SR 710 North Study. Technical Advisory Committee Meeting No. 16 August 13, 2014 Stakeholder Outreach Advisory Committee Meeting No. 12 August 14, 2014

Similar documents
LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

California High-Speed Train Program FEIR/EIS

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

COMPARISON OF PROJECT AGAINST EXISTING CONDITIONS

Exposition Light Rail Transit Project

Corridor Advisory Group and Task Force Meeting #19

Los Angeles Westside Purple Line Extension Project Challenges and Lessons Learned

Metro Blue Line Improvements & Project Update

4.17 Environmental Justice

Strategic Transportation Plan. Presented to: ECO-Rapid Transit Board of Directors Presented by: Gill V. Hicks, Cambridge Systematics, Inc.

Michael Gillam Deputy Program Director - Southern California

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

Purple Line Extension Section 1 Construction Community Meeting September 26, 2017

I-710 Project Committee Meeting

TECHNICAL MEMORANDUM

Exposition Light Rail Transit Project

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

BUS RAPID TRANSIT. El Camino Real Bus Rapid Transit Project. Environmental Scoping Meetings February 21 and 28

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

MOA Project # Golden View Drive Intersection & Safety Upgrades

Downtown Estes Loop Project Frequently Asked Questions

EMERGENCY STORAGE PROJECT San Vicente Pipeline and San Vicente Dam Raise Update Presentation Summary

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

6.2.2 Environmental Consequences and Mitigation Measures

HUDSON TUNNEL PROJECT

FINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA

Environmental Analysis, Chapter 4 Consequences, and Mitigation

CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION

INDEX FOR UNIFORM FILE SYSTEM, ENVIRONMENTAL ANALYSIS

Current Trends in Traffic Congestion Mitigation

APPENDIX A. Project Scoping

Venice Pumping Plant Dual Force Main Project Draft EIR

Countywide Comprehensive Transportation Plan

US 70 Corridor James City Project Update. Craig Young, Three Oaks Engineering US 70 Corridor Commission May 21, 2015

Members of the Board of Directors. Laurena Weinert, Clerk of the Board

Funding Intelligent Transportation Systems in the Los Angeles Region

Transportation Workshop. FORA Staff 9/8/17

For Public Input Period

Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Beach Blvd. including undercrossing to downstream I-5 Freeway.

I-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010

Santa Clara Valley Transportation Authority Board of Directors. General Manager, Nuria I. Fernandez

Wildlife Connectivity Assessment

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Phase 2 Exposition Metro Line Project

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

Connected/Autonomous Vehicles in a

US-101 CORRIDOR ADVISOR S UPDATE

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT

I-405 Freeway (OC Line to LAX) HOV to HOT Conversion Feasibility Study. Metro TAC Meeting March 5, 2014

SECTION F UPDATED PERMIT REQUIREMENTS

File No Supplemental November Geotechnical and Environmental Consulting Engineers

3 INTERSTATES. The Carolina Crossroads Project Team Welcomes You

Chapter 2: Alternatives

Response to Comments of Don and Tricia Nevis (Letter I25) See the master response to Public Outreach Process.

State Route 8 Bridge Replacement Project

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

Central Phoenix Transportation Framework Study

Large Diameter Highway Tunnels

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION

2.0 PROJ ECT D ESCRI PTION

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

METRA UP-W LINE. Locally Preferred Alternative Report

APPENDIX C COMMENTS AND RESPONSE TO COMMENTS RECEIVED ON DRAFT NEGATIVE DECLARATION

OKI Board of Directors. Presentation Ten June 2012

3.0 CUMULATIVE PROJECTS SCENARIO

Project Steering Committee April 14, 2015

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects

San Jacinto National Underground Science Laboratory. Site Visit February 28 March 1, 2001

