BRIDGE_ SIM: FRAMEWORK FOR PLANNING AND OPTIMIZING BRIDGE DECK CONSTRUCTION USING COMPUTER SIMULATION. Mohamed Marzouk Hisham Zein Moheeb Elsaid

Similar documents
Effects of construction sequences on a continuous bridge

Program Evaluation and Review Technique (PERT)

Construction of the Superstructure of Major Sea Crossings

MIDAS Training Series

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1

Bonner Bridge Replacement Update:

Ironton Russell Bridge Project

Ahmedabad Gandhinagar Metro - MEGA, Ahmedabad. Construction of Helipad Building at V. S. Hospital, Ahmedabad

Design studies of the Castle Bridge over Wislok River in Rzeszow with application of CAD System

Tagus Crossing at Carregado (Portugal): A project respectful of its sensitive environment

SPECIAL PURPOSE SIMULATION MODELING OF TOWER CRANES

SIMULATION OF BORED PILE CONSTRUCTION

Ironton Russell Bridge Project

Multi Objective Optimization of Time Cost. Quality Quantity Using Multi Colony. Ant Algorithm

Summary, Conclusion and Outlook

Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE

IMPLEMENTATION OF EFFECTIVE BED ALLOCATION AND JOB SCHEDULING IN HOSPITALS USING ANT COLONY OPTIMIZATION

Ironton Russell Bridge Project

CONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG

Ironton Russell Bridge Project

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Folsom Lake Crossing by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL

EURO CODES FOR DESIGN OF PRE-STRESSED CONCRETE HIGHWAY BRIDGES-A REVIEW FOR HIGHWAY LOADINGS

THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN

I-94/I-69 Interchange Bridge Construction

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

VIRTUAL REALITY TECHNOLOGY TO REPRESENT CONSTRUCTION ACTIVITIES

Rock Tunnel Engineering INTRODUCTION. Tunnel a hole in the ground to provide for desired movement or as mobility channel.

1. For s, a, initialize Q ( s,

A FRAMEWORK FOR APPLICATION OF GENETIC ALGORITHM IN PRODUCTIVITY OPTIMIZATION OF HIGHWAY EQUIPMENTS USING EVOLVER SOFTWARE

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options

Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction

Cast in-situ Balanced Cantilever for Building a Bridge

Kiski Area High School Allegheny Township, PA FLOOR SYSTEM ANALYSIS

CONSTRUCTION OF BALANCE CANTILEVER APPROACH SURAMADU BRIDGE

PULL REPLENISHMENT PERFORMANCE AS A FUNCTION OF DEMAND RATES AND SETUP TIMES UNDER OPTIMAL SETTINGS. Silvanus T. Enns

Project Reference Catalogue

SPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS

Boeing North Bridge in Washington State

AASHTOWare Bridge Rating/DesignTraining. STL8 Single Span Steel 3D Example (BrR/BrD 6.4)

4th International Engineering and Construction Conference - July 28, 2006

Hyperstatic (Secondary) Actions In Prestressing and Their Computation

Concrete Placement for Bridge Decks on an Expressway Extension Project

Experimental investigation of the use of CFRP grid for shear strengthening of RC beams

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems

The Europe Bridge in Portugal: concept and structural design

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

Service life extension of existing precast concrete girders

Pattullo Bridge Replacement Project. Cost Report

Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey

DESIGN GUIDELINES FOR BRIDGE DECK SLABS REINFORCED by CFRP and GFRP

Session 2: Basic Load Rating Calculations

European Construction Technology Platform

SCHEDULING FOR HIGH-RISE BUILDING CONSTRUCTION USING SIMULATION TECHNIQUES

ISSN: (Online) Volume 3, Issue 6, June 2015 International Journal of Advance Research in Computer Science and Management Studies

