Narragansett Bay Commission Checklist for Stormwater Connection Permit Applications

Similar documents
BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

4.8. Subsurface Infiltration

CITY OF DENTON ON-SITE SEWAGE FACILITY PERMIT APPLICATION. Permit Number

A Case for the Design and Modeling of BMP Infiltration and LID Techniques. By: Bob Murdock

The following is required for a complete permit submittal for each unit.

S.O.P. No. HMD

The following is required for a complete permit submittal for each unit.

4.8. Subsurface Infiltration

Food Service Establishment Permit Application

Review of State and Federal Stormwater Regulations November 2007

Our Eastern Shore Groundwater Part IV Groundwater Quality on the Eastern Shore: How safe is our groundwater and are there ways we can protect it?

Paraprofessional Training Session 1

Background / Regulatory Requirements

West Virginia Department of Health & Human Resources Department of Health

2011 Guidance Manual for Development Stormwater Quality Control Measures

Cass County Soil Erosion & Sedimentation Control Program

Construction Application for Permit (CAP) Instructions

INSTRUCTIONS TO FILL OUT WASTEWATER DISCHARGE PERMIT APPLICATION BASELINE MONITORING REPORT

SECTION 14 - GENERAL INDUSTRIAL ZONE (M2) REGULATIONS

WATER QUALITY MANAGEMENT PLAN PROCEDURES

INFRASTRUCTURE ELEMENT STORMWATER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions

BOARD OF PUBLIC UTILITIES SCHEDULE OF WASTEWATER RATES PROVISIONS APPLICABLE TO ALL CONSUMERS

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 21 Stormwater Management Bylaw

Municipal Stormwater Ordinances Summary Table

THE FOLLOWING INFORMATION IS REQUIRED TO OBTAIN A CITY OF OTHELLO COMMERCIAL BUILDING PERMIT:

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

9.3.9 Industry uses code

Decatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014

Modelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality

Residential Sewer Backup Prevention Program

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

8 Green Building Certification Credits

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications

SEPTIC SYSTEM EVALUATION AND CERTIFICATION FORM

City of Aliso Viejo Stormwater Program 2017 ANNUAL WATER QUALITY MANAGEMENT PLAN FOR HOMEOWNER ASSOCIATIONS AND PROPERTY MANAGEMENT COMPANIES

APPLICATION FOR PORCH / DECK PERMIT

Activity Calculating Property Drainage

Richland County Department of Public Works Engineering (Land Development) Division

6.1 Introduction to Wastewater Issues

Infiltration Guidelines

Madison County Property Improvement Check List

Integrated Catchment Modelling

Residential Electrical Upgrade Permit Revised: 11/15/17

Village of Arlington Heights. Sewer Back-up Rebate Program

Application Requirements for obtaining a Building Permit

THE CORPORATION OF THE CITY OF PENTICTON DEVELOPMENT COST CHARGES REDUCTION BYLAW NO

RESIDENTIAL BUILDING PERMIT

ORDINANCE #16- PROPOSED ORDINANCE #16-14

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

Water sensitive urban design. Developing design objectives for urban development in South East Queensland

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

B U I L D I N G P E R M I T A P P L I C A T I O N

Chatham Park Stormwater Manual

GUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT

CITY OF CRANSTON PLANS MUST BE APPROVED BY THE FIRE DEPARTMENT BEFORE SUBMITTING TO OUR OFFICE FOR REVIEW.

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

At least 2 feet above the seasonal high water table Overflow path or structure provided

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

RESIDENTIAL CONSTRUCTION PERMIT FEES

Boise City Public Works General Drainage Plan Review Requirements Checklist

Building Permit Submittal Requirements

PERMIT APPLICATION REQUIREMENTS NEW COMMERCIAL BUILDING/CONSTRUCTION CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC

Residential Accessory Structure Application Packet (Carport, Shed, Garage, Pool)

APPENDIX G Fire BMPs

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

62 POTOMAC STREET WEST ROXBURY, MA 02132

STORMWATER MANAGEMENT PROGRAM & ILLICIT DISCHARGE DETECTION AND ELIMINATION

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

What is a stormwater utility fee?