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

CHAPTER 26. SAN RAMON VALLEY FIRE PROTECTION DISTRICT ANNEX

Liquid Waste Coordination Committee

CROSSTOWN LRT Construction Liaison Committee November 1, 2017

TECHNICAL MEMORANDUM I-710 EIR/EIS INITIAL FEASIBILITY ANALYSIS (IFA) TECHNICAL APPENDIX WBS TASK ID:

3.6 GROUND TRANSPORTATION

The Northern Waterfront Seawall History and Earthquake Performance Waterfront Plan Working Group Meeting April 13, 2016

US Army Corps of Engineers

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

TRANSPORTATION IMPACT ANALYSIS GUIDELINES

4.13 POPULATION, EMPLOYMENT, AND HOUSING; GROWTH INDUCEMENT; AND ENVIRONMENTAL JUSTICE

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

4.7.1 Regulatory Framework and Methodology

Project Purpose. Federal Railroad Administration

Los Angeles County Congestion Reduction Demonstration Project

City of Los Angeles California

Berths [Everport] Container Terminal Improvements Project Draft EIS/EIR Public Meeting

South of Woodward Avenue Project

Traffic Noise Introduction to Traffic Noise Analysis and Abatement

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

III. Corrections and Additions

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

Sunrise Project South I-205 Corridor Improvement Project

CHAPTER 7. San Dieguito River Flooding Adaptation

Executive Summary Introduction and Background

PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME. 2 Objective of the Phase II Environmental and Social Programme

SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT JULY 2013

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

Transcription:

SR 710 North Study Technical Advisory Committee Meeting No. 16 August 13, 2014 Stakeholder Outreach Advisory Committee Meeting No. 12 August 14, 2014 1 1 1

Agenda Public Outreach Activities Project Report and Environmental Studies Documentation Update Recap of TAC No. 15 and SOAC No. 11 Update on Preliminary Engineering and Environmental Technical Studies Tunnel Design Considerations 2

Ground Rules Q&A after each section of the presentation Focus questions on information presented General comments and Q&A at the end 3

4 Public Outreach Activities

Outreach Activities June through August 2014 Briefings Elected Officials Legislative Briefing City Managers Irwindale Chamber of Commerce San Gabriel Valley Economic Partnership Media Engagement Pasadena Weekly Letter to the Editor South Pasadena Review Letter to the Editor 5 Eastern Group Publications

Collateral Materials Materials Produced: Overview Fact Sheet CEQA/NEPA Process Fact Sheet Contact Post Cards Frequently Asked Questions Fact Checks Updated Community Outreach PowerPoint Presentation Updating Web Page 6

Project Report and Environmental Studies Documentation Update 7

Recap of TAC No. 15 and SOAC No.11 Public Outreach Activities Project Report and Environmental Studies Documentation Update Recap of previous TAC/SOAC meetings Update on Preliminary Engineering and Environmental Technical Studies Cost-Benefit Analysis Discussion 8

Feedback Received During TAC No. 15/ SOAC No. 11 Will the TAC members be included in upcoming outreach activities? Will there be a city council presentation at each of the affected cities? Will there be visual simulations/renderings for all alternatives? Will consultants/technical advisors be available at outreach meetings to answer technical questions? Where will the funding come from for the preferred alternative, once it is selected? 9

Feedback Received During TAC No. 15/ SOAC No. 11 Will the Cost-Benefit Analysis (CBA) be made available at time of the EIR/EIS release? Is the CBA using the most updated SCAG and Census data? Is tunnel maintenance and operation part of the CBA? How do you analyze or include emissions/pollution into the CBA? Will you be releasing basic information as the studies are finalized? Requested to release complete information Will the results of historic resources evaluation be made available before the Draft Environmental Document? 10