USE OF SPECIALIZED SOFTWARE TOOLS FOR MODERN BRIDGE DESIGN

AASHTOWare BrD 6.8. BrR and BrD Tutorial. PS7-3 Stem PS Bridge Example

US 34 OVER THE MISSOURI RIVER: DESIGN & CONSTRUCTION OF A HAUNCHED STEEL PLATE GIRDER WITH SUBSTRINGER BRIDGE

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds

Precast Segmental Bridge Construction Precast Segment Manufacturing

TxDOT Project : Curved Plate Girder Design for Safe and Economical Construction

Bridge Development Update

Stress distributions of PSC box girder bridge due to creep shrinkage effect

Equipment Design Heavy Lifting

Stability of Precast/Prestressed Concrete Bridge Girders

Lesner Bridge Replacement

BISON PRECAST FLOORING SPECIFICATION

Bridge Installation Guide

Alternate Formwork System Evaluation

12/26/2013. Sharif University of Technology. Session#11. Instructor. Class time. Course evaluation. International Campus Kish

Critical Structures Construction Issues

LARGE-SCALED BRIDGE PROJECTS IN RECENT HONG KONG. Raymond W M Wong, Division of Building Science & Technology, City University of Hong Kong

Precast, Pretensioned, Post-Tensioned Concrete for Bridge Decks

Project Address: Name of Person Completing Form:

CIVIL BREADTH Exam Specifications

PERFORMANCE OF MECHANICAL SEISMIC LOAD TRANSMISSION DEVICE BASED ON IMPACT

Title Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

Design and Rating of Steel Bridges

North Mountain IMS Medical Office Building

District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016

Live Load Distribution Factors Suitable For Concrete Bridges Under Ecp 201 And Euro Code 1991 Loading

PUNCHING SHEAR STRENGTH OF GFRP REINFORCED DECK SLABS IN SLAB- GIRDER BRIDGES

AASHTOWare Bridge Rating/DesignTraining. STL9 Curved Steel 3D Example (BrR/BrD 6.5)

NONDESTRUCTIVE EVALUATION (NDE) METHODS FOR QUALITY ASSURANCE OF EPOXY INJECTION CRACK REPAIRS

Available online at ScienceDirect. Procedia Engineering 123 (2015 ) Creative Construction Conference 2015 (CCC2015)

Site Analysis. Site Conditions: Seismic Challenges Strong Winds Average Temperature 69. San Francisco

Design Aids of NU I-Girders Bridges

THE NEW AASHTO MANUAL FOR BRIDGE EVALUATION 2008

Work methodology for replacement of expansion joints of Meghna bridge in 2008

Optimization of Composite Laminates Stacking Sequence for Buckling using Adaptive Genetic Algorithm

Bridge Beams. Product brochure

INTERNSHIP REPORT GOUTHAM.J

The Bridge over Danube at Beska

PULL PRODUCTION CYCLE-TIME UNDER VARYING PRODUCT MIXES

Bridge Design. II. Bridge Types. Praveen Chompreda. Substructure. Superstructure. which support the roadway. Pier (Column) Abutment.

Development of extradosed structures in the bridge construction

BRIDGE GIRDERS TECHNICAL GUIDE

Ch.01 Introduction to Modeling. Management Science / Instructor: Bonghyun Ahn

Transcription:

Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds. BRIDGE_ SIM: FRAMEWORK FOR PLANNING AND OPTIMIZING BRIDGE DECK CONSTRUCTION USING COMPUTER SIMULATION Mohamed Marzouk Hisham Zein Moheeb Elsaid Structural Engineering Department Faculty of Engineering, Cairo University Cairo, Egypt ABSTRACT This paper presents a framework (named Bridge_Sim) that aids contractors in planning bridge deck construction using computer simulation. The proposed framework estimates the time and cost required for construction of bridges' decks. Seven construction methods are included in the proposed framework. These are: cast-in-place on falsework, steel bridge construction, cantilever carriage, pre-cast balanced cantilever, deck pushing, stepping formwork, and launching girder method. The framework estimates total duration and cost for each zone along with its sub-zones, taking into account uncertainties inherited in tasks duration by allowing utilization probability density functions. It allows defining different options and ranges of parameters that influence the duration and total cost associated with launching girder construction method to carry out optimization analysis utilizing Ant Colony optimization. A numerical example is presented to demonstrate the practical features of Bridge_Sim. 1 INTRODUCTION Infrastructure projects are characterized by long duration, large budget, and complexity. They encompass bridges tunnels, airports, dams, highways projects. Construction of bridge projects is a complex process that inherits uncertainty since the construction is executed in different job conditions. These conditions includes unusual or complex works, equipments breakdown, unfavorable weather conditions, and unexpected site conditions. When such production rates are altered within large-scale projects, like bridge construction projects, this might lead to deviation from original work plan. Traditional planning techniques do not account for uncertainties. New construction methods have been developed to improve constructability of bridges decks, such as Segmental construction which eliminates falsework system (Podolny and Muller 1982). Segmental construction is executed in a cyclic manner which nominates computer simulation as a best modeling technique. This paper presents a framework, named Bridge_Sim, for planning and optimizing bridge deck construction utilizing computer simulation. The paper provides an overview of the developed framework and its designated components. A numerical example is worked out to illustrate the practical use of the proposed framework. 2 PROPOSED FRAMEWORK The developed framework (Bridge_Sim) helps contractors in planning bridge deck construction. It performs two main functions; deck construction planning and optimizing deck construction using launching girder. These two functions are performed by four main components; Bridge Analyzer Module, Simulation Module, Optimization Module, and Reporting Module. Figure 1 depicts a schematic diagram for the proposed framework that shows the interaction between its components. The planning function of the framework is performed by Bridge Analyzer, Simulation, and Reporting modules (solid arrows in Figure 1). Meanwhile, the optimization function is performed by Optimization, Simulation, and Reporting modules (dashed arrows in Figure 1). The following sections describe the four components of Bridge_Sim. 2.1 Bridge Analyzer Module Bridge Analyzer Module is used to carry out planning function inherited in Bridge_Sim. It analyzes the project and breaks it down into construction zones and sub-zones. Seven construction methods are provided by Bridge_Sim: 1) cast-in-place on falsework, 2) steel girder construction, 3) cantilever carriage, 4) pre-cast balanced cantilever, 5) deck pushing, 6) stepping formwork, and 7) launching girder. The number of construction zones is determined based on the following criteria: 1-4244-0501-7/06/$20.00 2006 IEEE 2039

Figure 1: Bridge_Sim: main components 1. The construction method that is used in execution; i.e., a separate zone should be assigned for each utilized construction method. 2. The resources that are assigned in each construction method. For a given construction method, resources can be assigned differently in two different construction locations, these two locations are defined as two separate zones, however, they are using the same construction method. 3. The sequence of construction. If two parts are constructed using the same construction method and the same set of resources but it is required to be executed simultaneously or successively. In this case, these two parts are defined as two separate zones. On the other hand, zones are divided into sub-zones to model the existing segments types (e.g, typical, closing, and shoring segments) that lie thought and between piers. The procedure followed by the Bridge Analyzer Module to perform a planning session of deck construction is depicted in Figure 2. 2.2 Simulation Module Simulation Module is utilized for estimating the total duration and total cost of bridge deck construction. The proposed Simulation Module utilizes STROBOSCOPE (Martinez 1996), as a simulation engine. The module has been designed to adopt discrete event simulation (DEVS) technique. The simulation module is implemented in Microsoft Visual Basic 6.0 to activate STROBOSCOPE program. There are fourteen models that are built-in the developed Simulation Module as listed in Table 1. These simulation models are built based on the seven construction methods and their respective construction techniques. According to the method of construction, the simulation module selects the model that represents the case under consideration. Then, it modifies the selected model to account for the in- Analyzer Module Processes Figure 2: Bridge analyzer module procedure 2040