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

Building Consent Process

Application for adoption of new sewers

RESIDENTIAL FIRE SERVICE METERS Addendum #1

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

Property Owner's Name: Telephone #: Mailing Address: System Address (if different): Directions to location of installation:

City of Altamonte Springs Developer s Guide

SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

E. STORMWATER MANAGEMENT

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

LOT GRADING GUIDELINES

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Center for Watershed Protection Howard County Planning & Zoning Stormwater Maintenance, LLC

OIL AND GAS DRILLING/PRODUCTION PLAN

Bradley M. Hill, R.G. Utilities Director City of Flagstaff

Arlington s New Stormwater Management Ordinance. Informational Meeting May 28, 2014

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan

Western Washington Hydrology Model (WWHM) Software Introduction. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington

AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION

TOWN OF CHEEKTOWAGA BUILDING PERMIT FEE SCHEDULE

New Draft Model BMP Design Manual for San Diego Region

Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12

SITE DEVELOPMENT PLAN

Transcription:

Checklist for An application is complete and will be reviewed by the Narragansett Bay Commission only if the following items are submitted: 1. Complete the attached application form in its entirety (pages 1 through 4) along with the appropriate signatures. Please Note: The Applicant information listed in item 1, should name the person responsible for the stormwater connection permit, not an engineering consulting agency or other parties providing the service. 2. Submit a Stormwater Management Plan that evaluates all onsite stormwater management measures to reduce or eliminate stormwater flow to the NBC combined system. Include supporting engineering documentation of method(s) and calculations used for estimating the flows of pre-construction/post construction stormwater of the site as well as all green infrastructure opportunities used. (See NBC s Rules & Regulations, Article 4.4 for complete requirements for developing a Stormwater Management Plan.) 3. Submit a location plan of the property (plat & lot) with a North arrow that points up or to the right. This plan should show the street location with the public sewer/stormwater line, as well as a detailed plan of the proposed stormwater connection. If plans are produced on CAD, an electronic copy shall be submitted. 4. Submit a utility site plan identifying all utilities on/around the property. This utility site plan should show any stormwater drainage systems, LID use and any alternative options available to discharge stormwater into natural waterways. 5. Submit building layout plans. These plans should include plumbing plans showing any measures taken to separate sewer and stormwater and incorporate water reuse. 6. Submit plan(s) showing special stormwater design methods that will be used on site to reduce or eliminate stormwater flow to the NBC combined sewage system. Indicate the size/capacity of the equipment and the piping/plumbing connection arrangements. Submit a minimum of 2 copies of each of the Stormwater Management Plan, location plan, utility plan, building layout plan, and any plans for stormwater reduction along with the completed stormwater connection permit application. If plans are produced on CAD, one electronic copy shall be submitted. 4. Submit the stormwater connection permit application fee payable by check or money order to the Narragansett Bay Commission. This fee is applicable to all applications for a new stormwater connection, either connecting directly or indirectly to NBC facilities. The fee is payable at the time of application. RESIDENTIAL $260 per building connection COMMERCIAL/INDUSTRIAL $779 per building connection All residential condominiums will be charged under residential tariffs regardless of the number of dwelling units. No stormwater connection permit application will be processed without the appropriate fees. Any questions regarding this application, please call the Narragansett Bay Commission Permitting Section at (401) 461-8848 or visit our website at www.narrabay.com. Applications can be mailed to Narragansett Bay Commission, Permit Section, One Service Road, Providence, RI 02905.