Update on Preliminary Engineering and Environmental Technical Studies 11

Alternatives Being Studied in the EIR/EIS Phase 1. No Build 2. Transportation System Management (TSM)/ Transportation Demand Management (TDM) 3. Bus Rapid Transit (BRT) with TSM/TDM and bus feeder service 4. Light Rail Transit (LRT) with TSM/TDM and bus feeder service 5. Freeway Tunnel Freeway with TSM/TDM* (dual bore tunnel) Freeway with TSM/TDM and tolls* (single and dual bore tunnel) Freeway with TSM/TDM and Express Bus through the tunnel* (single and dual bore tunnel) *With and without trucks studied 12

Preliminary Engineering Update Addressing Metro and Caltrans comments on Alternatives design Conceptual construction schedule & equipment needs Finalizing construction and O&M cost estimates Coordinating with environmental team for technical studies Submitted Draft Project Report for review 13

Traffic Update Draft Transportation Technical Studies Have Been Completed Transportation Technical Report (TTR) 14 Key analysis reference 2020/2025 and 2035 analysis of alternatives (TSM/TDM, LRT, BRT, Freeway Tunnel) Traffic and Transportation EIR/EIS section Summarizes TTR, with a focus on impacts/mitigation Cost-Benefit Analysis Technical Study Based on modeling analysis Includes cost, travel time/vmt, safety, and environmental analysis Draft report in progress

15 Environmental Study Update

Environmental Technical Studies Final Review by CT/Metro Caltrans District 7 and Metro Review Complete Historic Properties Survey Report Paleontological Archaeological Survey Health Risk Assessment Drainage Report Visual Impact Assessment Traffic Location Hydraulics Noise Study Biological and Wetland Resources Noise Abatement Decision Report Floodplain Report Geologic Hazards Vibration Report Community Impact Relocation Impacts Water Quality Economic and Fiscal Impacts Hazardous Waste Assessment Cumulative Impacts Energy Report 16 Air Quality

Technical Studies Update Cumulative Impacts Cumulative impacts refer to two or more individual effects which, when considered together, are considerable or which compound or increase other environmental impacts. A cumulative impact analysis considers changes from the project when added to other closely related past, present, and reasonably foreseeable future projects. 17

Technical Studies Update Cumulative Impacts 18 Eight-Step Approach for Developing a Cumulative Impact Analysis: 1. Identify Resources to Consider in the Cumulative Impact Analysis 2. Define the Study Area for Each Resource 3. Describe the Current Health and Historical Context for Each Resource 4. Identify Direct and Indirect Impacts of the Proposed Project that Might Contribute to a Cumulative Impact

Technical Studies Update Cumulative Impacts Eight-Step Approach continued: 5. Identify Other Reasonably Foreseeable Actions that Could Affect Each Resource 6. Assess Potential Cumulative Impacts 7. Report the Results 8. Assess the Need for Mitigation 19

Technical Studies Update Cumulative Impacts 40 Projects identified for consideration of cumulative impacts. Examples: I-710 Corridor Project (Ocean Blvd to SR-60) Metro Gold Line Foothill Extension Devil s Gate Reservoir Sediment Removal and Management Project 100 West Walnut Planned Development 20

Technical Studies Update Cumulative Impacts SR 710 North Study Area Cumulative Projects 21 DRAFT

Typical Content of Draft ED Executive Summary Chapter 1 Proposed Project Chapter 2 Alternatives Chapter 3 Affected Environment, Environmental Consequences, Avoidance, Minimization and Mitigation Measures Chapter 4 CEQA Evaluation Chapter 5 Comments and Coordination Chapter 6 List of Preparers Chapter 7 Distribution List Appendices 22

CEQA/NEPA Process Technical Study review/approval (in progress) Administrative Draft EIR/EIS review/approval (in progress) Draft EIR/EIS circulate for public review in February 2015 Public Hearings to be held during public review period Between March and April, 2015 Public Participation - provide comments during public review period and at Public Hearings 23

CEQA/NEPA Process Final EIR/EIS Response to Comments Identification of Preferred Alternative Final EIR/EIS distributed Notice of Determination (CEQA) Record of Decision (NEPA) 24