put data (see Figure 3). These input data include; the scope of work (i.e. number of segments), numbers of the assigned resources, number of replications, number of working hours per day, and estimated durations for construction tasks. Once the modification is carried out, the simulation module launches STROBOSCOPE to run the model that has the case parameters. STROBOSCOPE estimates the durations which is exported to a text file in order to perform cost calculations. Table 2 lists the involved tasks of stepping formwork erection; considered in SteppingFormwork model, whereas, its simulation network is depicted in Figure 4. Detailed description of the fourteen models, coded in Simulation Module, can be found elsewhere (Zein 2006). 2.3 Optimization Module The proposed framework is capable to carry out time-cost trade-off analysis in order to optimize the construction of bridges decks using launching girder method. It searches for the near-optimum solution by minimizing the time and cost of construction. The construction of bridges' deck using launching girder technique is influenced by several parameters that impact construction time and associated totalcost. These parameters are: 1) location of casting yard, 2) time lag between pre-casting yard and construction zone tasks, 3) number of casting forms, 4) number of preparation platforms, 5) curing method, 6) number of reinforcement crews in the casting yard, and 7) number of stressing crews. The proposed framework provides construction contractors with a set of optimal solutions that form a Pareto face. Bridge_Sim performs the optimization analysis through three components; 1) Optimization Module, 2) Simulation Module, and 3) Reporting Module (see Figure 5). The optimization session starts by defining the available options of the optimization variables. Then, a random set of solutions is generated and fed to the Simulation Module to estimate the duration and total cost of generated solutions. The Optimization Module receives the duration and cost values to carry out the multi-objective optimiza tion. The interaction between Simulation and Optimization Modules occurs in a cyclic manner, producing a number of iterations. The number of iterations is a problem-dependent and is determined by conducting several pilot trials. When all iterations are generated, the Optimization Module exports its outputs to the Reporting Module as depicted in Figure 5. Table 1: Models of simulation module Method Model Description Cast-in-place on falsework CastinSitu Cast-in-place on falsework method. Steel girder construction Steel Steel span construction Cantilever carriage Cantilever carriage method using pump line technique for Carriage(1) typical segments only TotalCarriage(1) Cantilever carriage method using pump line technique for typical and stump segments Carriage(2) Cantilever carriage method using truck mixers technique for typical segments only TotalCarriage(2) Cantilever carriage method using truck mixers technique for typical and stump segments ClosingSegment Cantilever carriage method for closing segment construction Pre-cast balanced cantilever Deck pushing Precast(1) Precast(2) DeckPushing(1) DeckPushing(2) DeckPushingTotal Stepping formwork SteppingFormwork Stepping formwork method Launching girder LaunchingGirder Launching girder method Pre-cast balanced cantilever method using mobile cranes technique Pre-cast balanced cantilever method using Beam-Winch technique Segments fabrication operation (Deck pushing method) using single form technique Segments fabrication operation (Deck pushing method) using multi-forms technique Deck pushing method including all operations 2041

Figure 3: Simulation module procedure Table 2: Processes and tasks of SteppingFormwork model Operation Process Task Code Task Description System Erection St0 Erection of stepping formwork system on existing deck. St1 Prepare stepping formwork for advancing phase. St2 Advance the stepping formwork into new position. St3 Regroup bottom slab forms. St4 Placement of first layer of the reinforcement for bottom flange. St5 Placement of ducts for bottom flange. St6 Finish reinforcement work for bottom flange. St7 Casting of bottom flange. St8 Curing of bottom flange. St9 Erection of formwork for webs and top flange. St10 Placement of first layer of the reinforcement for webs and top flange. St11 Placement of ducts for webs and top flange. St12 Finish reinforcement work for webs and top flange. St13 Casting of webs and top flange. St14 Curing of webs and top flange. St15 Placement and pre-stressing of cables of webs and top flange. Segments Construction Construction of Bottom Flange Construction of Webs and Top Flange 2042

