mylars or originals should not be sent; non-relevant drawings to the piping system being registered should not be included. Submitter should be aware that, in the case of a large number of drawings involved, TSSA will determine which ones are relevant for registration. The remainder will be disposed of or returned, if so requested, at the submitter's expense. For submissions that include a large number of drawings or systems, the submitter must send along a line list and drawings list. For piping systems, which contain multiple services where some are subject to registration and others are not, those systems part(s), subject to registration, must be highlighted on all 3 sets of submitted drawings. Also, additions or modifications to existing systems should be identified (highlighted) on all 3 sets of drawings. Installer: The installer of the piping system must have a Certificate of Authorization from TSSA for piping installations. Inspection: The local TSSA Authorized Inspector must be notified prior to commencement of the installation. Shop fabricated piping must be registered and inspected during fabrication and a Piping Installation and Test Data Report Form must be prepared and signed by fabricator and countersigned by the Authorized Inspector and submitted to the owner of the installation. Page 6 of 6