25 Tunnel Design Considerations

Tunnel Design Considerations Tunnel Ground Characterization Key Geotechnical Considerations Mixed Face Conditions Control of Ground Movements High Groundwater Pressures Natural Occurring Gas Fault Crossing Concepts Excavation Support Systems 26

LRT: Geologic Conditions Alluvium: ~60% Topanga Formation: ~25% Puente/Fernando Formation: ~15% 27

Freeway: Geologic Conditions Alluvium: ~20% Topanga Formation: ~40% Fernando Formation: ~15% Puente Formation: ~20% Basement Rock (Quartz Diorite): ~5% 28

Key Geotechnical Considerations High Groundwater Pressures Fault Crossings Potential For Naturally- Occurring Gas Mixed Face Conditions 29

Mixed Face Conditions Weak sedimentary rock; hard rock (gneiss); and alluvium Challenge to maintain line and grade Ground behavior/stability Pressurized TBM needed to address these challenges 30

Control of Ground Movements Project Examples Ground successfully controlled on large and smaller diameter tunnels using TBM technology M30, Madrid (50ft diameter) Maximum Settlement recorded 0.4 inches Metro Gold Line Eastside Extension, Los Angeles Maximum Settlement recorded 0.2 inches Sound Transit Light Rail (U230), Seattle Maximum Settlement recorded 0.3 inches 31

High Groundwater Pressures Potential for high groundwater inflows in Alluvium and fractured/faulted rock zones Groundwater depth varies, especially on either side of some fault zones Water controlled at the face with Pressurized TBM Water inflows controlled behind the TBM with precast concrete gasketed segments 32

Naturally-Occurring Gas Potential for naturally-occurring gas in Puente Formation based on design team s experience on City of LA s Northeastern Interceptor Sewer Proper safety precautions must be followed Regulated by Cal/OSHA 33

Designing for Fault Offset Fault Width Offset (Horizontal/Vertical) Freeway LRT Raymond 80 feet 1.6/0.3 ft 3.2/0.6 ft San Rafael 160 feet 1.6/0.8 ft 1.6/0.8 ft Eagle Rock 160 feet 1.6/0.8 ft N/A 34

Designing for Fault Offset Design Objectives Meet agency design criteria no collapse Prevent ingress of ground Facilitate repairs post-event to open for service Design Concepts Create oversized excavation to accommodate movements or Special Lining to accommodate fault offset After ground movement occurs, roadway or track can be re-aligned to restore functionality 35

Project Examples Claremont Tunnel Seismic Upgrade BART Berkeley Hills Tunnels Metro Red Line Tunnels 36

LRT Station Excavation and Support Portal and Stations mostly in Alluvium above Groundwater Water Table (GWT) Localized dewatering if necessary Soldier Piles/Lagging with tiebacks or cross struts for stations Ground improvement behind headwall for break-in/-out 37

LRT Station Excavation and Support 38

Freeway Tunnel Portal Excavation and Support South Portal Alluvium/Puente, below GWT Slurry walls with tiebacks North Portal Alluvium, above GWT Soldier Piles/Lagging with tiebacks 39

40 Portal Excavation and Support

Summary Both LRT and Freeway Tunnel alternatives present challenges Technology exists to address these challenges Has been done successfully in Los Angeles, California, and around the world 41

Summary Paris A86 Tunnel Madrid M30 Tunnel Single Bore 2 lanes each level Diameter 36 feet Length 6.2 miles Dual Bore 3 lanes upper level, 2 emergency vehicle lanes below Diameter 50 feet Length 4.5 miles (south bypass) 42

43 Next Steps

Next Steps Finalize technical studies Finalize preliminary engineering and reports Continue preparation of Draft Environmental Document Expected release of Draft EIR/EIS February 2015 44

Tentative Meeting Dates for TAC/SOAC 2014 TAC/SOAC Meeting Schedule: November 12/13 45

46 Open Discussion