Figure 4: Simulation network of SteppingFormwork model 2043

Figure 5: Interaction between optimization, simulation, and reporting modules The developed Optimization Module utilizes a modified Ant Colony Optimization (ACO) to perform multiobjective optimization method (Zein et al. 2006). Ant Colony Optimization is one of the evolutionary algorithms which are used to solve optimization problems depicting nature evolution and species behavior living in it. ACO mimics ants behavior to find shortest path (optimum path) between their nest and the food using what is named as pheromone trails (see Figure 6). These trails are chemical compounds left behind each ant whenever and wherever it moves as indirect communication between ants (Dorigo 1996). Two multi-optimization methods are utilized to combine total duration and cost into one single fitness function to be evaluated by ACO. These methods are modified distance (Osyczka and Kundu 1996) and functiontransformation (Marler and Arora 2005). The modified distance method depends on expressing each solution with any generation with fitness value according to its location to the existing Pareto face. Meanwhile, functiontransformation method combines the cost and duration in a dimensionless function as per Equation 1. Detailed description of the fourteen models, coded in Simulation Module, can be found elsewhere (Zein 2006). Cost( k, t) MinCost Fitness( k, t) = MinCost Duration ( k, t) MinDuration + (1) MinDuration Where; Fitness( k, t) is a combined fitness for ant k at iteration t; Cost(k,t) and Duration(k,t) are the total cost and duration of ant k at iteration t; MinCost is the minimum value of total cost within iteration t, and MinDuration is the minimum value of durations within iteration t. Figure 6: Ants movement behavior (Dorigo 1996) 2.4 Reporting Module The Reporting Module is triggered in both planning and optimization operations provided by Bridge_Sim. It generates reports in text and graphical formats. Simulation Module provides Reporting Module with the duration and cost for each sub-zone. Reporting Module calculates minimum, mean, and maximum values of direct cost for each zone by summing up the corresponding values of its respective sub-zones. Similarly, it calculates minimum, mean, and maximum values of zones durations. The total duration of bridge deck construction is calculated utilizing central limit theorem, taking into account the defined relationships and lags amongst zones. The minimum and maximum values of total duration of deck construction are obtained by calculating the summation of minimum and maximum values of zones on the critical path. Subse- 2044

quently, the total cost (direct and indirect) is calculated using the following equations: TC min mean m i 1 m i m i 1 ( TDIC TDmin ) ( TDIC TDmean ) ( TDIC TD ) = = DC + TIIC + (2) i TC = =1 DC + TIIC + (3) TC where: max i = = DC + TIIC + (4) i max This numerical example considers El-Warrak Bridge, constructed using traditional cast-in-place on falsework and cantilever carriage methods. El-Warral Bridge is part of the Ring Road, around Greatest Cairo, crossing the River Nile (see Figure 7). It consists of five zones: i) eastern shore, ii) eastern Nile branch, iii) El-Warrak Island, iv) western Nile branch, and v) western shore. El-Warrak Bridge is executed in two stages. The first phase started in November 1996 and finished in October 1999. The second phase started immediately after the first phase and finished in October 2001. This case models the first phase construction. Table 3 lists the information pertaining to El-Warrak bridge zones and sub-zones. The data of the case are included in Zein (2006). Once the data are fed and the simulation experiments are conducted, Bridge_Sim estimates the direct cost and duration for El-Warrak Bridge zones as listed in Table 4. TC min, TC mesn, and TC max are the minimum, mean, maximum value of total cost of bridge deck construction respectively. TD min, TD mesn, and TD max are the minimum, mean, maximum value of total duration of bridge deck construction respectively. DC i is the direct cost of zone i, where i = 1, 2, 3,, m. and m is the number of zones TIIC is the time in-dependent indirect cost. TDIC is the time dependent indirect cost. 3 NUMERICAL EXAMPLE Figure 7: El-Warrak bridge after construction ID Zone Table 3: Bridge zones vs. number of spans No. of spans Construction Method No. of Sub- Zones Total Length (m) I Eastern Shore 13 Cast-in-Place on Falsework 4 400 II Eastern Nile Branch 6 Cantilever Carriage 7 600 III El-Warrak Island 6 Cast-in-Place on Falsework 3 230 IV Western Nile Branch 4 Cantilever Carriage 7 360 V Western Shore 22 Cast-in-Place on Falsework 11 670 Table 4: Simulation outputs ID Zone Expected Duration Direct Cost (Days) (L.E.) I Eastern Shore 122.75 6,460,190 II Eastern Nile Branch 381.33 12,884,271 III El-Warrak Island 90.61 4,064,869 IV Western Nile Branch 375.41 12,566,617 V Western Shore 405.93 21,815,761 2045