PERMIT NUMBER: F APPROVED I N REJECTED A L INACTIVE INTERNAL USE ONLY 1. Applicant: Company (if applicable) Address (Permit will be mailed to this address): City/Town: State: Zip: Telephone: (Cell) (Bus.) (Fax) E-mail: 2. Property Owner: (if other than applicant) Company (if applicable) Address: City/Town: State: Zip: Telephone: (Cell) (Bus.) (Fax) E-mail: 3. Name of Project (if applicable) Project 4. Property Location: Is the property part of a new subdivision? YES NO Provide a sketch or map identifying the property location with street names and/or plat & lot number(s). Property Address*: City/Town: Plat No.(s): Lot No.(s): *If a street address has not been assigned, the Applicant will be required to submit the street address prior to discharging from the connection. Revised 1/2016 Page 1 of 4

5. Building Description: Attach floor plan(s), site plan(s), and plans for special equipment to be used on site. Please check ( ) the appropriate building type. Residential (Up to and including two (2) dwelling units per building) Commercial/ Residential (Three (3) or more dwelling units per building) Commercial (Offices, Restaurants, Salons, Retail Stores, Hotels/Motels, Nursing Homes) Industrial/ Commercial (Retail/ Wholesale Factories, Multi-use Buildings) Industrial (Jewelry Companies, Machine Shops, Printing Companies) If the building is Residential, please supply the following: No. of Building(s) If the building is Commercial/Residential, please supply the following: If the building is Commercial, please supply the following: Describe the commercial operation and any special equipment to be used on site. If the building is Industrial, please supply the following: Will there be site remediation/dewatering associated with this project that will be discharged to the public combined sewer system? YES NO 6. Stormwater Sources: What is the source of stormwater on the premises? (please check the appropriate boxes) Shed Flow Areaway Drains Roof Down Spouts Others Sources Revised 1/2016 Page 2 of 4

7. Stormwater Mitigation Measures: Please indicate the types of Low Impact Development (LID) technology that will be installed at the project site. Dry Wells Green Roofs Catch Basins Reuse Sand Filters Filter Strips Swales Separated Storm Drain Permeable Paving Bioretention Areas Infiltration Systems Underground Storage Devices Stormwater Basins Oil & Grit Separator Landscape Areas Rainwater Harvesting What is the approximate cost of construction mitigation methods? $ Other: 8. Discharge Method: Please indicate the method(s) to be used to discharge stormwater from the project site. Recharge Discharged to River Public combined sewer facility 9. Stormwater Generation: Please indicate the total quantity of flow for the following questions. Pre-Construction Post-Construction 24 hr. Storm Duration (CFS) 24 hr. Storm Duration (CFS) 2 yr. 2 yr. 10 yr. 10 yr. 25 yr. 25 yr. 50 yr. 50 yr. 100 yr. 100 yr. *Please document and attach calculations for the method used for estimating stormwater flow. Revised 1/2016 Page 3 of 4

10. Construction: What are the approximate starting and finishing dates of construction? Starting : Finishing : Please provide information about the Drain Layer. License Number: Company: Address: City/Town: State: Zip: Telephone: (Bus.) (Fax) Please provide information about the Drain Layer s Bond Company. Company: Address: City/Town: State: Zip: Amount of Bond: Telephone (Bus.) (FAX) Will the proposed stormwater connection(s) require an extension to the public combined sewer system? YES NO If YES, this application must be signed below by an authorized representative of the City or Town confirming that the proposed sewer extension will conform to the City or Town RI DEM approved Facility Plan. Signature of Authorized City or Town Agent If this Stormwater Connection Permit Application is approved, the undersigned applicant agrees to accept and abide by all provisions of the Narragansett Bay Commission's Rules and Regulations for the Use of Wastewater Facilities within the Narragansett Bay Water Quality Management District, as amended, and shall in every respect conform to the terms of this application. Any changes to the information of this Stormwater Connection Permit Application must be reported to the Narragansett Bay Commission. Signature of Property Owner Signature of Drain Layer Revised 1/2016 Page 4 of 4