The expected total duration is estimated to be 544 working days (equals to 635 calendar days). The associated total cost of the deck is 66,875,526 L.E which consists of 57,791,708 and 9,083,818 L.E. as direct and indirect costs, respectively. The cost of cantilever carriage zones represents 44% of the total cost of the deck. The cost of casting concrete is 1,277 L.E/m 3 in cantilever carriage zones, compared to 1,045 L.E/m 3 in falsework zones. 4 CONCLUSIONS Construction of bridge projects is a complex process that inherits uncertainty and variety of demands. Construction contractors have to select the construction method that suits project constraints including: project conditions, technical, financial, and time constraints. This paper presented a framework (Bridge_Sim) that can be used in planning and optimizing of bridges decks. It estimates the time and cost required for construction of bridges' decks. Seven construction methods can be modeled in the proposed framework. Bridge_Sim consists of four components: Bridge Analyzer Module, Simulation Module, Optimization Module, and Reporting Module. Bridge Analyzer module aids in dividing bridge deck into zones and subzones, according to the utilized construction method. Whereas, simulation module estimates total duration and cost for each defined sub-zones, taking into account uncertainties inherited in tasks duration by allowing utilization probability density functions. Optimization Module allows defining different options and ranges of parameters that influence the duration and total cost associated with launching girder construction method. It utilizes a modified Ant Colony optimization to model time-cost trade-off analysis. The multi-objective problem is treated using the modified distance method and function-transformation. Reporting Module provides the time and cost of bridges decks construction in text and graphical formats. A numerical example was presented to demonstrate the use of the proposed framework. REFERENCES Osyczka, A., and S. Kundu. 1996. A modified distance method for multicriteria optimization, using genetic algorithms. Computers Industrial Engineering 30(4): 871-882. Dorigo, M., V. Maniezzo, and A. Colorni. 1996. Ant system: optimization by a colony of cooperating agents. IEEE Trans System Man, and Cybernetics Part B 26(1): 1-13. Martinez, J. C. 1996. STROBOSCOPE, state and resource based simulation of construction processes. Ph.D. Thesis, University of Michigan, USA. Marler, T., and J. S. Arora. 2005. Function-transformation methods for multi-objective optimization. Engineering Optimization 37(6): 551-570. Podolny W., and J. M. Muller. 1982. Construction and design of prestressed concrete segmental bridges. John Wiley & Sons, Inc., New York, NY, 1982. Zein, H. 2006. A framework for planning and optimizing bridge deck construction using computer simulation. M.Sc. Thesis, Cairo University, Egypt. Zein, H., M. Marzouk, and M. Elsaid. 2006. On the use of ant colony to optimize launch girder bridges. International Conference on Bridge Management Systems Monitoring, Assessment and Rehabilitation BMS07212:1-12. AUTHOR BIOGRAPHIES MOHAMED MARZOUK is Assistant Professor at Department of Structural Engineering, Faculty of Engineering, Cairo University. He received his B.Sc. and M.Sc. in Civil Engineering from Cairo University in 1995 and 1997, respectively. He received his Ph.D. form Concordia University in 2002. His research interest includes simulation and optimization of construction processes, O-O simulation, fuzzy logic and its applications in construction, risk analysis, and decision analysis. His e-mail is <mm_marzouk@yahoo.com>. HISHAM ZEIN is Teaching Assistant in Department at Structural Engineering, Faculty of Engineering, Cairo University. He received his B.Sc. and M.Sc. in structural engineering from Cairo University in 2003 and 2006, respectively. His research interest includes simulation and optimization of construction processes, decision support systems, and construction technology. His email is <h_zeineldein@yahoo.com>. MOHEEB ELSAID is Professor of construction engineering and management at Department of Structural Engineering, Faculty of Engineering, Cairo University. His research interest includes productivity, schedule risk assessment, life cycle costs, and simulation. His e-mail is <elsaid1204@yahoo.com>. 2046